Difference between revisions of "Advanced Tab for OnePager Pro for Version 7.0"

From OnePager Documentation
Jump to: navigation, search
(Show Absorbed Dates Checkbox)
Line 18: Line 18:
 
2) The '''Show hover boxes'''checkbox controls the display of detailed information about each task/milestone shape when the mouse cursor '''hovers''' over it.  
 
2) The '''Show hover boxes'''checkbox controls the display of detailed information about each task/milestone shape when the mouse cursor '''hovers''' over it.  
  
3) This information includes the '''Start/Finish dates''', the '''task/milestone name''', and the '''Unique-ID''' of the task from the Microsoft Project '''source plan'''.  
+
3) This information includes the '''Start/Finish dates''', the '''task/milestone shape name''', and the '''Unique-ID''' of the task from the Microsoft Project '''source plan'''.  
  
 
4) An example is shown below.
 
4) An example is shown below.
Line 27: Line 27:
 
===Select Associated Text Checkbox===
 
===Select Associated Text Checkbox===
  
5) OnePager 7.0 provides the '''Select associated text''' checkbox control for you to change the response that a left-click on a task shape allowing a single click on the task shape to select '''both the task shape and its corresponding text label'''.   
+
5) OnePager provides the '''Select associated text''' checkbox control for you to change the response that a left-click on a task shape allowing a single click on the task shape to select '''both the task shape and its corresponding text label'''.   
  
 
6) The '''Select associated text''' checkbox is also found in the '''Template ''' form’s '''Advanced '''tab in the '''Display options''' control group as shown below for the '''Chart Properties''' form:
 
6) The '''Select associated text''' checkbox is also found in the '''Template ''' form’s '''Advanced '''tab in the '''Display options''' control group as shown below for the '''Chart Properties''' form:
Line 34: Line 34:
 
<center>P70-0_4_2_3-70-(11)-06122019.png</center>
 
<center>P70-0_4_2_3-70-(11)-06122019.png</center>
  
7) If you mouse over this checkbox the following '''tool tip''' appears:  '''When the task/milestone shape is selected, also select all text associated with the shape, including the task name, dates, and percent complete labels'''.   As with all '''tool tips''' they are provided to assist you in determining what the control basically does.
+
7) If you mouse over this checkbox the following '''tool tip''' appears:  '''When the task/milestone shape is selected, also select all text associated with the shape, including the task name, dates, and percent complete labels'''.
  
8) As an example, the illustration below is a chart portion where there was a left-click on the task shape only when the '''Select associated text''' checkbox is checked '''Off'''.
+
8) As with all '''tool tips''' they are provided to assist you in determining what the control basically does.
 +
 
 +
9) As an example, the illustration below is a chart portion where there was a left-click on the task shape only when the '''Select associated text''' checkbox is checked '''Off'''.
  
 
<center>[[File:P70-0_4_2_3-70-(12)-06122019.png]]</center>
 
<center>[[File:P70-0_4_2_3-70-(12)-06122019.png]]</center>
 
<center>P70-0_4_2_3-70-(12)-06122019.png</center>
 
<center>P70-0_4_2_3-70-(12)-06122019.png</center>
  
9) Left-clicking the task shape '''only''' selects the task shape as shown above.
+
10) Left-clicking the task shape '''only''' selects the task shape as shown above.
 +
 
 +
11) When the task shape is selected in the above example, only the '''Icons''' on the '''Home '''tool bar tab that are applicable to '''editing''' task shapes are '''enabled'''. 
  
10) When the task shape is selected in the above example, only the '''Icons''' on the '''Home '''tool bar tab that are applicable to '''editing''' task shapes are '''enabled'''.  The '''enabled''' control groups are:  '''Editing''', '''Settings''', '''Font''', and '''Format'''.  
+
12) The '''enabled''' control groups are:  '''Editing''', '''Settings''', '''Font''', and '''Format'''.  
  
11) Even with the '''Select associated text''' checkbox checked '''Off''', left-clicks on the task shape still allow you to change '''Font properties''' but not '''text label position'''.   
+
13) Even with the '''Select associated text''' checkbox checked '''Off''', left-clicks on the task shape still allow you to change '''Font properties''' but not '''text label position'''.   
  
12) You can change '''text label alignment''' if the '''text label '''is configured such that '''text label alignment '''changes are available.
+
14) You can change '''text label alignment''' if the '''text label '''is configured such that '''text label alignment '''changes are available.
  
13) However, in the situation described above, where one or more task shapes are left-clicked with the '''Select associated text '''checkbox checked '''Off''', you can '''right-click''' on any of the selected task shape, access its normal '''context menu''', and use all the commands in the '''context menu '''as well as all the tabs available in the '''Change Task/Milestone Properties '''form accessed from the '''Format…''' command in the '''context menu'''.   
+
15) However, in the situation described above, where one or more task shapes are left-clicked with the '''Select associated text '''checkbox checked '''Off''', you can '''right-click''' on any of the selected task shape, access its normal '''context menu''', and use all the commands in the '''context menu '''as well as all the tabs available in the '''Change Task/Milestone Properties '''form accessed from the '''Format…''' command in the '''context menu'''.   
  
14) Additionally, you can access the '''Change Task/Milestone Properties '''form by clicking the '''Format… Icon''' on the '''Home '''tool bar tab as shown below:
+
16) Additionally, you can access the '''Change Task/Milestone Properties '''form by clicking the '''Format… Icon''' on the '''Home '''tool bar tab as shown below:
  
 
<center>[[File:P70-0_4_2_3-70-(13)-06122019.png]]</center>
 
<center>[[File:P70-0_4_2_3-70-(13)-06122019.png]]</center>
 
<center>P70-0_4_2_3-70-(13)-06122019.png</center>
 
<center>P70-0_4_2_3-70-(13)-06122019.png</center>
  
15) To complete the example, the illustration below is a chart portion where the '''Select associated text''' checkbox is checked '''On''', and the task shape is selected with a left-click:
+
17) To complete the example, the illustration below is a chart portion where the '''Select associated text''' checkbox is checked '''On''', and the task shape is selected with a left-click:
  
 
<center>[[File:P70-0_4_2_3-70-(14)-06122019.png]]</center>
 
<center>[[File:P70-0_4_2_3-70-(14)-06122019.png]]</center>
 
<center>P70-0_4_2_3-70-(14)-06122019.png</center>
 
<center>P70-0_4_2_3-70-(14)-06122019.png</center>
  
16) With the '''Select associated text''' checkbox''' '''checked '''ON''', a left-click on the task shape selects the task shape '''and''' its '''text label''' as shown above.
+
18) With the '''Select associated text''' checkbox''' '''checked '''ON''', a left-click on the task shape selects the task shape '''and''' its '''text label''' as shown above.
  
17) When the task shape and '''text label '''are selected in the above example, '''ALL''' '''Icons''' on the '''Home '''tool bar tab that are applicable to '''editing''' task shapes and '''text labels''' are '''enabled'''.  
+
19) When the task shape and '''text label '''are selected in the above example, '''ALL''' '''Icons''' on the '''Home '''tool bar tab that are applicable to '''editing''' task shapes and '''text labels''' are '''enabled'''.  
  
18) The applicable control groups are:  '''Editing''', '''Settings''', '''Font''', '''Format''', and '''Position'''.  
+
20) The applicable control groups are:  '''Editing''', '''Settings''', '''Font''', '''Format''', and '''Position'''.  
  
19) The '''Alignment''' control group is only '''enabled''' if there is an option available to '''re-align''' the '''text label''' or '''text labels''' for selected items.
+
21) The '''Alignment''' control group is only '''enabled''' if there is an option available to '''re-align''' the '''text label''' or '''text labels''' for selected items.
  
