Opening an EXISTING Project View - OnePager Pro Add-in for Version 5.3

From OnePager Documentation
Revision as of 21:57, 8 December 2015 by Rfeingold (Talk | contribs)

Jump to: navigation, search

Opening EXISTING Project View – OnePager Pro Add-in for Version 5.3 (P53-7_5_1-11232015)

Once project views are created, they can be re-opened from the “OnePager Pro Start” form either from a blank Microsoft Project plan or any named Microsoft Project plan. The purpose of this scenario is to retrieve a project view for inclusion in another presentation or to further edit the project view. Using this methodology does not import any new or old data from Microsoft Project. However, Microsoft Project needs to be launched so that you can access the “OnePager Pro” button.

With OnePager Pro Version 5.3 you have the option to install both the Add-in and Desktop applications. As an alternative you may double-click on the desired project view’s .TAM file to open an existing project view as described in the article at Opening an EXISTING Project View - OnePager Pro Desktop for Version 5.3 7.5.2-53.

The steps to open an EXISTING project view from within Microsoft Project are shown in the steps below:

P53-7 5 1-(1)-53-11202015.png
P53-7_5_1-(1)-53-11202015.png

1) Launch Microsoft Project. You may launch Microsoft Project either with a Microsoft Project source file to display or just launch Microsoft Project with a blank screen.

2) With Microsoft Project running, launch OnePager and click the “OPEN” button on the “OnePager Pro Start” form. OnePager will display a list of recently-used project views and a “BROWSE FILES…” option. If you click “BROWSE FILES…,” you will get a Windows “Open” form where you may select a project view to open.

P53-7 5 1-(2)-53-11202015.png
P53-7_5_1-(2)-53-11202015.png

3) Selecting a project view to open will tell OnePager to retrieve and display it. No data are imported from any Microsoft Project plan.

4) Once the project view is displayed and available, you may edit, save, and copy the project view to a PowerPoint slide or elsewhere as described previously.

5) Once a project view with multiple snapshots is opened, you may want to go between snapshots. There are two methods to do this.

a) The first is to use the forward/back arrows on the “View” tab to move between snapshot dates.
b) The second method is to click the “List All” button on the OnePager “View” tab which will display a list of all available snapshot dates for the project view as shown below:
P53-7 5 1-(3)-53-11202015.png
P53-7_5_1-(3)-53-11202015.png

6) In addition to editing the opened project view and switching between snapshots you can also use the “Data” tab on the OnePager ribbon to replace snapshots, add snapshots, and perform custom updates. The “Data” tab on the ribbon appears as shown below:

P53-7 5 1-(4)-53-11202015.png
P53-7_5_1-(4)-53-11202015.png

Related Links:

Creating a NEW Project View via Pull Update - OnePager Pro for Version 5.3 7.13.1-53

Creating a NEW Project View via Pull Update - OnePager Express for Version 5.3 7.13.2-53

REPLACING a Snapshot via Pull Update - OnePager Pro for Version 5.3 7.14.1-53

REPLACING a Snapshot via Pull Update - OnePager Express for Version 5.3 7.14.2-53

ADDING a Snapshot via Pull Update - OnePager Pro for Version 5.3 7.15.1-53

ADDING a Snapshot via Pull Update - OnePager Express for Version 5.3 7.15.2-53

Custom Update (Replacing) of a Snapshot via Pull Operation - OnePager Pro for Version 5.3 in a project view 7.16.1-53

Custom Update (Replacing) of a Snapshot via Pull Operation - OnePager Express for Version 5.3 in a project view 7.16.2-53

(7.5.1-53)