=Creating and Managing Virtual Summary Tasks for Version 7.0 (P70-18_0_1-70-09282020.docx)=
 +
 
==About Creating and Managing Virtual Summary Tasks==
 
==About Creating and Managing Virtual Summary Tasks==
  
1) A '''virtual summary task''' ('''VST''') is a summary task shape created by OnePager that does not exist in Microsoft Project or Excel.  
+
1) A '''virtual summary task''' ('''VST''') is a summary task bar created by OnePager that does not exist in Microsoft Project or Excel.  
  
2) It represents the '''start date''' and '''end date''' of two or more constituent task shapes or milestone shapes.   
+
2) It represents the '''start date''' and '''end date''' of two or more constituent task bars or milestone symbols.   
  
3) In this respect the '''VST''' is a OnePager '''summary''' task displayed in the chart.   
+
3) In this respect the '''VST''' is a OnePager '''summary '''task displayed in the chart.   
  
4) OnePager computes the '''start and end dates''' of a '''VST''' as its constituent '''tasks dates''' change from '''snapshot to snapshot'''.  
+
4) OnePager computes the '''start and end dates''' of a '''VST''' as its constituent '''task dates''' change from '''snapshot to snapshot'''.  
  
5) It also constructs '''baselines''', '''percent complete bars''', and '''critical path segments''' (One Pager Pro ('''OPP''') only) for task shapes being summarized.
+
5) It also constructs '''baselines''', '''percent complete bars''', and '''critical path segments''' (One Pager Pro ('''OPP''') only) for task bars being summarized.
  
 
6) The illustrations and examples in this article are from OnePager Pro.
 
6) The illustrations and examples in this article are from OnePager Pro.
Line 15: Line 17:
 
==Creating and Undoing Virtual Summary Tasks==
 
==Creating and Undoing Virtual Summary Tasks==
  
1) To create a Virtual Summary Task ('''VST'''), follow these steps.
+
===Make a Virtual Summary Task===
  
2) Select the '''first''' task shape or milestone shape.  
+
1) To create a '''Virtual Summary Task''' ('''VST'''), follow these steps.
  
3) Hold down the '''CTL key''' and select the '''second''' (and third, fourth, etc.) constituent task shapes and milestone shapes.  Or '''lasso''' them with the selection rectangle.
+
2) Select the '''first''' task bar or milestone symbol.  
  
4) Right-click on any of the selected task/milestone shapes to access the '''context menu''' shown below.
+
3) Use the '''CTL+Left-Click '''method to select the '''second''' (and '''third''', '''fourth''', etc.) constituent task bars and milestone symbols.  Or use the '''Lasso '''method to select the desired task bars or milestone symbols.
 +
 
 +
4) Right-click on any of the selected task/milestone symbols to access the '''task bar '''right-click '''context menu''' shown below.
  
 
5) Click the '''Make into virtual summary task''' command as shown below:
 
5) Click the '''Make into virtual summary task''' command as shown below:
  
<center>[[File:P61-18_0_1-61-(1)-11032017.png]]</center>
+
<center>[[File:P70-18_0_1-70-(1)-09282020.png]]</center>
<center>P61-18_0_1-61-(1)-11032017.png</center>
+
<center>P70-18_0_1-70-(1)-09282020.png</center>
  
 
6) The chart now looks like this:
 
6) The chart now looks like this:
  
<center>[[File:P61-18_0_1-61-(2)-11032017.png]]</center>
+
<center>[[File:P70-18_0_1-70-(2)-09282020.png]]</center>
<center>P61-18_0_1-61-(2)-11032017.png</center>
+
<center>P70-18_0_1-70-(2)-09282020.png</center>
  
7)  If there are '''Task Links''' associated with the selected task shapes their '''Task Links are not shown''' in the resulting '''VST'''.
+
7)  If there are '''Task Links''' associated with the selected task bars their '''Task Links are not shown''' in the resulting '''VST'''.
  