20) Essentially, checking the '''Select associated text''' checkbox '''On''' makes the OnePager 7.0 behavior relative to left-clicking of task shapes or '''text labels''' operate the same as left-clicking only the task shape in previous versions of OnePager.
+
22) Essentially, checking the '''Select associated text''' checkbox '''On''' makes the OnePager 7.0 behavior relative to left-clicking of task shapes or '''text labels''' operate the same as left-clicking only the task shape in previous versions of OnePager.
  
21) You can '''right-click '''on either the task shape or '''text label''' in this situation and the appropriate '''context menu '''is accessed and all associated commands operate as documented including gaining access to the '''Change Task/Milestone Properties '''form.
+
23) You can '''right-click '''on either the task shape or '''text label''' in this situation and the appropriate '''context menu '''is accessed and all associated commands operate as documented including gaining access to the '''Change Task/Milestone Properties '''form.
  
22) OnePager 7.0, regardless of the status of the '''Select associated text''' status of checked '''On''' or checked '''Off''', permits you to '''right-click '''on any previously selected task shape or '''text label''' and accesses any of the '''context menu '''commands.
+
24) OnePager 7.0, regardless of the status of the '''Select associated text''' status of checked '''On''' or checked '''Off''', permits you to '''right-click '''on any previously selected task shape or '''text label''' and accesses any of the '''context menu '''commands.
  
 
===Format With Times Checkbox===
 
===Format With Times Checkbox===
  
23) When the '''Format with times'''checkbox is checked '''On''', the '''snapshot dates''' are displayed with a '''time of day component'''.   
+
25) When the '''Format with times'''checkbox is checked '''On''', the '''snapshot dates''' are displayed with a '''time of day component'''.   
  
24) '''Snapshot dates''' that differ by their '''time of day component''' are considered different '''snapshot dates.'''  
+
26) '''Snapshot dates''' that differ by their '''time of day component''' are considered different '''snapshot dates.'''  
  
:a) For example, June 5, 2019 becomes '''June 5, 2019 5:23 PM''' and is a different '''snapshot date''' than '''June 5, 2019 6:00 PM'''.  
+
27) For example, June 5, 2019 becomes '''June 5, 2019 5:23 PM''' and is a different '''snapshot date''' than '''June 5, 2019 6:00 PM'''.  
 
   
 
   
:b) Note that this setting no longer controls the '''format of the dates''' on the tasks and milestone shapes.
+
28) Note that this setting no longer controls the '''format of the dates''' on the task shapes and milestone shapes.
  
:c) Below is an example of the '''Select Snapshot''' form displaying the '''date format with time''':  
+
29) Below is an example of the '''Select Snapshot''' form displaying the '''date format with time''':  
  
 
<center>[[File:P61-21_13_1-61-(3)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(3)-11112018.png]]</center>
 
<center>&lt;P61-21_13_1-61-(3)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(3)-11112018.png&gt;</center>
  
25) When the '''Show time cursor'''checkbox is checked '''On''', the vertical '''time-cursor line''' is '''shown''' as shown here:
+
30) When the '''Show time cursor'''checkbox is checked '''On''', the vertical '''time-cursor line''' is '''shown''' as shown here:
  
 
<center>[[File:P61-21_13_1-61-(4)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(4)-11112018.png]]</center>
 
<center>&lt;P61-21_13_1-61-(4)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(4)-11112018.png&gt;</center>
  
:a)  Checking the '''Show time cursor''' checkbox '''Off''', '''hides''' the vertical '''time-cursor line'''.
+
31)  Checking the '''Show time cursor''' checkbox '''Off''', '''hides''' the vertical '''time-cursor line'''.
  
:b) There is also a checkbox in the OnePager Pro '''View''' ribbon in the '''Graphic Elements''' group called '''Time Cursor''' that causes the vertical '''time-cursor line''' to be '''shown''' when the checkbox is checked '''On''' as shown below:
+
32) There is also a checkbox in the OnePager Pro '''View''' ribbon in the '''Graphic Elements''' group called '''Time Cursor''' that causes the vertical '''time-cursor line''' to be '''shown''' when the checkbox is checked '''On''' as shown below:
  
 
<center>[[File:P70-21_13_1-70-(5)-10312019.png]]</center>
 
<center>[[File:P70-21_13_1-70-(5)-10312019.png]]</center>
Line 104: Line 108:
 
===Allow Absorption Checkbox===
 
===Allow Absorption Checkbox===
  
26) When the '''Allow absorption''' checkbox is checked '''On''', you can '''drag''' one task onto another task and be prompted to '''absorb''' the former into the latter.   
+
33) When the '''Allow absorption''' checkbox is checked '''On''', you can '''drag''' one task shape onto another task shape and be prompted to '''absorb''' the former into the latter.   
  
27) When the checkbox is checked '''Off''', this process does not take place and one task dragged over another is displayed as two separate tasks superimposed.   
+
34) When the checkbox is checked '''Off''', this process does not take place and one task shape dragged over another is displayed as two separate task shapes superimposed.   
  
28) For more information on '''Absorbed Tasks''' please see the article at:  [[Absorbing one task into another for Version 7.0 | Absorbing one task into another]]. 17.0.1-70
+
35) For more information on '''Absorbed Tasks''', please see the article at:  [[Absorbing one task into another for Version 7.0 | Absorbing one task into another]]. 17.0.1-70
  
 
===Show Absorbed Dates Checkbox===
 
===Show Absorbed Dates Checkbox===
  
29) When the '''Show absorbed dates''' checkbox is checked '''On''' OnePager Pro '''creates''' a '''Comment box''' associated with the '''absorbed task''' connected to the task '''absorbing''' the '''absorbed''' task and provides you the option of specifying the '''date''' displayed in the '''Comment box''' as shown below:
+
36) When the '''Show absorbed dates''' checkbox is checked '''On''' OnePager Pro '''creates''' a '''Comment box''' associated with the '''absorbed task shape''' connected to the task shape '''absorbing''' the '''absorbed''' task shape and provides you the option of specifying the '''date''' displayed in the '''Comment box''' as shown below:
  
 
<center>[[File:P61-21_13_1-61-(6)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(6)-11112018.png]]</center>
 
<center>&lt;P61-21_13_1-61-(6)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(6)-11112018.png&gt;</center>
  
:a) The illustration above show the result of '''absorbing''' the first task where a '''Comment box''' is displayed connected to the '''absorbing task'''.
+
37) The illustration above show the result of '''absorbing''' the first task shape where a '''Comment box''' is displayed connected to the '''absorbing task shape'''.
  
:b)  Also shown in the illustration above is a second task in the process of being '''absorbed where the '''Absorption Options''' form is shown.  Making a selection from the radio buttons and clicking '''OK''' creates the second '''Comment box'''.
+
38)  Also shown in the illustration above is a second task shape in the process of being '''absorbed where the '''Absorption Options''' form is shown.   
  
:c) You have the option to display the '''At end date''', '''At start date''', or '''At both start and end date'''.
+
39) Making a selection from the radio buttons and clicking '''OK''' creates the second '''Comment box'''.
  
30) For more information please see the article at this link:  [[Absorbing one task into another for Version 7.0 | Absorbing one task into another]]. 17.0.1-70
+
40)  You have the option to display the '''At end date''', '''At start date''', or '''At both start and end date'''.
 +
 
 +
41) For more information on '''Absorbing one task into another''', please see the article at:  [[Absorbing one task into another for Version 7.0 | Absorbing one task into another]]. 17.0.1-70
  
 
===Copy Edits To All Snapshots Checkbox===
 
===Copy Edits To All Snapshots Checkbox===
  
31) The '''Copy edits to all snapshots (CTAS)''' checkbox is a '''toggle switch''' that turns '''On''' and '''Off''' the propagation of '''Maverick''' changes to '''all snapshots''' (turned '''ON''') or to keep '''maverick''' changes to tasks/milestones in the '''current snapshot''' (turned '''OFF''').  
+
42) The '''Copy edits to all snapshots (CTAS)''' checkbox is a '''toggle switch''' that turns '''On''' and '''Off''' the propagation of '''Maverick''' changes to '''all snapshots''' (turned '''ON''') or to keep '''maverick''' changes to tasks/milestone shapes in the '''current snapshot''' (turned '''OFF''').  
  
