Task/Milestone Links Tab for Version 6.1 (OnePager Pro)

From OnePager Documentation
Revision as of 18:00, 30 August 2018 by Rfeingold (Talk | contribs)

Jump to: navigation, search

This tab controls the global editing of data-driven and manual Task Links in the project view. The tab is shown below:

P61-0 4 1 7-61-(3A)-06092018.png
P61-0_4_1_7-61-(3A)-06092018.png

The control groups and individual settings in the PVP form's Task Links tab are described in detail at: Editing Task Links with the Project-View Properties Form for OnePager Pro 19.3.1-61

Related Link

Linking Task and Milestone Using Manual and Data-Driven Task Links 19.0.1-61

(21.12.1-61)