8) To '''unmake''' the '''VST''', right-click on the '''VST''', and click the '''Unmake virtual summary task''' command in the context menu.
+
===Unmake a Virtual Summary Task===
  
<center>[[File:P61-18_0_1-61-(3)-11032017.png]]</center>
+
8) To '''unmake''' the '''VST''', right-click on the '''VST '''to access the '''task bar '''right-click '''context menu''', and click the '''Unmake virtual summary task''' command in the context menu.
<center>P61-18_0_1-61-(3)-11032017.png</center>
+
  
9)  When a '''VST''' is '''unmade''', any '''Task Links''' associated with the participating selected task shapes are restored.
+
<center>[[File:P70-18_0_1-70-(3)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(3)-09282020.png</center>
 +
 
 +
9)  When a '''VST '''is '''unmade''', any '''Task Links''' associated with the participating selected task bars are '''restored'''.
  
 
==Setting Percent Complete for Virtual Summary Tasks==
 
==Setting Percent Complete for Virtual Summary Tasks==
  
1) Because a '''VST''' is really a collection of several other task shapes, it is not always clear how to define its '''percent complete value'''.  
+
1) Because a '''VST''' is really a collection of several other task bars, it is not always clear how to define its '''percent complete value'''.  
  
2) By '''default''', the '''percent complete''' for a '''VST''' is computed by OnePager so that the '''progress bar''' touches the '''time now line''', as shown below:
+
2) By '''default''', the '''percent complete''' for a '''VST''' is computed by OnePager so that the '''progress bar''' touches the '''time now line''' even if the '''Time Cursor''' is displayed or not in the chart as shown below:
  
<center>[[File:P61-18_0_1-61-(4)-11032017.png]]</center>
+
<center>[[File:P70-18_0_1-70-(4)-09282020.png]]</center>
<center>P61-18_0_1-61-(4)-11032017.png</center>
+
<center>P70-18_0_1-70-(4)-09282020.png</center>
  
3) This value can not always be appropriate because of the positions of the selected task shapes with respect to the '''time now vertical line''' (usually the '''snapshot date''').   
+
3) This value cannot always be appropriate because of the positions of the selected task bars with respect to the '''time now vertical line''' (usually the '''snapshot date''').   
  
 
4) In some cases there won’t be a '''percent complete''' calculated or in other cases the '''percent complete''' can be illogical.   
 
4) In some cases there won’t be a '''percent complete''' calculated or in other cases the '''percent complete''' can be illogical.   
Line 57: Line 63:
 
5) You can '''override''' this '''default''' and set the '''percent complete''' value manually by using these steps.
 
5) You can '''override''' this '''default''' and set the '''percent complete''' value manually by using these steps.
  
6) Right-click the '''VST''' and then click the '''Set % complete of virtual summary task''' command shown in the '''context menu''' below:
+
6) Right-click the '''VST''' to access the '''task bar '''right-click '''context menu '''and then click the '''Set % complete of virtual summary task''' command shown below:
  
<center>[[File:P61-18_0_1-61-(5)-11032017.png]]</center>
+
<center>[[File:P70-18_0_1-70-(5)-09282020.png]]</center>
<center>P61-18_0_1-61-(5)-11032017.png</center>
+
<center>P70-18_0_1-70-(5)-09282020.png</center>
  
 
7) Enter the new '''percent complete''' value and click '''OK'''.
 
7) Enter the new '''percent complete''' value and click '''OK'''.
  
<center>[[File:P52-18_-(6)-06042015.png]]</center>
+
 
 +
<center>[[File:P70-18_0_1-70-(6)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(6)-09282020.png</center>
 +
 
 +
8) After clicking the '''OK''' button, the '''VST''' and its '''percent complete bar''' look like this:
 +
 
 +
<center>[[File:P70-18_0_1-70-(6Z)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(6Z)-09282020.png</center>
  
 
==Critical Path Segments in Virtual Summary Tasks==
 
==Critical Path Segments in Virtual Summary Tasks==
  
1) '''OPP''' consolidates '''critical path segments''' into the '''VST''' from the constituent individual task shapes and milestone shapes.  
+
1) OnePager Pro consolidates '''critical path segments''' into the '''VST''' from the constituent individual task bars and milestone symbols.  
  
