==Glossary of Terms for OnePager Pro and Express Through Version 7.0==
+
The tables below list these Microsoft Project file fields that are accessible to OnePager.
  
'''1000 separator''' The field used to control the separation of three digit groups in number-group numeric fields greater than 1,000 in value. The separators are the '''comma, the period, or none'''.
+
<center>[[File:P61-29_0_1-61-(1)-12062018.png]]</center>
 +
<center>[[File:P61-29_0_1-61-(2)-12062018.png]]</center>
 +
<center>[[File:P61-29_0_1-61-(3)-12062018.png]]</center>
  
'''Add Custom-Date Format form''' This form allows the user to define a new '''Custom Date Format''' for use in the project view if defined in the '''Project-View Properties''' form or for all project views if defined in a '''Template''' form.
 
  
'''Adornments'''  Elements of a OnePager document such as the '''header, footer, corner, time axis area(s), title, text columns, swimlane labels, left margin and right margin''' as shown below:
+
(29.0.1-70)
 
+
<center>[[File:P52-28_-(1)-06052015.png]]</center>
+
 
+
'''Anchored ''' Means the legend is displayed in the same relative position on all pages of a multi-page project view.
+
 
+
'''Apply button'''  Where the '''Apply''' button appears at the bottom of a form clicking the '''Apply''' button makes the change you intended to the settings of the form but leaves the form visible so you can make further changes to settings if you desire.  See the '''OK''' entry below.
+
 
+
'''Arrow Style''' The physical connection point on a '''predecessor '''or '''successor''' task that includes the '''Begin''' and '''End type''' '''shape''' and the '''Begin''' and '''End shape Size'''.
+
 
+
'''Aspect Ratio''' The ratio between horizontal and vertical size calculated by OnePager to assure that the project view fits within the output media page.
+
 
+
'''Baseline Bar''' A colored, semi-transparent bar that represents the baseline schedule for a task/milestone of the same color in the same swimlane.
+
 
+
'''BMP''' Bitmap
+
 
+
'''Clip task/milestone labels at graph edges''' When this checkbox is checked '''ON''' in either the '''Advanced''' tab of the '''PVP''' form or '''Template Properties''' form, OnePager clips the task/milestone '''label''' on the left if rows/swimlanes are displayed and on the right if the task/milestone '''labels''' extend beyond the right edge of the graph area.
+
 
+
'''Clutter Reduction''' The process using '''Task Link Filtering '''to reduce the number of '''Data-Driven Task Links''' being '''shown '''in the project view or snapshot so as to focus attention on those '''Data-Driven Task Links''' that best contribute to supporting the user’s schedule conversation presentation.
+
 
+
'''Column''' A vertical representation of data or rule components appearing in a OnePager form, grid, or project view.
+
 
+
'''Comment Box''' A text filled box attached via a connector to a task/milestone. This box can be '''edited''' or can be dragged to a new position by clicking it with a mouse. As a task/milestone moves during a '''snapshot''' change, the task/milestone's attached '''comment boxes''' move with it.
+
 
+
'''Conditional Formatting Rules'''  A set of rules managed by the '''Conditional Formatting Rules''' engine that allows you to specify conditions which, when met, alters the project view for task/milestone '''shape''', '''color''', '''fill''', '''font''', and '''borders'''.  '''Conditional Formatting Rules''' are managed by the '''Conditional Formatting Rules''' form accessible from the '''Task''' or '''Milestones''' tab of the '''Project-View Properties''' form or the '''Template Properties''' form.
+
 
+
'''Conditional Import Filters Rules'''  A set of rules managed by the '''Conditional Import Filters''' rules engine that allows you to specify the conditions which, when met in either the Microsoft Project or Excel '''source plan''', controls the '''source plan''' rows that are brought into OnePager for the creation or update of a project plan. '''Conditional Import Filters''' rules are managed by the '''Conditional Import Rules''' form accessible from the '''OnePager Choices''' form or the '''Main''' tab of the '''Project-View Properties''' form or the '''Template Properties''' form.
+
 
+
'''Copy'''  The '''Copy''' button on the '''Home''' tab ribbon provides three options for '''copying''' the project view to the Windows clipboard.  These options are
+
 
+
:(1) '''Copy''' the entire project view as one image,
+
:(2) '''Copy''' the last (or current) page only, and
+
:(3) '''Copy''' a specific numbered page.
+
 
+
'''Copy edits to all snapshots (CTAS) Checkbox''' This checkbox is checked '''ON or OFF''' in the '''Advanced''' tabs of the Project-View Properties ('''PVP''') and '''Template Properties''' forms. Its function is to turn '''ON''' and '''OFF''' the propagation of '''Maverick''' changes to tasks/milestones to all '''snapshots''' (turned '''ON''') or to keep '''Maverick''' changes to tasks/milestones in the '''snapshot''' in which they were created (turned '''OFF''').
+
 
