Task/Milestone Links Tab for Version 6.1 (OnePager Pro)

From OnePager Documentation
Revision as of 12:09, 24 December 2018 by Rfeingold (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

About the Task Links Tab

1) This tab controls the global editing of data-driven and manual Task Links in the project view. The tab is shown below:

P61-0 4 1 7-61-(3A)-06092018.png

2) The control groups and individual settings in the PVP form's Task Links tab are described in detail at: Editing Task Links with the Project-View Properties Form for OnePager Pro.

Related Link

Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)

(21.12.1-61)