Overview

Illustrations used in this article are from OnePager Pro using data from Microsoft Project but the feature's function, controls, and manual edits apply equally to other OnePager editions that import from data sources like Microsoft Excel, Smartsheet, and Oracle Primavera P6.

The Chart Editor features covered in this article apply to charts created from Microsoft Project, Microsoft Excel, Oracle Primavera P6, and Smartsheet source plans.

The Where Are My Links? form, shown below, is a tool you can use to manage Data-Driven and manual Task Links in charts and snapshots.

P70-19 1 1-70-(11)-10182019.png

Accessing the Where Are My Links? Form

The Where Are My Links? form can be accessed at any time by accessing the OnePager Home ribbon tool bar tab in the Editing group, clicking the Show/Hide dropdown, and clicking the Where Are My Links? button as shown below:

P70-19 1 1-70-(4)-09282020.png

In OnePager, the Chart Properties form Task Link tab, in the Data-Driven Task Links control group there is an additional button, the Where Are My Links? button, as shown here:

P70-19 1 2 1-70-70-(7)-09292020.png


Each time the Where Are My Links? form is accessed, OnePager builds the content of the form to specifically reflect the Data-Driven and/or manual Task Links contained in the chart or snapshot, whether they are in the shown or hidden status, their predecessor and successor task shapes (with ID’s), and their source (Imported or Manual).

Where Are My Links? Form Column Usage

There are four (4) columns in the Where Are My Links? form.

In the Show column (1) you can check or uncheck any entry’s checkbox ON or OFF to control the showing (or hiding), respectively, of the associated Task Links.

The Predecessor column (2) and Successor column (3) provide the Task/Milestone Name participating respectively in the Task Link pair. The numbers in parenthesis following the task bar name label correspond to the Unique ID for Microsoft Project source plans.

The Source column (4) tells you which entries in the form are Data-Driven Task Links (Imported) or which are manual Task Links (Manual).

Sorting Columns

The four (4) columns in the form can be sorted by clicking on the column’s header.

Sorting on the Show column means that you are sorting between checked and unchecked entries.

Sorting on the Predecessor or Successor columns means that you are sorting alphanumerically on the contents of the entire field. Because of the relationship between these two columns, sorting on the Predecessor column, for example, brings along the corresponding Successor entry and vice versa.

Sorting on the Source column means that you are sorting between Imported and Manual entries.

Resetting Show/Hide Defaults

The Use Show/Hide Defaults button at the bottom of the form controls the resetting of defaults for showing (or hiding) Task Links based upon the Task Link Filter rules you established in the Task Link Filter Rules form. This button also applies if you are Showing All Task Links instead of using Task Link Filter rules. If after establishing which Task Links are to be shown (or hidden) in the Task Links Filter Rules form and you later make edits to any Task Link individually, clicking the Use Show/Hide Defaults button restores all Task Links to the current Task Link Filter rules or the Show all selection.

Shortcut Controls

There are two (2) other shortcut buttons at the bottom of the form.

The first shortcut button makes all Task Links, imported or Manual, show in the chart or snapshot (the Show All button).

The second shortcut Hide all Task Links in the chart or snapshot (the Hide All button).

The Where Are My Links? form Filter Feature

In some charts you can have many, many Data-Driven Task Links showing. You can use the Filter feature on the Where Are My Links? form to find sets of Data-Driven Task Links based on search arguments found in the snapshot’s task bars name labels. Use either the Chart Properties form’s Task Links tab or the OnePager Home ribbon tool bar tab to access the sample Where Are My Links? form shown here:

P70-19 1 1-70-(11)-10182019.png

The Where Are My Links? form above lists all the Data-Driven Task Links shown (or hidden) in the current snapshot as well as any manual Task Links. The Where Are My Links? form is “snapshot-dependent” in that OnePager creates the form’s content based upon the snapshot that is being displayed in the Chart Editor . At the top of the form, are controls to Filter entries contained in the form based upon current snapshot task bar's name labels such that only task bars/milestone symbols that meet the task name filtering rule appears in the form’s data window.

For example, if you want to show only those entries that relate to Engineering Team 2 task bar's name labels, type the task name into the window provided and click the Filter button and the Where Are My Links? form looks like this:

P70-19 1 3 1-70-(6)-09302020.png

After clicking the Filter button, the entries shown in the Where Are My Links? form’s window are only those where the Engineering Team 2 task bar name label appears in either a Predecessor or Successor task bar/milestone symbol name regardless of whether the Task Link is showing (or hidden). The current show/hide status is displayed in the Show column’s checkboxes as shown above.

The Filter feature provides you with access to a subset of Task Link entries and can help with the management of the associated Task Links. Additionally, any edits you make to the Show column are imparted to the snapshot when the OK button on the form is clicked. If you access the Where’s My Links? form after using the Filter feature to hide Task Links, the form reappears without any Filtering of task bar's name labels. However, the results of your show/hide edits are represented in the entries. Clicking the Clear Filter button restores all the entries in the Where Are My Links? form and clears the contents of the search window.

