Difference between revisions of "Handling Microsoft Excel Spreadsheets Containing Multiple Projects For Version 5.3"

From OnePager Documentation
Jump to: navigation, search
(Created page with "=Handling Microsoft Excel Spreadsheets Containing Multiple Projects For Version 5.3 (X53-8_3_1-12112015)= Representing multiple projects originating in a single Microsoft Exc...")
 
Line 1: Line 1:
=Handling Microsoft Excel Spreadsheets Containing Multiple Projects For Version 5.3 (X53-8_3_1-12112015)=
+
=Handling Microsoft Excel Spreadsheets Containing Multiple Projects For Version 5.3 (X53-8_3_1-12152015)=
  
 
Representing multiple projects originating in a single Microsoft Excel plan can be easily done using the Rows and Swimlanes feature.   
 
Representing multiple projects originating in a single Microsoft Excel plan can be easily done using the Rows and Swimlanes feature.   
Line 15: Line 15:
 
After configuring your Microsoft Excel plan with the “Project” column and the necessary multi-project schedule data you may create a useful Multi-Project project view by following the steps below:
 
After configuring your Microsoft Excel plan with the “Project” column and the necessary multi-project schedule data you may create a useful Multi-Project project view by following the steps below:
  
1) Launch OnePager Express from the desktop icon and click the “NEW button on the “OnePager Express Start” form.  This will bring up the short form of the “OnePager choices” form where you should click the “Select” button and navigate to multi-project Excel file desired as shown below:
+
1) Launch OnePager Express from the desktop icon and click the “NEW button on the “OnePager Express Start” form.  This will bring up the “OnePager choices” form where you should click the “Select” button and navigate to multi-project Excel file desired as shown below:
  
 
<center>[[File:X53-8_3_1-53-(2)-12112015.png]]</center>
 
<center>[[File:X53-8_3_1-53-(2)-12112015.png]]</center>
Line 25: Line 25:
 
==Setting up the Template for a Multi-Project Graph==
 
==Setting up the Template for a Multi-Project Graph==
  
2) Clicking the “Open” button on the “Open” form will bring up the expanded “OnePager choices” form where you can confirm the Excel source file, provide a name for the project view you are creating and confirm the snapshot dated.  Additionally, you need to change the “Template” to a multi-project template which is done by clicking the “Change” button in the “Starting Template” section of the form as shown below:
+
2) Clicking the “Open” button on the “Open” form will bring up the expanded “OnePager choices” form where you can confirm the Microsoft Excel source file, provide a name for the project view you are creating and confirm the snapshot dated.  Additionally, you need to change the template to a multi-project template which is done by clicking the “Change” button in the “Starting Template” section of the form as shown below:
  
 
<center>[[File:X53-8_3_1-53-(3)-12112015.png]]</center>
 
<center>[[File:X53-8_3_1-53-(3)-12112015.png]]</center>
Line 33: Line 33:
 
<center>X53-8_3_1-53-(3)-12112015.png</center>
 
<center>X53-8_3_1-53-(3)-12112015.png</center>
  
3) When you click the “Open” button on the “Open” form shown above, OnePager will change the current Template to the “Multi-Project Gantt Chart – Detailed” Template.
+
3) When you click the “Open” button on the “Open” form shown above, OnePager will change the current template to the “Multi-Project Gantt Chart – Detailed” template.
  
==Pull In the Microsoft Excel Source File to Create the Project View==
+
==Use the Microsoft Excel Source File to Create the Project View==
  
4) At this point you are ready to create the multi-project project view.  First, click the “Next&gt;” button which takes you to the second page of the “OnePager choices” form where you can check your column settings or make a Template adjustment.  When you are finished just click the “Create new project view” button on the second page and OnePager will generate a multi-project project view that looks like this:
+
4) At this point you are ready to create the multi-project project view.  First, click the “Next&gt;” button (shown above) which takes you to the second page of the “OnePager choices” form where you can check your column settings or make a template adjustment.  When you are finished just click the “Create new project view” button on the second page and OnePager will generate a multi-project project view that looks like this:
  
 
<center>[[File:X53-8_3_1-53-(4)-12112015.png]]</center>
 
<center>[[File:X53-8_3_1-53-(4)-12112015.png]]</center>
Line 47: Line 47:
 
5) The project view above represents two separate projects using the swimlanes to organize the tasks/milestones for each.
 
5) The project view above represents two separate projects using the swimlanes to organize the tasks/milestones for each.
  