 
2) This feature is not available in OnePager Express ('''OPX''') because '''OPX''' does not process '''percent complete''' information.
 
2) This feature is not available in OnePager Express ('''OPX''') because '''OPX''' does not process '''percent complete''' information.
  
3) In the OnePager Pro chart below, there are four (4) task shapes that are selected to become part of a '''VST''':
+
3) In the OnePager Pro chart below, there are four (4) task bars that are selected to become part of a '''VST''':
  
<center>[[File:P53-18_0_1-53-(6A1)-03182016.png]]</center>
+
<center>[[File:P70-18_0_1-70-(6A)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(6A)-09282020.png</center>
  
 
4) When the '''VST''' is created, the '''VST''' itself looks like this with consolidated '''critical path segments'''.
 
4) When the '''VST''' is created, the '''VST''' itself looks like this with consolidated '''critical path segments'''.
  
<center>[[File:P53-18_0_1-53-(6B)-03182016.png]]</center>
+
<center>[[File:P70-18_0_1-70-(6B)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(6B)-09282020.png</center>
  
==Displaying Milestone Shapes on Virtual Summary Tasks==
+
==Displaying Milestone Symbols on Virtual Summary Tasks==
  
1) Many users often represent their charts entirely with '''milestone shapes''' normally to focus attention to '''start dates''' and '''finish dates'''
+
1) Many users often represent their charts entirely with milestone symbols normally to focus attention to '''start dates''' and '''finish dates''' as shown here with milestone symbols '''represented''' at '''finish dates''':
  
2) OnePager Pro can represent any '''VST''' configured under circumstances where a '''VST''' is created from '''milestone shapes only''', displays the '''VST''' bar with the collected milestone shape '''shown on top''' of the bar as illustrated below:
+
<center>[[File:P70-18_0_1-70-(6C)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(6C)-09282020.png</center>
  
<center>[[File:P52-18_-(7)-06042015.png]]</center>
+
2) OnePager can represent any '''VST''' configured under circumstances where a '''VST''' is created from '''milestone symbols only''', displays the '''VST''' bar with the collected milestone symbol '''shown on top''' of the bar as illustrated below:
  
3) To control the use of this feature, a checkbox was added to the '''Chart Properties''' form’s '''Advanced''' tab, '''Display options''' group called '''Overlay VST element''' to turn this feature '''On''' and '''Off''' as shown below:
+
<center>[[File:P70-18_0_1-70-(7)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(7)-09282020.png</center>
  
<center>[[File:P61-18_0_1-61-(6)-11032017.png]]</center>
+
3) To control the use of this feature, a checkbox was added to the '''Chart Properties''' form’s '''Advanced''' tab’s, '''Display options''' control group called '''Overlay VST element''' to turn this feature '''ON''' and '''OFF''' as shown below:
<center>P61-18_0_1-61-(6)-11032017.png</center>
+
  
4) The same checkbox is also available in the '''Template Properties''' form’s '''Advanced''' tab in the same options group to set the feature on for all charts and '''snapshots''' created under that '''Template'''.
+
<center>[[File:P70-18_0_1-70-(8)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(8)-09282020.png</center>
  
5) As an example, take the portion of the '''BlueGrass...''' chart shown below where the seven (7) original task shapes are now represented as milestone shapes at the '''start date''' and the '''task labels''' hidden to better illustrate the result:
+
4) The same checkbox is also available in the '''Template Properties''' form’s '''Advanced''' tab in the same control group to set the feature on for all charts and '''snapshots''' created under that '''Template'''.
  
<center>[[File:P52-18_-(9)-06042015.png]]</center>
+
5) It is strongly recommended that you '''hide''' the '''task bar name labels''' for the task bars or milestone symbols you select to become members of the '''VST'''. This is because without '''hiding''' the '''task bar name labels''' they will appear '''overlaid''' onto the '''VST''' along with the task bar and/or '''milestone symbol selected to participate.  This consequence may cause '''task bar name label collisions''' on the '''VST task bar''' that may be unwanted.
  
