(Created page with "==About the Advanced Tab-OnePager Express== This tab controls various '''other properties''' of the project view and looks like this: <center>File:X60-21_1_14-60-(1)-02282...")
 
 
(35 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
This tab controls various '''other properties''' of the project view and looks like this:
 
This tab controls various '''other properties''' of the project view and looks like this:
  
<center>[[File:X60-21_1_14-60-(1)-02282016.png]]</center>
+
<center>[[File:X61-21_14_1-61-(1)-11122018.png]]</center>
<!--<center>X60-21_1_14-60-(1)-02282016.png</center>-->
+
<!--center>&lt;PX61-21_14_1-61-(1)-11122018.png&gt;</center-->
  
 
==Display Options==
 
==Display Options==
  
The '''Display Options''' group contains a number of checkboxes for making yes/no choices:
+
The '''Display Options''' group contains a number of checkboxes for making '''ON/OFF''' choices:
  
:a) '''Show hover boxes'''.  This checkbox controls the display of detailed information about each task/milestone when the mouse cursor '''hovers''' over it. This information includes the '''start/finish dates''', the '''task/milestone name''', and the '''Task Id''' of the task from the Microsoft Excel '''source plan'''. An example is shown below.
+
:a) '''Show hover boxes'''.  This checkbox controls the display of detailed information about each task/milestone when the mouse cursor '''hovers''' over it. This information includes the '''start/finish dates''', the '''task/milestone name''', and the '''Task ID''' of the task from the Microsoft Excel '''source plan'''. An example is shown below.
  
<center>[[File:X60-21_1_14-60-(2)-003142017.png]]</center>
+
<center>[[File:X61-21_14_1-61-(2)-11122018.png]]</center>
<!--<center>X60-21_1_14-60-(2)-003142017.png</center>-->
+
<!--center>&lt;X61-21_14_1-61-(2)-11122018.png&gt;</center-->
  
 
:b) '''Format with times'''.  When this checkbox is checked, the '''snapshot dates''' are displayed with a '''time of day component'''.  '''Snapshot dates''' that differ by their '''time of day component''' are considered different '''snapshot dates.'''  
 
:b) '''Format with times'''.  When this checkbox is checked, the '''snapshot dates''' are displayed with a '''time of day component'''.  '''Snapshot dates''' that differ by their '''time of day component''' are considered different '''snapshot dates.'''  
  
::i) For example, June 5, 2015 becomes '''June 5, 2015 5:23 PM''' and is a different '''snapshot date''' than '''June 5, 2015 6:00PM'''.   
+
::i) For example, June 5, 2019 becomes '''June 5, 2019 5:23 PM''' and is a different '''snapshot date''' than '''June 5, 2019 6:00 PM'''.   
::ii) Note that this setting no longer controls the '''format of the dates''' on the tasks and milestones.  
+
::ii) Note that this setting no longer controls the '''format of the dates''' on the tasks and milestones.
 +
::iii) Below is an example of the '''Select Snapshot''' form displaying the '''date format with time''':
  
:c) '''Show time cursor'''.   When this checkbox is unchecked, the vertical '''time-cursor line''' is hidden.
+
<center>[[File:X61-21_14_1-61-(3)-11122018.png]]</center>
 +
<!--center>&lt;PX61-21_14_1-61-(3)-11122018.png&gt;</center-->
  
:d) '''Allow absorption'''.  When this checkbox is checked, you can '''drag''' one task onto another task and be prompted to '''absorb''' the former into the latter.  When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
+
:c) '''Show time cursor'''.  When this checkbox is checked, the vertical '''time-cursor line''' is '''shown''' as shown here:
  
:e) '''Copy edits to all snapshots (CTAS)'''. The checkbox is a '''toggle switch''' that turns on and off the propagation of '''maverick''' changes to '''all snapshots''' (turned '''on''') or to keep '''maverick''' changes to tasks/milestones in the '''current snapshot''' (turned '''off'''). This checkbox affects editing of the following task/milestone properties:
+
<center>[[File:X61-21_14_1-61-(4)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(4)-11122018.png&gt;</center-->
 +
 
 +
::i)  Unchecking the '''Show time cursor''' '''hides''' the vertical '''time-cursor line'''.
 +
::ii) There is also a checkbox in the OnePager Express 6.1 '''View''' ribbon in the '''Graphic Elements''' group called '''Time Cursor''' that causes the vertical '''time-cursor line''' to be '''shown''' when the checkbox is checked '''ON''' as shown below:
 +
 
 +
<center>[[File:X61-21_14_1-61-(5)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(5)-11122018.png&gt;</center-->
 +
 
 +
:d) '''Allow absorption'''.    When this checkbox is checked, you can '''drag''' one task onto another task and be prompted to '''absorb''' the former into the latter.  When the checkbox is unchecked, this process does not take place and one task dragged over another is displayed as two separate tasks superimposed.  For more information on '''Absorbed Tasks''' please see the article at:  [[Absorbing one task into another for Version 6.1 | Absorbing one task into another]]. <!--17.0.1-61.-->
 +
 
 +
:e) '''Show absorbed dates'''.  Checking this checkbox '''ON''' tells OnePager Express 6.1 to create a '''Comment Box''' associated with the '''absorbed task''' connected to the task '''absorbing''' the '''absorbed''' task and provides you the option of specifying the '''date''' displayed in the '''Comment Box''' as shown below:
 +
 
 +
<center>[[File:X61-21_14_1-61-(6)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(6)-11122018.png&gt;</center-->
 +
 
 +
:i) The illustration above show the result of '''absorbing''' the first task where a '''Comment Box''' is displayed connected to the '''absorbing task'''.
 +
::ii)  Also shown in the illustration above is a second task in the process of being '''absorbed where the '''Absorption Options''' form is shown.  Making a selection from the radio buttons and clicking '''OK''' creates the second '''Comment Box'''.
 +
::iii)  You have the option to display the '''At end date''', '''At start date''', or '''At both start and end date'''.
 +
::iv) For more information please see the article at this link:  [[Absorbing one task into another for Version 6.1 | Absorbing one task into another]]. <!--17.0.1-61.-->
 +
 
