Task/Milestone Links Tab for Version 7.0 (OnePager Express)

From OnePager Documentation
Revision as of 17:27, 26 February 2019 by Rfeingold (Talk | contribs)

Jump to: navigation, search

About the Task Links Tab

1) This tab controls the global editing of data-driven and manual Task Links in the chart. The tab is shown below:

X61-0 4 1 7-61-(4)-08072018.png
X61-0_4_1_7-61-(4)-08072018

2) The control groups and individual settings in the PVP form's Task Links tab are described in detail at: Editing Task Links with the Chart Properties Form for OnePager Express. 19.3.2-61

Related Link

Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal) 19.0.1-61

(21.12.2-70)