6) With the '''Overlay VST elements''' checkbox checked '''On''', we created a '''VST''' as described in the previous section. 
+
6) As another example, using the '''BlueGrass...''' chart shown below where the seven (7) original task bars are now represented as milestone symbols at the '''START DATE''' and again '''hide''' the '''task bar name labels''' to better illustrate the result:
  
7) The resulting '''VST''' looks like this:
+
<center>[[File:P70-18_0_1-70-(9)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(9)-09282020.png</center>
  
<center>[[File:P52-18_-(10)-06042015.png]]</center>
+
7) With the '''Overlay VST elements''' checkbox checked '''ON''', a '''VST''' is created as described in the previous section.
  
8) If you want to move the '''VST''' to another row or swimlane, we have two (2) suggestions on how to do this efficiently.
+
8) The resulting '''VST''' looks like this:
 +
 
 +
<center>[[File:P70-18_0_1-70-(10)-09282020.png]]</center>
 +
<center>P70-18_0_1-70-(10)-09282020.png</center>
 +
 
 +
9) If you want to '''move''' the '''VST''' to another '''row''' or '''swimlane''', there are two (2) recommended approaches on how to do this efficiently.
  
 
===First Recommendation===
 
===First Recommendation===
  
9) If the '''VST''' and milestone shape configuration is the only thing in the row or swimlane, it is recommended that the move be done by making the move as a row or swimlane move versus trying to select the '''VST''' as a task and move the task.   
+
10) If the '''VST''' and milestone symbol configuration is the only thing in the '''row''' or '''swimlane''', it is recommended that the '''move''' be done by making the '''move''' as a '''row''' or '''swimlane move''' versus trying to select the '''VST''' as a task bar and '''move''' the task bar individually.   
  
10) The reason is that the overlays of milestone shapes are separate graphics from the '''VST''' task bar and do not move with the '''VST''' task bar.
+
11) The reason is that the '''overlays of milestone symbols''' are separate graphics from the '''VST''' task bar and do not '''move''' with the '''VST''' task bar.
  
 
===Second Recommendation===
 
===Second Recommendation===
  
10) If the '''VST''' and milestone shape configuration occupy a row or swimlane with other items, we recommend that you '''lasso''' the entire configuration which selects all elements and with the selection '''lasso''' active, make the move up or down.
+
12) If the '''VST''' and milestone symbols configuration occupy a '''row''' or '''swimlane''' with other task bars/milestone symbols, we recommend that you '''lasso''' the entire configuration which selects all task bars/milestone symbols and with the selection '''lasso''' active, make the '''move''' up or down for the selected task bars/milestone symbols.
  
 
==Task Links and Virtual Summary Tasks (VST)==
 
==Task Links and Virtual Summary Tasks (VST)==
  
1) If you are '''creating''' or '''editing''' '''Virtual Summary Tasks''' ('''VST''') that have either '''Data-Driven''' or manual '''Task Links''', it is important to be aware of how those '''Task Links''' appear after the '''creation''' or '''editing''' processes are complete.
+
1) If you are '''creating''' or '''editing''' '''Virtual Summary Tasks''' ('''VST''') that have either '''Data-Driven''' or manual '''Task Links''', it is important to be aware of how those '''Task Links''' appear after the '''creation''' or '''editing''' processes are complete.
+
 
2)  For more information on the subject of '''Task Links''' and '''Virtual Summary Tasks''', please see this section in the article at: [[Manual Editing of Task Links for OnePager Pro for Version 7.0#Task Links and Virtual Summary Tasks (VST) | Manual Editing of Task Links for OnePager Pro - Task Links and Virtual Summary Tasks (VST)]]. 19.4.1-70
+
2) Any '''Task Links''' associated with the '''VST''' task bar/milestone symbols are '''hidden''' in the resulting '''VST''' representation.
 +
 