 +
:f) '''Copy edits to all snapshots (CTAS)'''.   The checkbox is a '''toggle switch''' that turns '''ON''' and '''OFF''' the propagation of '''Maverick''' changes to '''all snapshots''' (turned '''ON''') or to keep '''Maverick''' changes to tasks/milestones in the '''current snapshot''' (turned '''OFF'''). This checkbox affects '''editing''' of the following task/milestone properties:
  
 
::i) '''Color'''
 
::i) '''Color'''
Line 32: Line 55:
 
::v) '''Text Font'''
 
::v) '''Text Font'''
 
::vi) '''Task/milestone height'''
 
::vi) '''Task/milestone height'''
 +
::vii) '''Task Links'''
  
:f) '''Clip task/milestone labels at graph edges'''     If this checkbox is checked, OnePager will '''clip''' all task/milestone '''labels''' that extend '''over the edge of the graph''' so that the '''labels''' will no longer extend over the graph boundaries.  The project view below shows how OnePager will handle task/milestone '''labels''' that extend into the displayed '''swimlane label''' area when the checkbox is checked:
+
:For more information on how '''CTAS''' applies to the new '''Task Links''' feature in OnePager Express 6.1, pleas see the section at:  [[Data-Driven Task Links for OnePager Express for Version 6.1#Condition 2: The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links | Data-Driven Task Links for OnePager Express - Condition 2: The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links]]. <!--19.1.1.2-61.-->
  
<center>[[File:P52-21_1_13-(3)-06052015.png]]</center>
+
:g) '''Clip task/milestone labels at graph edges'''.   If this checkbox is checked '''ON''', OnePager Express 6.1 '''clips''' all task/milestone '''labels''' that extend '''over the edge of the graph''' so that the '''labels''' no longer extend over the graph boundaries. 
<!--<center>P52-21_1_13-(3)-06052015.png</center>-->
+
  
::Here is the same project view with the checkbox unchecked:
+
::i) The project view below shows how OnePager Express 6.1 handles task/milestone '''labels''' that extend into the displayed '''Row/Swimlane label''' area when the checkbox is checked '''ON''':
  
<center>[[File:P52-21_1_13-(4)-06052015.png]]</center>
+
<center>[[File:X61-21_14_1-61-(7)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(7)-11122018.png&gt;</center-->
  
:g) '''Overlay VST elements'''.    When this checkbox is checked, during the construction of a Virtual Summary Task ('''VST''') with milestones, the milestones will be displayed on top of the created '''VST''' bar.  See the article at this link for more information:  [[Creating and Managing Virtual Summary Tasks for Version 6.1 | Creating and Managing Virtual Summary Tasks]] 18.0.1-61.  An example is provided below:
+
::ii) Here is the same project view with the checkbox unchecked:
  
<center>[[File:P52-21_1_13-(5)-06052015.png]]</center>
+
<center>[[File:X61-21_14_1-61-(8)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(8)-11122018.png&gt;</center-->
  
:h) '''Lock background'''. When this checkbox is checked, all '''background shapes''' are '''frozen'''. This includes '''images, swimlane titles, graph title, and time axis annotation'''. Clicking them with the mouse no longer selects them, so it becomes easier to select tasks and milestones with the selection '''lasso'''.
+
:g) '''Overlay VST elements'''.   When this checkbox is checked '''ON''', during the construction of a Virtual Summary Task ('''VST''') with milestones, the milestones are displayed on top of the created '''VST''' bar.
  
:i) '''Show absorbed dates'''.  When this checkbox is checked, the ''date labels'' for absorbed task will appear in '''comment boxes''' for the task being '''absorbed'''.  The '''date label''' component displayed is controlled by the '''Absorption Options''' form accessible when the selected task/milestone is being '''absorbed'''. For more information please see the article at this link:  [[Absorbing one task into another for Version 6.1 | Absorbing one task into another]] 17.0.1-61.
+
::i) See the article at this link for more information:  [[Creating and Managing Virtual Summary Tasks for Version 6.1 | Creating and Managing Virtual Summary Tasks]]. <!--18.0.1-61.--> 
  
==Task/Milestone Threshold==
+
::ii) An example is provided below:
  
1) This numeric window controls whether '''short duration tasks''' are displayed as task bars or as milestone symbols. The unit of measure is '''task bar duration in number of days'''.
+
<center>[[File:X61-21_14_1-61-(9)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(9)-11122018.png&gt;</center-->
  
2) With the setting shown in the '''PVP''' form at the top of this article of two (2) days, any task in the project view that is '''less than two (2) days duration''' will be displayed as a milestone symbol.  Therefore, one day tasks will display as milestones symbols with the default settings of two (2) days.  Since no duration can be less than zero (0), setting the parameter to zero (0) turns '''off''' all conversion of tasks into milestones symbols which means that you may see Gantt bars with very small width, which will make them very hard to see and to select.
+
:h) '''Lock background'''.  When this checkbox is checked '''ON''', all '''background shapes''' are '''frozen'''.  
  
==Auto-adjust Timeline==
+
::i) This includes '''images, swimlane titles, graph title, and time axis annotation'''.
 +
::ii) Clicking any of them with the mouse no longer selects them, so it becomes easier to select tasks and milestones with the selection '''lasso'''.
  
1) This dropdown menu lets you tell OnePager to '''automatically change the start date and/or end date''' of the project view when it '''re-opens''' or updates the project view and finds that some tasks or milestones lie '''outside the current extent'''. You can choose from one of the three options shown below:
+
==Task/Milestone Threshold==
  
<center>[[File:P52-21_1_13-(6)-06052015.png]]</center>
+
1) This numeric window controls whether '''short duration tasks''' are displayed as task bars or as milestone symbols. The unit of measure is '''task bar duration in number of days'''.
 
+
:(1) If you choose '''Ask each time''', the following form will appear whenever OnePager detects tasks or milestones outside the current boundaries:
+
 
+
<center>[[File:P52-21_1_13-(7)-06052015.png]]</center>
+
 
+
:(2) If you choose '''Always yes''', OnePager will automatically adjust the timeline.
+
 
+
:(3) If you choose '''Always no''', OnePager will not adjust the timeline if tasks or milestones are outside the current project view boundaries.
+
  
2) OnePager can also detect that the '''timeline''' needs to be '''shortened''' rather than '''lengthened.'''
+
2) With the setting shown in the '''PVP''' form at the top of this article of two (2) days, any task in the project view that is '''less than two (2) days duration''' is displayed as a milestone symbol.  Therefore, one day tasks are displayed as milestones symbols with the default settings of two (2) days.  Since no duration can be less than zero (0), setting the parameter to zero (0) turns '''off''' all conversion of tasks into milestones symbols, which means that you can see Gantt bars with very small width, which makes them very hard to see and to select.
  
