Difference between revisions of "Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 6.1"

From OnePager Documentation
Jump to: navigation, search
(Introduction)
Line 16: Line 16:
 
:(3) Use controls to define '''Task Link''' '''show/hide''' filtering rules.
 
:(3) Use controls to define '''Task Link''' '''show/hide''' filtering rules.
  
:(4) And use enhanced editing techniques  to alter '''Task Link colors, arrow heads, line styles, and other properties'''.   
+
:(4) Use enhanced editing techniques  to alter '''Task Link colors, arrow heads, line styles, and other properties'''.   
 +
 
 +
:(5) Perform enhanced editing of manual '''Task Link properties'''.
  
 
2) As with previous versions of OnePager you can manually create and edit '''Task Links'''.
 
2) As with previous versions of OnePager you can manually create and edit '''Task Links'''.

Revision as of 22:17, 11 December 2017

About Links and Linking Tasks/Milestones

Introduction

If you need to show dependencies in your project views, OnePager 6.1 provides a means for you to link one task or milestone shape with others using predecessor data from your source plan. When you do so a typical project view looks like this:

File:P61-19 0 1-61-(1)-12042017.png
P61-19_0_1-61-(1)-12042017.png

1) Using OnePager Pro/Express version 6.1 you can now:

(1) Import Task Link data from your source plans.
(2) Manipulate Task Link representations in your project views.
(3) Use controls to define Task Link show/hide filtering rules.
(4) Use enhanced editing techniques to alter Task Link colors, arrow heads, line styles, and other properties.
(5) Perform enhanced editing of manual Task Link properties.

2) As with previous versions of OnePager you can manually create and edit Task Links.

3) Finally, you are provided with tools so you can manage all Task Links in your project view and all its various snapshots.

4) Please use the Wiki article links below which provide detailed information on the new data-driven Task Links feature and the enhancements made to manually created Task Links in OnePager 6.1. The top row's two articles in the table of links below provide you with an overview to the new Data-Driven Task Link feature and the enhancements made to the existing Manual Task Link capabilities.

Using OnePager Pro 6.1 Task Links – An Overview 19.1.1-61 Using OnePager Express 6.1 Task Links – An Overview 19.2.1-61
Data-Driven Task Links for OnePager Pro 6.1 P61-19.1.2-61 Data-Driven Task Links for OnePager Express 6.1 P61-19.2.2-61
Using Task Link Filtering Rules with OnePager Pro 6.1 19.1.3-61 Using Task Link Filtering Rules with OnePager Express 6.1 19.2.3-61
Project-View Properties Form Editing of Task Links for OnePager Pro 6.1 19.1.4-61 Project-View Properties Form Editing Task Links for OnePager Express 6.1 19.2.4-61
Manual Editing of Task Links for OnePager Pro 6.1 19.1.5-61 Manual Editing of Task Links for OnePager Express 6.1 19.2.5-61
Notes on Data-Driven Task Links for OnePager Pro 6.1 19.1.6-61 Notes on Data-Driven Task Links for OnePager Express 6.1 19.2.6-61

(19.0.1-61)