 +
3)  For more information on the subject of '''Task Links''' and '''Virtual Summary Tasks''', please see this section in the article at: [[Manual Editing of Task Links for OnePager Pro for Version 7.0#Task Links and Virtual Summary Tasks (VST) | Manual Editing of Task Links for OnePager Pro - Task Links and Virtual Summary Tasks (VST)]]. 19.4.1-70
  
 
==Related Links==
 
==Related Links==
Line 146: Line 171:
 
[[Category:Templates]]
 
[[Category:Templates]]
 
[[Category:Chart Properties Form]]
 
[[Category:Chart Properties Form]]
 +
[[Category:Task Links]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Express]]
 
[[Category:OnePager Express]]

Revision as of 18:35, 28 September 2020

Creating and Managing Virtual Summary Tasks for Version 7.0 (P70-18_0_1-70-09282020.docx)

About Creating and Managing Virtual Summary Tasks

1) A virtual summary task (VST) is a summary task bar created by OnePager that does not exist in Microsoft Project or Excel.

2) It represents the start date and end date of two or more constituent task bars or milestone symbols.

3) In this respect the VST is a OnePager summary task displayed in the chart.

4) OnePager computes the start and end dates of a VST as its constituent task dates change from snapshot to snapshot.

5) It also constructs baselines, percent complete bars, and critical path segments (One Pager Pro (OPP) only) for task bars being summarized.

6) The illustrations and examples in this article are from OnePager Pro.

Creating and Undoing Virtual Summary Tasks

Make a Virtual Summary Task

1) To create a Virtual Summary Task (VST), follow these steps.

2) Select the first task bar or milestone symbol.

3) Use the CTL+Left-Click method to select the second (and third, fourth, etc.) constituent task bars and milestone symbols. Or use the Lasso method to select the desired task bars or milestone symbols.

4) Right-click on any of the selected task/milestone symbols to access the task bar right-click context menu shown below.

5) Click the Make into virtual summary task command as shown below:

P70-18 0 1-70-(1)-09282020.png
P70-18_0_1-70-(1)-09282020.png

6) The chart now looks like this:

P70-18 0 1-70-(2)-09282020.png
P70-18_0_1-70-(2)-09282020.png

7) If there are Task Links associated with the selected task bars their Task Links are not shown in the resulting VST.

Unmake a Virtual Summary Task

8) To unmake the VST, right-click on the VST to access the task bar right-click context menu, and click the Unmake virtual summary task command in the context menu.

P70-18 0 1-70-(3)-09282020.png
P70-18_0_1-70-(3)-09282020.png

9) When a VST is unmade, any Task Links associated with the participating selected task bars are restored.

Setting Percent Complete for Virtual Summary Tasks

1) Because a VST is really a collection of several other task bars, it is not always clear how to define its percent complete value.

2) By default, the percent complete for a VST is computed by OnePager so that the progress bar touches the time now line even if the Time Cursor is displayed or not in the chart as shown below:

P70-18 0 1-70-(4)-09282020.png
P70-18_0_1-70-(4)-09282020.png

3) This value cannot always be appropriate because of the positions of the selected task bars with respect to the time now vertical line (usually the snapshot date).

4) In some cases there won’t be a percent complete calculated or in other cases the percent complete can be illogical.

5) You can override this default and set the percent complete value manually by using these steps.

6) Right-click the VST to access the task bar right-click context menu and then click the Set % complete of virtual summary task command shown below:

P70-18 0 1-70-(5)-09282020.png
P70-18_0_1-70-(5)-09282020.png

7) Enter the new percent complete value and click OK.


P70-18 0 1-70-(6)-09282020.png
P70-18_0_1-70-(6)-09282020.png

8) After clicking the OK button, the VST and its percent complete bar look like this:

P70-18 0 1-70-(6Z)-09282020.png
P70-18_0_1-70-(6Z)-09282020.png

Critical Path Segments in Virtual Summary Tasks

1) OnePager Pro consolidates critical path segments into the VST from the constituent individual task bars and milestone symbols.

