Difference between revisions of "OnePager Import of Data from Wrike for Version 7.2"

From OnePager Documentation
Jump to: navigation, search
(Representing Multiple Resources)
 
Line 1: Line 1:
 
==Introduction==
 
==Introduction==
  
The purpose of this article is to provide you one place with as much information as possible about how '''OnePager''' is used to create OnePager charts with data '''imported '''from Wrike.
+
The purpose of this article is to provide you one place with as much information as possible about how OnePager is used to create OnePager charts with data '''imported '''from Wrike.
  
In most cases '''OnePager''' handles data fields from Wrike very much like data coming from Microsoft Excel.  This article focuses on two major topics:
+
In most cases OnePager handles data fields from Wrike very much like data coming from Microsoft Excel.  This article focuses on two major topics:
  
:1) Connecting to and '''importing''' Wrike data into '''OnePager'''.
+
:1) Connecting to and '''importing''' Wrike data into OnePager.
  
 
:2) '''OnePager’s''' handling of specific Wrike '''column''' data once those data are '''imported'''.
 
:2) '''OnePager’s''' handling of specific Wrike '''column''' data once those data are '''imported'''.
  
As a convention, whenever we refer to the '''OnePager''' in the context of Wrike, we'll just say '''OnePager''' when it’s absolutely clear that we are discussing '''OnePager''' with Wrike.  Since only the '''Standalone''' edition of '''OnePager''' connects to Wrike files online, we'll just leave the suffix '''"Standalone"''' off.
+
As a convention, whenever we refer to the OnePager in the context of Wrike, we'll just say OnePager when it’s absolutely clear that we are discussing OnePager with Wrike.  Since only the '''Standalone''' edition of OnePager connects to Wrike files online, we'll just leave the suffix '''"Standalone"''' off.
  
 
==About Connecting and Importing Wrike Data to OnePager==
 
==About Connecting and Importing Wrike Data to OnePager==
  
'''OnePager imports '''data from Wrike by first making the '''connection''' from '''OnePager '''to your Wrike account online.  Therefore, you must first have a Wrike account and '''login credentials''' so '''OnePager '''can access your account, your Wrike files, and be able to download selected file or files to your computer.
+
'''OnePager imports '''data from Wrike by first making the '''connection''' from OnePager to your Wrike account online.  Therefore, you must first have a Wrike account and '''login credentials''' so OnePager can access your account, your Wrike files, and be able to download selected file or files to your computer.
  
Detailed information on setting up you Wrike data for import to '''OnePager''' and other topics related to '''getting started using OnePager Bundle''' can be found at this article:  
+
Detailed information on setting up you Wrike data for import to OnePager and other topics related to '''getting started using OnePager Bundle''' can be found at this article:  
  
 
<center>
 
<center>
Line 25: Line 25:
 
===Data Imports to OnePager===
 
===Data Imports to OnePager===
  
'''OnePager''' expects that you created a Wrike '''Project formatted''' file from one of the many available Wrike templates.  In most cases, the '''column headings''' for the '''Project formatted '''file look like this:  
+
OnePager expects that you created a Wrike '''Project formatted''' file from one of the many available Wrike templates.  In most cases, the '''column headings''' for the '''Project formatted '''file look like this:  
  
 
<center>[[File:P72-4_0_1_15-72-(1)-04282023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(1)-04282023.png]]</center>
Line 32: Line 32:
 
====Minimum Column Names and Flag Column Definition====
 
====Minimum Column Names and Flag Column Definition====
  
The minimum '''Column names''' needed by '''OnePager '''are the '''Name''', '''Start date''', and '''Due date'''.    Additionally, You should add a '''user defined field''' as a '''Boolean''' field specifically to facilitate the interface between Wrike and OnePager.  Setting the checkboxes for tasks that you want to '''import''' to OnePager '''ON''' assures that OnePager can identify these tasks and successfully '''import''' them. An example is shown here:  
+
The minimum '''Column names''' needed by OnePager are the '''Name''', '''Start date''', and '''Due date'''.    Additionally, You should add a '''user defined field''' as a '''Boolean''' field specifically to facilitate the interface between Wrike and OnePager.  Setting the checkboxes for tasks that you want to '''import''' to OnePager '''ON''' assures that OnePager can identify these tasks and successfully '''import''' them. An example is shown here:  
  