32) This checkbox affects '''editing''' of these task/milestone shape properties: (1) '''Color''', (2) '''Shape''', (2) '''Fill Pattern''', (3) '''Border''', (4) '''Text Font''', (5) '''Task/milestone height''', (6) '''Task Links'''
+
43) This checkbox affects '''editing''' of these task/milestone shape properties: (1) '''Color''', (2) '''Shape''', (2) '''Fill Pattern''', (3) '''Border''', (4) '''Text Font''', (5) '''Task/milestone height''', (6) '''Task Links'''
  
33) For more information on how '''CTAS''' applies to the new '''Task Links''' feature in OnePager Pro, please see the section at:  [[Data-Driven Task Links for OnePager Pro for Version 7.0#Condition 2:  The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links | Data-Driven Task Links for OnePager Pro - Condition 2:  The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links]]. 19.1.1.1-70
+
44) For more information on how '''CTAS''' applies to the new '''Task Links''' feature in OnePager Pro, please see this section in the article at:  [[Data-Driven Task Links for OnePager Pro for Version 7.0#Condition 2:  The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links | Data-Driven Task Links for OnePager Pro - Condition 2:  The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links]]. 19.1.1.1-70
  
 
===Clip Task/Milestone Labels at Graph Edges Checkbox===
 
===Clip Task/Milestone Labels at Graph Edges Checkbox===
  
34) When the '''Clip task/milestone labels at graph edges''' checkbox is checked '''On''', OnePager Pro '''clips''' all task/milestone '''labels''' that extend '''over the edge of the graph''' so that the '''labels''' no longer extend over the '''graph boundaries'''.   
+
45) When the '''Clip task/milestone labels at graph edges''' checkbox is checked '''On''', OnePager Pro '''clips''' all task/milestone shape '''labels''' that extend '''over the edge of the graph''' so that the '''labels''' no longer extend over the '''graph boundaries'''.   
  
:a) The chart below shows how OnePager Pro handles task/milestone '''labels''' that extend into the displayed '''Row/Swimlane label''' area when the checkbox is checked '''On''':
+
46) The chart below shows how OnePager Pro handles task/milestone shape '''labels''' that extend into the displayed '''Row/Swimlane label''' area when the checkbox is checked '''On''':
  
 
<center>[[File:P61-21_13_1-61-(7)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(7)-11112018.png]]</center>
 
<center>&lt;P61-21_13_1-61-(7)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(7)-11112018.png&gt;</center>
  
:b) Here is the same chart with the checkbox checked '''Off''':
+
47) Here is the same chart with the checkbox checked '''Off''':
  
 
<center>[[File:P61-21_13_1-61-(8)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(8)-11112018.png]]</center>
Line 149: Line 155:
 
===Overlay VST Elements Checkbox===
 
===Overlay VST Elements Checkbox===
  
35) When the '''Overlay VST elements'''checkbox is checked '''On''' during the construction of a Virtual Summary Task ('''VST''') with milestone shapes, the milestone shapes are displayed on top of the created '''VST''' bar.   
+
48) When the '''Overlay VST elements'''checkbox is checked '''On''' during the construction of a Virtual Summary Task ('''VST''') with milestone shapes, the milestone shapes are displayed on top of the created '''VST''' bar.   
  
36) An example is provided below:
+
49) An example is provided below:
  
 
<center>[[File:P61-21_13_1-61-(9)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(9)-11112018.png]]</center>
 
<center>&lt;P61-21_13_1-61-(9)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(9)-11112018.png&gt;</center>
  
37) See the article at this link for more information:  [[Creating and Managing Virtual Summary Tasks for Version 7.0 | Creating and Managing Virtual Summary Tasks]]. 18.0.1-70
+
50) For more information on '''Creating and managing virtual summary tasks''' please see the article at:  [[Creating and Managing Virtual Summary Tasks for Version 7.0 | Creating and Managing Virtual Summary Tasks]]. 18.0.1-70
  
 
===Lock Background Checkbox===
 
===Lock Background Checkbox===
  
38) When the '''Lock background''' checkbox is checked '''On''', all '''Background shapes''' are '''frozen'''.  
+
51) When the '''Lock background''' checkbox is checked '''On''', all '''Background shapes''' are '''frozen'''.  
  
:a) This includes these elements: '''images, swimlane titles, graph title, and time axis annotation'''.  
+
52) This includes these (3) elements: '''images, swimlane titles, graph title, and time axis annotation'''.  
  
:b) Clicking any of these elements with the mouse no longer selects them, so it becomes easier to select tasks and milestone shapes with the selection '''lasso'''.
+
53) Clicking any of these elements with the mouse no longer selects them, so it becomes easier to select task shapes and milestone shapes with the selection '''Lasso'''.
  
 
==Task/Milestone Threshold==
 
==Task/Milestone Threshold==
  
1) This numeric window controls whether '''short duration tasks''' are displayed as task bars or as milestone symbols.  
+
1) This numeric window controls whether '''short duration tasks''' are displayed as task shapes or as milestone shapes.  
  
 
2) The unit of measure is '''task bar duration in number of days'''.   
 
2) The unit of measure is '''task bar duration in number of days'''.   
  
3) With the setting shown in the '''Chart Properties''' form at the top of this article of two (2) days, any task in the chart that is '''less than two (2) days duration''' is displayed as a milestone symbol.   
+
3) With the setting shown in the '''Chart Properties''' form at the top of this article of two (2) days, any task shape in the chart that is '''less than two (2) days duration''' is displayed as a milestone shape.   
  
4) Therefore, one day tasks are displayed as milestones symbols with the default settings of two (2) days.   
+
4) Therefore, one day task s are displayed as milestones symbols with the default settings of two (2) days.   
  
5) Since no duration can be less than zero (0), setting the parameter to zero (0) turns '''Off''' all conversion of tasks into milestones symbols, which means that you can see task bars with very small width, which makes them very hard to see and to select.
+
5) Since no duration can be less than zero (0), setting the parameter to zero (0) turns '''Off''' all conversion of task shapes into milestones shapes, which means that you can see task shapes with very small width, which makes them very hard to see and to select.
  
 
==Warn If Import Exceeds==
 
==Warn If Import Exceeds==
Line 184: Line 190:
 
2) Recall that OnePager has the capability to make '''multiple pages of output''' both vertically and horizontally.   
 
2) Recall that OnePager has the capability to make '''multiple pages of output''' both vertically and horizontally.   
  
3) The warning message example below is configured so that it can issue the warning if more than 10 tasks were imported.
+
3) The warning message example below is configured so that it can issue the warning if more than 10 task shapes were imported.
  
 
<center>[[File:P61-21_13_1-61-(10)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(10)-11112018.png]]</center>
Line 200: Line 206:
 
<center>&lt;P61-21_13_1-61-(11)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(11)-11112018.png&gt;</center>
  
4) This form allows you to set your own '''parameters''' for when you wish to be warned if too many extra tasks are being '''merged''' or too many tasks are '''missing'''.   
+
4) This form allows you to set your own '''parameters''' for when you wish to be warned if too many extra task shapes are being '''merged''' or too many task shapes are '''missing'''.   
  
 
5) Setting these percentages to '''100%''' has the impact of turning the fixes and warning '''Off'''.
 
5) Setting these percentages to '''100%''' has the impact of turning the fixes and warning '''Off'''.
  
6) Setting the percentages to '''0%''' provides an assurance that any extra or missing tasks triggers the fixes and warnings.
+
6) Setting the percentages to '''0%''' provides an assurance that any extra or missing task shapes triggers the fixes and warnings.
  
