Difference between revisions of "Modifying the Time Axis for Version 5.3 (Portal)"
From OnePager Documentation
(→About Modifying the Time Axis) |
(→About Modifying the Time Axis) |
||
Line 14: | Line 14: | ||
|- | |- | ||
| [[Creating a Countdown to Project End by Months on the Time Axis (OnePager Pro) | Creating a Countdown to Project End by Months on the Time Axis-OnePager Pro]] | | [[Creating a Countdown to Project End by Months on the Time Axis (OnePager Pro) | Creating a Countdown to Project End by Months on the Time Axis-OnePager Pro]] | ||
+ | | [[Creating a Countdown to Project End by Months on the Time Axis (OnePager Express) | Creating a Countdown to Project End by Months on the Time Axis-OnePager Express]] | ||
|- | |- | ||
| [[Changing the Time Axis Background Color]] | | [[Changing the Time Axis Background Color]] |
Latest revision as of 14:21, 11 April 2016
About Modifying the Time Axis
The time axis is an integral part of the project view. It can be displayed at the top and/or the bottom of the graph. It can be displayed in many formats to suit your needs and can be displayed in multiple levels as shown below:
Use the following links to learn more about the OnePager time axis:
(22.0.1-53)