Task/Milestone Links Tab for Version 7.0 (OnePager Pro)
From OnePager Documentation
About the Task Links Tab
1) This tab controls the global editing of data-driven and manual Task Links in the chart. The tab is shown below:
![P61-0 4 1 7-61-(3A)-06092018.png](/wiki/images/e/ea/P61-0_4_1_7-61-%283A%29-06092018.png)
2) The control groups and individual settings in the PVP form's Task Links tab are described in detail at: Editing Task Links with the Chart Properties Form for OnePager Pro. 19.3.1-61
Related Link
Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal) 19.0.1-61
(21.12.1-70)