Using the Where Are My Links? Form to Show or Hide Task Link

The Where Are My Links? form’s capabilities can be used for showing (or hiding) Task Links. You can use the form to quickly edit the show/hide status of any Task Link entry in the form for the current snapshot. The Where Are My Links? form provides a convenient list of all Task Links and a means to control the turning of individual Task Links from show to hide or vice versa. The convenient search Filter feature, covered above, is also useful with show/hide editing.

The Where Are My Links? form is shown below being accessed from the Chart Properties form Task Links tab:

P70-19 1 3 1-70-(7)-09302020.png

If you don’t use the Task Links Filter Rules form to conditionally control the showing (or hiding) of Data-Driven Task Links, the Where Are My Links? form gives you total manual control over the showing (or hiding) of all Task Links in a snapshot at any time. Editing the show/hide status of Task Link(s) in the Where Are My Links? form as described above can turn the edited Task Link(s) into maverick Task Link(s). The edit made to any entry in the Where Are My Links? form applies to the current snapshot.

The Where Are My Links? form and Snapshots

The Where Are My Links? form is snapshot-dependent meaning that the content of the form is built to reflect the show/hide status of Task Links in each snapshot contained in the chart. If a source plan task, imported in a first snapshot is not imported in a subsequent snapshot, the Where Are My Links? form’s contents for the snapshot without the imported task reflects absence of the non-imported task and its associated Task Links. If different snapshots have Task Links hidden, then the Where Are My Links? form for that snapshot reflects the show/hide status for the Task Link appropriate to the snapshot being displayed in the Chart Editor. The next sub-section provides step wise examples of these two (2) situations.

Example of Changing A Task Import Flag Between Snapshots

Suppose we have the chart and its first snapshot shown in part below:

P70-19 5 1-70-(1)-10052020.png

The MERLIN Subcontractor Selection task, with Unique ID 22, is of interest in this example as it appears in Snapshot 1 and it has Data-Driven Task Links associated with it as shown in the Where Are My Links? form below for the above snapshot.

P70-19 5 1-70-(2)-10052020.png

The Where Are My Links? form above show two entries for Imported Task Links associated with the MERLIN Subcontractor Selection (22) task. Both entries are represented in the form as Task Links that are shown in the snapshot.

Now if we go back to the source plan and change the Flag20 field for the MERLIN Subcontractor Selection task from Yes to No and then use the OnePager Data ribbon tool bar tab and click the Add Snapshot button and provide the appropriate snapshot date, the added snapshot looks like this:

P70-19 5 1-70-(3)-10052020.png

The Where Are My Links? form for Snapshot 2 looks like this:

P70-19 5 1-70-(4)-10052020.png

Although OnePager imported all Data-Driven Task Links when snapshot 2 was created and added to the chart, because the MERLIN Subcontractor Selection (22) task did not get imported, there are no entries in the Where Are My Links? form above associated with the non-imported task.

If you go to the OnePager View ribbon tool bar tab and click the Left Arrow in the Snapshot group you can access Snapshot 1 as shown below:

P70-19 5 1-70-(5)-10052020.png

When Snapshot 1 is shown in the Chart Editor, it shows the MERLIN Subcontractor Selection (22) task bar and looks like this:

P70-19 5 1-70-(6)-10052020.png

If you access the Where Are My Links? form while Snapshot 1 is displayed in the Chart Editor, the form has entries for the MERLIN Subcontractor Selection (22) task bar which have the Show column checkboxes checked ON as shown below.

P70-19 5 1-70-(2)-10052020.png

It is recommended that when creating snapshots where task bars/milestone symbols are unflagged that you review the contents of this section in the article at: Advanced Tab for OnePager-Row hiding options 21.13.1-71

For more information on the Add Snapshot workflow, please see the article at: ADDING a Snapshot via Pull Operation 7.15.1-71

Example of Hiding A Data-Driven Task Link Between Snapshots

As a second example, suppose we use the same Microsoft Project source plan and create a NEW first snapshot with all task bars and Data-Driven Task Links showing and as seen below in this chart segment:

P70-19 5 1-70-(1)-10052020.png

The Where Are My Links? form shows the same information as the Where Are My Link? form in the previous example above. If we further create a second snapshot and when it appears in the Chart Editor right-click on one of the Data-Driven Task Links associated with the MERLIN Subcontractor Selection (22) task bar and hide it, the snapshot looks like this before and after completing the operation:

Before Hiding Selected Data-Driven Task Link in Snapshot 2
P70-19 5 1-70-(7)-10052020.png
After Hiding Selected Data-Driven Task Link in Snapshot 2
P70-19 5 1-70-(8)-10052020.png

The contents of the Where Are My Link? form for Snapshot 2 looks like this:

P70-19 5 1-70-(9)-10052020.png

The above form’s contents indicate that the Data-Driven Task Link is available but hidden in Snapshot 2. If we transition back to Snapshot 1, the snapshot itself and the corresponding Where Are My Links? form looks like this:

P70-19 5 1-70-(10)-10052020.png

The Data-Driven Task Link hidden in Snapshot 2 is shown in Snapshot 1 and the Where Are My Links? form entry for this Task Link records its status.