==Introduction to the Deadlines Feature in OnePager==
+
==Introduction to the Endpoints Feature in OnePager==
  
This article describes OnePager’s '''Deadlines''' feature.  The article covers the '''Add-in''' and '''Standalone''' editions of OnePager Pro, OnePager Express, and OnePager 360.  Illustrations used in this article are from OnePager Pro but the feature's function, controls, and manual edits apply equally to OnePager Express and OnePager 360.
+
This article describes OnePager’s '''Endpoints''' feature.  The article covers the '''Add-in''' and '''Standalone''' editions of OnePager Pro, OnePager Express, and OnePager 360.  Illustrations used in this article are from OnePager Pro but the feature's function, controls, and manual edits apply equally to OnePager Express and OnePager 360.
  
==About Editing Deadlines==
+
==About Editing Endpoints==
  
OnePager translates '''Deadlines''' from your '''source plan''' into '''deadline''' shapes in the '''graph''' to indicate the '''deadline date''' for a task bar or milestone symbol.  To illustrate with a simple example, consider the Microsoft Project '''source plan''' given below with three tasks containing '''Start and Finish dates''', a '''deadline date''', and the Microsoft Project '''Flag20''' field set to '''Yes''' so that OnePager '''imports''' the data for all three task bars:
+
There are four (4) '''endpoints''' definable in OnePager for each task bar.  By definition, milestone symbols in OnePager do not have multiple '''endpoints'''. Accordingly, '''endpoints''' for milestone symbols are not supported and there is no '''decoration''' controls for '''endpoints''' in the '''Template Properties''' or '''Chart Properties''' form's '''Milestones''' tab.
  
<center>[[File:P70-10_9_1-(1)-06032020.png]]</center>
+
For all practical purposes, the four possible '''endpoints''' ('''Endpoint1, Endpoint2, Endpoint3, and Endpoint4''') can be thought of as additional '''deadline dates''' for task bars that can be defined to communicate related '''dates''' associated with the task bar. As an additional thought, you can consider the four '''endpoints''' as task-oriented '''milestones''' as they occupy the same row as their parent task bar.  
<!--<center>P70-10_9_1-70-(1)-09182019.png</center>-->
+
  
When a simple chart is created from the '''source plan''' above and '''Deadlines''' are turned '''ON''', the example chart looks like this:
+
The control and the behavior of all four '''endpoints''' are identical to that discussed for '''deadlines'''
  
<center>[[File:P70-10_9_1-(2)-06032020.png]]</center>
+
For more information on '''Deadlines''', please see the article at:  [[Deadlines for OnePager for Version 7.1 | Deadlines for OnePager]] 10.9.1-71
<!--<center>P70-10_9_1-70-(2)-09182019.png</center>-->
+
  
When '''deadlines''' are turned '''ON''', they appear (by default) as '''red down-arrow shape''' in each task bar's row at the '''deadline date''' position with respect to the '''time axis'''. Above, '''deadline shapes''' that are not contained within their respective task bar are shown with '''back dash-dot connecting lines''' to illustrate the capability.
+
By '''convention and as a default''', the initial association of '''Endpoints 1 through 4''' are to Microsoft Project '''source plan''' fields is as follows:
  
==Editing All Deadline Properties==
+
:* '''Endpoint 1: Start Date'''.
 +
:* '''Endpoint 2: Finish Date'''.
 +
:* '''Endpoint 3: Baseline Start Date'''.
 +
:* '''Endpoint 4: Baseline Finish Date'''.
  
To display '''deadline dates''' in your charts you must first assure that the '''source plan''' has its '''Deadline''' field populated with valid '''dates'''. When '''deadline dates''' are present in the '''source plan''' they must first be turned '''ON''' as the '''default setting''' in most distributed '''Template Properties''' form is for '''deadlines''' to be turned '''OFF'''. To do this, click the '''Chart Properties''' button on the OnePager '''Home''' ribbon tool bar tab to access the '''Chart Properties''' form. Next, navigate to the '''Chart Properties''' '''Task Bars''' tab and to the '''Task Bars Decoration''' control group. Check the '''Deadline markers''' checkbox '''ON''' to '''enable''' the '''Deadline Properties...''' button to the immediate right of the checkbox as shown below:
+
These '''default settings''' are contained in all distributed OnePager '''Template Properties''' forms. Since controls are provided as described below whereby you can '''edit''' the '''endpoint''' association with '''source plan''' fields, it is recommended that you establish your '''endpoint''' relationships to specific '''source plan date''' fields before creating the first chart. This recommendation can be done by '''editing''' the '''Template Properties''' form you plan to use before launching OnePager or after launching OnePager by '''editing''' the '''Template Properties''' form using the '''access point''' in the '''OnePager choices''' ('''OPC''') form described in the following section.
  
