Difference between revisions of "Making Multi-Project Charts for Asana for Version 7.2"

From OnePager Documentation
Jump to: navigation, search
(Use the Asana Source Plan to Create the Chart)
 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Making Multi-Project Charts for Asana for Version 7.2 (P72-8.5.9-72-10052023.txt)=
 
 
 
==Overview==
 
==Overview==
  
Line 14: Line 12:
  
 
<center>[[File:P72-8_5_9-72-(1)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(1)-10052023.png]]</center>
<center>P72-8_5_9-72-(1)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(1)-10052023.png</center>-->
  
 
After configuring your Asana '''source plan''' with the '''Project''' field and the necessary '''multi-project''' schedule data, you can create a useful '''multi-project''' chart by following the steps described in the next section.
 
After configuring your Asana '''source plan''' with the '''Project''' field and the necessary '''multi-project''' schedule data, you can create a useful '''multi-project''' chart by following the steps described in the next section.
Line 21: Line 19:
  
 
<center>[[File:P72-7_2_3-72-(2)-05152023.png]]</center>
 
<center>[[File:P72-7_2_3-72-(2)-05152023.png]]</center>
<center>P72-7_2_3-72-(2)-05152023.png</center>
+
<!--<center>P72-7_2_3-72-(2)-05152023.png</center>-->
  
 
===Creating a NEW Chart from a Multi-Project Source Plan===
 
===Creating a NEW Chart from a Multi-Project Source Plan===
Line 28: Line 26:
  
 
<center>[[File:P72-8_5_9-72-(3)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(3)-10052023.png]]</center>
<center>P72-8_5_9-72-(3)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(3)-10052023.png</center>-->
  
 
For this illustration, we'll select the '''source plan''' named '''BlueGrass Project'''.  When we do this, the '''OPC''' form is expanded to look like this:
 
For this illustration, we'll select the '''source plan''' named '''BlueGrass Project'''.  When we do this, the '''OPC''' form is expanded to look like this:
  
 
<center>[[File:P72-8_5_9-72-(3A)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(3A)-10052023.png]]</center>
<center>P72-8_5_9-72-(3A)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(3A)-10052023.png</center>-->
  
 
Before creating the '''NEW multi-project''' chart we must change the '''Template Properties''' form to support the creation of a chart from a '''multi-project source plan''' as described below.
 
Before creating the '''NEW multi-project''' chart we must change the '''Template Properties''' form to support the creation of a chart from a '''multi-project source plan''' as described below.
Line 42: Line 40:
  
 
<center>[[File:P72-8_5_9-72-(3B)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(3B)-10052023.png]]</center>
<center>P72-8_5_9-72-(3B)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(3B)-10052023.png</center>-->
  
 
Clicking the '''Change''' button accesses the folder where OnePager stores Asana '''Template Properties''' forms distributed with the product as shown above. Select the '''Multi-Project Gantt Chart - Detailed for Asana''' entry in the window shown above and click the '''Open''' button at the bottom of the form. When you click the '''Open''' button on the '''Open''' form shown above, OnePager changes the current '''Template Properties''' form to the '''Multi-Project Gantt Chart – Detailed for Asana Template'''.
 
Clicking the '''Change''' button accesses the folder where OnePager stores Asana '''Template Properties''' forms distributed with the product as shown above. Select the '''Multi-Project Gantt Chart - Detailed for Asana''' entry in the window shown above and click the '''Open''' button at the bottom of the form. When you click the '''Open''' button on the '''Open''' form shown above, OnePager changes the current '''Template Properties''' form to the '''Multi-Project Gantt Chart – Detailed for Asana Template'''.
Line 53: Line 51:
  
 
<center>[[File:P72-8_5_9-72-(4)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(4)-10052023.png]]</center>
<center>P72-8_5_9-72-(4)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(4)-10052023.png</center>-->
  
 
Next, check your '''field mapping settings''' or make any '''Template Properties''' form adjustments.  When you are finished, click the '''Create new chart''' button on the second page. OnePager generates a '''multi-project''' chart that looks like this:
 
Next, check your '''field mapping settings''' or make any '''Template Properties''' form adjustments.  When you are finished, click the '''Create new chart''' button on the second page. OnePager generates a '''multi-project''' chart that looks like this:
  
 
<center>[[File:P72-8_5_9-72-(5)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(5)-10052023.png]]</center>
<center>P72-8_5_9-72-(5)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(5)-10052023.png</center>-->
  
 
The chart above represents two separate projects using the swimlanes to organize the tasks/milestones for each project grouping. As the projects progress and additional projects are added, the additional swimlanes with their corresponding rows are added to the chart in future snapshots.
 