 
==Warn If Import Exceeds==
 
==Warn If Import Exceeds==
Line 76: Line 95:
 
1) This checkbox tells OnePager to provide '''a warning message''' if the number of task/milestones imported '''exceeds the quantity set in the adjacent window'''.   
 
1) This checkbox tells OnePager to provide '''a warning message''' if the number of task/milestones imported '''exceeds the quantity set in the adjacent window'''.   
  
2) Recall that OnePager has the capability to make '''multiple pages of output''' both vertically and horizontally.  The warning message example below was configured so that it would issue the warning if more than 10 tasks were imported.
+
2) Recall that OnePager has the capability to make '''multiple pages of output''' both vertically and horizontally.  The warning message example below is configured so that it can issue the warning if more than 10 tasks were imported.
  
<center>[[File:X53-21_1_13-53-(8)-04162016.png]]</center>
+
<center>[[File:X61-21_14_1-61-(10)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(10)-11122018.png&gt;</center-->
  
 
==Warn Of Merging Tasks==
 
==Warn Of Merging Tasks==
Line 84: Line 104:
 
1) The checkbox shown in the '''Advanced''' tab at the beginning of this article is accompanied by a '''Warning options''' button.   
 
1) The checkbox shown in the '''Advanced''' tab at the beginning of this article is accompanied by a '''Warning options''' button.   
  
2) When this checkbox is checked, the '''Warning options''' button is active.  Clicking the '''Warning options''' button will bring up the '''Set warning thresholds''' form shown below:
+
2) When this checkbox is checked '''ON''', the '''Warning options''' button is enabled.  Clicking the '''Warning options''' button accesses the '''Set warning thresholds''' form shown below:
  
<center>[[File:X53-21_1_14_1-53-(8A)-05022016.png]]</center>
+
<center>[[File:X61-21_14_1-61-(11)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(11)-11122018.png&gt;</center-->
  
 
3) This form allows you to set your own parameters for when you wish to be warned if too many extra tasks are being merged or too many tasks are missing.   
 
3) This form allows you to set your own parameters for when you wish to be warned if too many extra tasks are being merged or too many tasks are missing.   
Line 92: Line 113:
 
:a) Setting these percentages to '''100%''' has the impact of turning the fixes and warning off.
 
:a) Setting these percentages to '''100%''' has the impact of turning the fixes and warning off.
  
:b) Setting the percentages to '''0%''' provides an assurance that any extra or missing tasks will trigger the fixes and warnings.
+
:b) Setting the percentages to '''0%''' provides an assurance that any extra or missing tasks triggers the fixes and warnings.
  
4) When this checkbox is checked, OnePager looks to see if too many newly introduced task/milestones are being imported when '''updating a snapshot''' or if too many tasks are missing per the thresholds set in the form above.   
+
4) When this checkbox is checked '''ON''', OnePager Express 6.1 looks to see if too many newly introduced task/milestones are being imported when '''updating a snapshot''' or if too many tasks are missing per the thresholds set in the form above.   
  
5) After making the calculation, OnePager will provide '''a warning message''' asking if you want to proceed with the update of the '''snapshot''' or not.   
+
5) After making the calculation, OnePager Express 6.1 provides '''a warning message''' asking if you want to proceed with the update of the '''snapshot''' or not.   
  
6) Additionally, the warning message also give you access to the '''See Extra and Missing Tasks''' form so you can make a fix if desired.  The warning message example below was configured so that it would issue the warning if more than 45 percent of the tasks differ from those of the current project view.
+
6) Additionally, the warning message also give you access to the '''See Extra and Missing Tasks''' form so you can make a fix if desired.  The warning message example below was configured so that it issues the warning if more than 45 percent of the tasks differ from those of the current project view.
  
<center>[[File:X53-21_1_14_1-53-(9)-04162016.png]]</center>
+
<center>[[File:X61-21_14_1-61-(10)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(10)-11122018.png&gt;</center-->
  
7) For more information on how to make fixes to these situations please go to this article: [[Merging the Wrong Tasks into a Project View for Version 6.1 - OnePager Express | Merging the Wrong Tasks into a Project View - OnePager Express]] 7.12.1-61
+
7) For more information on how to make fixes to these situations please go to this article: [[Merging the Wrong Tasks into a Project View for Version 6.1 - OnePager Express | Merging the Wrong Tasks into a Project View - OnePager Express]]. <!--7.12.1-61.-->
  
 
==Merge Tasks On Snapshot Replacement: ==
 
==Merge Tasks On Snapshot Replacement: ==
Line 114: Line 136:
 
:b) After making a new project view from the first '''source plan''', you open the second Microsoft Excel '''source plan''' and update the project view in '''Replace Snapshot''' mode.   
 
:b) After making a new project view from the first '''source plan''', you open the second Microsoft Excel '''source plan''' and update the project view in '''Replace Snapshot''' mode.   
  
:c) If the checkbox is checked, the project view will now contain Tasks A, B, C, D, E, and F.   
+
:c) If the checkbox is checked, the project view now contains Tasks A, B, C, D, E, and F.   
  
:d) If the checkbox is unchecked, the project view will now contain only Tasks D, E, and F.
+
:d) If the checkbox is unchecked, the project view now contains only Tasks D, E, and F.
  