<center>[[File:P70-10_9_1-(3)-06032020.png]]</center>
+
==Displaying Endpoints==
<!--<center>P70-10_9_1-70-(3)-09182019.png</center>-->
+
  
By default, '''deadlines''' are mapped to the '''Deadline date''' field in Microsoft Project.
+
For OnePager to properly display your '''endpoints''', you must first define the '''endpoint''' field in your '''source plan''' and map them to OnePager through the OnePager choices ('''OPC''') form. A sample, Microsoft Project '''source plan''' is shown below with both '''deadline''' and '''endpoint''' definitions:
  
===Set Deadline Properties Form===
+
<center>[[File:P70-10_11_1-(1)-06042020.png]]</center>
 +
<!--<center>P70-10_11_1-(1)-06042020.png</center>-->
  
To '''edit''' the format of all '''deadlines''', click the '''Deadline Properties...''' button, to access the '''Set deadline properties''' form shown below:
+
In the sample above, we see the typical task information with '''Flag20''' used to signal OnePager which '''rows''' to '''import''', the Microsoft Project '''Deadline''' field and four '''Date''' fields ('''Date1, Date2, Date3, and Date4''') which are used to '''import''' information to OnePager representing '''Endpoints 1 through 4''' respectively.
  
<center>[[File:P70-10_9_1-(4)-06032020.png]]</center>
+
When the '''OnePager''' button is clicked on the Microsoft Project '''Add-ins''' tool bar tab and you click the '''NEW''' button on the '''OnePager Pro Start''' form, OnePager displays the first page of the '''OPC''' form as shown below:
<!--<center>P70-10_9_1-70-(4)-09182019.png</center>-->
+
  
The form above provides all the '''editing''' controls for '''all deadline shapes''' that can be displayed in the chart.
+
<center>[[File:P70-10_11_1-(2)-06042020.png]]</center>
 +
<!--<center>P70-10_11_1-(2)-06042020.png</center>-->
  
====Standard Basic Deadline Shape Controls====
+
Clicking the '''Next>''' button with the '''Show field mappings''' checkbox checked '''ON''' accesses the second page of the '''OPC''' form shown below:
  
As stated previously, many of the controls in this group of the '''Set deadline properties''' form are standard.
+
<center>[[File:P70-10_11_1-(3)-06042020.png]]</center>
 +
<!--<center>P70-10_11_1-(3)-06042020.png</center>-->
  
The '''deadline shapes''' available are the same as '''Milestone symbols''' found in the '''Milestones''' tab of the '''Template Properties''' and '''Chart Properties''' forms. Likewise, the '''Fill patterns''' available are the same for task bars and milestone symbols also found on their respective tabs of the '''Template Properties''' and '''Chart Properties''' forms.
+
Clicking the '''Edit current template…''' button takes you to the '''Template Properties''' form. Navigate to the '''Task Bars''' tab and the '''Endpoints''' checkbox in the '''Task Bar Decorations''' control group of the form as shown below:
  
The '''Height percentage''' control represents the '''percentage''' of the total task bar/milestone symbol's '''height''' itself, is covered elsewhere and behaves in a standard way. The default '''Height percentage''' is 100% meaning that the '''deadline shape''' is the same '''height''' as the task bar/milestone symbol.
+
<center>[[File:P70-10_11_1-(4)-06042020.png]]</center>
 +
<!--<center>P70-10_11_1-(4)-06042020.png</center>-->
  
Similarly, the '''Transparency''' control for the '''deadline''' operates in the same way as '''transparency''' controls for other objects.  The higher the value selected, the greater the '''transparency'''. Conversely, the low the value selected, the more solid the '''deadline shape''' appears.
+
Check the checkbox to '''ON''' and Click the '''Endpoint Properties..." button to access the '''Set endpoint properties''' form shown below where you can '''set and edit''' the properties of any one '''endpoint''' or all four.
  