The chart above represents two separate projects using the swimlanes to organize the tasks/milestones for each project grouping. As the projects progress and additional projects are added, the additional swimlanes with their corresponding rows are added to the chart in future snapshots.
Line 68: Line 66:
 
<center>
 
<center>
 
{| class="wikitable"
 
{| class="wikitable"
| [[REPLACING a Snapshot via Pull Operation for Version 7.2 | REPLACING a Snapshot via Pull Operation]] 7.14.1-72
+
| [[REPLACING a Snapshot via Pull Operation for Version 7.2 | REPLACING a Snapshot via Pull Operation]] <!--7.14.1-72-->
 
|-
 
|-
| [[ADDING a Snapshot via Pull Operation for Version 7.2 | ADDING a Snapshot via Pull Operation]] 7.15.1-72
+
| [[ADDING a Snapshot via Pull Operation for Version 7.2 | ADDING a Snapshot via Pull Operation]] <!--7.15.1-72-->
 
|}
 
|}
 
</center>
 
</center>
Line 76: Line 74:
 
The key to making '''updates''' to '''multi-project''' charts from '''multiple-projects''' contained in a '''single''' Asana '''source plan''' is the proper management of the Asana '''source plan''' data in the '''source packet'''.  Recall that the '''source packet''' contains the '''import source plan''' or '''import source plans''' that are to be used to either '''create''' or '''update''' a chart.  They are stored as '''file names and path names''' in the chart’s '''.TAM''' file, and can be accessed from the OnePager '''Data''' ribbon tool bar tab’s '''Selected file(s)''' button on the ribbon as shown below:
 
The key to making '''updates''' to '''multi-project''' charts from '''multiple-projects''' contained in a '''single''' Asana '''source plan''' is the proper management of the Asana '''source plan''' data in the '''source packet'''.  Recall that the '''source packet''' contains the '''import source plan''' or '''import source plans''' that are to be used to either '''create''' or '''update''' a chart.  They are stored as '''file names and path names''' in the chart’s '''.TAM''' file, and can be accessed from the OnePager '''Data''' ribbon tool bar tab’s '''Selected file(s)''' button on the ribbon as shown below:
  
<center>[[File:P71-8_5_3-71-(6)-11303031.png]]</center>
 
<center>P71-8_5_3-71-(6)-11303031.png</center>
 
 
<center>[[File:P72-8_5_9-72-(6)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(6)-10052023.png]]</center>
<center>P72-8_5_9-72-(6)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(6)-10052023.png</center>-->
  
 
Validating the contents of the '''source packet''' and assuring that these are the Asana '''source plans''' that were '''updated''' is an essential step before proceeding to perform a chart '''update'''.
 
Validating the contents of the '''source packet''' and assuring that these are the Asana '''source plans''' that were '''updated''' is an essential step before proceeding to perform a chart '''update'''.
Line 87: Line 83:
 
===Introduction===
 
===Introduction===
  
Suppose you have '''multiple''' Asana '''source plans''' that are related and you want to create a '''single''' chart that shows the important schedule items and will be '''updated''' as the project proceeds.  Whenever chart '''updates''' are contemplated in the future OnePager requires that tasks being '''imported''' have '''unique task identifiers''' that OnePager can use to keep the '''updates''' aligned.  Asana '''source plans''' have '''unique task identifiers''' built in and the data are '''imported''' when OnePager '''imports''' the Asana '''source plan'''.  OnePager makes these '''unique task identifiers''' available in the OnePager  '''Chart Editor''' as the '''Asana Task ID''' field which is discussed later.  
+
Suppose you have '''multiple''' Asana '''source plans''' that are related and you want to create a '''single''' chart that shows the important schedule items and will be '''updated''' as the project proceeds.  Whenever chart '''updates''' are contemplated in the future OnePager requires that tasks being '''imported''' have '''unique task identifiers''' that OnePager can use to keep the '''updates''' aligned.  Asana '''source plans''' have '''unique task identifiers''' built in and the data are '''imported''' when OnePager '''imports''' the Asana '''source plan'''.  OnePager makes these '''unique task identifiers''' available in the OnePager  '''Chart Editor''' as the '''Asana ID''' field which is discussed later.  
  
For more information on '''Asana Task ID''', please see the section in the article at:  
+
For more information on '''Asana ID''', please see the section in the article at:  
  
 
<center>
 
<center>
 
{| class="wikitable"
 
{| class="wikitable"
| [[Merging the Wrong Tasks into a Chart for Version 7.2 - OnePager Bundle - Asana#The Task ID Field | The Asana Task ID Field]] 7.21.1-72
+
| [[Merging the Wrong Tasks into a Chart for Version 7.2 - OnePager Bundle - Asana#The ID Field | Asana - The ID Field]] <!--7.22.5-72-->
 
|}
 
|}
 
</center>
 
</center>
Line 99: Line 95:
 
===Making a Multi-Project Chart from Separate Asana Source Plans===
 
===Making a Multi-Project Chart from Separate Asana Source Plans===
  
To illustrate what is needed, let’s construct a '''multi-project''' chart from the '''BlueGrass Project Plan''' Asana '''source plan''' by splitting original '''source plan''' into two distinct '''import source plans''' as shown below:
+
To illustrate what is needed, let’s construct a '''multi-project''' chart from three simple '''source plans''' - '''Project A''', '''Project B''', and '''Project C'''.  Each has essentially the same tasks and WBS structure but each has different Asana '''ID''' values.  The three '''source plans''' are shown below:
  
<center>'''Merlin Project Phases 1 and 2'''</center>
+
<center>'''Project A'''</center>
  
<center>[[File:P71-8_5_3-71-(7-1)-12022021.png]]</center>
+
<center>[[File:P72-8_5_9-72-(7-1)-10052023.png]]</center>
<center>P71-8_5_3-71-(7-1)-12022021.png</center>
+
<!--<center>P72-8_5_9-72-(7-1)-10052023.png</center>-->
<center>[[File:P72-8_5_9-72-(7)-10052023.png]]</center>
+
<center>P72-8_5_9-72-(7)-10052023.png</center>
+
  