==Chart Background==
+
==Reset Unique Ids On Update==
  
1) This group of controls allows you to mange the project view's background '''colors''' and create '''striping''' highlights.
+
1) The '''Reset unique ids on update''' checkbox is '''disabled''' so that you see that it is there. This feature can be '''enabled''' as a last resort under the situation where you are attempting to merge Microsoft Excel '''source plans''' from different physical files into a single '''source plan''' where the Microsoft Excel '''Unique IDs''' do not match.  Contact OnePager '''Support''' for information on how to use this rarely-used feature: [[Getting Support and Contacting Chronicle Graphics for Version 6.1 | Getting Support and Contacting Chronicle Graphics]]. <!--30.0.1-61.-->
  
2)  To show a '''phasing''' of '''color''' across the '''background''', choose two colors to '''blend''' and choose the '''blending direction'''. Alternatively, you can choose to have a '''single-color background'''.  
+
2) Please see the article at: [[Field Mappings Tab for OnePager Express for Version 6.1 | Field Mappings Tab for OnePager Express]] <!--21.16.1-61--> for more details on selecting alternate '''Unique ID''' fields for this purpose.
  
3) Additionally, this group allows '''zebra-striping''' of '''rows and swimlanes'''. Please see the article at this link for more information on '''zebra-striping''': [[Zebra Striping for Rows and Swimlanes for Version 5.3 (OnePager Express) | Zebra Striping for Rows and Swimlanes-OnePager Express]] <!--12.24.1-60-->
+
3)  For additional help please go to the following link to the OnePager '''Frequently Asked Questions''' page: [https://www.onepager.com/support/faq.php?id=95 Selecting a Custom Unique ID].
  
4) See the graphic immediately below.
+
4) If you encounter difficulties, contact our '''Support Team''' at [https://www.onepager.com/support/ticket.php support ticket], by [mailto:support@onepager.com e-mailing us], or by calling '''+1.303.779.0344'''.
  
<center>[[File:P60-21_1_13-60-(10)-02282017.png]]</center>
+
==Task Representation==
<!--<center>P60-21_1_13-60-(10)-02282017.png</center>-->
+
  
==Borders, Frame, and Time-cursor Properties==
+
1) These radio buttons let you select how a task is represented: as a task by a '''Gantt bar''' or by a '''Milestone at the start or end date''' of the task.
  
Click this button to bring up the '''Set line properties''' form that lets you customize the properties of various lines: '''row/swimlane boundaries, vertical gridlines (at time axis tics), frames (the rectangles that surround the graph), and the time cursor'''. 
+
2)  Below is an example of a protion of a project view with tasks represented as '''Gantt bars''':
  
<center>[[File:P60-21_1_13-60-(11)-002282017.png]]</center>
+
<center>[[File:X61-21_14_1-61-(13)-11122018.png]]</center>
<!--<center>P60-21_1_13-60-(11)-002282017.png</center>-->
+
<!--center>&lt;X61-21_14_1-61-(13)-11122018.png&gt;</center-->
  
1) The form looks like this with five tabs as shown below:
+
3) If we click the '''Milestone at start''' radio button and the tab's '''OK''' or '''Apply''' button, the portion of the project view looks like this:
  
<center>[[File:P52-21_1_13-(12)-06052015.png]]</center>
+
<center>[[File:X61-21_14_1-61-(14)-11122018.png]]</center>
 +
<!--center>&lt;PX61-21_14_1-61-(14)-11122018.png&gt;</center-->
  
2) And the affected graphical elements look like this:
+
4) If we select the '''Milestones at end''' radio button option and click the tab's '''OK''' or '''Apply''' button, the portion of the project view in the above illustration changes to look like this:
  
<center>[[File:P53-21_1_13_1-53-(13)-12312015.png]]</center>
+
<center>[[File:X61-21_14_1-61-(15)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(15)-11122018.png&gt;</center-->
  
==Task Representation==
+
5)  Making the selection in the '''PVP''' form changes all tasks in the project view to the selected option.  You can individually '''maverick''' a task/milestone shape by selecting it with a right-click and use the '''Format ...''' Command in the '''Context Menu''' to access the '''Change task/milestone properties''' form to change the shape at the '''Format''' tab.
 
+
These radio buttons let you select how a task is represented: as a task by a Gantt bar or by a milestone at the '''start or end date''' of the task.
+
  
 
==Default Snapshot Date==
 
==Default Snapshot Date==
  
1) OnePager establishes the default '''date of the snapshot''' based upon data imported from the Microsoft Excel '''source plan'''. You can, of course, change the snapshot date to a value different from the default date in the '''OnePager Choices''' form.  Unlike Microsoft Project, Microsoft Excel does not have built in project schedule date fields.  Rather, you must define your '''snapshot date''' using the dates that Microsoft Excel has availableOnePager can configure '''snapshot dates''' from any one of the four (4) options for setting the default snapshot date:
+
1) OnePager establishes the default '''date of the snapshot''' based upon '''data imported''' from the Microsoft Project '''source plan'''.   
  
:(1) '''Last-modified date''' This is the date that the Microsoft Excel '''source plan''' was '''last modified'''.
+
2) You can, of course, change the '''snapshot date''' to a value different from the '''default date''' in the '''OnePager Choices''' form.  
  
:(2) '''Sheet name (then last modified)'''  This is the date specified in the Microsoft Excel '''source plan''' '''sheet name''' tab at the bottom of the Microsoft Excel '''source plan'''.  If there is no date value for the '''sheet name''', OnePager will use the '''Last-modified date'''.
+
3) In this control group you have four (4) options for setting the basis for the '''default snapshot date''' that is used for all snapshots created for this project view:
  
:(3) '''Sheet name (then current)'''  This is the date specified in the Microsoft Excel '''source plan''' '''sheet name''' tab at the bottom of the Microsoft Excel '''source plan'''.  If there is no date value for the '''sheet name''', OnePager will use the '''Current date'''.
+
:(1) '''Last-modified date'''. This is the date that the Microsoft Excel '''source plan''' was '''last modified'''.
  
:(4) '''Current date'''  This date is the date available on the day you imported the data from your Microsoft Excel '''source plan''' and creating the '''snapshot'''.
+
:(2) '''Current date'''. This date is the date when you imported the data from your Microsoft Excel '''source plan''' into OnePager to create the '''snapshot'''.
  
2) The controls for the '''snapshot date''' selection feature are shown in the '''Advanced''' tab shown below:
+
:(3) '''Sheet name (then last modified)'''.  This is the date established in the Microsoft Excel '''source plan''' for the '''status date''' of the '''source plan''' found in the '''Sheet name''' tab.  If there is no value for the '''status date''' in the Microsoft Excel '''source plan''' '''Sheet name''' tab, OnePager Express 6.1 uses the '''Last-Modified date'''.
  