The '''Field''' dropdown in the upper right of the form allows you to select another '''source plan date field''' instead of the default '''Deadline''' field typically used in Microsoft Project.  Contents of the '''Field''' dropdown list is shown below:
+
==Editing All Endpoint Properties==
  
<center>[[File:P70-10_9_1-(5)-06032020.png]]</center>
+
The '''Set endpoint properties''' form is a '''multi-endpoint''' form in that using this one form allows you to '''edit''' the properties of all four '''endpoint shapes''' available for display in the chart.
<!--<center>P70-10_9_1-70-(5)-09182019.png</center>-->
+
  
The '''Position''' of the '''deadline''' has a unique meaning. '''Deadlines''' are always associated with a task bar/milestone symbol and can be to the left, within, or to the right of the task bar/milestone symbol itself depending on your  '''source plan''' data for the task bar’s '''start''', '''finish''' and '''deadline dates'''.  The position in this context is about where within the task bar/milestone symbol’s row area vertically the '''deadline''' should be placed. There are three (3) available positions for the placement of the '''deadline shapes''' with respect to the task bar:
+
===Set Endpoint Properties Form===
  
:* '''Centered''' in the task bar/milestone symbol.
+
Clicking the '''Endpoint Properties...''' button accesses the '''Set endpoint properties''' form where the '''Choose endpoint''' dropdown is shown below allowing you the option to select to '''edit''' one of the four available '''endpoints''':
:* '''Above''' the task bar/milestone symbol.
+
:* '''Below''' the task bar/milestone symbol
+
  
The three available positions are shown here:
+
<center>[[File:P70-10_11_1-(5)-06042020.png]]</center>
 +
<!--<center>P70-10_11_1-(5)-06042020.png</center>-->
  
<center>[[File:P70-10_9_1-(6)-06032020.png]]</center>
+
In the illustration above, '''Endpoint 1''' is shown '''edited''' with all its available elements turned '''ON'''. The above form is almost identical to the '''Set deadline properties''' form.  The difference is the '''Show this endpoint''' checkbox which refers to the dropdown menu shown above whereby you can select which '''endpoint''' to control. In effect, this form is four (4) forms in one allowing you to turn '''ON''' and '''OFF''' each individual '''endpoint''' and configure the properties of each '''endpoint''' separately. The illustration above covers up two important controls that need to be addressed. The '''Show this endpoint''' checkbox and the '''Field''' dropdown menu by which you tell OnePager which Microsoft Project '''source plan''' field is used for each particular '''endpoint'''. These controls are shown here:
<!--<center>P70-10_9_1-70-(6)-09182019.png</center>-->
+
  
The '''Use custom color''' checkbox can be checked '''ON''' when it is desired to select a '''color''' for the '''deadline shape''' other than the '''color''' for its parent task bar/milestone symbol.  When the '''Use custom color''' checkbox is checked '''ON''', the standard '''Custom color''' dropdown is '''enabled. Clicking the dropdown button shows the standard '''Color Chooser''' form.
+
<center>[[File:P70-10_11_1-(6)-06042020.png]]</center>
 +
<!--<center>P70-10_11_1-(6)-06042020.png</center>-->
  
====Showing Deadline Delays====
+
As necessary, repeat the above '''editing''' steps for '''Endpoint 2 through 4''' as required such that when the '''endpoint''' data are '''imported''' into OnePager the '''endpoint shapes''' and '''other properties''' are unique.
  
The purpose of the display of '''Deadline Delays''' is to provide you with the capability to highlight '''deadlines''' that are '''missed''' as shown in the chart. When the '''Color-code delays''' checkbox is checked '''On''', OnePager uses the selected '''Delay color''' (determined by the selection of the '''delay color''' from the standard '''Color Chooser''' form) to show all '''deadlines''' that are '''missed''':
+
===Saving the Current Template Properties Form===
  
<center>[[File:P70-10_9_1-(7)-06032020.png]]</center>
+
Now that the '''endpoints''' are defined with distinct properties for all task bars in our example, go back to the '''Template Properties''' form, click the '''Save and use''' button to get back to the second page of the '''OPC''' form. Then, click the '''Create new chart''' button and OnePager produces the following chart:  
<!--<center>P70-10_9_1-70-(7)-09182019.png</center>-->
+
  
The '''deadline''' is set to the selected '''Delay color''' if, for any '''deadline shape''':  
+
<center>[[File:P70-10_11_1-(7-1)-06042020.png]]</center>
 +
<!--<center>P70-10_11_1-(7-1)-06042020.png</center>-->
  
:* The '''Color-code delays''' checkbox is checked '''ON''',
+
For the illustration above, '''Endpoints 1 through 4''' are lined up from left to right in each row.
:* The '''deadline date''' is '''earlier than the current snapshot date''',  
+
:*  And the '''percent (%) complete''' for the parent task bar/milestone symbols less than 100%.
+
  
If any of the conditions stated above are '''not met''', the '''color''' of the '''deadline''' is set to the '''default color''', unless a '''custom color''' is otherwise specified.
+
===Editing Endpoint Properties===
  
====Example Deadline Date Delay====
+
The above section's discussion covered the set up and initial display of '''endpoints'''. Recall that '''endpoint''' controls are exactly identical to the controls for '''deadlines'''.
  