6) As the Program progresses and additional projects are added, the additional swimlanes with their corresponding rows will be added to the project view in future snapshots.
+
6) As the projects progress and additional projects are added, the additional swimlanes with their corresponding rows will be added to the project view in future snapshots.
 +
 
 +
==Updating Project Views Created from Multiple Projects in a Single Microsoft Excel Spreadsheet==
 +
 
 +
7) Eventually you will want to update your multi-project project view by either adding a snapshot or replacing a snapshot with better data.  To perform either the ADD or the REPLACE snapshot, the processes described in the related links below can be used.
 +
 
 +
8) The key to making updated to multi-project project views from multiple-projects contained in a single Microsoft spreadsheet is the proper management of the Microsoft Excel data in the source packet.  Recall that the source packet contains the file or files that are to be used to either create or update a project view, they are stored as file names and path names in the project view’s .TAM file, and can be accessed from the “Data” tab’s “Selected file(s)” button on the OnePager ribbon as shown below:
 +
 
 +
<center>[[File:X53-8_3_1-53-(5)-12152015.png]]</center>
 +
 
 +
<center></center>
 +
 
 +
<center>X53-8_3_1-53-(5)-12152015.png</center>
 +
 
 +
9) Validating the contents of the source packet and assuring that these are the Microsoft Excel source files that were updated is an essential step before proceeding to perform a project update.
  
 
==Related Links==
 
==Related Links==
Line 53: Line 67:
 
[[Creating a NEW Project View via Pull Operation - OnePager Express for Version 5.3]] 7.13.2-53
 
[[Creating a NEW Project View via Pull Operation - OnePager Express for Version 5.3]] 7.13.2-53
  
[[REPLACING a Snapshot via Pull Operation - OnePager Express for Version 5.3]] 7.14.3-53
+
[[REPLACING a Snapshot via Pull Operation - OnePager Express for Version 5.3]] 7.14.2-53
 +
 
 +
[[ADDING a Snapshot via Pull Operations – OnePager Express for Version 5.3]] 7.15.2-53
  
 
(8.3.1-53)
 
(8.3.1-53)

Revision as of 17:25, 23 December 2015

Handling Microsoft Excel Spreadsheets Containing Multiple Projects For Version 5.3 (X53-8_3_1-12152015)

Representing multiple projects originating in a single Microsoft Excel plan can be easily done using the Rows and Swimlanes feature.

Multi-Project Excel Spreadsheet

One method is to add a column to your Microsoft Excel plan with a column name of “Project.” This name is recognized by OnePager Express and is utilized in OnePager Express Multi-project Templates shipped with the product. An example spreadsheet with the “Project” column is shown below:

X53-8 3 1-53-(1)-12112015.png
X53-8_3_1-53-(1)-12112015.png

After configuring your Microsoft Excel plan with the “Project” column and the necessary multi-project schedule data you may create a useful Multi-Project project view by following the steps below:

1) Launch OnePager Express from the desktop icon and click the “NEW button on the “OnePager Express Start” form. This will bring up the “OnePager choices” form where you should click the “Select” button and navigate to multi-project Excel file desired as shown below:

X53-8 3 1-53-(2)-12112015.png
X53-8_3_1-53-(2)-12112015.png

Setting up the Template for a Multi-Project Graph

2) Clicking the “Open” button on the “Open” form will bring up the expanded “OnePager choices” form where you can confirm the Microsoft Excel source file, provide a name for the project view you are creating and confirm the snapshot dated. Additionally, you need to change the template to a multi-project template which is done by clicking the “Change” button in the “Starting Template” section of the form as shown below:

X53-8 3 1-53-(3)-12112015.png
X53-8_3_1-53-(3)-12112015.png

3) When you click the “Open” button on the “Open” form shown above, OnePager will change the current template to the “Multi-Project Gantt Chart – Detailed” template.

Use the Microsoft Excel Source File to Create the Project View

4) At this point you are ready to create the multi-project project view. First, click the “Next>” button (shown above) which takes you to the second page of the “OnePager choices” form where you can check your column settings or make a template adjustment. When you are finished just click the “Create new project view” button on the second page and OnePager will generate a multi-project project view that looks like this:

X53-8 3 1-53-(4)-12112015.png
X53-8_3_1-53-(4)-12112015.png

5) The project view above represents two separate projects using the swimlanes to organize the tasks/milestones for each.

6) As the projects progress and additional projects are added, the additional swimlanes with their corresponding rows will be added to the project view in future snapshots.

Updating Project Views Created from Multiple Projects in a Single Microsoft Excel Spreadsheet

7) Eventually you will want to update your multi-project project view by either adding a snapshot or replacing a snapshot with better data. To perform either the ADD or the REPLACE snapshot, the processes described in the related links below can be used.

8) The key to making updated to multi-project project views from multiple-projects contained in a single Microsoft spreadsheet is the proper management of the Microsoft Excel data in the source packet. Recall that the source packet contains the file or files that are to be used to either create or update a project view, they are stored as file names and path names in the project view’s .TAM file, and can be accessed from the “Data” tab’s “Selected file(s)” button on the OnePager ribbon as shown below:

File:X53-8 3 1-53-(5)-12152015.png
X53-8_3_1-53-(5)-12152015.png

9) Validating the contents of the source packet and assuring that these are the Microsoft Excel source files that were updated is an essential step before proceeding to perform a project update.

Related Links

Creating a NEW Project View via Pull Operation - OnePager Express for Version 5.3 7.13.2-53

REPLACING a Snapshot via Pull Operation - OnePager Express for Version 5.3 7.14.2-53

ADDING a Snapshot via Pull Operations – OnePager Express for Version 5.3 7.15.2-53

(8.3.1-53)