<center>'''Adonis Project Phases 1 and 2'''</center>
+
<center>'''Project B'''</center>
  
<center>[[File:P71-8_5_3-71-(8-1)-12022021.png]]</center>
 
<center>P71-8_5_3-71-(8-1)-12022021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(8)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(8)-10052023.png]]</center>
<center>P72-8_5_9-72-(8)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(8)-10052023.png</center>-->
 +
 
 +
<center>'''Project C'''</center>
 +
 
 +
<center>[[File:P72-8_5_9-72-(8A)-10052023.png]]</center>
 +
<!--<center>P72-8_5_9-72-(8A)-10052023.png</center>-->
  
 
====Important Note====
 
====Important Note====
  
Each of the Asana '''source plans''' above have unique '''Asana Task ID''' fields with '''unique numbers''' generated by OnePager at '''source plan import'''.  It is important throughout the use of these Asana '''source plans''' that these assigned unique '''Asana Task ID''' numbers remain with their respective tasks.  '''Dates''' can change in the Asana '''source plan's''' rows along with other '''updated''' information as the projects progress, but the '''Asana Task ID''' number '''must''' remain associated with the task activity.  Tasks can be '''deleted''', but the '''deleted Asana Task ID''' should not be '''reused''' for a later snapshot.  OnePager can process out of sequence '''Asana Task ID''' numbers.
+
Each of the Asana '''source plans''' above have unique '''Asana ID''' fields with '''unique numbers''' generated by OnePager at '''source plan import'''.  It is important throughout the use of these Asana '''source plans''' that these assigned unique '''Asana ID''' values remain with their respective tasks.  '''Dates''' can change in the Asana '''source plan's''' rows along with other '''updated''' information as the projects progress, but the '''Asana ID''' values '''must''' remain associated with the task activity.  Tasks can be '''deleted''', but the '''deleted Asana Internal''' should not be '''reused''' for a later snapshot.  OnePager can process out of sequence '''Asana ID''' numbers.
  
 
===Setting up the One Pager Template Properties Form for a Multi-Project Chart===
 
===Setting up the One Pager Template Properties Form for a Multi-Project Chart===
Line 123: Line 120:
 
The next step is to select and '''update''' an appropriate '''Template Properties''' form.   
 
The next step is to select and '''update''' an appropriate '''Template Properties''' form.   
  
For this illustration we’ve selected the '''Multi-Project Gantt Chart – Detailed Template Properties''' form.  Once the current '''Template Properties''' form is established as a '''multiple-project Template Properties''' form, go to the '''Rows/Swimlanes''' tab and make sure that the '''Group rows into swimlanes''' and '''Label swimlanes by''' windows are set to '''Project'''.  Also, for this illustration, make sure that '''text columns''' are displayed and that the '''Custom Text Columns''' are set to '''Phase'''.
+
For this illustration we’ve selected the '''Multi-Project Gantt Chart – Detailed for Planisware Template Properties''' form.  Once the current '''Template Properties''' form is established as a '''multiple-project Template Properties''' form, go to the '''Rows/Swimlanes''' tab and make sure that the '''Group rows into swimlanes''' and '''Label swimlanes by''' windows are set to '''Project name'''.  Also, for this illustration, make sure that '''text columns''' are displayed and that the '''Custom Text Columns''' are set to '''Level 2 summary name''' which is the '''WBS''' level for '''Phases'''.
  
 
The '''Rows/Swimlanes''' tab in the '''Template Properties''' form looks like this:
 
The '''Rows/Swimlanes''' tab in the '''Template Properties''' form looks like this:
  
<center>[[File:P71-8_5_3-71-(9-1)-01042022.png]]</center>
 
<center>P71-8_5_3-71-(9-1)-01042022.png</center>
 
 
<center>[[File:P72-8_5_9-72-(9)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(9)-10052023.png]]</center>
<center>P72-8_5_9-72-(9)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(9)-10052023.png</center>-->
  
 
When the steps above are completed and the '''Template Properties''' form for is '''updated''', click the '''Save and use''' button to make the modified '''Template Properties''' form the current '''Template'''.
 
When the steps above are completed and the '''Template Properties''' form for is '''updated''', click the '''Save and use''' button to make the modified '''Template Properties''' form the current '''Template'''.
Line 138: Line 133:
 
====Launch Asana and Load the First Asana Import Source Plan====
 
====Launch Asana and Load the First Asana Import Source Plan====
  
Launch Asana, open the first of the multi-project Asana '''source plans''', and make any '''editing''' changes necessary.  In this case it’s the '''Merlin-Project Phase 1 and 2''' file.   
+
Launch Asana, open the first of the multi-project Asana '''source plans''', and make any '''editing''' changes necessary.  In this case it’s the '''Project A''' file.   
  
 
Next, launch OnePager Bundle.  The '''OnePager Bundle Start''' form appears.   
 