To illustrate the operation of the '''Color-code delay''' feature, let's set the stage by supposing that a project of three task bar is has the following initial conditions:
+
For more information on '''Deadlines''', please see the article at: [[Deadlines for OnePager for Version 7.1 | Deadlines for OnePager]] 10.9.1-71
  
:* Project Start Date – 10/1/2020
+
The exception is only for the necessity to turn '''ON''' and '''OFF''' the individual '''endpoints''' through their respective '''Show this endpoint''' checkbox and to enter the Microsoft Project '''source plan''' field you need to use for the respective '''endpoints''' in the '''Field''' dropdown menu of the '''Set endpoint properties''' form.
:* Project Finish Date (Estimated) – 10/18/2020
+
:* First Status Date – 9/11/2020
+
:* Task A Deadline Date – 10/15/2020 (Task A Finish Date projected before Deadline Date)
+
:* Task B Deadline Date – 10/10/2020 (Task B Finish Date beyond Deadline Date)
+
:* Task C Deadline Date- 10/1/2020 (Task C Start Date beyond Deadline Date)
+
  
With these initial conditions, the Microsoft Project '''source plan''' looks like this:
+
==Editing Individual Task Endpoint Properties==
  
<center>[[File:P70-10_9_1-(8)-06032020.png]]</center>
+
'''Endpoint properties''' can be set or '''edited''' for individual task bars. In addition to the capabilities for '''editing all Endpoint properties''' using the '''Template Properties''' and/or '''Chart Properties''' forms, you can select and individually '''edit Endpoint properties''' showing in the chart. A prerequisite for '''editing''' individual '''endpoint properties''' is the necessity for '''endpoint''' data to be '''imported''' from the Microsoft Project '''source plan'''.  
<!--<center>P70-10_9_1-70-(8)-09182019.png</center>-->
+
 
+
If we take a snapshot using the above '''source plan''' as of '''10/10/2019''' the chart looks like this:
+
 
+
<center>[[File:P70-10_9_1-(9)-06032020.png]]</center>
+
<!--<center>P70-10_9_1-70-(9)-09182019.png</center>-->
+
 
+
OnePager recognizes the '''snapshot date''' similar to the way Microsoft Project recognizes its '''Status date'''.
+
 
+
====Connecting Lines====
+
 
+
The '''Connecting Lines''' control group of the '''Set deadline properties''' form deals with '''connecting lines properties''' when you require that '''deadline shapes''' are tied to their parent task bar/milestone symbol. The controls available are shown below:
+
 
+
<center>[[File:P70-10_9_1-(10)-06032020.png]]</center>
+
<!--<center>P70-10_9_1-70-(10)-09182019.png</center>-->
+
 
+
To '''enable deadline shape connection lines''', check the '''Connect deadline markers to current markers''' checkbox '''ON''' as shown above. A default '''color''', '''line style''', and '''line width''' is established from your '''current Template Properties''' form. If you wish to specify a '''custom color''', check the '''Use custom color''' checkbox '''ON''' and use the '''Custom color''' dropdown button to access the standard '''Color Chooser''' form. 
+
 
+
You also have the option of selecting from a variety of '''line styles''' by clicking on the '''Line style''' dropdown button.
+
 
+
There are five (5) standard '''line styles''' to select from which are the same as used to connect '''Baselines''' to their parent task bar/milestone symbols as described in the section of the article at: [[Baselines for OnePager for Version 7.1#Connect Baselines and Actual Task Bars/Milestone Symbols | Baselines for OnePager - Connect Baselines and Actual Task Bars/Milestone Symbols]] 10.5.1-71 
+
 
+
The value dial to the right of the '''Line style''' dropdown provides the capability to '''edit''' the '''width''' of the '''deadline shape connection line'''. The form above shows the extent of control that you have over the '''connecting lines'''.  These include the specification of a '''custom color''', '''line width''' and '''line style'''.
+
 