 
<center>[[File:P72-4_0_1_15-72-(2)-04282023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(2)-04282023.png]]</center>
 
<!--<center>P72-4_0_1_15-72-(2)-04282023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(2)-04282023.png</center>-->
  
In the example above, the '''OnePager''' column’s purpose is to instruct '''OnePager '''on which '''rows''' to process when '''importing''' the Wrike '''Project formatted '''file. '''OnePager '''expects to see either '''ON''' or '''OFF''' appropriately entered in the cells of the '''OnePager''' column indicating which '''rows''' to '''import''' ('''ON''') and which '''rows''' not to import ('''OFF''' or '''blank''').
+
In the example above, the OnePager column’s purpose is to instruct OnePager on which '''rows''' to process when '''importing''' the Wrike '''Project formatted '''file. OnePager expects to see either '''ON''' or '''OFF''' appropriately entered in the cells of the OnePager column indicating which '''rows''' to '''import''' ('''ON''') and which '''rows''' not to import ('''OFF''' or '''blank''').
  
 
===OnePager Recognized Data Types===
 
===OnePager Recognized Data Types===
  
What follows is a short discussion of how '''OnePager '''applies it’s built in intelligence functions with respect to Wrike’s '''Internally Defined Columns'''.  The goal here is to provide an understanding of the process so you know what to expect from '''OnePager '''when various '''column heading''' names and '''data (column) types''' are encountered by '''OnePager '''in your Wrike '''source plan'''. There are four (4) '''column types''' that '''OnePager '''looks for when '''importing''' data from Wrike:
+
What follows is a short discussion of how OnePager applies it’s built in intelligence functions with respect to Wrike’s '''Internally Defined Columns'''.  The goal here is to provide an understanding of the process so you know what to expect from OnePager when various '''column heading''' names and '''data (column) types''' are encountered by OnePager in your Wrike '''source plan'''. There are four (4) '''column types''' that OnePager looks for when '''importing''' data from Wrike:
  
 
:* Dates
 
:* Dates
Line 48: Line 48:
 
:* Text Strings (A through Z, 0-9, special characters)
 
:* Text Strings (A through Z, 0-9, special characters)
  
All data provided by the Wrike interface to OnePager, regardless of '''data type''', are '''imported''' from Wrike '''Project formatted '''files.  '''OnePager '''begins this analysis from top-left to bottom-right. Once the '''column headers '''are located and the '''data types''' are analyzed, '''OnePager '''associates these '''columns''' with specific usages in the '''OnePager choices '''('''OPC''') form as illustrated below. Using the second page of the '''OPC''' form shown below, you can change the '''column''' usage by selecting another '''column''' to serve the function from the dropdown list provided.  The dropdown list is built from all the '''column headers''' that '''OnePager '''found during its analysis pass.  An example of a dropdown list of '''column header''' names taken from a Wrike '''source plan''' is shown here:
+
All data provided by the Wrike interface to OnePager, regardless of '''data type''', are '''imported''' from Wrike '''Project formatted '''files.  OnePager begins this analysis from top-left to bottom-right. Once the '''column headers '''are located and the '''data types''' are analyzed, OnePager associates these '''columns''' with specific usages in the '''OnePager choices '''('''OPC''') form as illustrated below. Using the second page of the '''OPC''' form shown below, you can change the '''column''' usage by selecting another '''column''' to serve the function from the dropdown list provided.  The dropdown list is built from all the '''column headers''' that OnePager found during its analysis pass.  An example of a dropdown list of '''column header''' names taken from a Wrike '''source plan''' is shown here:
  
 
<center>[[File:P72-4_0_1_15-72-(4)-04272023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4)-04272023.png]]</center>
 
<!--<center>P72-4_0_1_15-72-(4)-04272023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(4)-04272023.png</center>-->
  
Highlighted above is the second page of the '''OnePager choices '''form showing a dropdown list of Wrike available '''column names''' along with '''virtual column names '''created by '''OnePager'''.
+
Highlighted above is the second page of the '''OnePager choices '''form showing a dropdown list of Wrike available '''column names''' along with '''virtual column names '''created by OnePager.
  