<center>[[File:X60-21_1_14-60-(9)-02282017.png]]</center>
+
:(4) '''Sheet name (then current)'''.  This is the date established in the Microsoft Excel '''source plan''' for the '''status date''' of the '''source plan''' found in the '''Sheet name''' tab.  If there is no value for the '''status date''' in the Microsoft Excel '''source plan''' '''Sheet name''' tab, OnePager Express 6.1 uses the '''current date'''.
<!--<center>X60-21_1_14-60-(9)-02282017.png</center>-->
+
  
3) OnePager can translate most '''date formats''' acceptable for the '''sheet name''' tab field in Microsoft Excel. 
+
2) The controls for the '''snapshot date''' selection feature are shown in the '''Advanced''' tab below:
  
:a) However, there are restrictions on using the '''/''' character when specifying Microsoft Excel '''sheet names'''.
+
<center>[[File:X61-21_14_1-61-(16)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(16)-11122018.png&gt;</center-->
  
:b) We recommend that '''snapshot date''' information used in Microsoft Excel '''sheet names''' be formatted as shown in the illustration below:
+
==Row hiding options==
  
<center>[[File:P53-21_1_14_1-53-(2)-03142016.png]]</center>
+
1) The controls in this group govern the operation of '''automatic hiding''' (cropping) of rows.  Access to the '''Row Hiding Options''' form is by clicking the '''Row hiding options''' button in the '''PVP''' form's '''Advanced''' tab as shown below:
 +
 
 +
<center>[[File:X61-21_14_1-61-(17)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(17)-11122018.png&gt;</center-->
 +
 
 +
2) When the '''Row hiding options''' button is clicked, the '''Row Hiding Options''' form shown below appears providing you with four (4) options to select:
 +
 
 +
<center>[[File:PX61-21_14_1-61-(18)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(18)-11122018.png&gt;</center-->
 +
 
 +
:(1) '''Look at current snapshot only'''.  When this checkbox is checked '''ON''', OnePager Express 6.1 only examines the '''current snapshot''' when deciding which rows are empty.  When this checkbox is '''OFF''', OnePager Express 6.1 considers a '''row empty''' only if it is unoccupied across '''all snapshots'''.    In either case, the '''auto-row hiding''' action hides rows in '''all snapshots'''.
 +
 
 +
:(2) '''Hide newly-empty rows on import'''.  When this checkbox is checked '''ON''', OnePager Express 6.1 '''automatically hides''' any rows that becomes empty because tasks are missing when you '''UPDATE''' a project view.  When this checkbox is '''OFF''', OnePager Express 6.1 leaves any empty rows that became empty because of such missing tasks.
 +
 
 +
:(3) '''Unhide rows for flagged tasks/milestones'''.  When this checkbox is checked '''ON''', OnePager Express 6.1 '''automatically unhides''' hidden rows if they contain any of the tasks/milestones that are '''flagged''' for import on the '''current snapshot'''.  If the checkbox is '''OFF''', OnePager Express 6.1 continues to hide previously hidden rows.
 +
 
 +
:(4) '''Hide rows when tasks are outside date range'''.  When this option is selected, OnePager Express 6.1 '''automatically hides''' any empty rows where tasks and/or milestones are '''outside''' the '''Start date''' and '''End date''' established for the project view.  The '''Start date''' and '''End date''' settings are either generated by OnePager Express 6.1 based upon the range of dates provided from the '''source packet''', set in the '''PVP''' form '''Time Axis''' tab's '''Calendar''' sub-tab, or set in the OnePager Express 6.1 '''View''' ribbon tab in the '''Dates''' control group.
 +
 
 +
3) When tasks and their respective rows are '''hidden''' and subsequently cropped, the '''Where’s My Stuff?!''' form can be accessed from the OnePager Express 6.1 ribbon’s '''Home''' tab in the '''Editing''' group and shown here:
 +
 
 +
<center>[[File:X61-21_14_1-61-(19)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(19)-11122018.png&gt;</center-->
 +
 
 +
4) For more information on the '''Where's My Stuff?!''' feature pleas see the article at: [[Managing Hidden Tasks and Milestones Using "Where's My Stuff?!" for Version 6.1 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]]. <!--9.4.1-61-->
  
 
==Clipboard Format==
 
==Clipboard Format==
Line 181: Line 225:
 
2) Essentially, this format is vector output with capabilities to retain high quality resolution when moving from the project view '''snapshot''' to Microsoft PowerPoint, Word, Excel, or email messages.  
 
2) Essentially, this format is vector output with capabilities to retain high quality resolution when moving from the project view '''snapshot''' to Microsoft PowerPoint, Word, Excel, or email messages.  
  
3) Although the default option is '''EMF format''', you may change the default to the alternative option of '''Image PNG''' as shown below:
+
3) Although the default option is '''EMF format''', you can change the default to the alternative option of '''Image PNG''' as shown below:
  
<center>[[File:P52-21_1_13-(14)-06052015.png]]</center>
+
<center>[[File:X61-21_14_1-61-(20)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(20)-11122018.png&gt;</center-->
  
==Cropping Empty Rows==
+
==Image file DPI==
  
1) The controls in this group govern the operation of '''automatic cropping''' (hiding) of rows as follows:
+
1) This control provides the capability for you to select between three '''DPI''' settings when '''outputting images''' from OnePager Express 6.1 to other media.
  