+
====Deadline Dates====
+
 
+
The '''Deadline Dates''' control group in the '''Set deadline properties''' form provides the controls for turning '''ON''' and '''positioning''' the '''deadline date text labels''' as shown below:
+
 
+
<center>[[File:P70-10_9_1-(11)-06032020.png]]</center>
+
<!--<center>P70-10_9_1-70-(11)-09182019.png</center>-->
+
 
+
The form above shows the extent of control that you have over the display of '''date labels''' for '''deadline shapes'''.  These are the same controls as for other '''decoration date''' specifications and include controls for '''date format''', the use of the '''fiscal year''' feature, the positioning of the '''date label/text''', and the '''font properties''' for the '''date label''' text. 
+
 
+
For more specific information about the controls in this control group, please reference the corresponding section for '''Baseline Decorations''' at: [[Baselines for OnePager for Version 7.1#Showing Baseline Dates | Baselines for OnePager - Showing Baseline Dates]] 10.5.1-71
+
 
+
==Editing Individual Task Deadline Properties==
+
 
+
'''Deadline shape''' displays are normally turned '''OFF''' in distributed '''Template Properties''' forms. In addition to the capabilities for '''editing all Deadline properties''' using the '''Template Properties''' and/or '''Chart Properties''' forms, you can select and individually '''edit Deadline properties''' showing in the chart. As a prerequisite for '''editing''' individual '''deadline''' properties it is the necessity for '''deadline''' data to be '''imported''' from the Microsoft Project '''source plan'''.  
+
  
 
===Selecting Individual Task Bar or Bars===
 
===Selecting Individual Task Bar or Bars===
  
Some individual task bar '''deadline''' properties can be '''edited''' by selecting the desired task bar or bars with a left-click operation, then right-clicking one of the selected task bars to access the task bar right-click '''context menu''', and click the '''Format...'''button. This action accesses the '''Change Task/Milestone Properties''' form at the '''Format''' tab. Navigate to the '''Deadlines''' tab as shown below:
+
Individual task bar '''endpoint properties''' can be '''edited''' by selecting the desired task bar or task bars with a right-click operation to access the task bar right-click '''context menu''' and then clicking on the '''Format...''' command in the '''context menu''' as shown below:
  
<center>[[File:P70-10_9_1-(12)-06032020.png]]</center>
+
<center>[[File:P70-10_11_1-(8)-06042020.png]]</center>
<!--<center>P70-10_9_1-70-(12)-09182019.png</center>-->
+
<!--<center>P70-10_11_1-(8)-06042020.png</center>-->
  
Before you can do so, you must confirm that the '''Deadline markers''' checkbox in either the '''Template Properties''' or '''Chart Properties''' form's '''Task Bars''' and/or '''Milestones''' tab is checked '''ON'''.
+
Before you can do so, you must confirm that the '''Endpoints''' checkbox in either the '''Template Properties''' or '''Chart Properties''' form's '''Task Bars''' tab is checked '''ON'''.
  
 
===Accessing the Change Task/Milestone Properties Form===
 
===Accessing the Change Task/Milestone Properties Form===
  
Select the '''Format…''' command which access the '''Change Task/Milestone Properties''' form. Next, navigate to the '''Deadlines''' tab, which displays the '''deadline''' control options shown below:
+
Selecting the '''Format…''' command accesses the '''Change Task/Milestone Properties''' form. Next, navigate to the '''Endpoints''' tab, which displays the '''endpoint''' control options shown below:
  
<center>[[File:P70-10_9_1-(13)-06032020.png]]</center>
+
<center>[[File:P70-10_11_1-(9)-06042020.png]]</center>
<!--<center>P70-10_9_1-70-(13)-09182019.png</center>-->
+
<!--<center>P70-10_11_1-(9)-06042020.png</center>-->
  