Next, launch OnePager Bundle.  The '''OnePager Bundle Start''' form appears.   
Line 144: Line 139:
 
Click the '''NEW''' button which accesses the OnePager choices ('''OPC''') form as shown below:
 
Click the '''NEW''' button which accesses the OnePager choices ('''OPC''') form as shown below:
  
<center>[[File:P71-8_5_3-71-(10)-12012021.png]]</center>
 
<center>P71-8_5_3-71-(10)-12012021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(10)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(10)-10052023.png]]</center>
<center>P72-8_5_9-72-(10)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(10)-10052023.png</center>-->
  
Note that the '''Merlin-Project Phase 1 and 2''' Asana '''source plan''' appears in the '''Selected File(s)''' group and that the '''Add/Remove''' button is active.
+
Note that the '''Project A''' Asana '''source plan''' appears in the '''Selected File(s)''' group and that the '''Add/Remove''' button is active.
  
 
====Adding the Second Asana Import Source Plan====  
 
====Adding the Second Asana Import Source Plan====  
Line 155: Line 148:
 
Click the '''Add/Remove''' button which accesses the '''Data source selection''' form as shown below:
 
Click the '''Add/Remove''' button which accesses the '''Data source selection''' form as shown below:
  
<center>[[File:P71-8_5_3-71-(11)-12012021.png]]</center>
 
<center>P71-8_5_3-71-(11)-12012021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(11)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(11)-10052023.png]]</center>
<center>P72-8_5_9-72-(11)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(11)-10052023.png</center>-->
  
We want to now '''add''' the other Asana '''source plan''' to the '''source packet'''.  To do this, click the '''ADD''' button in the '''Data source selection''' form and a Windows '''Open''' form appears.  Navigate to the desired '''source plan''', select it, and then click the '''Open''' button as shown below:  
+
We want to now '''add''' the second Asana '''source plan''' to the '''source packet'''.  To do this, click the '''Add''' button in the '''Data source selection''' form and a Windows '''Open''' form appears.  Navigate to the desired '''source plan''', select it, and then click the '''Open''' button as shown below:  
  
<center>[[File:P71-8_5_3-71-(12)-12012021.png]]</center>
 
<center>P71-8_5_3-71-(12)-12012021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(12)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(12)-10052023.png]]</center>
<center>P72-8_5_9-72-(12)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(12)-10052023.png</center>-->
  
After you’ve completed placing the second Asana '''source plan''' into the '''source packet''', the window in the '''Data source selection''' form looks like this:
+
Repeat the process shown above to add the third Asana '''source plan''' to the '''source packet'''.
 +
 
 +
After you’ve completed placing the third Asana '''source plan''' into the '''source packet''', the window in the '''Data source selection''' form looks like this:
  
<center>[[File:P71-8_5_3-71-(13)-12012021.png]]</center>
 
<center>P71-8_5_3-71-(13)-12012021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(13)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(13)-10052023.png]]</center>
<center>P72-8_5_9-72-(13)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(13)-10052023.png</center>-->
  
When you click the '''OK''' button above, the '''OPC''' form is '''updated''' to reflect that two (2) '''source plans''' are in the '''source packet''' and the '''title''' for the new chart that we typed in as shown here:
+
When you click the '''OK''' button above, the '''OPC''' form is '''updated''' to reflect that three (3) '''source plans''' are in the '''source packet''' and the '''title''' for the new chart that we typed in as shown here:
  
<center>[[File:P71-8_5_3-71-(14)-12012021.png]]</center>
 
<center>P71-8_5_3-71-(14)-12012021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(14)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(14)-10052023.png]]</center>
<center>P72-8_5_9-72-(14)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(14)-10052023.png</center>-->
  
 
====Create the NEW OnePager - Asana Multi-Project Chart====
 
====Create the NEW OnePager - Asana Multi-Project Chart====
Line 187: Line 174:
 
When these confirmations are complete, click the '''Create new chart''' button.  The chart looks like this:
 
When these confirmations are complete, click the '''Create new chart''' button.  The chart looks like this:
  
<center>[[File:P71-8_5_3-71-(15)-12012021.png]]</center>
 
<center>P71-8_5_3-71-(15)-12012021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(15)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(15)-10052023.png]]</center>
<center>P72-8_5_9-72-(15)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(15)-10052023.png</center>-->
  
 
Once you '''merge''' all your projects into a single snapshot, you can now '''add''' a new snapshot to the chart to show how tasks changed.
 
Once you '''merge''' all your projects into a single snapshot, you can now '''add''' a new snapshot to the chart to show how tasks changed.
Line 200: Line 185:
 
<center>
 
<center>
 
{| class="wikitable"
 
{| class="wikitable"
| [[REPLACING a Snapshot via Pull Operation for Version 7.2 | REPLACING a Snapshot via Pull Operation]] 7.14.1-72
+
| [[REPLACING a Snapshot via Pull Operation for Version 7.2 | REPLACING a Snapshot via Pull Operation]] <!--7.14.1-72-->
 
|-
 
|-
| [[ADDING a Snapshot via Pull Operation for Version 7.2 | ADDING a Snapshot via Pull Operation]] 7.15.1-72
+
| [[ADDING a Snapshot via Pull Operation for Version 7.2 | ADDING a Snapshot via Pull Operation]] <!--7.15.1-72-->
 
|}
 
|}
 
</center>
 
</center>
Line 210: Line 195:
 
They are stored as '''file names''' and '''path names''' in the chart’s '''.TAM''' '''import source plan''' and can be accessed from the '''Data''' tab’s '''Selected file(s)''' button on the ribbon as shown below:
 
They are stored as '''file names''' and '''path names''' in the chart’s '''.TAM''' '''import source plan''' and can be accessed from the '''Data''' tab’s '''Selected file(s)''' button on the ribbon as shown below:
  
<center>[[File:P71-8_5_3-71-(16)-12012021.png]]</center>
 
<center>P71-8_5_3-71-(16)-12012021.png</center>
 
 
<center>[[File:P72-8_5_9-72-(16)-10052023.png]]</center>
 
<center>[[File:P72-8_5_9-72-(16)-10052023.png]]</center>
<center>P72-8_5_9-72-(16)-10052023.png</center>
+
<!--<center>P72-8_5_9-72-(16)-10052023.png</center>-->
  
 
Validating the contents of the '''source packet''' and assuring that these are the Asana '''source plans''' that were '''updated''' is an essential step before proceeding to perform a project '''update'''.
 
