Difference between revisions of "Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 6.1"

From OnePager Documentation
Jump to: navigation, search
(Introduction)
(Introduction)
Line 10: Line 10:
  
 
Please use the Wiki article links below which provide detailed  information on the new  '''data-driven Task Links'''  feature and the enhancements made to  '''manually created Task Links'''  in OnePager 6.1.  The top two articles in the set of links below provide you with an overview to the new '''Data-Driven Task Link''' feature and the enhancements made to the existing '''Manual Task Link''' capabilities.
 
Please use the Wiki article links below which provide detailed  information on the new  '''data-driven Task Links'''  feature and the enhancements made to  '''manually created Task Links'''  in OnePager 6.1.  The top two articles in the set of links below provide you with an overview to the new '''Data-Driven Task Link''' feature and the enhancements made to the existing '''Manual Task Link''' capabilities.
 
<center>
 
{| class="wikitable"
 
| [[OnePager Pro Task Links - An Overview for Version 6.1 | OnePager Pro Task Links - An Overview]] 19.1.1-61
 
| [[OnePager Express Task Links - An Overview for Version 6.1 | OnePager Express Task Links - An Overview]] 19.2.1-61
 
|}
 
</center>
 
  
 
<center>
 
<center>

Revision as of 16:17, 17 November 2017

About Links and Linking Tasks/Milestones

Introduction

If you need to show dependencies, OnePager provides a means for you to link one task or milestone with others.

In OnePager Pro/Express version 6.1 you can now import Task Link data from your source plans. You can manipulate Task Link representations in your project views; exercise controls by defining Task Link show/hide filter rules; and use enhanced graphics to alter Task Link colors, arrow heads, and line styles.

As with previous versions of OnePager you can manually create and edit Task Links.

Please use the Wiki article links below which provide detailed information on the new data-driven Task Links feature and the enhancements made to manually created Task Links in OnePager 6.1. The top two articles in the set of links below provide you with an overview to the new Data-Driven Task Link feature and the enhancements made to the existing Manual Task Link capabilities.

Using OnePager Pro 6.1 Task Links – An Overview 19.1.1-61 Using OnePager Express 6.1 Task Links – An Overview 19.2.1-61
Data-Driven Task Links for OnePager Pro 6.1 P61-19.1.2-61 Data-Driven Task Links for OnePager Express 6.1 P61-19.2.2-61
Using Task Link Filtering Rules with OnePager Pro 6.1 19.1.3-61 Using Task Link Filtering Rules with OnePager Express 6.1 19.2.3-61
Project-View Properties Form Editing of Task Links for OnePager Pro 6.1 19.1.4-61 Project-View Properties Form Editing Task Links for OnePager Express 6.1 19.2.4-61
Manual Editing of Task Links for OnePager Pro 6.1 19.1.5-61 Manual Editing of Task Links for OnePager Express 6.1 19.2.5-61
Notes on Data-Driven Task Links for OnePager Pro 6.1 19.1.6-61 Notes on Data-Driven Task Links for OnePager Express 6.1 19.2.6-61


(19.0.1-61)