Task/Milestone Links Tab for Version 6.1 (OnePager Express)

From OnePager Documentation
Revision as of 14:44, 4 September 2018 by Rfeingold (Talk | contribs) (Related Link)

Jump to: navigation, search

This tab controls the global editing of data-driven and manual Task Links in the project view. The tab is shown below:

X61-0 4 1 7-61-(4)-08072018.png
X61-0_4_1_7-61-(4)-08072018

The control groups and individual settings in the PVP form's Task Links tab are described in detail at: Editing Task Links with the Project-View Properties Form for OnePager Express 19.3.2-61

Related Link

Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal) 19.0.1-61

(21.12.2-61)