 
==Selecting Tasks for Import into OnePager==
 
==Selecting Tasks for Import into OnePager==
  
Since '''OnePager '''is connected to your Wrike account, it has access to your '''Project formatted '''files.  Anyone of these files can be '''imported''' into '''OnePager '''and a chart created.  The benefit derived from '''OnePager '''is that you can select the tasks you which to display in your '''OnePager '''chart along with other decorations and features that are best for presentation in a schedule discussion.   
+
Since OnePager is connected to your Wrike account, it has access to your '''Project formatted '''files.  Anyone of these files can be '''imported''' into OnePager and a chart created.  The benefit derived from OnePager is that you can select the tasks you which to display in your OnePager chart along with other decorations and features that are best for presentation in a schedule discussion.   
  
A way to set up a Wrike '''Project formatted '''file for '''import''' to '''OnePager '''is to include the Wrike '''OnePager''' field in your '''source plan''' and set the '''Boolean''' value of '''ON''' in the cells for each row in your source plan that you want '''OnePager '''to '''import'''.  For illustration here we’ve define the Wrike '''defined column''' called '''OnePager''' as a '''checkbox column''' and with inserted '''“Checkmarks”''' and '''“Unchecked Boxes”''' to indicate to '''OnePager '''which tasks we wish to '''import'''.  This is illustrated in the '''source plan '''portion below:
+
A way to set up a Wrike '''Project formatted '''file for '''import''' to OnePager is to include the Wrike OnePager field in your '''source plan''' and set the '''Boolean''' value of '''ON''' in the cells for each row in your source plan that you want OnePager to '''import'''.  For illustration here we’ve define the Wrike '''defined column''' called OnePager as a '''checkbox column''' and with inserted '''“Checkmarks”''' and '''“Unchecked Boxes”''' to indicate to OnePager which tasks we wish to '''import'''.  This is illustrated in the '''source plan '''portion below:
  
 
<center>[[File:P72-4_0_1_15-72-(4A)-04282023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4A)-04282023.png]]</center>
 
<!--<center>P72-4_0_1_15-72-(4A)-04282023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(4A)-04282023.png</center>-->
  
When making your first chart, we strongly recommend that you '''import''' 50 or fewer '''Tasks'''. Please note that '''OnePager '''is shipped with a number of fully populated '''templates''' that are based on the Wrike '''source plan''' used in the '''Tutorial''' shipped with the product – '''BlueGrass Project Plan'''. Three '''column headings''' must always be present as a minimum: '''Name''',''' Start date''',''' '''and''' Due date'''.
+
When making your first chart, we strongly recommend that you '''import''' 50 or fewer '''Tasks'''. Please note that OnePager is shipped with a number of fully populated '''templates''' that are based on the Wrike '''source plan''' used in the '''Tutorial''' shipped with the product – '''BlueGrass Project Plan'''. Three '''column headings''' must always be present as a minimum: '''Name''',''' Start date''',''' '''and''' Due date'''.
  
Once you’ve made the determination which '''source plan''' tasks to '''import''' you can launch '''OnePager '''and create your '''OnePager '''chart.
+
Once you’ve made the determination which '''source plan''' tasks to '''import''' you can launch OnePager and create your OnePager chart.
  
 
This discussion continues at this link:   
 
This discussion continues at this link:   
Line 80: Line 80:
 
====Task Selection Option (1): Select All Tasks====
 
====Task Selection Option (1): Select All Tasks====
  
Wrike '''source plans''' like the one shown above with many tasks results in a very large '''OnePager''' chart usually not suitable for detailed schedule conversations.  Accordingly, we do not recommend '''importing '''more than 50 tasks so that the resulting chart is a useful one page rendering of the '''source plan'''. However, for small projects where the number of tasks falls below the recommended maximum, using the '''Select all tasks''' shown in the '''Task Selection''' sub-control group of the '''OnePager choice''' form below is an easy way to specify this option:
+
Wrike '''source plans''' like the one shown above with many tasks results in a very large OnePager chart usually not suitable for detailed schedule conversations.  Accordingly, we do not recommend '''importing '''more than 50 tasks so that the resulting chart is a useful one page rendering of the '''source plan'''. However, for small projects where the number of tasks falls below the recommended maximum, using the '''Select all tasks''' shown in the '''Task Selection''' sub-control group of the '''OnePager choice''' form below is an easy way to specify this option:
  