<center>[[File:X60-21_1_14-60-(14)-02282017.png]]</center>
+
2) The selection options are '''96 DPI''', '''200 DPI''', and '''300 DPI''' as shown below:
<!--<center>X60-21_1_14-60-(14)-02282017.png</center>-->
+
  
2) When the '''Crop options''' button is clicked the '''Row hiding options''' form shown below will appear providing you with four (4) options to select:
+
<center>[[File:X61-21_14_1-61-(21)-11122018.png]]</center>
 +
<!--center>&lt;X61-21_14_1-61-(21)-11122018.png&gt;</center-->
  
<center>[[File:X53-21_1_14_1-53-(14AB)-05022016.png]]</center>
+
3) For more information on '''image outputs''' from OnePager Express 6.1, please the articles at: [[Managing Project View Data for Version 6.1 | Managing Project View Data (Portal)]] <!--23.0.1-61--> and specifically the section at:  [[Sharing Project Views for Version 6.1 (Portal)#Sharing an Image | Sharing an Image]]. <!--23.2.1-61.-->
  
:(1) '''Look at current snapshot only'''.  When this checkbox is checked, OnePager will only examine the '''current snapshot''' when deciding which rows are empty.  When this checkbox is unchecked, OnePager considers a '''row empty''' only if it is unoccupied across '''all snapshots'''.    In either case, the '''auto-cropping''' action hides rows in '''all snapshots'''.
+
==Related Links==
  
:(2) '''Crop newly-empty rows on import'''. When this checkbox is checked, OnePager will '''automatically hide''' any rows that become empty because tasks are missing when you '''UPDATE''' a project view.  When this checkbox is unchecked, OnePager will leave any empty rows that became empty because of such missing tasks.
+
[[Absorbing one task into another for Version 6.1 | Absorbing one task into another]] <!--17.0.1-61-->
  
:(3) '''Unhide rows for flagged tasks/milestones'''.  When this checkbox is checked, OnePager will '''automatically unhide''' hidden rows if they contain any of the tasks/milestones that are '''flagged''' for import on the '''current snapshot'''. If the checkbox is unchecked, OnePager will continue to hide previously hidden rows.
+
[[Data-Driven Task Links for OnePager Express for Version 6.1 | Data-Driven Task Links for OnePager Express]] <!--19.1.1.2-61-->
  
:(4) '''Hide rows when tasks are outside date range'''. When this option is selected, OnePager will '''automatically hide''' any empty rows where tasks and/or milestones are '''outside''' the '''Start date''' and '''End date''' established for the project view. The '''Start date'''and '''End date''' settings are either generated by OnePager based upon the range of dates provided from the '''source packet''' or as set in the '''Main''' tab of the '''PVP''' form.
+
[[Creating and Managing Virtual Summary Tasks for Version 6.1 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-61-->
  
3) '''Where’s My Stuff?!'''  When tasks and their respective rows are '''hidden''' and subsequently cropped, the '''Where’s My Stuff?!''' feature can be invoked from the OnePager ribbon’s '''Home''' tab in the '''Editing''' group and shown here:
+
[[Merging the Wrong Tasks into a Project View for Version 6.1 - OnePager Express | Merging the Wrong Tasks into a Project View - OnePager Express]] <!--7.12.1-61-->
  
<center>[[File:P52-21_1_13-(16)-06052015.png]]</center>
+
[[Getting Support and Contacting Chronicle Graphics for Version 6.1 | Getting Support and Contacting Chronicle Graphics]] <!--30.0.1-61-->
  
4) See the article at this link for more information:  [[Managing Hidden Tasks and Milestones Using "Where's My Stuff?!" for Version 6.1 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]] 9.4.1-61
+
[[Field Mappings Tab for OnePager Express for Version 6.1 | Field Mappings Tab for OnePager Express]] <!--21.16.1-61-->
  
==Related Links==
+
[[Managing Hidden Tasks and Milestones Using "Where's My Stuff?!" for Version 6.1 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]] <!--9.4.1-61-->
 +
 
 +
[[Using OnePager Express with Server Resident Project Plans for Version 6.1 (Portal) | Using OnePager Express with Server Resident Project Plans (Portal)]] <!--8.5.1-61-->
  
[[Creating and Managing Virtual Summary Tasks for Version 6.1 | Creating and Managing Virtual Summary Tasks]] 18.0.1-61
+
[[Managing Project View Data for Version 6.1 | Managing Project View Data (Portal)]] <!--23.0.1-61-->
  
[[Zebra Striping for Rows and Swimlanes for OnePager Express for Version 6.1 | Zebra Striping for Rows and Swimlanes for OnePager Express]] 12.24.1-61
+
[[Sharing Project Views for Version 6.1 (Portal) | Sharing Project Views (Portal)]] <!--23.2.1-61-->
  
[[Managing Hidden Tasks and Milestones Using "Where's My Stuff?!" for Version 6.1 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]] 9.4.1-61
+
[https://www.onepager.com/support/faq.php?id=95 Selecting a Custom Unique ID].
  
 
(21.14.1-61)
 
(21.14.1-61)
Line 230: Line 277:
 
[[Category:Sharing Output]]
 
[[Category:Sharing Output]]
 
[[Category:Virtual Summary Tasks]]
 
[[Category:Virtual Summary Tasks]]
[[Category:Cropping Rows]]
+
[[Category:Hiding Rows]]
 
[[Category:Row Stripes]]
 
[[Category:Row Stripes]]
 
[[Category:Swimlane Stripes]]
 
[[Category:Swimlane Stripes]]
Line 238: Line 285:
 
[[Category:Importing]]
 
[[Category:Importing]]
 
[[Category:Row/Swimlane Borders]]
 
[[Category:Row/Swimlane Borders]]
[[Category:Cropping Rows]]
+
[[Category:Hiding Rows]]
 
[[Category:Clip]]
 
[[Category:Clip]]
 
[[Category:Unique ID]]
 
[[Category:Unique ID]]
Line 247: Line 294:
 
[[Category:Templates]]
 
[[Category:Templates]]
 
[[Category:Project-View Properties Form]]
 
[[Category:Project-View Properties Form]]
[[Category:OnePager Excel]]
+
[[Category:OnePager Express]]

Latest revision as of 12:51, 24 December 2018

About the Advanced Tab-OnePager Express

This tab controls various other properties of the project view and looks like this:

X61-21 14 1-61-(1)-11122018.png

Display Options

The Display Options group contains a number of checkboxes for making ON/OFF choices:

a) Show hover boxes. This checkbox controls the display of detailed information about each task/milestone when the mouse cursor hovers over it. This information includes the start/finish dates, the task/milestone name, and the Task ID of the task from the Microsoft Excel source plan. An example is shown below.
X61-21 14 1-61-(2)-11122018.png
b) Format with times. When this checkbox is checked, the snapshot dates are displayed with a time of day component. Snapshot dates that differ by their time of day component are considered different snapshot dates.
i) For example, June 5, 2019 becomes June 5, 2019 5:23 PM and is a different snapshot date than June 5, 2019 6:00 PM.
ii) Note that this setting no longer controls the format of the dates on the tasks and milestones.
iii) Below is an example of the Select Snapshot form displaying the date format with time:
X61-21 14 1-61-(3)-11122018.png
c) Show time cursor. When this checkbox is checked, the vertical time-cursor line is shown as shown here:
X61-21 14 1-61-(4)-11122018.png
i) Unchecking the Show time cursor hides the vertical time-cursor line.
ii) There is also a checkbox in the OnePager Express 6.1 View ribbon in the Graphic Elements group called Time Cursor that causes the vertical time-cursor line to be shown when the checkbox is checked ON as shown below:
X61-21 14 1-61-(5)-11122018.png
d) Allow absorption. When this checkbox is checked, you can drag one task onto another task and be prompted to absorb the former into the latter. When the checkbox is unchecked, this process does not take place and one task dragged over another is displayed as two separate tasks superimposed. For more information on Absorbed Tasks please see the article at: Absorbing one task into another.
e) Show absorbed dates. Checking this checkbox ON tells OnePager Express 6.1 to create a Comment Box associated with the absorbed task connected to the task absorbing the absorbed task and provides you the option of specifying the date displayed in the Comment Box as shown below:
X61-21 14 1-61-(6)-11122018.png
i) The illustration above show the result of absorbing the first task where a Comment Box is displayed connected to the absorbing task.
ii) Also shown in the illustration above is a second task in the process of being absorbed where the Absorption Options form is shown. Making a selection from the radio buttons and clicking OK creates the second Comment Box.
iii) You have the option to display the At end date, At start date, or At both start and end date.
iv) For more information please see the article at this link: Absorbing one task into another.
f) Copy edits to all snapshots (CTAS). The checkbox is a toggle switch that turns ON and OFF the propagation of Maverick changes to all snapshots (turned ON) or to keep Maverick changes to tasks/milestones in the current snapshot (turned OFF). This checkbox affects editing of the following task/milestone properties:
i) Color
ii) Shape
iii) Fill Pattern
iv) Border
v) Text Font
vi) Task/milestone height
vii) Task Links
For more information on how CTAS applies to the new Task Links feature in OnePager Express 6.1, pleas see the section at: Data-Driven Task Links for OnePager Express - Condition 2: The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links.
g) Clip task/milestone labels at graph edges. If this checkbox is checked ON, OnePager Express 6.1 clips all task/milestone labels that extend over the edge of the graph so that the labels no longer extend over the graph boundaries.
i) The project view below shows how OnePager Express 6.1 handles task/milestone labels that extend into the displayed Row/Swimlane label area when the checkbox is checked ON:
X61-21 14 1-61-(7)-11122018.png
ii) Here is the same project view with the checkbox unchecked:
X61-21 14 1-61-(8)-11122018.png
g) Overlay VST elements. When this checkbox is checked ON, during the construction of a Virtual Summary Task (VST) with milestones, the milestones are displayed on top of the created VST bar.
i) See the article at this link for more information: Creating and Managing Virtual Summary Tasks.
ii) An example is provided below:
X61-21 14 1-61-(9)-11122018.png
h) Lock background. When this checkbox is checked ON, all background shapes are frozen.
i) This includes images, swimlane titles, graph title, and time axis annotation.
ii) Clicking any of them with the mouse no longer selects them, so it becomes easier to select tasks and milestones with the selection lasso.

Task/Milestone Threshold

1) This numeric window controls whether short duration tasks are displayed as task bars or as milestone symbols. The unit of measure is task bar duration in number of days.

2) With the setting shown in the PVP form at the top of this article of two (2) days, any task in the project view that is less than two (2) days duration is displayed as a milestone symbol. Therefore, one day tasks are displayed as milestones symbols with the default settings of two (2) days. Since no duration can be less than zero (0), setting the parameter to zero (0) turns off all conversion of tasks into milestones symbols, which means that you can see Gantt bars with very small width, which makes them very hard to see and to select.

Warn If Import Exceeds

1) This checkbox tells OnePager to provide a warning message if the number of task/milestones imported exceeds the quantity set in the adjacent window.

2) Recall that OnePager has the capability to make multiple pages of output both vertically and horizontally. The warning message example below is configured so that it can issue the warning if more than 10 tasks were imported.

X61-21 14 1-61-(10)-11122018.png

Warn Of Merging Tasks

1) The checkbox shown in the Advanced tab at the beginning of this article is accompanied by a Warning options button.

2) When this checkbox is checked ON, the Warning options button is enabled. Clicking the Warning options button accesses the Set warning thresholds form shown below:

X61-21 14 1-61-(11)-11122018.png

3) This form allows you to set your own parameters for when you wish to be warned if too many extra tasks are being merged or too many tasks are missing.

a) Setting these percentages to 100% has the impact of turning the fixes and warning off.
b) Setting the percentages to 0% provides an assurance that any extra or missing tasks triggers the fixes and warnings.

4) When this checkbox is checked ON, OnePager Express 6.1 looks to see if too many newly introduced task/milestones are being imported when updating a snapshot or if too many tasks are missing per the thresholds set in the form above.

5) After making the calculation, OnePager Express 6.1 provides a warning message asking if you want to proceed with the update of the snapshot or not.

6) Additionally, the warning message also give you access to the See Extra and Missing Tasks form so you can make a fix if desired. The warning message example below was configured so that it issues the warning if more than 45 percent of the tasks differ from those of the current project view.

X61-21 14 1-61-(10)-11122018.png

7) For more information on how to make fixes to these situations please go to this article: Merging the Wrong Tasks into a Project View - OnePager Express.

Merge Tasks On Snapshot Replacement:

1) The Merge tasks on snapshot replacement checkbox supports the import of multiple Microsoft Excel source plans to form single project view.

2) A simple example shows how this checkbox works.

a) Suppose that the first Microsoft Excel source plan contains Tasks A, B, and C and that the second plan contains Tasks D, E, and F.
b) After making a new project view from the first source plan, you open the second Microsoft Excel source plan and update the project view in Replace Snapshot mode.
c) If the checkbox is checked, the project view now contains Tasks A, B, C, D, E, and F.
d) If the checkbox is unchecked, the project view now contains only Tasks D, E, and F.