Validating the contents of the '''source packet''' and assuring that these are the Asana '''source plans''' that were '''updated''' is an essential step before proceeding to perform a project '''update'''.
 
==Creating a Multi-Project Chart from Asana Report Imported as a Single Source Plan==
 
 
===Introduction===
 
 
Asana supports the creation of '''Asana Reports''' of several kinds and in the context of OnePager we are focusing on the '''Asana Reports''' created from one or more Asana Gantt charts.  The procedure for creating '''Asana Reports''' of '''multiple Gantt charts''' is covered within the Asana Application.  In this section we'll use a '''Asana Report''' made up of four (4) separate '''Asana Gantt charts''' as described in the example that follows
 
 
Suppose you have '''multiple''' Asana '''source plans''' that are related and you want to create a '''single''' chart from these Asana '''source plans''' that are organized into a '''Asana Report'''.  The chart mujst show the important schedule items and will be '''updated''' as the project proceeds.  Whenever chart '''updates''' are contemplated in the future OnePager requires that tasks being '''imported''' have '''unique task identifiers''' that OnePager can use to keep the '''updates''' aligned.  Asana '''source plans''' have '''unique task identifiers''' built in and the data are '''imported''' when OnePager '''imports''' the Asana '''source plan'''.  OnePager makes these '''unique task identifiers''' available in the OnePager  '''Chart Editor''' as the '''Asana Task ID''' field which is discussed later.
 
 
For more information on '''Asana Task ID''', please see the section in the article at:
 
 
<center>
 
{| class="wikitable"
 
| [[Merging the Wrong Tasks into a Chart for Version 7.2 - OnePager Bundle - Asana#The Task ID Field |  The Task ID Field]] 7.22.1-72
 
|}
 
</center>
 
 
===Making a Multi-Project Chart from a Asana Report===
 
 
To illustrate what is needed, let’s construct a '''Asana Report''' from four (4) charts related to the '''BlueGrass Project Plan''' Asana '''source plan''' as shown below:
 
 
<center>'''Merlin Project Phases 1'''</center>
 
 
<center>[[File:P71-8_5_3-71-(20)-05252022.png]]</center>
 
<center>P71-8_5_3-71-(20)-05252022.png</center>
 
<center>[[File:P72-8_5_9-72-(20)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(20)-10052023.png</center>
 
 
<center>'''Merlin Project Phases 2'''</center>
 
 
<center>[[File:P71-8_5_3-71-(21)-05252022.png]]</center>
 
<center>P71-8_5_3-71-(21)-05252022.png</center>
 
<center>[[File:P72-8_5_9-72-(21)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(21)-10052023.png</center>
 
 
<center>'''Adonis Project Phases 1'''</center>
 
 
<center>[[File:P71-8_5_3-71-(22)-05252022.png]]</center>
 
<center>P71-8_5_3-71-(22)-05252022.png</center>
 
<center>[[File:P72-8_5_9-72-(22)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(22)-10052023.png</center>
 
 
<center>'''Adonis Project Phases 2'''</center>
 
 
<center>[[File:P71-8_5_3-71-(23)-05252022.png]]</center>
 
<center>P71-8_5_3-71-(23)-05252022.png</center>
 
<center>[[File:P72-8_5_9-72-(23)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(23)-10052023.png</center>
 
 
Using these four (4) Asana files, create a '''Asana Report''' named '''Report Project Ocean (Adonis & Merlin)''' and save it in your Asana account.
 
 
====Important Note====
 
 
Each of the Asana '''source plans''' above have unique '''Asana Task ID''' fields with '''unique numbers''' generated by OnePager at '''source plan import'''.  It is important throughout the use of these Asana '''source plans''' that these assigned unique '''Asana Task ID''' numbers remain with their respective tasks.  '''Dates''' can change in the Asana '''source plan's''' rows along with other '''updated''' information as the projects progress, but the '''Asana Task ID''' number '''must''' remain associated with the task activity.  Tasks can be '''deleted''', but the '''deleted Asana Task ID''' should not be '''reused''' for a later snapshot.  OnePager can process out of sequence '''Asana Task ID''' numbers.
 
 
===Setting the One Pager Template Properties Form for a Multi-Project Chart===
 
 
The next step is to select and '''update''' an appropriate '''Template Properties''' form. 
 
 
For this illustration we’ve selected the '''Multi-Project Gantt Chart – Detailed Template Properties''' form.  Once the current '''Template Properties''' form is established as a '''multiple-project Template Properties''' form, go to the '''Rows/Swimlanes''' tab and make sure that the '''Group rows into swimlanes''' and '''Label swimlanes by''' windows are set to '''Project''' for the '''Left#1 swimlane'''.  Additionally, we want to show the four projects as swimlanes so change the label for '''Left#2 swimlane''' to '''Project name'''.  Since we plan to be interested in '''project risk''', make sure that the '''Group rows into swimlanes''' and '''Label swimlanes by''' windows are set to '''Category''' for the '''Left#3 swimlane'''. 
 