+
'''Critical Path''' A small optional horizontal bar that appears inside and at the top of a '''Gantt bar''', indicating that the extent portion within the '''Gantt bar''' is on the '''critical path'''.  OnePager does not compute the '''critical path'''; OnePager displays the '''critical path''' extent that is imported from Microsoft Project.  '''OPX''' does not support the display of '''critical path''' information.
+
 
+
'''CSOM''' (Client Side Object Model)  A newer methodology through which OnePager can access Microsoft Project '''source plan''' data from Microsoft Project Server.
+
 
+
'''Cursor''' synonym for '''Time Cursor'''.  The vertical line displayed in the project view that graphically shows the '''snapshot''' date.
+
 
+
'''Curtain''' A vertical colored strip of user controlled width between a '''Start date''' and '''End date''' that denotes a date intervals that crosses all swimlanes.
+
 
+
'''Curtains and Modified Time-Axis Grid''' (or ''' The Grid''') A table provided in the '''Template''' or '''Project-View Properties''' form’s '''Time Axis''' tabs at the '''Format''' sub-tab that contains a list of all '''Curtains''' of various types within the project view or a snapshot.  Some entries in '''The Grid''' can be '''edited''' within '''The Grid''' while others are for information purposes only.
+
 
+
'''Custom Date Formats''' – A feature of OnePager Pro and Express where the user can define and use '''date formats''' in the '''Time Axis''', in '''Text Columns''', and '''Date Labels'''.  '''Custom Date Formats''' are incorporated into the dropdown lists for '''Time Axis Formats''' and can be '''edited''' at any time.
+
 
+
'''Daily Curtains''' – '''Curtains''' '''shown''' in the project view that are associated with '''days of the week'''.  The controls for '''Daily Curtains''' allow the user to '''show/hide''' '''days of the week''' and to display one-day-wide colored '''curtains''' in the project view representing that day.  '''Daily Curtains''' have controls for '''transparency''' and '''simple border''' controls. '''Daily Curtains''' are '''snapshot-independent'''.
+
 
+
'''Daisy Chain Task Links''' A series of three or more selected tasks that are connected by a '''Manually Created Task Link'''.  '''Daisy Chain Task Links''' are created by sequentially selecting three or more tasks with a CTL+LEFT-CLICK and then clicking the '''Task Links''' button on the Onepager '''Insert''' tool bar.
+
 
+
'''Data-Driven Task Links'''  A '''Task Link''' available to OnePager for '''showing''' or '''editing''' in the project view which was imported from a Microsoft Project, Microsoft Excel, or Primavera P6 '''source plan'''.  '''Data-Driven Task Links''' can be '''shown''' or '''hidden''' in the project view/snapshot and can be '''edited''' globally or individually in the project view.
+
 
+
'''Date Boundaries''' – On a project view these dates are inclusive of '''Start Date''' to '''Finish Date'''.
+
 
+
'''Date Formats''' The organization of day, month, year into a single element for the purpose of representing '''Date Labels''' within OnePager.  For example, 3-Feb-2019 and February 3, 2019 are two of many formats supported by OnePager and are consistent with '''date formats''' supported by Microsoft Project and Microsoft Excel.
+
 
+
'''Date Label''' The optional addition of date information imported from Microsoft Project or Microsoft Excel to a task/milestone name.
+
 
+
'''Deadline''' An optional symbol that designates a '''do not go beyond''' date in a project view as imported from Microsoft Project or Microsoft Excel.
+
 
+
'''Decorations''' Decorations include the following data driven elements associated with a task/milestone:
+
 
+
:(1) Date labels
+
:(2) Percent complete
+
:(3) Baselines
+
:(4) Critical path
+
:(5) Deadlines
+
:(6) Endpoints
+
 
+
'''Default Task Link Formatting''' – The process of restoring the '''default properties''' of '''Task Links''' through the use of the '''Use Show/Hide Defaults '''button in the '''Task Link Properties '''form, where the software '''un-mavericks''' the results of applied '''Task Link Filter rules''' or '''un-mavericks''' results of '''show all '''actions depending on the user’s original selection.
+
 
+
'''Dependency Types''' –The allowable relationship options between tasks connected by '''Task Links''' which include the following types:  '''(1) Finish-to-Finish (FF), (2) Finish-to-Start (FS), (3) Start-to-Start (SS), and (4) Start-to-Finish (SF)'''.
+
 
+
'''Docked''' Means that the '''legend''' is placed in one of the sixteen (16) positions on the '''edges''' and '''corners''' of the '''graph''' (8 positions) or on the '''edges''' and '''corners''' of the '''page''' (8 positions).
+
 
+
'''Document Area''' The entirety of the OnePager document with a specified page '''width''' and '''height''' and containing the graph area as shown below:
+
 
+
<center>[[File:P52-28_-(2)-06052015.png]]</center>
+
 
+
'''Document Scaling'''  Computed as a function of '''page fit''' by OnePager or provided by you.  When a document is fit to x by y pages, it is '''scaled''' to a percentage of its actual size to fit on a specified number of pages.  When you select '''Automatic X Automatic''' mode, OnePager computes the output page configuration based on how much you choose to '''scale''' the document before putting it onto the pages.
+
 