7) When this checkbox is checked '''On''', OnePager Pro looks to see if too many newly introduced task/milestone shapes are being '''imported''' when '''updating a snapshot''' or if too many tasks are '''missing''' per the '''thresholds''' set in the form above.   
+
7) When this checkbox is checked '''On''', OnePager looks to see if too many newly introduced task/milestone shapes are being '''imported''' when '''updating a snapshot''' or if too many task shapes are '''missing''' per the '''thresholds''' set in the form above.   
  
8) After making the calculation, OnePager Pro provides '''a warning message''' asking if you want to proceed with the update of the '''snapshot''' or not.   
+
8) After making the calculation, OnePager provides '''a warning message''' asking if you want to proceed with the update of the '''snapshot''' or not.   
  
 
9) Additionally, the warning message also give you access to the '''See Extra and Missing Tasks''' form so you can make a fix if desired.   
 
9) Additionally, the warning message also give you access to the '''See Extra and Missing Tasks''' form so you can make a fix if desired.   
  
10) The warning message example below was configured so that it  issues the warning if more than 45 percent of the tasks differ from those of the current chart.
+
10) The warning message example below was configured so that it  issues the warning if more than 45 percent of the task shapes differ from those of the current chart.
  
 
<center>[[File:P61-21_13_1-61-(12)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(12)-11112018.png]]</center>
 
<center>&lt;P61-21_13_1-61-(12)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(12)-11112018.png&gt;</center>
  
11) For more information on how to make fixes to these situations please go to this article: [[Merging the Wrong Tasks into a Chart for Version 7.0 - OnePager Pro | Merging the Wrong Tasks into a Chart - OnePager Pro]]. 7.11.1-70
+
11) For more information on how to make fixes to these situations, please see the article at: [[Merging the Wrong Tasks into a Chart for Version 7.0 - OnePager Pro | Merging the Wrong Tasks into a Chart - OnePager Pro]]. 7.11.1-70
  
 
==Safely Combine Tasks From Different Files==
 
==Safely Combine Tasks From Different Files==
  
1) The '''Safely combine tasks from different files''' checkbox is '''disabled''' so that you see that it is there.   
+
1) The '''Safely combine task shapes from different files''' checkbox is '''disabled''' so that you see that it is there.   
  
 
2) This control is '''enabled''' in the '''Template''' form's '''Advanced''' tab.
 
2) This control is '''enabled''' in the '''Template''' form's '''Advanced''' tab.
  
3) To avoid confusing OnePager Pro when '''importing''' additional Microsoft Project '''source plans''' during the '''Replace''' operation, it is necessary for this feature to be '''On''' and functioning.   
+
3) To avoid confusing OnePager when '''importing''' additional Microsoft Project '''source plans''' during the '''Replace''' operation, it is necessary for this feature to be '''On''' and functioning.   
  
4) The reason for this is that the tasks being '''imported''' from the second Microsoft Project '''source plan''' in the '''Replace''' function have the same '''UniqueID''' numbers as the tasks from the first Microsoft Project '''source plan'''.   
+
4) The reason for this is that the task shapes being '''imported''' from the second Microsoft Project '''source plan''' in the '''Replace''' function have the same '''UniqueID''' numbers as the task shapes from the first Microsoft Project '''source plan'''.   
  
5) OnePager Pro can be fooled into thinking that these are the same tasks (coming in from the second Microsoft Project '''source plan''') are from the first Microsoft Project '''source plan''' when they are clearly not.   
+
5) OnePager can be fooled into thinking that these are the same task shapes (coming in from the second Microsoft Project '''source plan''') are from the first Microsoft Project '''source plan''' when they are clearly not.   
  
 
6) Having the '''Safely combine tasks from different file''' checkbox checked '''On''' in the '''Template''' form's '''Advanced''' tab avoids confusing the identity of replacement tasks in the '''Replace snapshot''' function.
 
6) Having the '''Safely combine tasks from different file''' checkbox checked '''On''' in the '''Template''' form's '''Advanced''' tab avoids confusing the identity of replacement tasks in the '''Replace snapshot''' function.
Line 235: Line 241:
 
==Reset Unique Ids On Update==
 
==Reset Unique Ids On Update==
  
1) The '''Reset unique ids on update''' checkbox is '''disabled''' so that you see that it is there. This feature can be '''enabled''' as a last resort under the situation where you are attempting to merge Microsoft Project '''source plans''' from different physical files into a single '''source plan''' where the Microsoft Project '''Unique IDs''' do not match. 
+
1) The '''Reset unique ids on update''' checkbox is '''disabled''' so that you see that it is there.  
  
2) Contact OnePager '''Support''' for information on how to use this rarely-used feature: [[Getting Support and Contacting Chronicle Graphics for Version 7.0 | Getting Support and Contacting Chronicle Graphics]]. 30.0.1-70
+
2) This feature can be '''enabled''' as a last resort under the situation where you are attempting to merge Microsoft Project '''source plans''' from different physical files into a single '''source plan''' where the Microsoft Project '''Unique IDs''' do not match.
  
3) Please see the article at: [[Field Mappings Tab for OnePager Pro for Version 7.0 | Field Mappings Tab for OnePager Pro]] 21.15.1-70 for more details on selecting alternate '''Unique ID''' fields for this purpose.
+
3) Contact OnePager '''Support''' for information on how to use this rarely-used feature by referring to the article at: [[Getting Support and Contacting Chronicle Graphics for Version 7.0 | Getting Support and Contacting Chronicle Graphics]]. 30.0.1-70
  
4)  For additional help please go to the following link to the OnePager '''Frequently Asked Questions''' page: [https://www.onepager.com/support/faq.php?id=95 Selecting a Custom Unique ID].
+
4) For more details on selecting alternate '''Unique ID''' fields for this purpose, please see the article at:  [[Field Mappings Tab for OnePager Pro for Version 7.0 | Field Mappings Tab for OnePager Pro]] 21.15.1-70.
 +
 
 +
5)  For additional help, please go to the following link to the OnePager '''Frequently Asked Questions''' page: [https://www.onepager.com/support/faq.php?id=95 Selecting a Custom Unique ID].
  
 
5)  If you encounter difficulties, contact our '''Support Team''' at [https://www.onepager.com/support/ticket.php support ticket], by [mailto:support@onepager.com e-mailing us], or by calling '''+1.303.779.0344'''.
 
5)  If you encounter difficulties, contact our '''Support Team''' at [https://www.onepager.com/support/ticket.php support ticket], by [mailto:support@onepager.com e-mailing us], or by calling '''+1.303.779.0344'''.
Line 247: Line 255:
 
==Task Representation==
 
==Task Representation==
  
1) The '''Task representation''' control group consists of three radio buttons as shown below:
+
1) The '''Task representation''' control group consists of three (3) radio buttons as shown below:
  
 
<center>[[File:P70-21_13_1-70-(6)-10312019.png]]</center>
 
<center>[[File:P70-21_13_1-70-(6)-10312019.png]]</center>
 
<center>&lt;P70-21_13_1-70-(6)-10312019.png&gt;</center>
 
<center>&lt;P70-21_13_1-70-(6)-10312019.png&gt;</center>
  
2) These radio buttons let you select how a task is represented: as a task by a '''Gantt bar/Task bar''' or by a '''Milestone at the start or end date''' of the task.
+
2) These radio buttons let you select how a task shape is represented: as a '''Gantt bar/Task bar''' or by a '''Milestone at the start or end date''' of the task shape.
  
