Difference between revisions of "Selecting Tasks/Milestones for Editing"
From OnePager Documentation
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | ==Tasks and Milestones== | + | ==About Selecting Tasks and Milestones== |
− | OnePager provides several methods for selecting one or multiple tasks/milestones in order to make manual edits: | + | OnePager provides several methods for '''selecting''' one or multiple tasks/milestones in order to make manual edits: |
− | '''Single selection | + | :(1) '''Single selection ''' Select, using a left click, a single task/milestone in the graph, and notice that it receives a '''solid border selection box''' with two '''grab points''' (top and bottom) in the middle of the task/milestone. |
− | '''Multiple selections | + | :(2) '''Multiple selections''' Select multiple tasks/milestones by holding down the '''Control key''' ('''CTRL''') and then selecting several tasks or milestones using successive left clicks. |
− | '''Lasso | + | :(3) '''Lasso''' You can also drag a '''selection lasso''' around a group of tasks/milestones by first left clicking the mouse in some empty area of the graph and then dragging the '''selection rectangle''' around a group of tasks/milestones. Releasing the mouse left click button will select the tasks/milestones inside the '''lasso'''. |
− | '''Select all | + | :(4) '''Select all''' Alternatively, go to the OnePager '''Home''' tab and click '''Select All''' button in the '''Editing''' group to select all tasks/milestones on the screen. Then you can hold down the '''Control key''' and '''deselect''' tasks that you do not want to select. |
− | '''Esc key | + | :(5) '''Esc key''' If you want to '''redo''' your task/milestone '''selections''', press the '''ESC key''' and OnePager will '''deselect''' all previously selected tasks/milestones. |
(9.1) | (9.1) | ||
[[Category:Version 5.2]] | [[Category:Version 5.2]] | ||
+ | [[Category:Version 5.3]] | ||
+ | [[Category:Version 6.0]] | ||
[[Category:Project Views]] | [[Category:Project Views]] | ||
[[Category:Editing a Project View]] | [[Category:Editing a Project View]] | ||
[[Category:Task/Milestone Editing]] | [[Category:Task/Milestone Editing]] | ||
+ | [[Category:OnePager Pro]] | ||
+ | [[Category:OnePager Express]] |
Latest revision as of 18:09, 9 February 2017
About Selecting Tasks and Milestones
OnePager provides several methods for selecting one or multiple tasks/milestones in order to make manual edits:
- (1) Single selection Select, using a left click, a single task/milestone in the graph, and notice that it receives a solid border selection box with two grab points (top and bottom) in the middle of the task/milestone.
- (2) Multiple selections Select multiple tasks/milestones by holding down the Control key (CTRL) and then selecting several tasks or milestones using successive left clicks.
- (3) Lasso You can also drag a selection lasso around a group of tasks/milestones by first left clicking the mouse in some empty area of the graph and then dragging the selection rectangle around a group of tasks/milestones. Releasing the mouse left click button will select the tasks/milestones inside the lasso.
- (4) Select all Alternatively, go to the OnePager Home tab and click Select All button in the Editing group to select all tasks/milestones on the screen. Then you can hold down the Control key and deselect tasks that you do not want to select.
- (5) Esc key If you want to redo your task/milestone selections, press the ESC key and OnePager will deselect all previously selected tasks/milestones.
(9.1)