+
'''Document Size'''  This is the overall size of the document, irrespective of page count.  The '''document size''' can be altered as a result of your actions to, for example, add rows, swimlanes, or change the height of various adornments.
+
 
+
'''ECF'''  Enterprise Custom Field
+
 
+
'''EMF''' Enhanced Meta File (a Microsoft vector graphics format)
+
 
+
'''Endpoints'''  Up to four optional symbols that can be designated in a project view as imported from Microsoft Project or Microsoft Excel.  '''Endpoints''' are typically used to display very important dates within the extent of a task.
+
 
+
'''Field''' A vertical representation of '''source plan''' data originating from either a Microsoft Project or Excel '''source plan''' an imported into OnePager for preparation of a project view.
+
 
+
'''Field Mapping'''  The '''use''' of a '''source plan''' field for a particular OnePager '''purpose'''.  There are more than 25 OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task/milestone identifier'''.
+
 
+
'''Filter Link Conditions '''– The relationships specified by the user in a '''Task Link Filter rule''' that determines if the '''Data-Driven Task Links''' are '''shown '''or '''hidden''' in the current snapshot of the project view.
+
 
+
'''Filter Links''' A control group in the '''Template''' and '''Project-View Properties''' form’s '''Task Link''' tab that provides the user with the option to '''Show All''' task links imported or to use '''Filtering Rules''' to control the '''show/hide status''' of task links.
+
 
+
'''Floating Time Axis''' A copy of any of the three '''Time Axis Levels''' that can float in the middle of the project view.  '''Floating Time Axes '''are not anchored to the '''top''' or''' bottom''' of the '''graph'''.  The properties of a '''Floating Time Axis Level''' and its '''Cells '''are identical to the corresponding '''Time Axis Level''' and its '''Cells'''.  '''Floating Time Axis Levels''' and '''Cells''' can be selected and '''edited''' and any changes are also reflected in corresponding '''Time Axis Levels''' and '''Cells'''.  '''Floating Time Axes''' are '''snapshot-independent'''.
+
 
+
'''Floating Time Axis Cell''' See '''Time Axis Cell'''.
+
 
+
'''Floating Time Axis Level''' See '''Time Axis Level'''.
+
 
+
'''Free Floating box''' a free floating text '''comment box''' that is '''not''' attached to any task or milestone.
+
 
+
'''Free-floating'''  When the '''legend''' is not '''docked''' or '''anchored''', the '''legend''' is free-floating for single and multi-page outputs.
+
 
+
'''From/To Dates''' The dates used to define and/or '''edit''' the range of any '''curtain''' in the project view.
+
 
+
'''Gantt Bar''' The task that represents a period of work over a segment of time.
+
 
+
'''Graph Area or the graph'''  The portion of the OnePager document that contains the tasks and milestones.  See '''Document Area''' above where the '''Graphic Area''' is in the green rectangle.
+
 
+
'''Horizontal Anchor Position for Manual Task Links Only''' Manually controlled property of manual '''Task Links''' where the user can change the '''Dependency Type '''(e.g., FS, FF, SS, and SF), and control the positon of the '''Begin''' shape on the '''predecessor''' task and the '''End''' shape on '''successor''' tasks with '''slider bars'''.
+
 
+
'''Horizontal Page Break'''  A page break set by you or calculated by OnePager that divides the document into pages running left and right.  The lines showing horizontal page breaks are vertical.
+
 
+
'''Hover Box''' A small, semi-transparent box that appears when you let the mouse cursor '''hover''' over a task/milestone.  The '''hover''' box displays the task/milestone’s '''short description''', its '''start date''', '''end date''' and '''unique task identifier'''. This is very useful for Gantt bars that are so short that it is difficult to read the text inside.  The '''unique task identifier''' is the best way to trace a task/milestone back to its data in the Microsoft Project or Microsoft Excel plan.  The '''hover box''' is activated by a checkbox on the ''''View''' tab of the OnePager ribbon.
+
 
+
'''Import predecessors''' Checkbox in the T'''emplate''' form’s '''Task Links''' tab with a default setting of unchecked that, when checked in the '''Template''' form tells OnePager Pro or Express to import all '''Data-Driven Task Link''' information from the '''source plan'''.
+
 
+
'''Imported Task Links''' '''Task links''' data taken from the user’s '''source plan''' that become '''Data-Driven Task Link '''information available for processing by OnePager Pro or Express.
+
 
+
'''Installation Code'''  The unique code provided with the OnePager software which is submitted by you, the OnePager user, to Chronicle Graphics for the generation of the unique '''License Key''' used to activate the OnePager license.
+
 
+
'''ISO 8601'''  International Standards Organization 8601: Data elements and interchange formats – Information interchange – Representation of '''dates and times''' is an international standard covering the exchange of '''calendar date''' and '''time related data'''.
+
 