 
<center>[[File:P72-4_0_1_15-72-(4B)-04282023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4B)-04282023.png]]</center>
Line 87: Line 87:
 
====Task Selection Option (2): Select Tasks with ‘Yes’ in field:====
 
====Task Selection Option (2): Select Tasks with ‘Yes’ in field:====
  
As mentioned above, one method for telling '''OnePager '''which '''tasks''' to '''import '''is to use a '''Flag''' '''column'''.  As shown in the previous section, the Wrike '''source plan''' has a '''User Defined Column '''Boolean field named '''OnePager''' and when the associated checkbox is checked '''ON''' that task is '''imported '''into '''OnePager'''.  Here is an illustration of the '''OnePager choices''' form where a '''Flag column''' is used to select tasks from the '''source plan''':
+
As mentioned above, one method for telling OnePager which '''tasks''' to '''import '''is to use a '''Flag''' '''column'''.  As shown in the previous section, the Wrike '''source plan''' has a '''User Defined Column '''Boolean field named OnePager and when the associated checkbox is checked '''ON''' that task is '''imported '''into OnePager.  Here is an illustration of the '''OnePager choices''' form where a '''Flag column''' is used to select tasks from the '''source plan''':
  
 
<center>[[File:P72-4_0_1_15-72-(4C)-04272023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4C)-04272023.png]]</center>
 
<!--<center>P72-4_0_1_15-72-(4C)-04272023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(4C)-04272023.png</center>-->
  
When this is done for the '''source plan '''shown above, and other appropriate settings are made for '''OnePager''', the resulting chart looks like this:
+
When this is done for the '''source plan '''shown above, and other appropriate settings are made for OnePager, the resulting chart looks like this:
  
 
<center>[[File:P72-4_0_1_15-72-(4D)-04282023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4D)-04282023.png]]</center>
 
<!--<center>P72-4_0_1_15-72-(4D)-04282023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(4D)-04282023.png</center>-->
  
As mentioned earlier, you can also use a Wrike '''checkbox '''with a unique '''column header name'''. '''OnePager''' recognizes the '''checkbox column '''as a possible '''flag column '''and makes it available in the '''OnePager choices '''form in the '''dropdown list '''for the '''Select task with ‘Yes’ in field:''' option as shown below:
+
As mentioned earlier, you can also use a Wrike '''checkbox '''with a unique '''column header name'''. OnePager recognizes the '''checkbox column '''as a possible '''flag column '''and makes it available in the '''OnePager choices '''form in the '''dropdown list '''for the '''Select task with ‘Yes’ in field:''' option as shown below:
  
 
<center>[[File:P72-4_0_1_15-72-(4J)-04282023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4J)-04282023.png]]</center>
 
<!--<center>P72-4_0_1_15-72-(4J)-04282023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(4J)-04282023.png</center>-->
  
When the '''column heading''' called '''OnePager''' is selected in the form above, '''OnePager imports''' rows where the '''OnePager checkbox '''is checked '''ON'''.
+
When the '''column heading''' called OnePager is selected in the form above, '''OnePager imports''' rows where the '''OnePager checkbox '''is checked '''ON'''.
  
 
====Task Selection Option (3): Select Tasks by custom filter: (Conditional Import Rules)====
 
====Task Selection Option (3): Select Tasks by custom filter: (Conditional Import Rules)====
  
You can use the '''Conditional Import feature''' to fine tune the tasks you want to '''import'''.  Assuming that you’re familiar with the '''Conditional Import '''feature, the '''Conditional Import Rules '''form can be accessed by selecting the '''Select tasks by custom filter: '''radio button as shown in the illustration below.  Using the '''Conditional Import Rules '''form as shown here, it is possible to select tasks between specified '''Start Dates''' and '''Due Dates''' including those where '''OnePager''' is '''TRUE'''.
+
You can use the '''Conditional Import feature''' to fine tune the tasks you want to '''import'''.  Assuming that you’re familiar with the '''Conditional Import '''feature, the '''Conditional Import Rules '''form can be accessed by selecting the '''Select tasks by custom filter: '''radio button as shown in the illustration below.  Using the '''Conditional Import Rules '''form as shown here, it is possible to select tasks between specified '''Start Dates''' and '''Due Dates''' including those where OnePager is '''TRUE'''.
  