2) This feature is not available in OnePager Express (OPX) because OPX does not process percent complete information.

3) In the OnePager Pro chart below, there are four (4) task bars that are selected to become part of a VST:

P70-18 0 1-70-(6A)-09282020.png
P70-18_0_1-70-(6A)-09282020.png

4) When the VST is created, the VST itself looks like this with consolidated critical path segments.

P70-18 0 1-70-(6B)-09282020.png
P70-18_0_1-70-(6B)-09282020.png

Displaying Milestone Symbols on Virtual Summary Tasks

1) Many users often represent their charts entirely with milestone symbols normally to focus attention to start dates and finish dates as shown here with milestone symbols represented at finish dates:

P70-18 0 1-70-(6C)-09282020.png
P70-18_0_1-70-(6C)-09282020.png

2) OnePager can represent any VST configured under circumstances where a VST is created from milestone symbols only, displays the VST bar with the collected milestone symbol shown on top of the bar as illustrated below:

P70-18 0 1-70-(7)-09282020.png
P70-18_0_1-70-(7)-09282020.png

3) To control the use of this feature, a checkbox was added to the Chart Properties form’s Advanced tab’s, Display options control group called Overlay VST element to turn this feature ON and OFF as shown below:

P70-18 0 1-70-(8)-09282020.png
P70-18_0_1-70-(8)-09282020.png

4) The same checkbox is also available in the Template Properties form’s Advanced tab in the same control group to set the feature on for all charts and snapshots created under that Template.

5) It is strongly recommended that you hide the task bar name labels for the task bars or milestone symbols you select to become members of the VST. This is because without hiding the task bar name labels they will appear overlaid onto the VST along with the task bar and/or milestone symbol selected to participate. This consequence may cause task bar name label collisions on the VST task bar that may be unwanted.

6) As another example, using the BlueGrass... chart shown below where the seven (7) original task bars are now represented as milestone symbols at the START DATE and again hide the task bar name labels to better illustrate the result:

P70-18 0 1-70-(9)-09282020.png
P70-18_0_1-70-(9)-09282020.png

7) With the Overlay VST elements checkbox checked ON, a VST is created as described in the previous section.

8) The resulting VST looks like this:

P70-18 0 1-70-(10)-09282020.png
P70-18_0_1-70-(10)-09282020.png

9) If you want to move the VST to another row or swimlane, there are two (2) recommended approaches on how to do this efficiently.

First Recommendation

10) If the VST and milestone symbol configuration is the only thing in the row or swimlane, it is recommended that the move be done by making the move as a row or swimlane move versus trying to select the VST as a task bar and move the task bar individually.

11) The reason is that the overlays of milestone symbols are separate graphics from the VST task bar and do not move with the VST task bar.

Second Recommendation

12) If the VST and milestone symbols configuration occupy a row or swimlane with other task bars/milestone symbols, we recommend that you lasso the entire configuration which selects all task bars/milestone symbols and with the selection lasso active, make the move up or down for the selected task bars/milestone symbols.

Task Links and Virtual Summary Tasks (VST)

1) If you are creating or editing Virtual Summary Tasks (VST) that have either Data-Driven or manual Task Links, it is important to be aware of how those Task Links appear after the creation or editing processes are complete.

2) Any Task Links associated with the VST task bar/milestone symbols are hidden in the resulting VST representation.

3) For more information on the subject of Task Links and Virtual Summary Tasks, please see this section in the article at: Manual Editing of Task Links for OnePager Pro - Task Links and Virtual Summary Tasks (VST). 19.4.1-70

Related Links

Manual Editing of Task Links for OnePager Pro). 19.4.1-70

Template Only Features-OnePager Pro 24.1.1-70

Template Only Features-OnePager Express 24.2.1-70

Advanced Tab for OnePager Pro 21.13.1-70

Advanced Tab-OnePager Express 21.14.1-70

(18.0.1-70)