The '''Deadlines''' tab, shown above controls the display of '''deadline connectors''' and '''deadline text dates''' for the selected task bar/milestone symbol and the placement of the '''deadline date labels/text''' with respect to the '''deadline shape'''.  The '''Show Deadline''' checkbox allows you to turn '''ON''' and '''OFF''' the display of '''deadline shape''' information. When the '''Show Deadline''' checkbox is checked '''ON''', you have the option to specify the display of the '''connector''' and the display of '''deadline date''' for the selected task bar/milestone symbol. When the '''Show Deadline Date Label''' checkbox is checked '''ON''', you have access to control over the '''Deadline Date Position''' selection dropdown and '''Deadline Date Font''' selection button as discussed above related to '''editing''' all task bar/milestone symbol '''deadline information'''. There are seven (7) standard '''deadline date label''' positions to select from as shown below:
+
From the '''Endpoints''' tab of the form above, you are able to turn the selected '''endpoint''' '''ON''' or '''OFF''', show the '''endpoint connector''' to the task bar, and show or hide the '''endpoint date label text'''. Recall that selecting a milestone symbol in the manner described above to access its '''Change Task/Milestone Properties''' form accesses the version of the form without either the '''Critical Path''' or the '''Endpoints''' tab as shown here:
  
<center>[[File:P70-10_9_1-(14)-06032020.png]]</center>
+
<center>[[File:P70-10_11_1-(10)-06042020.png]]</center>
<!--<center>P70-10_9_1-70-(14)-09182019.png</center>-->
+
<!--<center>P70-10_11_1-(10)-06042020.png</center>-->
  
Clicking the '''Deadline Date Font''' button accesses the standard '''Font properties''' form where '''edits''' of the '''deadline date text''' can be made.
+
===Using Endpoints Example===
  
===Individually Edited Deadline Shape Example===
+
For example, using the '''Deadlines-Endpoints Example''' previously illustrated above, suppose we want to make the following '''edits''':
  
Below is an example of a single task bar's '''deadline information using the chart previously shown in this article:
+
:* Turn '''OFF''' the display of Endpoint 1 for Task B
 +
:* Hide the '''Endpoint connector''' for Endpoint 1 to Task C
 +
:* Hide the '''Date Label''' for Endpoint 4 for Task C under the task
  
<center>[[File:P70-10_9_1-(15)-06032020.png]]</center>
+
For each task bar we select the task bar with a right-click to access the task bar right-click '''context menu''', select the '''Format…''' command to get to the '''Change Task/Milestone Properties''' form, and finally accessed the '''Endpoints''' tab. These steps are performed for each of the task bars involved starting with Task B where one '''edit''' to '''Endpoint 1''' was made and then to Task C where an '''edit''' was made to '''Endpoints 1 and 4'''. After making these '''edits''' the chart looks like this:
<!--<center>P70-10_9_1-70-(15)-09182019.png</center>-->
+
  
The controls at the '''Deadline''' tab of the '''Change Task/Milestone Properties''' form for the '''Show Deadline Date''', that is, the '''Position''' and '''Font''' controls operate exactly as described for other '''start/finish date''' displays in OnePager.
+
<center>[[File:P70-10_11_1-(11)-06042020.png]]</center>
 
+
<!--<center>P70-10_11_1-(11)-06042020.png</center>-->
For more information describing the use of these controls for the '''Percent Complete''' tab of this form, please see the section in the article at: [[Percent complete for OnePager for Version 7.1#Example | Percent complete for OnePager - Example]] 10.3.1-71 
+
 
+
There are no controls available in the '''Deadline''' tab of the '''Change Task/Milestone Properties''' form to '''edit''' the properties of the '''connector line''' for an '''individually''' selected task/milestone shape.
+
  
 
==Related Links==
 
==Related Links==
Line 171: Line 125:
 
[[Manual Editing Task/Milestone Shapes and Text Labels for Version 7.1 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] 9.0.1-71
 
[[Manual Editing Task/Milestone Shapes and Text Labels for Version 7.1 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] 9.0.1-71
  
[[Changing Individual Task/Milestone Properties (Color, Shape, Labels, etc.) for Version 7.0 | Changing Individual Task/Milestone Properties (Color, Shapes, Labels, etc.)]] 9.2.1-70
+
[[Changing Individual Task/Milestone Properties (Color, Shape, Labels, etc.) for Version 7.0 | Changing Individual Task/Milestone Properties (Color, Shapes, Labels, etc.)]] <!--9.2.1-70
  
 
[[Labeling Task/Milestone Dates for OnePager for Version 7.1 | Labeling Task/Milestone Dates for OnePager]] 10.1.1-71
 
[[Labeling Task/Milestone Dates for OnePager for Version 7.1 | Labeling Task/Milestone Dates for OnePager]] 10.1.1-71
Line 178: Line 132:
  
 
[[Baselines for OnePager for Version 7.1 | Baselines for OnePager]] 10.5.1-71
 
[[Baselines for OnePager for Version 7.1 | Baselines for OnePager]] 10.5.1-71
 +
 +
[[Deadlines for OnePager for Version 7.1 | Deadlines for OnePager]] 10.9.1-71
  