+
'''JPEG''' Joint Photographic Expert Group
+
 
+
'''Labels''' Text elements that are provided to support the naming of rows (text columns), swimlanes, tasks, milestones, time axes, and The Corner.
+
 
+
'''License Key'''  The unique group of six (6) four (4) digit numbers and letters that are provided by Chronicle Graphics to activate the OnePager software generated from your provided '''Installation Code'''.
+
 
+
'''Line Style''' The physical line connecting a '''predecessor''' task to a '''successor''' task that includes line '''color''', '''width''', '''dash type''', '''corner radius'''.
+
 
+
'''Manage Custom Date Formats form''' – This form provides a list of all '''Custom Date Formats''' defined for the project view or within the '''Template''' forms that are available.  From this form, the user can add new '''Custom Date Formats''' or delete existing '''Custom Date Formats''' selected from the form’s '''Date Format''' list.
+
 
+
'''Manual Editing of Task Links''' All '''Task Links''' '''shown''' in the project view can be selected and manually '''edited'''.  The '''edits''' include using the right-clicking to access the '''Task Link''' '''context menu''' to select appropriate '''Task Link''' '''editing''' commands and accessing and using the '''Task Link Properties form''' to '''maverick''' one or all of the properties of the selected '''Task Link'''.
+
 
+
'''Manual Editing with Drag and Drop''' Selected '''Task Links''' display a number of '''handlebars '''(i.e., '''yellow''' or '''green circles)''' that can be used to '''drag and drop''' the '''dependency''' line segment in the project view.  There '''handlebars''' are placed at several points on the '''dependency '''line: (1) at the '''Begin shape''', (2) at the '''End shape''', and (3) on vertical/horizontal segments of the '''dependency''' line depending on how OnePager routes the''' '''line between the '''predecessor''' and '''successor''' tasks.
+
 
+
'''Manual Task Link ''' Formerly called '''Event Links''' in previous OnePager Pro and Express versions.  These '''Task Links''' are manually inserted into project views by the user who identifies the '''predecessor''' and '''successor''' tasks that have task relationship '''dependencies'''.  The user has control over the definition of the manual '''Task Link dependency''' type (i.e., FS, FF, SS, and SF), its connecting line '''properties''', '''arrowhead''' '''shapes''', '''line corner sizes''', '''anchor points''', and any associated text.
+
 
+
'''Manual Task Link Daisy Chains''' A series of manual '''Task Links''', created by selecting a single '''predecessor''' and multiple '''successors''' and creating all of the '''links''' simultaneously. Properties are defined with the standard set of '''Task Link''' properties. 
+
 
+
'''Manually Created Task Links aka Even Links'''  A '''Task Link''' manually created in the project view by the user after the project view is created.  '''Manually Created Task Links''' can be '''shown''' or '''hidden''' in the project view/snapshot and can be '''edited''' globally or individually in the project view.
+
 
+
'''Master Switch for Data-Driven Task Links''' The '''Import predecessors''' checkbox in the OnePager Pro and Express '''Template''' form’s '''Task Links''' tab that controls whether OnePager imports or does not import all '''Data-Driven Task Links''' when a project view is created.  The default value for these checkboxes is unchecked.
+
 
+
'''Maverick Data-Driven Task Link''' Any '''Data-Driven Task Link''' that has one or more property altered by the user from those properties either imported or defined in the '''Project-View Properties''' form’s '''Task Links''' tab.
+
 
+
'''Maverick Task/Milestone''' A task/milestone  is said to be turned into a '''Maverick''' if the task/milestone has one or more of its default properties manually changed (e.g. changing the''' color''' of a task to green, when the default or data computer assigned color is red). There are a total of eight (8) properties of task/milestones that can become mavericks.
+
 
+
'''Multi-Page Project View''' A project view that is divided into more than one page where you are setting appropriate page breaks or OnePager is setting page breaks depending on the number of horizontal and vertical pages you determine necessary.
+
 
+
'''No Fill'''  A checkbox option in all '''Color Chooser''' forms that allows you to eliminate the '''color''' inside the selected objects such as:
+
 
+
:(1) Tasks/milestones,
+
:(2) Comment boxes,
+
:(3) Free boxes, and
+
:(4) Curtains.
+
 
+
'''Non-Linear Time Axis''' A representation of a '''Time Axis Level''' where the '''Time Axis Cells''' are not of '''uniform width''' as determined by manual '''editing'''.  '''Non-Linear Time Axes''' are '''snapshot-independent'''.
+
 
+
'''Non-Working Hour Curtains''' '''Curtains''' '''shown''' in the project view when the '''Show Non-Working Hours''' checkbox is checked and there is a '''non-No-Fill color''' selected for the adjacent '''Color Picker''' using the '''Color Chooser''' form.  '''Non-Working Hour Curtains''' are '''snapshot-independent'''.
+
 
+
'''Normal View Mode'''  The standard view of the OnePager '''graph''' upon creating, opening, or updating the OnePager project view which can be '''edited''' with the Project View Editor ('''PVE''').
+
 
