Difference between revisions of "Handling Microsoft Excel Spreadsheets Containing Multiple Projects For Version 7.0"

From OnePager Documentation
Jump to: navigation, search
(Overview)
(Multi-Project Excel Source Plan in a Single Spreadsheet)
Line 11: Line 11:
 
==Multi-Project Excel Source Plan in a Single Spreadsheet==
 
==Multi-Project Excel Source Plan in a Single Spreadsheet==
  
One method is to add a field to your Microsoft Excel '''source plan''' with a field name of '''Project'''.  This name is recognized by OnePager Express ('''OPX''') and is utilized in '''OPX''' multi-project '''Templates''' shipped with the product.  An example Microsoft Excel '''source plan''' with the '''Project''' field is shown below:
+
1) One method for using a '''single''' Microsoft Excel spreadsheet is to add a field to your '''source plan''' with a field name of '''Project'''.   
 +
 
 +
2) This name is recognized by OnePager Express ('''OPX''') and is utilized in '''OPX''' multi-project '''Templates''' shipped with the product.   
 +
 
 +
3) An example Microsoft Excel '''source plan''' with the '''Project''' field is shown below:
 +
 
 +
<center>[[File:X70-8_3_1-70-(1)-08272019.png]]</center>
 +
<center>X70-8_3_1-70-(1)-08272019.png</center>
  
 
<center>[[File:X61-8_3_1-61-(1)-10272017.png]]</center>
 
<center>[[File:X61-8_3_1-61-(1)-10272017.png]]</center>
 
<center>X61-8_3_1-61-(1)-10272017.png</center>
 
<center>X61-8_3_1-61-(1)-10272017.png</center>
  
After configuring your Microsoft Excel '''source plan''' with the '''Project''' field and the necessary multi-project schedule data, you can create a useful multi-project chart by following the steps below:
+
4) After configuring your Microsoft Excel '''source plan''' with the '''Project''' field and the necessary '''multi-project''' schedule data, you can create a useful '''multi-project''' chart by following the steps below:
  
 
==Procedures==
 
==Procedures==

Revision as of 15:11, 27 August 2019

Overview

Representing multiple projects originating in a single Microsoft Excel source plan can be easily done using the Rows and Swimlanes feature.

1) One of OnePager Express' strength is its ability to create compact visual representations of multiple projects that are part of a single Microsoft Excel spreadsheet.

2) These can be several projects that belong to one program or they can be several projects and programs in an organization’s portfolio.

3) Representing multiple projects originating in a single Microsoft Excel source plan can, therefore, be easily done with the creative selection of Row and Swimlane fields from the Microsoft Excel source plan.

Multi-Project Excel Source Plan in a Single Spreadsheet

1) One method for using a single Microsoft Excel spreadsheet is to add a field to your source plan with a field name of Project.

2) This name is recognized by OnePager Express (OPX) and is utilized in OPX multi-project Templates shipped with the product.

3) An example Microsoft Excel source plan with the Project field is shown below:

X70-8 3 1-70-(1)-08272019.png
X70-8_3_1-70-(1)-08272019.png
X61-8 3 1-61-(1)-10272017.png
X61-8_3_1-61-(1)-10272017.png

4) After configuring your Microsoft Excel source plan with the Project field and the necessary multi-project schedule data, you can create a useful multi-project chart by following the steps below:

Procedures

1) Launch OPX from the desktop icon and click the NEW button on the OnePager Express Start form. This accesses the OnePager choices (OPC) form where you should click the Select button and navigate to the multi-project Microsoft Excel source plan desired as shown below:

X61-8 3 1-61-(2)-10272017.png
X61-8_3_1-61-(2)-10272017.png

Setting up the OnePager Express Template for a Multi-Project Chart

2) Clicking the Open button on the Open form accesses the expanded OPC form where you can confirm the Microsoft Excel source plan, provide a name for your chart, and confirm the snapshot date. Additionally, you need to change the OnePager Express Template to a multi-project Template which is done by clicking the Change button in the Starting Template group of the form as shown below:

X61-8 3 1-61-(3)-10272017.png
X61-8_3_1-61-(3)-10272017.png

3) When you click the Open button on the Open form shown above, OnePager changes the current Template to the Multi-Project Gantt Chart – Detailed Template.

Use the Microsoft Excel Source Plan to Create the Chart

4) You are now ready to create the multi-project chart.

a) First, click the Next> button (shown above) which takes you to the second page of the OPC form.
b) Next, check your field mapping settings or make any Template adjustments.
c) When you are finished, click the Create new chart button on the second page.
d) OnePager generatea a multi-project chart that looks like this:
X61-8 3 1-61-(4)-10272017.png
X61-8_3_1-61-(4)-10272017.png

5) The chart above represents two separate projects using the swimlanes to organize the tasks/milestones for each.

6) As the projects progress and additional projects are added, the additional swimlanes with their corresponding rows are added to the chart in future snapshots.

Updating Charts Created from Multiple Projects in a Single Microsoft Excel Source Plan

7) Eventually you want to update your multi-project chart by either adding a snapshot or replacing a snapshot. To perform either the add or the replace snapshot, the processes described in the Related Links section below can be used.

8) The key to making updated to multi-project charts from multiple-projects contained in a single Microsoft source plan is the proper management of the Microsoft Excel source plan data in the source packet.

a) Recall that the source packet contains the file or files that are to be used to either create or update a chart.
b) They are stored as file names and path names in the chart’s .TAM file, and can be accessed from the Data tab’s Selected file(s) button on the ribbon as shown below:
X61-8 3 1-61-(5)-10272017.png
X61-8_3_1-61-(5)-10272017.png

9) Validating the contents of the source packet and assuring that these are the Microsoft Excel source plans that were updated is an essential step before proceeding to perform a chart update.

Related Links

Creating a NEW Chart via Pull Operation - OnePager Express 7.13.2-70

REPLACING a Snapshot via Push Update - OnePager Express Desktop 7.14.2-70

ADDING a Snapshot via Pull Operation - OnePager Express 7.15.2-70

(8.3.1-70)