 
<center>[[File:P72-4_0_1_15-72-(4E-5)-06232023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4E-5)-06232023.png]]</center>
Line 128: Line 128:
 
===Using Other Columns as Flag Columns in Wrike===
 
===Using Other Columns as Flag Columns in Wrike===
  
'''OnePager '''offers a wide range of Wrike '''column''' and '''data types''' to be used as a '''flag '''for controlling the '''import''' of '''rows''' for making OnePager charts as shown below:   
+
OnePager offers a wide range of Wrike '''column''' and '''data types''' to be used as a '''flag '''for controlling the '''import''' of '''rows''' for making OnePager charts as shown below:   
  
 
<center>[[File:P72-4_0_1_15-72-(4J-A)-005012023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(4J-A)-005012023.png]]</center>
 
<!--<center>P72-4_0_1_15-72-(4J-A)-005012023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(4J-A)-005012023.png</center>-->
  
'''OnePager '''is set to recognize only '''“Boolean”''' situations that resolve to either '''TRUE''' '''import''' to OnePager or '''FALSE''' do not '''import''' to '''OnePager'''.
+
OnePager is set to recognize only '''“Boolean”''' situations that resolve to either '''TRUE''' '''import''' to OnePager or '''FALSE''' do not '''import''' to OnePager.
  
 
====Integers Used as Flag Columns in Wrike====
 
====Integers Used as Flag Columns in Wrike====
Line 141: Line 141:
 
====Decimal Numbers Used as Flag Columns in Wrike====
 
====Decimal Numbers Used as Flag Columns in Wrike====
  
'''Number columns''' that contain an '''integer and decimal fraction''' are eligible to become '''flag''' when their contents are either '''1.0''' or '''0.0'''.  However, such fields are not picked up by '''OnePager '''as a '''flag '''as discussed above for Wrike '''text fields'''.  Therefore, we do not recommend that '''Number columns''' be used for the purpose of general task selection.  Accordingly, it is still useful to consider '''number columns''' for task selection if the values contained in these '''number column '''cells need to be used for decision making on which tasks should be '''imported'''.  
+
'''Number columns''' that contain an '''integer and decimal fraction''' are eligible to become '''flag''' when their contents are either '''1.0''' or '''0.0'''.  However, such fields are not picked up by OnePager as a '''flag '''as discussed above for Wrike '''text fields'''.  Therefore, we do not recommend that '''Number columns''' be used for the purpose of general task selection.  Accordingly, it is still useful to consider '''number columns''' for task selection if the values contained in these '''number column '''cells need to be used for decision making on which tasks should be '''imported'''.  
  
 
====Checkboxes Used as Flag Columns in Wrike====
 
====Checkboxes Used as Flag Columns in Wrike====
Line 150: Line 150:
 
<!--<center>P72-4_0_1_15-72-(4A)-04282023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(4A)-04282023.png</center>-->
  
'''OnePager''' recognizes '''Checkbox columns''' in Wrike as possible '''flag '''columns and makes the '''column''' available in the '''flag '''column selection process discussed later in this article.
+
OnePager recognizes '''Checkbox columns''' in Wrike as possible '''flag '''columns and makes the '''column''' available in the '''flag '''column selection process discussed later in this article.
  