 
===Gantt Bar/Task Bar Radio Button===
 
===Gantt Bar/Task Bar Radio Button===
  
3)  Below is an example of a portion of a chart with tasks represented as '''Gantt bars/Task bars''':
+
3)  Below is an example of a portion of a chart with task shapes represented as '''Gantt bars/Task bars''':
  
 
<center>[[File:P61-21_13_1-61-(13)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(13)-11112018.png]]</center>
Line 275: Line 283:
 
<center>&lt;P61-21_13_1-61-(15)-11112018.png&gt;</center>
 
<center>&lt;P61-21_13_1-61-(15)-11112018.png&gt;</center>
  
6)  Making the selection in the '''Chart Properties''' form changes all tasks in the chart to the selected option.   
+
6)  Making the selection in the '''Chart Properties''' form changes all task shapes in the chart to the selected option.   
  
 
7) You can individually '''maverick''' a task/milestone shape by selecting it with a right-click and use the '''Format ...''' Command in the '''Context Menu''' to access the '''Change task/milestone properties''' form to change the shape at the '''Format''' tab.
 
7) You can individually '''maverick''' a task/milestone shape by selecting it with a right-click and use the '''Format ...''' Command in the '''Context Menu''' to access the '''Change task/milestone properties''' form to change the shape at the '''Format''' tab.
Line 281: Line 289:
 
==Default Snapshot Date==
 
==Default Snapshot Date==
  
1) The '''Default Snapshot Date''' control group consists of four radio buttons as shown below:
+
1) The '''Default Snapshot Date''' control group consists of four (4) radio buttons as shown below:
  
 
<center>[[File:P70-21_13_1-70-(7)-10312019.png]]</center>
 
<center>[[File:P70-21_13_1-70-(7)-10312019.png]]</center>
Line 304: Line 312:
 
7) This is the date established in the Microsoft Project '''source plan''' for the '''status date''' of the '''source plan'''.   
 
7) This is the date established in the Microsoft Project '''source plan''' for the '''status date''' of the '''source plan'''.   
  
8) If there is no value for the '''status date''' in the Microsoft Project '''source plan''', OnePager Pro uses the '''Last-Modified date'''.
+
8) If there is no value for the '''status date''' in the Microsoft Project '''source plan''', OnePager uses the '''Last-Modified date'''.
  
 
===Status Date (Then Current) Radio Button===
 
===Status Date (Then Current) Radio Button===
Line 310: Line 318:
 
9) This is the date established in the Microsoft Project '''source plan''' for the '''status date''' of the plan.   
 
9) This is the date established in the Microsoft Project '''source plan''' for the '''status date''' of the plan.   
  
10) If there is no value for the '''status date''' in the Microsoft Project '''source plan''', OnePager Pro uses the '''current date'''.
+
10) If there is no value for the '''status date''' in the Microsoft Project '''source plan''', OnePager uses the '''current date'''.
  
 
==Row hiding options==
 
==Row hiding options==
  
1) The controls in this group govern the operation of '''automatic hiding''' (cropping) of rows.  Access to the '''Row Hiding Options''' form is by clicking the '''Row hiding options''' button in the '''Chart Properties''' form's '''Advanced''' tab as shown below:
+
1) The controls in this group govern the operation of '''automatic hiding''' (cropping) of rows.   
 +
 
 +
2) Access to the '''Row Hiding Options''' form is by clicking the '''Row hiding options''' button in the '''Chart Properties''' form's '''Advanced''' tab as shown below:
  
 
<center>[[File:P70-21_13_1-70-(8)-10312019.png]]</center>
 
<center>[[File:P70-21_13_1-70-(8)-10312019.png]]</center>
 
<center>&lt;P70-21_13_1-70-(8)-10312019.png&gt;</center>
 
<center>&lt;P70-21_13_1-70-(8)-10312019.png&gt;</center>
  
2) When the '''Row hiding options''' button is clicked, the '''Row Hiding Options''' form shown below appears providing you with four (4) options to select:
+
3) When the '''Row hiding options''' button is clicked, the '''Row Hiding Options''' form shown below appears providing you with four (4) options to select:
  
 
<center>[[File:P61-21_13_1-61-(18)-11112018.png]]</center>
 
<center>[[File:P61-21_13_1-61-(18)-11112018.png]]</center>
Line 326: Line 336:
 
===Look At Current Snapshot Only Checkbox===
 
===Look At Current Snapshot Only Checkbox===
  
3) When this checkbox is checked '''On''', OnePager Pro only examines the '''current snapshot''' when deciding which rows are empty.   
+
4) When this checkbox is checked '''On''', OnePager only examines the '''current snapshot''' when deciding which rows are empty.   
  
4) When this checkbox is '''Off''', OnePager Pro considers a '''row empty''' only if it is unoccupied across '''all snapshots'''.     
+
5) When this checkbox is '''Off''', OnePager considers a '''row empty''' only if it is unoccupied across '''all snapshots'''.     
  
5) In either case, the '''auto-row hiding''' action hides rows in '''all snapshots'''.
+
6) In either case, the '''auto-row hiding''' action hides rows in '''all snapshots'''.
  
 
===Hide Newly-Empty Rows On Import Checkbox===
 
===Hide Newly-Empty Rows On Import Checkbox===
  
6) When this checkbox is checked '''On''', OnePager Pro '''automatically hides''' any rows that becomes empty because tasks are missing when you '''UPDATE''' a chart.   
+
7) When this checkbox is checked '''On''', OnePager '''automatically hides''' any rows that becomes empty because task shapes are missing when you '''UPDATE''' a chart.   
  
7) When this checkbox is '''OFF''', OnePager Pro leaves any empty rows that became empty because of such missing tasks.
+
8) When this checkbox is '''OFF''', OnePager leaves any empty rows that became empty because of such missing task shapes.
  
 
===Unhide Rows for Flagged Tasks/Milestones Checkbox===
 
===Unhide Rows for Flagged Tasks/Milestones Checkbox===
  
8) When this checkbox is checked '''On''', OnePager Pro '''automatically unhides''' hidden rows if they contain any of the tasks/milestones that are '''flagged''' for import on the '''current snapshot'''.   
+
9) When this checkbox is checked '''On''', OnePager '''automatically unhides''' hidden rows if they contain any of the tasks/milestone shapes that are '''flagged''' for import on the '''current snapshot'''.   
  
9) If the checkbox is '''Off''', OnePager Pro continues to hide previously hidden rows.
+
10) If the checkbox is '''Off''', OnePager continues to hide previously hidden rows.
  
 
===Hide Rows When Tasks Are Outside Date Range Checkbox===
 
===Hide Rows When Tasks Are Outside Date Range Checkbox===
  
10) When this option is selected, OnePager Pro '''automatically hides''' any empty rows where tasks and/or milestone shapes are '''outside''' the '''Start date''' and '''End date''' established for the chart.   
+
11) When this option is selected, OnePager '''automatically hides''' any empty rows where task shapes and/or milestone shapes are '''outside''' the '''Start date''' and '''End date''' established for the chart.   
  
11) The '''Start date''' and '''End date''' settings are either generated by OnePager Pro based upon the range of dates provided from the '''source packet''', set in the '''Chart Properties''' form '''Time Axis''' tab's '''Calendar''' sub-tab, or set in the OnePager Pro '''View''' ribbon tab in the '''Dates''' control group.
+
12) The '''Start date''' and '''End date''' settings are either generated by OnePager based upon the range of dates provided from the '''source packet''', set in the '''Chart Properties''' form '''Time Axis''' tab's '''Calendar''' sub-tab, or set in the OnePager Pro '''View''' ribbon tab in the '''Dates''' control group.
  