 
The '''Rows/Swimlanes''' tab in the '''Template Properties''' form looks like this:
 
 
<center>[[File:P71-8_5_3-71-(24A)-06062022.png]]</center>
 
<center>P71-8_5_3-71-(24A)-06062022.png</center>
 
<center>[[File:P72-8_5_9-72-(24A)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(24A)-10052023.png</center>
 
 
When the steps above are completed and the '''Template Properties''' form is '''updated''', click the '''Save and use''' button to make the modified '''Template Properties''' form the current '''Template'''.
 
 
===Create a Multi-Project Chart from a Asana Report===
 
 
Next, launch OnePager Bundle.  The '''OnePager Bundle Start''' form appears. 
 
 
Click the '''NEW''' button which accesses the OnePager choices ('''OPC''') form.
 
 
Then, click the '''Select''' button in the '''Select File(s)''' section of the '''OPC''' form and navigate to select the '''Report Project Ocean (Adonis & Merlin)''' as shown below:
 
 
<center>[[File:P71-8_5_3-71-(25)-05252022.png]]</center>
 
<center>P71-8_5_3-71-(25)-05252022.png</center>
 
<center>[[File:P72-8_5_9-72-(25)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(25)-10052023.png</center>
 
 
Next, use the '''Change''' button in the '''Starting Template''' section to make sure that your updated '''Template Properties''' form is selected as shown here:
 
 
<center>[[File:P71-8_5_3-71-(26A)-06062022.png]]</center>
 
<center>P71-8_5_3-71-(26A)-06062022.png</center>
 
 
With this done, name the chart '''Report Project Ocean (Adonis & Merlin)''', '''save''' it, and make sure that '''Show It''' is selected '''Task Selection''' section as shown here:
 
 
<center>[[File:P71-8_5_3-71-(27)-05252022.png]]</center>
 
<center>P71-8_5_3-71-(27)-05252022.png</center>
 
<center>[[File:P72-8_5_9-72-(27)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(27)-10052023.png</center>
 
 
When these confirmations are complete, click the '''Create new chart''' button.  The chart looks like this:
 
 
<center>[[File:P71-8_5_3-71-(28A)-06062022.png]]</center>
 
<center>P71-8_5_3-71-(28A)-06062022.png</center>
 
<center>[[File:P72-8_5_9-72-(28A)-10052023.png]]</center>
 
<center>P72-8_5_9-72-(28A)-10052023.png</center>
 
 
Once you created the chart from a '''Asana Report''' the chart can be managed as a single snapshot. You can now '''add''' a new snapshot to the chart to show how tasks changed by updating the constituent project charts and updating your '''Asana Report''' before accessing it to create a new snapshot.
 
 
===Updating a Chart Created from a Asana Report===
 
 
Eventually you want to '''update''' your '''Asana Report''' based chart by either '''adding''' a snapshot or '''replacing''' a snapshot with '''updated''' data.  To perform either the '''add''' or the '''replace''' snapshot, the processes described in these two referenced article references that follow can be used.
 
 
<center>
 
{| class="wikitable"
 
| [[REPLACING a Snapshot via Pull Operation for Version 7.2 | REPLACING a Snapshot via Pull Operation]] 7.14.1-72
 
|-
 
| [[ADDING a Snapshot via Pull Operation for Version 7.2 | ADDING a Snapshot via Pull Operation]] 7.15.1-72
 
|}
 
</center>
 
 
The key to making '''updated''' '''Asana Report''' created charts involving '''multiple''' Asana '''source plan''' is the proper management of the Asana data at the '''Asana file level'''.  Recall that the '''Asana files''' contains the '''source plan(s)''' that are to be used to either create or '''update''' a '''Asana Report''' based chart.
 
  
 
==Related Links==
 
==Related Links==
  
 
{| class="wikitable"
 
{| class="wikitable"
| [[Creating a NEW Chart via Pull Operation Feature for Version 7.2 | Creating a NEW Chart via Pull Operation Feature]] 7.13.1-72
+
| [[Creating a NEW Chart via Pull Operation Feature for Version 7.2 | Creating a NEW Chart via Pull Operation Feature]] <!--7.13.1-72-->
| [[REPLACING a Snapshot via Pull Operation for Version 7.2 | REPLACING a Snapshot via Pull Operation]] 7.14.1-72
+
| [[REPLACING a Snapshot via Pull Operation for Version 7.2 | REPLACING a Snapshot via Pull Operation]] <!--7.14.1-72-->
 
|-
 
|-
| [[ADDING a Snapshot via Pull Operation for Version 7.2 | ADDING a Snapshot via Pull Operation]] 7.15.1-72
+
| [[ADDING a Snapshot via Pull Operation for Version 7.2 | ADDING a Snapshot via Pull Operation]] <!--7.15.1-72-->
| [[Using the OnePager "Data" Tab's "Selected file(s)" Button for Version 7.2 | Using the OnePager "Data" Tab's "Selected file(s)" Button]] 7.17.1-72
+
| [[Using the OnePager "Data" Tab's "Selected file(s)" Button for Version 7.2 | Using the OnePager "Data" Tab's "Selected file(s)" Button]] <!--7.17.1-72-->
 