Reset Unique Ids On Update

1) The Reset unique ids on update checkbox is disabled so that you see that it is there. This feature can be enabled as a last resort under the situation where you are attempting to merge Microsoft Excel source plans from different physical files into a single source plan where the Microsoft Excel Unique IDs do not match. Contact OnePager Support for information on how to use this rarely-used feature: Getting Support and Contacting Chronicle Graphics.

2) Please see the article at: Field Mappings Tab for OnePager Express for more details on selecting alternate Unique ID fields for this purpose.

3) For additional help please go to the following link to the OnePager Frequently Asked Questions page: Selecting a Custom Unique ID.

4) If you encounter difficulties, contact our Support Team at support ticket, by e-mailing us, or by calling +1.303.779.0344.

Task Representation

1) These radio buttons let you select how a task is represented: as a task by a Gantt bar or by a Milestone at the start or end date of the task.

2) Below is an example of a protion of a project view with tasks represented as Gantt bars:

X61-21 14 1-61-(13)-11122018.png

3) If we click the Milestone at start radio button and the tab's OK or Apply button, the portion of the project view looks like this:

X61-21 14 1-61-(14)-11122018.png

4) If we select the Milestones at end radio button option and click the tab's OK or Apply button, the portion of the project view in the above illustration changes to look like this:

X61-21 14 1-61-(15)-11122018.png

5) Making the selection in the PVP form changes all tasks in the project view to the selected option. You can individually maverick a task/milestone shape by selecting it with a right-click and use the Format ... Command in the Context Menu to access the Change task/milestone properties form to change the shape at the Format tab.

Default Snapshot Date

1) OnePager establishes the default date of the snapshot based upon data imported from the Microsoft Project source plan.

2) You can, of course, change the snapshot date to a value different from the default date in the OnePager Choices form.

3) In this control group you have four (4) options for setting the basis for the default snapshot date that is used for all snapshots created for this project view:

(1) Last-modified date. This is the date that the Microsoft Excel source plan was last modified.
(2) Current date. This date is the date when you imported the data from your Microsoft Excel source plan into OnePager to create the snapshot.
(3) Sheet name (then last modified). This is the date established in the Microsoft Excel source plan for the status date of the source plan found in the Sheet name tab. If there is no value for the status date in the Microsoft Excel source plan Sheet name tab, OnePager Express 6.1 uses the Last-Modified date.
(4) Sheet name (then current). This is the date established in the Microsoft Excel source plan for the status date of the source plan found in the Sheet name tab. If there is no value for the status date in the Microsoft Excel source plan Sheet name tab, OnePager Express 6.1 uses the current date.

2) The controls for the snapshot date selection feature are shown in the Advanced tab below:

X61-21 14 1-61-(16)-11122018.png

Row hiding options

1) The controls in this group govern the operation of automatic hiding (cropping) of rows. Access to the Row Hiding Options form is by clicking the Row hiding options button in the PVP form's Advanced tab as shown below:

X61-21 14 1-61-(17)-11122018.png

2) When the Row hiding options button is clicked, the Row Hiding Options form shown below appears providing you with four (4) options to select:

PX61-21 14 1-61-(18)-11122018.png
(1) Look at current snapshot only. When this checkbox is checked ON, OnePager Express 6.1 only examines the current snapshot when deciding which rows are empty. When this checkbox is OFF, OnePager Express 6.1 considers a row empty only if it is unoccupied across all snapshots. In either case, the auto-row hiding action hides rows in all snapshots.
(2) Hide newly-empty rows on import. When this checkbox is checked ON, OnePager Express 6.1 automatically hides any rows that becomes empty because tasks are missing when you UPDATE a project view. When this checkbox is OFF, OnePager Express 6.1 leaves any empty rows that became empty because of such missing tasks.
(3) Unhide rows for flagged tasks/milestones. When this checkbox is checked ON, OnePager Express 6.1 automatically unhides hidden rows if they contain any of the tasks/milestones that are flagged for import on the current snapshot. If the checkbox is OFF, OnePager Express 6.1 continues to hide previously hidden rows.
(4) Hide rows when tasks are outside date range. When this option is selected, OnePager Express 6.1 automatically hides any empty rows where tasks and/or milestones are outside the Start date and End date established for the project view. The Start date and End date settings are either generated by OnePager Express 6.1 based upon the range of dates provided from the source packet, set in the PVP form Time Axis tab's Calendar sub-tab, or set in the OnePager Express 6.1 View ribbon tab in the Dates control group.

3) When tasks and their respective rows are hidden and subsequently cropped, the Where’s My Stuff?! form can be accessed from the OnePager Express 6.1 ribbon’s Home tab in the Editing group and shown here:

X61-21 14 1-61-(19)-11122018.png

4) For more information on the Where's My Stuff?! feature pleas see the article at: Managing Hidden Tasks and Milestones Using "Where's My Stuff?!".

Clipboard Format

1) The default clipboard format is Vector EMF (Enhanced Meta File).

2) Essentially, this format is vector output with capabilities to retain high quality resolution when moving from the project view snapshot to Microsoft PowerPoint, Word, Excel, or email messages.

3) Although the default option is EMF format, you can change the default to the alternative option of Image PNG as shown below:

X61-21 14 1-61-(20)-11122018.png

Image file DPI

1) This control provides the capability for you to select between three DPI settings when outputting images from OnePager Express 6.1 to other media.

2) The selection options are 96 DPI, 200 DPI, and 300 DPI as shown below:

X61-21 14 1-61-(21)-11122018.png

3) For more information on image outputs from OnePager Express 6.1, please the articles at: Managing Project View Data (Portal) and specifically the section at: Sharing an Image.

Related Links

Absorbing one task into another

Data-Driven Task Links for OnePager Express

Creating and Managing Virtual Summary Tasks

Merging the Wrong Tasks into a Project View - OnePager Express

Getting Support and Contacting Chronicle Graphics

Field Mappings Tab for OnePager Express

Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"

Using OnePager Express with Server Resident Project Plans (Portal)

Managing Project View Data (Portal)

Sharing Project Views (Portal)

Selecting a Custom Unique ID.

(21.14.1-61)