 
===Accessing the Where's My Stuff?! Form===
 
===Accessing the Where's My Stuff?! Form===
  
12) When tasks and their respective rows are '''hidden''' and subsequently cropped, the '''Where’s My Stuff?!''' form can be accessed from the OnePager Pro ribbon’s '''Home''' tab in the '''Editing''' group and shown here:
+
13) When task shapes and their respective rows are '''hidden''' and subsequently cropped, the '''Where’s My Stuff?!''' form can be accessed from the OnePager Pro ribbon’s '''Home''' tab in the '''Editing''' group and shown here:
  
 
<center>[[File:P70-21_13_1-70-(9-1)-10312019.png]]</center>
 
<center>[[File:P70-21_13_1-70-(9-1)-10312019.png]]</center>
 
<center>&lt;P70-21_13_1-70-(9-1)-10312019.png&gt;</center>
 
<center>&lt;P70-21_13_1-70-(9-1)-10312019.png&gt;</center>
  
13) For more information on the '''Where's My Stuff?!''' feature please see the article at: [[Managing Hidden Tasks and Milestones Using "Where's My Stuff?!" for Version 7.0 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]]. 9.4.1-70
+
14) For more information on the '''Where's My Stuff?!''' feature, please see the article at: [[Managing Hidden Tasks and Milestones Using "Where's My Stuff?!" for Version 7.0 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]]. 9.4.1-70
  
 
==Server Method Selection==
 
==Server Method Selection==
Line 374: Line 384:
 
<center>&lt;P70-21_13_1-70-(10)-10312019.png&gt;</center>
 
<center>&lt;P70-21_13_1-70-(10)-10312019.png&gt;</center>
  
6) For more information please go to this article: [[Using OnePager Pro with Server Resident Project Plans for Version 7.0 (Portal) | Using OnePager Pro with Server Resident Project Plans (Portal)]]. 8.5.1-70
+
6) For more information on '''Using OnePager Pro with server resident '''source plans''', please see the article at: [[Using OnePager Pro with Server Resident Project Plans for Version 7.0 (Portal) | Using OnePager Pro with Server Resident Project Plans (Portal)]]. 8.5.1-70
  
 
==Clipboard Format==
 
==Clipboard Format==
Line 389: Line 399:
 
==Image file DPI==
 
==Image file DPI==
  
1) This control provides the capability for you to select between three '''DPI''' settings when '''outputting images''' from OnePager Pro 7.0 to other media.
+
1) This control provides the capability for you to select between three '''DPI''' settings when '''outputting images''' from OnePager to other media.
  
 
2) The selection options are '''96 DPI''', '''200 DPI''', and '''300 DPI''' as shown below:
 
2) The selection options are '''96 DPI''', '''200 DPI''', and '''300 DPI''' as shown below:
Line 396: Line 406:
 
<center>&lt;P70-21_13_1-70-(12)-10312019.png&gt;</center>
 
<center>&lt;P70-21_13_1-70-(12)-10312019.png&gt;</center>
  
3) For more information on '''image outputs''' from OnePager Pro 7.0, please the articles at: [[Managing Chart Data for Version 7.0 | Managing Chart Data (Portal)]] 23.0.1-70 and specifically the section at:  [[Sharing Charts for Version 7.0 (Portal)#Sharing an Image | Sharing an Image]]. 23.2.1-70
+
3) For more information on '''image outputs''' from OnePager Pro, please the articles at: [[Managing Chart Data for Version 7.0 | Managing Chart Data (Portal)]] 23.0.1-70 and specifically the section at:  [[Sharing Charts for Version 7.0 (Portal)#Sharing an Image | Sharing an Image]]. 23.2.1-70
  
 
==Related Links==
 
==Related Links==

Revision as of 22:36, 2 January 2020

About the Advanced Tab-OnePager Pro

1) The Advanced tab controls various other properties of the chart and looks like this:

File:P70-21 13 1-70-(1)-10312019.png
<P70-21_13_1-70-(1)-10312019.png.png>

2) The Advanced tab shown above has several control groups that generally group controls by functional area.

3) Each of these control groups and their sub-controls groups are covered in the sub-sections that follow.

Display Options

1) The Display Options group contains a number of checkboxes for making On/Off choices governing features in the Chart Editor, various thresholds, and input/output options.

Show Hover Boxes Checkbox

2) The Show hover boxescheckbox controls the display of detailed information about each task/milestone shape when the mouse cursor hovers over it.

3) This information includes the Start/Finish dates, the task/milestone shape name, and the Unique-ID of the task from the Microsoft Project source plan.

4) An example is shown below.

P61-21 13 1-61-(2)-11112018.png
<P61-21_13_1-61-(2)-11112018.png>

Select Associated Text Checkbox

5) OnePager provides the Select associated text checkbox control for you to change the response that a left-click on a task shape allowing a single click on the task shape to select both the task shape and its corresponding text label.

6) The Select associated text checkbox is also found in the Template form’s Advanced tab in the Display options control group as shown below for the Chart Properties form:

File:P70-0 4 2 3-70-(11)-06122019.png
P70-0_4_2_3-70-(11)-06122019.png

7) If you mouse over this checkbox the following tool tip appears: When the task/milestone shape is selected, also select all text associated with the shape, including the task name, dates, and percent complete labels.

8) As with all tool tips they are provided to assist you in determining what the control basically does.

9) As an example, the illustration below is a chart portion where there was a left-click on the task shape only when the Select associated text checkbox is checked Off.

P70-0 4 2 3-70-(12)-06122019.png
P70-0_4_2_3-70-(12)-06122019.png

10) Left-clicking the task shape only selects the task shape as shown above.

11) When the task shape is selected in the above example, only the Icons on the Home tool bar tab that are applicable to editing task shapes are enabled.

12) The enabled control groups are: Editing, Settings, Font, and Format.

13) Even with the Select associated text checkbox checked Off, left-clicks on the task shape still allow you to change Font properties but not text label position.

14) You can change text label alignment if the text label is configured such that text label alignment changes are available.

15) However, in the situation described above, where one or more task shapes are left-clicked with the Select associated text checkbox checked Off, you can right-click on any of the selected task shape, access its normal context menu, and use all the commands in the context menu as well as all the tabs available in the Change Task/Milestone Properties form accessed from the Format… command in the context menu.

16) Additionally, you can access the Change Task/Milestone Properties form by clicking the Format… Icon on the Home tool bar tab as shown below:

File:P70-0 4 2 3-70-(13)-06122019.png
P70-0_4_2_3-70-(13)-06122019.png

17) To complete the example, the illustration below is a chart portion where the Select associated text checkbox is checked On, and the task shape is selected with a left-click:

P70-0 4 2 3-70-(14)-06122019.png
P70-0_4_2_3-70-(14)-06122019.png

18) With the Select associated text checkbox checked ON, a left-click on the task shape selects the task shape and its text label as shown above.

19) When the task shape and text label are selected in the above example, ALL Icons on the Home tool bar tab that are applicable to editing task shapes and text labels are enabled.

20) The applicable control groups are: Editing, Settings, Font, Format, and Position.

21) The Alignment control group is only enabled if there is an option available to re-align the text label or text labels for selected items.

22) Essentially, checking the Select associated text checkbox On makes the OnePager 7.0 behavior relative to left-clicking of task shapes or text labels operate the same as left-clicking only the task shape in previous versions of OnePager.

23) You can right-click on either the task shape or text label in this situation and the appropriate context menu is accessed and all associated commands operate as documented including gaining access to the Change Task/Milestone Properties form.

24) OnePager 7.0, regardless of the status of the Select associated text status of checked On or checked Off, permits you to right-click on any previously selected task shape or text label and accesses any of the context menu commands.

Format With Times Checkbox

25) When the Format with timescheckbox is checked On, the snapshot dates are displayed with a time of day component.

26) Snapshot dates that differ by their time of day component are considered different snapshot dates.

27) For example, June 5, 2019 becomes June 5, 2019 5:23 PM and is a different snapshot date than June 5, 2019 6:00 PM.

28) Note that this setting no longer controls the format of the dates on the task shapes and milestone shapes.

