Undoing and Redoing Changes for Version 6.1

From OnePager Documentation
Jump to: navigation, search

About UNDO and REDO

1) To Undo the last operation you performed, click the Undo button above the OnePager ribbon tabs. If you hover the mouse over this button, a tool tip displays the operation that you are about to Undo.

P61-9 6 1-53-61-(1)-10272017.png

2) To Redo an operation after you have undone it, press the Redo button above the OnePager ribbon tabs. You can Undo or Redo up to 99 operations in sequence.

P61-9 6 1-53-61-(2)-10272017.png

3) Tool Tips are provided to tell you what operation is next for either UNDO or REDO depending on the button selected.

P61-9 6 1-53-61-(3)-10272017.png

(9.6.1-61)