 
==Intelligent Changes Made to OnePager Current Template Properties Forms==
 
==Intelligent Changes Made to OnePager Current Template Properties Forms==
  
'''OnePager '''is shipped to you with a predefined set of '''Template Properties''' forms.  This means that all '''column '''usage settings within these shipped '''Template Properties''' forms are based upon a typical Wrike '''source plan'''. Since the flexibility of Wrike is considered in the design of '''OnePager''', it is necessary to '''update''' the current '''Template Properties''' form based upon '''your''' Wrike '''source plan'''. Accordingly, '''OnePager '''uses the analysis techniques discussed above to modify the '''current Template Properties''' form.  '''OnePager''' makes intelligent choices and recommendations on Wrike '''source plan column''' usage based on the findings of the intelligent engine.   
+
OnePager is shipped to you with a predefined set of '''Template Properties''' forms.  This means that all '''column '''usage settings within these shipped '''Template Properties''' forms are based upon a typical Wrike '''source plan'''. Since the flexibility of Wrike is considered in the design of OnePager, it is necessary to '''update''' the current '''Template Properties''' form based upon '''your''' Wrike '''source plan'''. Accordingly, OnePager uses the analysis techniques discussed above to modify the '''current Template Properties''' form.  OnePager makes intelligent choices and recommendations on Wrike '''source plan column''' usage based on the findings of the intelligent engine.   
  
 
You can change or override these findings as follows:  
 
You can change or override these findings as follows:  
Line 167: Line 167:
 
:3) The settings found in the '''Row & Swimlanes''' tab are determined by the '''current Template Properties''' form and by the intelligent analysis described above.  
 
:3) The settings found in the '''Row & Swimlanes''' tab are determined by the '''current Template Properties''' form and by the intelligent analysis described above.  
  
:4) If your Wrike '''source plan''' contains a '''column heading''' that exists in the '''Template Properties''' form, '''OnePager '''uses that '''column'''.   
+
:4) If your Wrike '''source plan''' contains a '''column heading''' that exists in the '''Template Properties''' form, OnePager uses that '''column'''.   
  
 
:5) Otherwise, it makes an intelligent recommendation from the '''column headings''' it discovers.   
 
:5) Otherwise, it makes an intelligent recommendation from the '''column headings''' it discovers.   
  
The illustration below shows that several of the settings in the '''Template Properties''' form’s '''Rows & Swimlanes''' tab reflect the decisions that '''OnePager '''made concerning '''column''' usage.  These settings are consistent with the selections displayed in the '''OPC''' form.
+
The illustration below shows that several of the settings in the '''Template Properties''' form’s '''Rows & Swimlanes''' tab reflect the decisions that OnePager made concerning '''column''' usage.  These settings are consistent with the selections displayed in the '''OPC''' form.
  
 
<center>[[File:P72-4_0_1_15-72-(3-1)-08112023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(3-1)-08112023.png]]</center>
Line 178: Line 178:
 
The illustration above shows that the '''Start Date column''' from the Wrike '''source plan''' is selected as the '''text column''' to appear in the chart.  You can change the '''Row & Swimlanes''' tab settings as well as settings in any of the other tabs.  When you are ready, click '''Save and use''' button to make these changes part of the '''current Template Properties''' form.  
 
The illustration above shows that the '''Start Date column''' from the Wrike '''source plan''' is selected as the '''text column''' to appear in the chart.  You can change the '''Row & Swimlanes''' tab settings as well as settings in any of the other tabs.  When you are ready, click '''Save and use''' button to make these changes part of the '''current Template Properties''' form.  
  
In other tabs of the '''Template Properties''' form, '''OnePager '''has adjusted settings in a similar way to be consistent with its intelligent engine’s analysis of the Wrike '''source plan column headers''' and '''data types'''. If '''OnePager '''cannot find a '''column header''' name in the Wrike '''source plan''' that can be correlated with a specific '''OnePager '''purpose, it makes as intelligent a choice as possible and you are then able to make any change necessary. You are '''cautioned''' that all '''current Template Properties''' forms are altered when used in this way.  We recommend that unique '''Template Properties''' form names be subsequently given to such modified '''Template Properties''' form for future reference and for sharing these modified '''Template Properties''' form with others.
+
In other tabs of the '''Template Properties''' form, OnePager has adjusted settings in a similar way to be consistent with its intelligent engine’s analysis of the Wrike '''source plan column headers''' and '''data types'''. If OnePager cannot find a '''column header''' name in the Wrike '''source plan''' that can be correlated with a specific OnePager purpose, it makes as intelligent a choice as possible and you are then able to make any change necessary. You are '''cautioned''' that all '''current Template Properties''' forms are altered when used in this way.  We recommend that unique '''Template Properties''' form names be subsequently given to such modified '''Template Properties''' form for future reference and for sharing these modified '''Template Properties''' form with others.
  