29) Below is an example of the Select Snapshot form displaying the date format with time:

P61-21 13 1-61-(3)-11112018.png
<P61-21_13_1-61-(3)-11112018.png>

30) When the Show time cursorcheckbox is checked On, the vertical time-cursor line is shown as shown here:

P61-21 13 1-61-(4)-11112018.png
<P61-21_13_1-61-(4)-11112018.png>

31) Checking the Show time cursor checkbox Off, hides the vertical time-cursor line.

32) There is also a checkbox in the OnePager Pro View ribbon in the Graphic Elements group called Time Cursor that causes the vertical time-cursor line to be shown when the checkbox is checked On as shown below:

File:P70-21 13 1-70-(5)-10312019.png
<P70-21_13_1-70-(5)-10312019.png>

Allow Absorption Checkbox

33) When the Allow absorption checkbox is checked On, you can drag one task shape onto another task shape and be prompted to absorb the former into the latter.

34) When the checkbox is checked Off, this process does not take place and one task shape dragged over another is displayed as two separate task shapes superimposed.

35) For more information on Absorbed Tasks, please see the article at: Absorbing one task into another. 17.0.1-70

Show Absorbed Dates Checkbox

36) When the Show absorbed dates checkbox is checked On OnePager Pro creates a Comment box associated with the absorbed task shape connected to the task shape absorbing the absorbed task shape and provides you the option of specifying the date displayed in the Comment box as shown below:

P61-21 13 1-61-(6)-11112018.png
<P61-21_13_1-61-(6)-11112018.png>

37) The illustration above show the result of absorbing the first task shape where a Comment box is displayed connected to the absorbing task shape.

38) Also shown in the illustration above is a second task shape in the process of being absorbed where the Absorption Options form is shown.

39) Making a selection from the radio buttons and clicking OK creates the second Comment box.

40) You have the option to display the At end date, At start date, or At both start and end date.

41) For more information on Absorbing one task into another, please see the article at: Absorbing one task into another. 17.0.1-70

Copy Edits To All Snapshots Checkbox

42) The Copy edits to all snapshots (CTAS) checkbox is a toggle switch that turns On and Off the propagation of Maverick changes to all snapshots (turned ON) or to keep maverick changes to tasks/milestone shapes in the current snapshot (turned OFF).

43) This checkbox affects editing of these task/milestone shape properties: (1) Color, (2) Shape, (2) Fill Pattern, (3) Border, (4) Text Font, (5) Task/milestone height, (6) Task Links

44) For more information on how CTAS applies to the new Task Links feature in OnePager Pro, please see this section in the article at: Data-Driven Task Links for OnePager Pro - Condition 2: The Copy Edits to All Snapshots (CTAS) Feature and Data-Driven Task Links. 19.1.1.1-70

Clip Task/Milestone Labels at Graph Edges Checkbox

45) When the Clip task/milestone labels at graph edges checkbox is checked On, OnePager Pro clips all task/milestone shape labels that extend over the edge of the graph so that the labels no longer extend over the graph boundaries.

46) The chart below shows how OnePager Pro handles task/milestone shape labels that extend into the displayed Row/Swimlane label area when the checkbox is checked On:

P61-21 13 1-61-(7)-11112018.png
<P61-21_13_1-61-(7)-11112018.png>

47) Here is the same chart with the checkbox checked Off:

P61-21 13 1-61-(8)-11112018.png
<P61-21_13_1-61-(8)-11112018.png>

Overlay VST Elements Checkbox

48) When the Overlay VST elementscheckbox is checked On during the construction of a Virtual Summary Task (VST) with milestone shapes, the milestone shapes are displayed on top of the created VST bar.

49) An example is provided below:

P61-21 13 1-61-(9)-11112018.png
<P61-21_13_1-61-(9)-11112018.png>

50) For more information on Creating and managing virtual summary tasks please see the article at: Creating and Managing Virtual Summary Tasks. 18.0.1-70

Lock Background Checkbox

51) When the Lock background checkbox is checked On, all Background shapes are frozen.

52) This includes these (3) elements: images, swimlane titles, graph title, and time axis annotation.

53) Clicking any of these elements with the mouse no longer selects them, so it becomes easier to select task shapes and milestone shapes with the selection Lasso.

Task/Milestone Threshold

1) This numeric window controls whether short duration tasks are displayed as task shapes or as milestone shapes.

2) The unit of measure is task bar duration in number of days.

3) With the setting shown in the Chart Properties form at the top of this article of two (2) days, any task shape in the chart that is less than two (2) days duration is displayed as a milestone shape.

4) Therefore, one day task s are displayed as milestones symbols with the default settings of two (2) days.

5) Since no duration can be less than zero (0), setting the parameter to zero (0) turns Off all conversion of task shapes into milestones shapes, which means that you can see task shapes with very small width, which makes them very hard to see and to select.

Warn If Import Exceeds

1) This checkbox tells OnePager to provide a warning message if the number of task/milestone shapes imported exceeds the quantity set in the adjacent window.

2) Recall that OnePager has the capability to make multiple pages of output both vertically and horizontally.

3) The warning message example below is configured so that it can issue the warning if more than 10 task shapes were imported.

P61-21 13 1-61-(10)-11112018.png
<P61-21_13_1-61-(10)-11112018.png>

Warn Of Merging Tasks

1) The checkbox shown in the Advanced tab at the beginning of this article is accompanied by a Warning options button.

2) When this checkbox is checked On, the Warning options button is enabled.

3) Clicking the Warning options button accesses the Set warning thresholds form shown below:

P61-21 13 1-61-(11)-11112018.png
<P61-21_13_1-61-(11)-11112018.png>

4) This form allows you to set your own parameters for when you wish to be warned if too many extra task shapes are being merged or too many task shapes are missing.

5) Setting these percentages to 100% has the impact of turning the fixes and warning Off.

6) Setting the percentages to 0% provides an assurance that any extra or missing task shapes triggers the fixes and warnings.

7) When this checkbox is checked On, OnePager looks to see if too many newly introduced task/milestone shapes are being imported when updating a snapshot or if too many task shapes are missing per the thresholds set in the form above.

8) After making the calculation, OnePager provides a warning message asking if you want to proceed with the update of the snapshot or not.

9) Additionally, the warning message also give you access to the See Extra and Missing Tasks form so you can make a fix if desired.

10) The warning message example below was configured so that it issues the warning if more than 45 percent of the task shapes differ from those of the current chart.

P61-21 13 1-61-(12)-11112018.png
<P61-21_13_1-61-(12)-11112018.png>

11) For more information on how to make fixes to these situations, please see the article at: Merging the Wrong Tasks into a Chart - OnePager Pro. 7.11.1-70

Safely Combine Tasks From Different Files

1) The Safely combine task shapes from different files checkbox is disabled so that you see that it is there.

2) This control is enabled in the Template form's Advanced tab.

3) To avoid confusing OnePager when importing additional Microsoft Project source plans during the Replace operation, it is necessary for this feature to be On and functioning.

4) The reason for this is that the task shapes being imported from the second Microsoft Project source plan in the Replace function have the same UniqueID numbers as the task shapes from the first Microsoft Project source plan.

5) OnePager can be fooled into thinking that these are the same task shapes (coming in from the second Microsoft Project source plan) are from the first Microsoft Project source plan when they are clearly not.

6) Having the Safely combine tasks from different file checkbox checked On in the Template form's Advanced tab avoids confusing the identity of replacement tasks in the Replace snapshot function.

Reset Unique Ids On Update

1) The Reset unique ids on update checkbox is disabled so that you see that it is there.

2) This feature can be enabled as a last resort under the situation where you are attempting to merge Microsoft Project source plans from different physical files into a single source plan where the Microsoft Project Unique IDs do not match.

3) Contact OnePager Support for information on how to use this rarely-used feature by referring to the article at: Getting Support and Contacting Chronicle Graphics. 30.0.1-70

4) For more details on selecting alternate Unique ID fields for this purpose, please see the article at: Field Mappings Tab for OnePager Pro 21.15.1-70.