|-
 
|-
| [[Merging the Wrong Tasks into a Chart for Version 7.2 - OnePager Bundle - Asana | Merging the Wrong Tasks into a Chart - OnePager Bundle - Asana]] 7.22.1-72
+
| [[Merging the Wrong Tasks into a Chart for Version 7.2 - OnePager Bundle - Asana | Merging the Wrong Tasks into a Chart - OnePager Bundle - Asana]] <!--7.22.5-72-->
| [[OnePager's Ribbon Tool Bar Data Tab for Version 7.2 | OnePager's Ribbon Tool Bar Data Tab]] 4.0.2.2.7-72
+
| [[OnePager's Ribbon Tool Bar Data Tab for Version 7.2 | OnePager's Ribbon Tool Bar Data Tab]] <!--4.0.2.2.7-72-->
 
|}
 
|}
  

Latest revision as of 18:46, 9 January 2024

Overview

One of the strength of OnePager is its ability to create compact visual representations of multiple projects that are part of a single Asana import source plan as well as create OnePager charts from multiple single Asana files. These can be several projects that belong to one program or they can be several projects and programs in an organization’s portfolio. Representing multiple projects originating in a single Asana source plan can, therefore, be easily done with the creative selection of Row and Swimlane fields from the Asana source plan.

The OnePager Bundle Standalone application can import these multi-project Asana import source plans and produce multi-project charts.

Additionally, OnePager has the capability to build multi-project charts from individual Asana exported files.

Creating a Multi-Project Chart from a Multi-Project Asana Import Source Plan

One method for using a single Asana import source plan is to add a field to your source plan with a field name of Project. This name is recognized by OnePager and is utilized in multi-project Template Properties form shipped with the product. An example Asana source plan with the Project field is shown below:

P72-8 5 9-72-(1)-10052023.png

After configuring your Asana source plan with the Project field and the necessary multi-project schedule data, you can create a useful multi-project chart by following the steps described in the next section.

Launch OnePager and connect to your Asana account. Select the NEW option on the OnePager Bundle Start form and select the Asana multi-project file shown here:

P72-7 2 3-72-(2)-05152023.png

Creating a NEW Chart from a Multi-Project Source Plan

Next, click the NEW button on the OnePager Bundle Start form. This accesses the OnePager choices (OPC) form where clicking the Select command in the Please select a source file sub-control group enables you to BROWSE Asana ... import source plans or to select a RECENT import source plan as shown here:

P72-8 5 9-72-(3)-10052023.png

For this illustration, we'll select the source plan named BlueGrass Project. When we do this, the OPC form is expanded to look like this:

P72-8 5 9-72-(3A)-10052023.png

Before creating the NEW multi-project chart we must change the Template Properties form to support the creation of a chart from a multi-project source plan as described below.

Setting up the OnePager Template Properties Form for a Multi-Project Chart

As shown above, the OnePager choices (OPC) form does not show that a multi-project Template Properties form is being used. Before proceeding further we must change the Template Properties form's setting so that a multi-project Template Properties form is used to create the chart. This is done by clicking the Change button in the Starting Template group of the form as shown below:

P72-8 5 9-72-(3B)-10052023.png

Clicking the Change button accesses the folder where OnePager stores Asana Template Properties forms distributed with the product as shown above. Select the Multi-Project Gantt Chart - Detailed for Asana entry in the window shown above and click the Open button at the bottom of the form. When you click the Open button on the Open form shown above, OnePager changes the current Template Properties form to the Multi-Project Gantt Chart – Detailed for Asana Template.

After changing the Template Properties selection, type in the title of the chart and assure that the Task Selection sub-control group's controls are set to import the tasks you need for your chart.

Use the Asana Source Plan to Create the Chart

You are now ready to create the multi-project chart. First, click the Next> button (shown above) which takes you to the second page of the OPC form shown below:

P72-8 5 9-72-(4)-10052023.png

Next, check your field mapping settings or make any Template Properties form adjustments. When you are finished, click the Create new chart button on the second page. OnePager generates a multi-project chart that looks like this:

P72-8 5 9-72-(5)-10052023.png

The chart above represents two separate projects using the swimlanes to organize the tasks/milestones for each project grouping. As the projects progress and additional projects are added, the additional swimlanes with their corresponding rows are added to the chart in future snapshots.

Updating Charts Created from Multiple Projects in a Single Asana Import Source Plan

Eventually you want to update your multi-project chart by either adding a snapshot or replacing a snapshot. To perform either the add or the replace snapshot, the processes described in these two referenced article references that follow can be used.

REPLACING a Snapshot via Pull Operation
ADDING a Snapshot via Pull Operation

The key to making updates to multi-project charts from multiple-projects contained in a single Asana source plan is the proper management of the Asana source plan data in the source packet. Recall that the source packet contains the import source plan or import source plans that are to be used to either create or update a chart. They are stored as file names and path names in the chart’s .TAM file, and can be accessed from the OnePager Data ribbon tool bar tab’s Selected file(s) button on the ribbon as shown below:

P72-8 5 9-72-(6)-10052023.png

Validating the contents of the source packet and assuring that these are the Asana source plans that were updated is an essential step before proceeding to perform a chart update.