+
'''OK button'''  Where the '''OK''' button appears at the bottom of a form clicking the '''OK''' button makes the change you intended to the settings of the form and immediately closes the form.  See the '''Apply''' entry above.
+
 
+
'''OPC''' OnePager choices form.
+
 
+
'''OPP''' OnePager Pro
+
 
+
'''OPX''' OnePager Express
+
 
+
'''Order''' The capability that changes the '''z-Axis''' position of a graphic element in the project view.  Elements can be moved:
+
 
+
:(1) '''Forward or back''' in the '''z-Axis''' direction,
+
:(2) Brought all the way '''forward''' toward the viewer, or
+
:(3) Moved to the '''back''' away from the viewer.
+
 
+
'''Page''' As used in the context of a '''Multi-Page Project View''', a '''page''' consists of an entire '''document area''' (one page) or portions of an entire '''document area''' segmented in accordance with '''page break''' control settings.
+
 
+
'''Page Break View Mode''' The view of the OnePager graph with the superimposed '''page breaks''' and '''watermark page''' numbers. Like the '''Normal View''', the '''Page Break View''' can be '''edited'''. 
+
 
+
'''Page Fitting'''  The process by which you can select to fix the OnePager document to '''x-horizontal''' and '''y-vertical''' pages.  When determined, the document is '''resized''' to fit the requested dimensions.  The '''Aspect ratio''' of the document is not changed. 
+
 
+
'''Page Size'''  The size of each output page in a multi-page situation.  You can select the page size from a dropdown menu list of page sizes or you can specify a custom page size.
+
 
+
'''Percent-Complete Bar''' A small horizontal bar that appears inside a '''Gantt bar''', indicating what '''percent of a task is complete'''.  OnePager does not compute percent complete; OnePager displays the '''percent-complete''' number that is imported from Microsoft Project or Microsoft Excel.
+
 
+
'''PNG''' Portable Network Graphics
+
 
+
'''Predecessor Syntax'''  The format that the user specifies for the expression of '''Data-Driven Task Link''' constraints to OnePager.  There are two available '''Predecessor Syntax''': Microsoft Project and Primavera P6.
+
 
+
'''Predecessor Task'''  The first member of a '''Task Link Relationship Type''' pair.  See '''Task Link Relationship Types'''.
+
 
+
'''Print Preview View Mode''' The '''non-editable''' view of the OnePager '''graph''' configured as the output appears when printed or copied to the clipboard.
+
 
+
'''Project View Graph or the graph''' Graphical screen that displays the project view. This screen contains the '''time cursor''', '''tasks/milestones''' and all task/milestone '''decorations'''.
+
 
+
'''Project View Name''' The '''name''' of the file you assign to the project view through Microsoft Windows.
+
 
+
'''Project View''' The collection of tasks/milestones, decorations, text columns, swimlane labels, adornments, and display settings.  Similar terms include: '''Gantt Chart''', '''Report''', '''Timeline'''.
+
 
+
'''Project View Title''' The '''name''' you give to occupy the '''title area''' of the project view
+
 
+
'''PSI''' Project Server Interface. A methodology through which OnePager can access Microsoft Project plan data from Microsoft Project Server.
+
 
+
'''Put at all snapshots'''  The command associated with the right click context menus for '''comment boxes''', '''free boxes''', and '''curtains''' that puts the graphic in all '''snapshots''' associated with the project view.
+
 
+
'''PVE''' Project View Editor  The graphical representation of a project view that is the main screen for OnePager and which you use to '''edit''' a project view.
+
 
+
'''PVP''' Project-View Properties form.  The form that supports your ability to '''edit''' the project view at the level of '''rows/swimlanes, tasks and milestones, the legend, multi-page output, headers and footers, comment boxes, task links, and advanced features'''.
+
 
+
'''Related Links''' A section is almost every Wiki Article that provides clickable hyperlinks to other articles that provide additional or more in-depth information on the subject article.
+
 
+
'''Repeat on all pages'''  A checkbox in various tabs of the '''PVP''' and '''Template Properties''' form that tells OnePager that a repeatable '''adornment''' such as the '''legend''', '''title''', '''text columns''', '''swimlane labels''', '''time axes''', '''headers''', and '''footers''' are to be repeated on all output pages created in multi-page mode.
+
 
+
'''Row''' A horizontal lane that holds tasks/milestones in the '''graph'''. Rows can be used to distinguish among different task/milestone groups; different functional groups, etc.  Rows can be collected into swimlanes.
+
 
+
'''Row Label''' See '''Text Columns'''.
+
 
+
'''Row Stripes''' A pattern, generated under your control, for creating an '''alternate colored''' of background '''colors''' in adjacent rows starting at the bottom and continuing to the top row.  The '''row stripes''' include the row '''labels''' if row '''labels''' are visible.
+
 
+
'''Show Data-Driven Links''' Checkbox in the '''Project-View Properties''' form’s '''Task Links''' tab for OnePager Express with a default setting of unchecked that when checked in the '''Project-View Properties''' form tells OnePager Express to go out to the project view’s '''source plan(s)''' and import all '''Data-Driven Task Links''' and '''show''' them in the project view.
+
 