5) For additional help, please go to the following link to the OnePager Frequently Asked Questions page: Selecting a Custom Unique ID.

5) If you encounter difficulties, contact our Support Team at support ticket, by e-mailing us, or by calling +1.303.779.0344.

Task Representation

1) The Task representation control group consists of three (3) radio buttons as shown below:

File:P70-21 13 1-70-(6)-10312019.png
<P70-21_13_1-70-(6)-10312019.png>

2) These radio buttons let you select how a task shape is represented: as a Gantt bar/Task bar or by a Milestone at the start or end date of the task shape.

Gantt Bar/Task Bar Radio Button

3) Below is an example of a portion of a chart with task shapes represented as Gantt bars/Task bars:

P61-21 13 1-61-(13)-11112018.png
<P61-21_13_1-61-(13)-11112018.png>

Milestone At Start Radio Button

4) If the Milestone at start radio button is clicked On and the tab's OK or Apply button is clicked, the portion of the chart looks like this:

P61-21 13 1-61-(14)-11112018.png
<P61-21_13_1-61-(14)-11112018.png>

Milestone At End Radio Button

5) If the Milestones at end radio button is clicked On and the tab's OK or Apply button is clicked, the portion of the chart in the above illustration changes to look like this:

P61-21 13 1-61-(15)-11112018.png
<P61-21_13_1-61-(15)-11112018.png>

6) Making the selection in the Chart Properties form changes all task shapes in the chart to the selected option.

7) You can individually maverick a task/milestone shape by selecting it with a right-click and use the Format ... Command in the Context Menu to access the Change task/milestone properties form to change the shape at the Format tab.

Default Snapshot Date

1) The Default Snapshot Date control group consists of four (4) radio buttons as shown below:

File:P70-21 13 1-70-(7)-10312019.png
<P70-21_13_1-70-(7)-10312019.png>

2) OnePager establishes the default date of the snapshot based upon data imported from the Microsoft Project source plan.

3) You can, of course, change the snapshot date to a value different from the default date in the OnePager Choices form.

4) In this control group you have four (4) options for setting the basis for the default snapshot date that is used for all snapshots created for this chart:

Last-Modified Date Radio Button

5) This is the date that the Microsoft Project source plan was last modified.

Current Date Radio Button

6) This date is the date when you imported the data from your Microsoft Project source plan into OnePager to create the snapshot.

Status Date (Then Last Modified) Radio Button

7) This is the date established in the Microsoft Project source plan for the status date of the source plan.

8) If there is no value for the status date in the Microsoft Project source plan, OnePager uses the Last-Modified date.

Status Date (Then Current) Radio Button

9) This is the date established in the Microsoft Project source plan for the status date of the plan.

10) If there is no value for the status date in the Microsoft Project source plan, OnePager uses the current date.

Row hiding options

1) The controls in this group govern the operation of automatic hiding (cropping) of rows.

2) Access to the Row Hiding Options form is by clicking the Row hiding options button in the Chart Properties form's Advanced tab as shown below:

File:P70-21 13 1-70-(8)-10312019.png
<P70-21_13_1-70-(8)-10312019.png>

3) When the Row hiding options button is clicked, the Row Hiding Options form shown below appears providing you with four (4) options to select:

P61-21 13 1-61-(18)-11112018.png
<P61-21_13_1-61-(18)-11112018.png>

Look At Current Snapshot Only Checkbox

4) When this checkbox is checked On, OnePager only examines the current snapshot when deciding which rows are empty.

5) When this checkbox is Off, OnePager considers a row empty only if it is unoccupied across all snapshots.

6) In either case, the auto-row hiding action hides rows in all snapshots.

Hide Newly-Empty Rows On Import Checkbox

7) When this checkbox is checked On, OnePager automatically hides any rows that becomes empty because task shapes are missing when you UPDATE a chart.

8) When this checkbox is OFF, OnePager leaves any empty rows that became empty because of such missing task shapes.

Unhide Rows for Flagged Tasks/Milestones Checkbox

9) When this checkbox is checked On, OnePager automatically unhides hidden rows if they contain any of the tasks/milestone shapes that are flagged for import on the current snapshot.

10) If the checkbox is Off, OnePager continues to hide previously hidden rows.

Hide Rows When Tasks Are Outside Date Range Checkbox

11) When this option is selected, OnePager automatically hides any empty rows where task shapes and/or milestone shapes are outside the Start date and End date established for the chart.

12) The Start date and End date settings are either generated by OnePager based upon the range of dates provided from the source packet, set in the Chart Properties form Time Axis tab's Calendar sub-tab, or set in the OnePager Pro View ribbon tab in the Dates control group.

Accessing the Where's My Stuff?! Form

13) When task shapes and their respective rows are hidden and subsequently cropped, the Where’s My Stuff?! form can be accessed from the OnePager Pro ribbon’s Home tab in the Editing group and shown here:

File:P70-21 13 1-70-(9-1)-10312019.png
<P70-21_13_1-70-(9-1)-10312019.png>

14) For more information on the Where's My Stuff?! feature, please see the article at: Managing Hidden Tasks and Milestones Using "Where's My Stuff?!". 9.4.1-70

Server Method Selection

1) The Server method dropdown on the Advanced tab for OnePager Pro Add-in application lets you specify whether to use Microsoft Project Professional to read data from Microsoft Project Server/Online source plans or to directly read your project data from the server.

2) Using Microsoft Project Professional to read the data is recommended because it makes more local custom fields available to you.

3) For example the numbered baseline fields (Baseline 1 Start, etc.) are generally not available when you ask OnePager Pro to read the data directly from the server but are available when you let Microsoft Project do the reading for OnePager Pro.

4) This option is only available in OnePager Pro Add-in and not for the OnePager Pro Desktop application.

5) To make your selection click on the dropdown and click your choice as shown below:

File:P70-21 13 1-70-(10)-10312019.png
<P70-21_13_1-70-(10)-10312019.png>

6) For more information on Using OnePager Pro with server resident source plans, please see the article at: Using OnePager Pro with Server Resident Project Plans (Portal). 8.5.1-70

Clipboard Format

1) The default clipboard format is Vector EMF (Enhanced Meta File).

2) Essentially, this format is vector output with capabilities to retain high quality resolution when moving from the chart snapshot to Microsoft PowerPoint, Word, Excel, or email messages.

3) Although the default option is EMF format, you can change the default to the alternative option of Image PNG as shown below:

File:P70-21 13 1-70-(11)-10312019.png
<P70-21_13_1-70-(11)-10312019.png>

Image file DPI

1) This control provides the capability for you to select between three DPI settings when outputting images from OnePager to other media.

2) The selection options are 96 DPI, 200 DPI, and 300 DPI as shown below:

File:P70-21 13 1-70-(12)-10312019.png
<P70-21_13_1-70-(12)-10312019.png>

3) For more information on image outputs from OnePager Pro, please the articles at: Managing Chart Data (Portal) 23.0.1-70 and specifically the section at: Sharing an Image. 23.2.1-70

Related Links

Absorbing one task into another 17.0.1-70

Data-Driven Task Links for OnePager Pro 19.1.1.1-70

Creating and Managing Virtual Summary Tasks 18.0.1-70

Merging the Wrong Tasks into a Chart - OnePager Pro 7.11.1-70

Getting Support and Contacting Chronicle Graphics 30.0.1-70

Field Mappings Tab for OnePager Pro 21.15.1-70

Managing Hidden Tasks and Milestones Using "Where's My Stuff?!" 9.4.1-70

Using OnePager Pro with Server Resident Project Plans (Portal) 8.5.1-70

Managing Chart Data (Portal) 23.0.1-70

Sharing Charts (Portal) 23.2.1-70

Selecting a Custom Unique ID.

(21.13.1-70)