 
[[Editing with the Chart Properties form for Version 7.1 (Portal) | Editing with the Chart Properties form (Portal)]] 21.0.1-71
 
[[Editing with the Chart Properties form for Version 7.1 (Portal) | Editing with the Chart Properties form (Portal)]] 21.0.1-71
Line 183: Line 139:
 
[[Managing Templates for Version 7.1 (Portal) | Managing Templates (Portal)]] 24.0.1-71
 
[[Managing Templates for Version 7.1 (Portal) | Managing Templates (Portal)]] 24.0.1-71
  
(10.9.1-71)
+
(10.11.1-71)
  
 
[[Category:Version 7.1]]
 
[[Category:Version 7.1]]
Line 191: Line 147:
 
[[Category:Task/Milestone Editing]]
 
[[Category:Task/Milestone Editing]]
 
[[Category:Task/Milestone Decorations]]
 
[[Category:Task/Milestone Decorations]]
[[Category:Deadlines]]
+
[[Category:OnePager Choices Form]]
 +
[[Category:Templates]]
 +
[[Category:Endpoints]]
 
[[Category:Mavericks]]
 
[[Category:Mavericks]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Express]]
 
[[Category:OnePager Express]]
 
[[Category:OnePager 360]]
 
[[Category:OnePager 360]]

Revision as of 17:28, 19 February 2021

Introduction to the Endpoints Feature in OnePager

This article describes OnePager’s Endpoints feature. The article covers the Add-in and Standalone editions of OnePager Pro, OnePager Express, and OnePager 360. Illustrations used in this article are from OnePager Pro but the feature's function, controls, and manual edits apply equally to OnePager Express and OnePager 360.

About Editing Endpoints

There are four (4) endpoints definable in OnePager for each task bar. By definition, milestone symbols in OnePager do not have multiple endpoints. Accordingly, endpoints for milestone symbols are not supported and there is no decoration controls for endpoints in the Template Properties or Chart Properties form's Milestones tab.

For all practical purposes, the four possible endpoints (Endpoint1, Endpoint2, Endpoint3, and Endpoint4) can be thought of as additional deadline dates for task bars that can be defined to communicate related dates associated with the task bar. As an additional thought, you can consider the four endpoints as task-oriented milestones as they occupy the same row as their parent task bar.

The control and the behavior of all four endpoints are identical to that discussed for deadlines.

For more information on Deadlines, please see the article at: Deadlines for OnePager 10.9.1-71

By convention and as a default, the initial association of Endpoints 1 through 4 are to Microsoft Project source plan fields is as follows:

  • Endpoint 1: Start Date.
  • Endpoint 2: Finish Date.
  • Endpoint 3: Baseline Start Date.
  • Endpoint 4: Baseline Finish Date.

These default settings are contained in all distributed OnePager Template Properties forms. Since controls are provided as described below whereby you can edit the endpoint association with source plan fields, it is recommended that you establish your endpoint relationships to specific source plan date fields before creating the first chart. This recommendation can be done by editing the Template Properties form you plan to use before launching OnePager or after launching OnePager by editing the Template Properties form using the access point in the OnePager choices (OPC) form described in the following section.

Displaying Endpoints

For OnePager to properly display your endpoints, you must first define the endpoint field in your source plan and map them to OnePager through the OnePager choices (OPC) form. A sample, Microsoft Project source plan is shown below with both deadline and endpoint definitions:

P70-10 11 1-(1)-06042020.png

In the sample above, we see the typical task information with Flag20 used to signal OnePager which rows to import, the Microsoft Project Deadline field and four Date fields (Date1, Date2, Date3, and Date4) which are used to import information to OnePager representing Endpoints 1 through 4 respectively.

When the OnePager button is clicked on the Microsoft Project Add-ins tool bar tab and you click the NEW button on the OnePager Pro Start form, OnePager displays the first page of the OPC form as shown below:

P70-10 11 1-(2)-06042020.png

Clicking the Next> button with the Show field mappings checkbox checked ON accesses the second page of the OPC form shown below:

P70-10 11 1-(3)-06042020.png

Clicking the Edit current template… button takes you to the Template Properties form. Navigate to the Task Bars tab and the Endpoints checkbox in the Task Bar Decorations control group of the form as shown below:

P70-10 11 1-(4)-06042020.png

Check the checkbox to ON and Click the Endpoint Properties..." button to access the Set endpoint properties form shown below where you can set and edit the properties of any one endpoint or all four.