+
'''Show Non-Working Hours Checkbox''' A checkbox for controlling the display of '''Non-Working Hour Curtains'''.  Checking this checkbox displays any defined '''Non-Working Hour Curtains'''.  Unchecking this checkbox '''hides''' any defined '''Non-Working Hour Curtains'''.  The '''Show Non-Working Hours''' checkbox is '''snapshot-independent'''.
+
 
+
'''Show/Hide Status of Task Links''' A property of manual and '''Data-Driven Task Links''' that indicates whether they are presently being displayed in the current snapshot of the project view, or if they are '''hidden''' from view.  The user has total control over this property.
+
 
+
'''Snapshot''' A version of a set of tasks/milestone of a project. '''Snapshots''' capture changes in tasks/milestones over time. When a plan changes, you create a new '''snapshot''' for the project and import the new '''start and finish dates''' for the tasks/milestones that have changed.
+
 
+
'''Snapshot Date/Time''' The '''date''' and '''time''' on which a '''snapshot''' becomes effective for your project. This is equivalent to a '''reporting date/time'''.
+
 
+
'''Snapshot Dependent''' Means that the value, style, or format of an object (i.e., task or milestone property) can change from one '''snapshot''' to another as the underlying project data changes. These properties are '''snapshot-dependent''':
+
 
+
:(1) Start Date
+
:(2) Finish Date
+
:(3) Baseline Start
+
:(4) Baseline Finish
+
:(5) %Complete
+
:(6) Critical-Path
+
:(7) Deadline Date
+
:(8) Endpoints
+
:(9) Task Links
+
:(10) Task/Milestone Color
+
:(11) Task/Milestone Shape
+
:(12) Task/Milestone Height %
+
:(13) Task/Milestone Border
+
:(14) Task/Milestone Label Font Properties
+
 
+
'''Snapshot Independent''' Means that an object (i.e., task or milestone property) does not change from one '''snapshot''' to another. Most properties of a OnePager objects are '''snapshot dependent''', but properties like '''task names''', '''task label positions''', and '''row/swimlane configurations''' are '''snapshot independent''', because they are the same across all '''snapshot'''.  '''Note''' that the rows and swimlanes themselves are '''snapshot independent'''.  Also, '''note''' there is no way to have a different set of rows and swimlanes on one '''snapshot''' than you have on all the other '''snapshots''' in OnePager.
+
 
+
'''Snapshot-Independence of Task Links''' The formatting of all''' Task Links '''is consistent across all snapshots in a project view, but whether a given '''Task Link''' is '''shown''' or '''hidden''' can vary from snapshot to snapshot.
+
 
+
'''Source Plan''' The Microsoft Project or Microsoft Excel file used as the input to the creation or update of a project view.  The source where OnePager Pro and Express obtain their imported data to support the creation or update of a project view.
+
 
+
'''Successor Task'''  The second or last member of a '''Task Link Relationship Type''' pair.  See '''Task Link Relationship Types'''.
+
 
+
'''Swimlane''' A group of one or more contiguous rows.
+
 
+
'''Swimlane Label'''  The text area on the far left of swimlane containing text that can be input from the Microsoft Project or Microsoft Excel plan.
+
 
+
'''Swimlane Stripes'''  A pattern, generated under your control, for creating an '''alternating colored''' of background '''colors''' in swimlanes.  The '''swimlane stripes''' include the swimlane '''labels''' if swimlane '''labels''' are visible.
+
 
+
'''Syntax Selector''' The dropdown that tells OnePager Express what format to expect for the '''Task Link Field''' in the '''source plan''' from which '''Data-Driven Task Links''' are imported.  There are two options: (1) Microsoft Project, and (2) Oracle Primavera.
+
 
+
'''.TAM''' A file type for saving or sharing project views with other OnePager users.
+
 
+
'''.TAP''' A file type for saving or sharing color palettes with other OnePager users.
+
 
+
'''Task Link (aka Event Link)''' An '''editable''' connector showing that two tasks/milestones are '''linked''' to each other. Typically this shows that one of them depends upon the other in some way. The '''Task Link''' can display text that describes the '''link''' and can be configured with respect to line thickness, color, and other properties.  '''Task Links''' can be '''Data-Driven''' or '''individually manually created'''.
+
 
+
'''Task Link Connection Line Elbow'''  The 90-degree bend in a '''Task Link Connection Line''' created by OnePager in the project view.
+
 
+
'''Task Link Connection Line Handlebars'''  The highlighted locations on a selected '''Task Link Connection Line''' where the user can use the mouse to manipulate the '''Task Link Connection Line'''.  There are three (3) '''Task Link Connection Line Handlebar''' locations:  (1) '''Begin point''' on the '''Predecessor Task''', (2) '''End point''' on the '''Successor Task''', and (3) '''Middle point''' between the two previous points.
+
 
