Revision as of 21:36, 19 February 2017
About Modifying the Time Axis
The time axis is an integral part of the project view. It can be displayed at the top and/or the bottom of the graph. It can be displayed in many formats to suit your needs and can be displayed in multiple levels as shown below:
![P53-22 0 1-53-(1)-01042015.png](/wiki/images/3/38/P53-22_0_1-53-%281%29-01042015.png)
Use the following links to learn more about the OnePager time axis:
(22.0.1-60)