Editing All Endpoint Properties

The Set endpoint properties form is a multi-endpoint form in that using this one form allows you to edit the properties of all four endpoint shapes available for display in the chart.

Set Endpoint Properties Form

Clicking the Endpoint Properties... button accesses the Set endpoint properties form where the Choose endpoint dropdown is shown below allowing you the option to select to edit one of the four available endpoints:

P70-10 11 1-(5)-06042020.png

In the illustration above, Endpoint 1 is shown edited with all its available elements turned ON. The above form is almost identical to the Set deadline properties form. The difference is the Show this endpoint checkbox which refers to the dropdown menu shown above whereby you can select which endpoint to control. In effect, this form is four (4) forms in one allowing you to turn ON and OFF each individual endpoint and configure the properties of each endpoint separately. The illustration above covers up two important controls that need to be addressed. The Show this endpoint checkbox and the Field dropdown menu by which you tell OnePager which Microsoft Project source plan field is used for each particular endpoint. These controls are shown here:

P70-10 11 1-(6)-06042020.png

As necessary, repeat the above editing steps for Endpoint 2 through 4 as required such that when the endpoint data are imported into OnePager the endpoint shapes and other properties are unique.

Saving the Current Template Properties Form

Now that the endpoints are defined with distinct properties for all task bars in our example, go back to the Template Properties form, click the Save and use button to get back to the second page of the OPC form. Then, click the Create new chart button and OnePager produces the following chart:

P70-10 11 1-(7-1)-06042020.png

For the illustration above, Endpoints 1 through 4 are lined up from left to right in each row.

Editing Endpoint Properties

The above section's discussion covered the set up and initial display of endpoints. Recall that endpoint controls are exactly identical to the controls for deadlines.

For more information on Deadlines, please see the article at: Deadlines for OnePager 10.9.1-71

The exception is only for the necessity to turn ON and OFF the individual endpoints through their respective Show this endpoint checkbox and to enter the Microsoft Project source plan field you need to use for the respective endpoints in the Field dropdown menu of the Set endpoint properties form.

Editing Individual Task Endpoint Properties

Endpoint properties can be set or edited for individual task bars. In addition to the capabilities for editing all Endpoint properties using the Template Properties and/or Chart Properties forms, you can select and individually edit Endpoint properties showing in the chart. A prerequisite for editing individual endpoint properties is the necessity for endpoint data to be imported from the Microsoft Project source plan.

Selecting Individual Task Bar or Bars

Individual task bar endpoint properties can be edited by selecting the desired task bar or task bars with a right-click operation to access the task bar right-click context menu and then clicking on the Format... command in the context menu as shown below:

P70-10 11 1-(8)-06042020.png

Before you can do so, you must confirm that the Endpoints checkbox in either the Template Properties or Chart Properties form's Task Bars tab is checked ON.

Accessing the Change Task/Milestone Properties Form

Selecting the Format… command accesses the Change Task/Milestone Properties form. Next, navigate to the Endpoints tab, which displays the endpoint control options shown below:

P70-10 11 1-(9)-06042020.png

From the Endpoints tab of the form above, you are able to turn the selected endpoint ON or OFF, show the endpoint connector to the task bar, and show or hide the endpoint date label text. Recall that selecting a milestone symbol in the manner described above to access its Change Task/Milestone Properties form accesses the version of the form without either the Critical Path or the Endpoints tab as shown here:

P70-10 11 1-(10)-06042020.png

Using Endpoints Example

For example, using the Deadlines-Endpoints Example previously illustrated above, suppose we want to make the following edits:

  • Turn OFF the display of Endpoint 1 for Task B
  • Hide the Endpoint connector for Endpoint 1 to Task C
  • Hide the Date Label for Endpoint 4 for Task C under the task

For each task bar we select the task bar with a right-click to access the task bar right-click context menu, select the Format… command to get to the Change Task/Milestone Properties form, and finally accessed the Endpoints tab. These steps are performed for each of the task bars involved starting with Task B where one edit to Endpoint 1 was made and then to Task C where an edit was made to Endpoints 1 and 4. After making these edits the chart looks like this:

P70-10 11 1-(11)-06042020.png

Related Links

Manual Editing Task/Milestone Shapes and Text Labels (Portal) 9.0.1-71

Changing Individual Task/Milestone Properties (Color, Shapes, Labels, etc.)