+
'''Task Link Connection Lines'''  The graphically displayed lines in the project view that joins '''Predecessor Tasks''' to '''Successor Tasks'''.  '''Task Link Connection Lines''' can be '''edited''' alone the length of the line and at the '''Predecessor Task''' and '''Successor Task''' attachment points.
+
 
+
'''Task Link Field''' The dropdown list that tells OnePager Express which field from the Excel '''source plan(s)''' to use for importing '''Data-Driven Task Links'''.
+
 
+
'''Task Link Filter Rules form''' A form accessed in the '''Template''' and '''Project-View Properties''' form’s '''Task Links''' tab that provides the user with the capability to define rules to control the '''show/hide status''' of task links based upon the relationships between other imported data from the user’s '''source plan'''.  The '''Task Link Filter Rules''' form permits the creation, '''editing''', and deletion of rules in the '''Template''' and the '''Project-View Properties''' form.
+
 
+
'''Task Link Filtering''' The capability that allows the user to control the '''showing''' or''' hiding '''of '''Data-Driven Task Links''' in the project view based upon relationships between data elements contained in the user’s '''source plan'''.
+
 
+
'''Task Link Filtering Rules'''  The user's rules expressed in the '''Task Link Filter Rules''' form by which the user specifies how various '''Data-Driven Task Links''' are '''shown or hidden''' in the project view or snapshot.
+
 
+
'''Task Link Relationship Types'''  The constraint type specified by the user between the '''Predecessor''' and '''Successor''' tasks.  '''Task Link Relationship Types''' include:  Finish-to-Start (FS), Start-to-Start (SS), Finish-to-Finish (FF), and Start-to-Finish (SF).
+
 
+
'''Task Link Source Column''' A column in the '''Where Are My Links? form''' that specifies whether the entry is associated with a '''Task Link''' that was '''Imported''' from a '''source plan '''or '''manually''' created in the project view or snapshot.
+
 
+
'''Task Link Upgrade''' The new features and modifications to the '''Event Links''' features of OnePager Pro and Express that are part of the Version 6.1 Releases.
+
 
+
'''Task Link Vertical Attachment'''  The point on a '''Predecessor Task''' or '''Successor Task''' where a '''Task Link Connection Line''' can be attached to the task.  There are three (3) possible '''Task Link Vertical Attachment''' points:  (1) '''Top''' of the task, (2)  '''Middle''' of the task, and (3) '''Bottom''' of the task.
+
 
+
'''.TAT''' A file type for saving or sharing '''templates''' with other OnePager users.
+
 
+
'''Template Properties''' The OnePager form that supports your ability to pre-establish project view properties at the level of '''rows/swimlanes, tasks and milestones, the legend, multi-page output, headers and footers, comment boxes, task links, and advanced features'''.  There are many '''Template Properties''' form sets distributed with OnePager and you can create new '''Template Properties''' forms by either '''editing''' an existing distributed '''Template Properties''' form or converting an '''edited'''' project view into a new '''Template Properties''' form.
+
 
+
'''Text Columns''' The text area immediately to the left of a task/milestone row that contains text that is imported from the Microsoft Project or Microsoft Excel plan.  There are up to five (5) '''text columns''' that can be configured in a project view with data populated from the '''source plan'''.
+
 
+
'''Tic''' A '''Tic''' is the '''vertical border''' outlining a '''Time Axis Cell'''.
+
 
+
'''Tic Unit''' A '''Tic '''Unit''' is the space between the two '''vertical borders''' that define a '''Time Axis Cell'''.
+
 
+
'''Time Axis Borders''' A '''Time Axis Level''' has a '''top''' and a '''bottom horizontal border''' with properties that include '''color''', line '''width''', and '''dash type'''.  '''Time Axis Borders''' are '''snapshot-independent'''.
+
 
+
'''Time Axis Cell''' Each '''Time Axis Level''' is made up of '''Time Axis Cells''' representing the '''Time Axis Units''' from the project view’s '''Start Date''' through its '''Finish Date'''.
+
 
+
'''Time Axis Cell Vertical Gridlines''' A the '''vertical borders''' for any '''Time Axis Cell'''.  '''Vertical Gridlines''' can enclose the '''Time Axis Cell''' and/or can extend vertically into the '''graph'''.  '''Time Axis Vertical Gridlines''' have the same properties as '''Time Axis Borders'''.  '''Time Axis Cell Vertical Gridlines''' are '''snapshot-independent'''.
+
 
+
'''Time Axis Count Up/Down''' A '''Date Format''' available for any '''Time Axis Level''' where the user can specify the '''Zero (0) Time Axis Cell''' for the origin of the count and whether the count is '''up''' or '''down''' from the origin in integer units for each '''Time Axis Level Cell''' within the '''Level'''.
+
 
+
'''Time Axis Levels''' OnePager Pro and Express provides up to three '''levels''' of '''Time Axis''' representation with corresponding property management controls.  Each '''Time Axis Level''' is selectable and its properties can be changed in the project view. Displaying one, two, or three '''Time Axis Levels''' is '''snapshot-independent'''.
+
 