Creating a Multi-Project Chart from Individual Single-Project Asana Import Source Plans

Introduction

Suppose you have multiple Asana source plans that are related and you want to create a single chart that shows the important schedule items and will be updated as the project proceeds. Whenever chart updates are contemplated in the future OnePager requires that tasks being imported have unique task identifiers that OnePager can use to keep the updates aligned. Asana source plans have unique task identifiers built in and the data are imported when OnePager imports the Asana source plan. OnePager makes these unique task identifiers available in the OnePager Chart Editor as the Asana ID field which is discussed later.

For more information on Asana ID, please see the section in the article at:

Asana - The ID Field

Making a Multi-Project Chart from Separate Asana Source Plans

To illustrate what is needed, let’s construct a multi-project chart from three simple source plans - Project A, Project B, and Project C. Each has essentially the same tasks and WBS structure but each has different Asana ID values. The three source plans are shown below:

Project A
P72-8 5 9-72-(7-1)-10052023.png
Project B
P72-8 5 9-72-(8)-10052023.png
Project C
P72-8 5 9-72-(8A)-10052023.png

Important Note

Each of the Asana source plans above have unique Asana ID fields with unique numbers generated by OnePager at source plan import. It is important throughout the use of these Asana source plans that these assigned unique Asana ID values remain with their respective tasks. Dates can change in the Asana source plan's rows along with other updated information as the projects progress, but the Asana ID values must remain associated with the task activity. Tasks can be deleted, but the deleted Asana Internal should not be reused for a later snapshot. OnePager can process out of sequence Asana ID numbers.

Setting up the One Pager Template Properties Form for a Multi-Project Chart

The next step is to select and update an appropriate Template Properties form.

For this illustration we’ve selected the Multi-Project Gantt Chart – Detailed for Planisware Template Properties form. Once the current Template Properties form is established as a multiple-project Template Properties form, go to the Rows/Swimlanes tab and make sure that the Group rows into swimlanes and Label swimlanes by windows are set to Project name. Also, for this illustration, make sure that text columns are displayed and that the Custom Text Columns are set to Level 2 summary name which is the WBS level for Phases.

The Rows/Swimlanes tab in the Template Properties form looks like this:

P72-8 5 9-72-(9)-10052023.png

When the steps above are completed and the Template Properties form for is updated, click the Save and use button to make the modified Template Properties form the current Template.

Create a Multi-Project Chart from Separate Multiple Asana Import Source Plans

Launch Asana and Load the First Asana Import Source Plan

Launch Asana, open the first of the multi-project Asana source plans, and make any editing changes necessary. In this case it’s the Project A file.

Next, launch OnePager Bundle. The OnePager Bundle Start form appears.

Click the NEW button which accesses the OnePager choices (OPC) form as shown below:

P72-8 5 9-72-(10)-10052023.png

Note that the Project A Asana source plan appears in the Selected File(s) group and that the Add/Remove button is active.

Adding the Second Asana Import Source Plan

Click the Add/Remove button which accesses the Data source selection form as shown below:

P72-8 5 9-72-(11)-10052023.png

We want to now add the second Asana source plan to the source packet. To do this, click the Add button in the Data source selection form and a Windows Open form appears. Navigate to the desired source plan, select it, and then click the Open button as shown below:

P72-8 5 9-72-(12)-10052023.png

Repeat the process shown above to add the third Asana source plan to the source packet.

After you’ve completed placing the third Asana source plan into the source packet, the window in the Data source selection form looks like this:

P72-8 5 9-72-(13)-10052023.png

When you click the OK button above, the OPC form is updated to reflect that three (3) source plans are in the source packet and the title for the new chart that we typed in as shown here:

P72-8 5 9-72-(14)-10052023.png

Create the NEW OnePager - Asana Multi-Project Chart

When you click the Next> button, OnePager goes to the second page of the OPC form where you can confirm other settings or make any Template Properties form setting changes.

When these confirmations are complete, click the Create new chart button. The chart looks like this:

P72-8 5 9-72-(15)-10052023.png

Once you merge all your projects into a single snapshot, you can now add a new snapshot to the chart to show how tasks changed.

Updating a Chart Created from Multiple Asana Import Source Plans

Eventually you want to update your multi-project chart by either adding a snapshot or replacing a snapshot with updated data. To perform either the add or the replace snapshot, the processes described in these two referenced article references that follow can be used.

REPLACING a Snapshot via Pull Operation
ADDING a Snapshot via Pull Operation

The key to making updated multi-project charts from multiple Asana source plan is the proper management of the Asana data in the source packet. Recall that the source packet contains the source plan(s) that are to be used to either create or update a chart.

They are stored as file names and path names in the chart’s .TAM import source plan and can be accessed from the Data tab’s Selected file(s) button on the ribbon as shown below:

P72-8 5 9-72-(16)-10052023.png

Validating the contents of the source packet and assuring that these are the Asana source plans that were updated is an essential step before proceeding to perform a project update.

Related Links

Creating a NEW Chart via Pull Operation Feature REPLACING a Snapshot via Pull Operation
ADDING a Snapshot via Pull Operation Using the OnePager "Data" Tab's "Selected file(s)" Button
Merging the Wrong Tasks into a Chart - OnePager Bundle - Asana OnePager's Ribbon Tool Bar Data Tab

(8.5.9-72)