+
'''Time Axis Upgrade''' The new features and modifications to the '''Time Axis''' features in OnePager Pro and Express that are part of the version 6.1 release.
+
 
+
'''Time Cursor''' A vertical line whose position indicate the '''Snapshot date''' for the '''snapshot''' that is being displayed.
+
 
+
'''Timespan''' Any interval (i.e., '''Cell''') along the '''Time Axis '''that is '''stretched longer''', '''compressed smaller''', or '''hidden''' entirely.
+
 
+
'''Unstretch All Cells''' The processes of reverting '''Time Axis Levels''' and '''Cells''' previously made into one or more '''Non-Linear Time Axis Levels''' and '''Cells''' back to uniform '''Time Axis Cell widths'''.
+
 
+
'''Use Show/Hide Defaults button''' The control in the '''Where Are My Links? form''' that is used to eliminate any manual '''showing/hiding''' of '''Task Links''', and revert instead to the '''default Task Link Filtering'''.
+
 
+
'''Use System Generated Start/Finish Dates Checkbox''' A checkbox in the '''Template''' form’s '''Main''' tab that, when checked, tells OnePager to generate '''Start/Finish Dates''' based upon the tasks that are imported from Microsoft Project or Excel.  Users can uncheck this box to define their own '''Start/Finish dates'''.
+
 
+
'''Vertical Anchor Position for All Task Links''' A set of radio buttons that are used to define where the '''Begin''' and '''End''' points on '''predecessor''' and '''successor''' tasks should be placed in terms of '''top''', '''middle''', '''bottom''' or '''automatically''' determined by OnePager.
+
 
+
'''Vertical Page Break'''  A page break set by you or calculated by OnePager that divides the document into two or more pages from top to bottom.  '''Note''' that the page break lines that separate such pages are horizontal lines.
+
 
+
'''Warm of merging tasks''' A checkbox found on the '''PVP''' and '''Template Properties''' form's '''Advanced''' tab that provides controls for merging tasks during the project view update process by identifying extra and missing tasks as define below:
+
 
+
:(1) '''Extra tasks''' Are tasks that are present in the current source but were not present in the original source during an update operation.
+
:(2) '''Missing tasks''' Are tasks that were present in the original source but are not present in the current source during an update operation.
+
 
+
'''Watermark Page Numbers''' The ghosted '''page''' numbers displayed in project view in the '''Page Break View Mode'''.
+
 
+
'''Where Are My Links? form''' A form, similar to the '''Where’s My Stuff?!''' form, that lists all manual and '''Data-Driven Task Links''' in the current snapshot of the project view.  The form provides an entry for each '''Task Link''' pair, their '''Unique ID''' or '''Task ID''', their '''show/hide status''', and the '''Task Link source''' either '''Manual''' or '''Imported'''.  The form is used to locate '''Task Links''', examine their defined properties, and can be used to '''show '''or '''hide selected''' '''Task Links'''.
+
 
+
'''Working Hours''' The daily time periods defined the '''Set Working Times''' form by using the '''Time Picker''' for each day of the week to set the '''Start working time''' and the '''Finish working time''' for that day.  When '''Working Hours''' are set the user then has the option to '''show''' or '''hide''' '''Non-Working Hour Curtains'''.
+
 
+
'''Zebra Stripes'''  A common name for '''alternating colors''' applied to rows or swimlanes and their '''labels'''.  See the '''Row Stripes''' and '''Swimlane Stripes''' definitions above.
+
 
+
'''Zoom %''' The name of a cell in the '''Format Date Ranges Grid''' or '''Date Range Curtain Grid''' that allows the user to change the amount of '''horizontal space''' in the project view used to display any '''Curtain’s From/To Dates'''.  A
+
'''Zoom''' '''%''' of 100 means that the amount of '''horizontal space''' is determined by the standard width set for the '''Bottom Time Axis Level'''.  A '''Zoom %''' of 200 is double that '''Bottom Time Axis''' '''cell(s) width'''.
+
 
+
<!--[[Glossary for Task Link Terms]] 28.1.1-61
+
 
+
[[Glossary for Time Axis Terms]] 28.2.1-61
+
 
+
[[Merged Glossary of Terms Test]]] 28.3.1-61-->
+
 
+
(28.0.1-70)
+
  
 
[[Category:Version 7.0]]
 
[[Category:Version 7.0]]
 +
[[Category:Editing a Project View]]
 +
[[Category:Task/Milestone Editing]]
 +
[[Category:Project Views]]
 +
[[Category:Microsoft Project]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Pro]]
[[Category:OnePager Express]]
 

Revision as of 21:42, 23 January 2019

The tables below list these Microsoft Project file fields that are accessible to OnePager.

P61-29 0 1-61-(1)-12062018.png
P61-29 0 1-61-(2)-12062018.png
P61-29 0 1-61-(3)-12062018.png


(29.0.1-70)