 
For more information on the '''management '''of '''Template Properties '''forms, please see the article at:  
 
For more information on the '''management '''of '''Template Properties '''forms, please see the article at:  
Line 190: Line 190:
 
==Missing Columns, Column Headers, or Misspelled Column Headings==
 
==Missing Columns, Column Headers, or Misspelled Column Headings==
  
'''OnePager '''also checks '''column headings''' when '''importing''' data in '''UPDATE''' mode.  If the '''column''' was used in previous '''snapshots''' for any purpose, '''OnePager '''checks to assure that the new '''import''' for the '''snapshot''' has those same '''columns'''.  When '''OnePager '''cannot find the expected '''columns''', one or more '''column heading''' names are missing or blank, the '''column heading''' is recognizably misspelled, or the '''data type''' is different from the previous snapshot, '''OnePager '''provides a '''warning message''' as shown in the example below:
+
OnePager also checks '''column headings''' when '''importing''' data in '''UPDATE''' mode.  If the '''column''' was used in previous '''snapshots''' for any purpose, OnePager checks to assure that the new '''import''' for the '''snapshot''' has those same '''columns'''.  When OnePager cannot find the expected '''columns''', one or more '''column heading''' names are missing or blank, the '''column heading''' is recognizably misspelled, or the '''data type''' is different from the previous snapshot, OnePager provides a '''warning message''' as shown in the example below:
  
 
<center>[[File:P71-4_0_1_7-71-(5)-09272021.png]]</center>
 
<center>[[File:P71-4_0_1_7-71-(5)-09272021.png]]</center>
 
<!--<center>P71-4_0_1_7-71-(5)-09272021.png</center>-->
 
<!--<center>P71-4_0_1_7-71-(5)-09272021.png</center>-->
  
This can occur when you inadvertently attempt to '''update''' a chart from the incorrect Wrike '''source plan''' or the desired Wrike '''source plan''' was altered to the extent that '''OnePager '''cannot find the '''columns''' needed to accomplish the '''UPDATE''' functions. You are given two choices when the message above is displayed:
+
This can occur when you inadvertently attempt to '''update''' a chart from the incorrect Wrike '''source plan''' or the desired Wrike '''source plan''' was altered to the extent that OnePager cannot find the '''columns''' needed to accomplish the '''UPDATE''' functions. You are given two choices when the message above is displayed:
  
 
===Continue with missing field(s)===
 
===Continue with missing field(s)===
  
By selecting the '''Continue…''' button, the '''import''' proceeds.  '''OnePager '''blanks some values that it cannot find. '''Note:'''  The results can be unexpected.
+
By selecting the '''Continue…''' button, the '''import''' proceeds.  OnePager blanks some values that it cannot find. '''Note:'''  The results can be unexpected.
  
 
===Go back and fix field(s)===
 
===Go back and fix field(s)===
  
Selecting the '''Go back…''' button tells '''OnePager '''to '''stop''' the '''import''' process and return control to Wrike.  You can now correct the Wrike '''source plan''' or select another one and start the '''UPDATE''' process again.
+
Selecting the '''Go back…''' button tells OnePager to '''stop''' the '''import''' process and return control to Wrike.  You can now correct the Wrike '''source plan''' or select another one and start the '''UPDATE''' process again.
  
 
==Missing Task Start/Finish Dates==
 
==Missing Task Start/Finish Dates==
Line 214: Line 214:
 
==OnePager Chart Representation of Virtual Columns ==
 
==OnePager Chart Representation of Virtual Columns ==
  
'''OnePager''' '''imports''' all Wrike '''columns''' at the beginning of the chart building process and analyzes them for '''data type''' and how they may be used in charts.  Wrike has many '''predefined columns'''. Wrike also supports '''User Defined Columns'''.  The OnePager intelligent preprocessor '''imports''' all available '''columns''' and analyzes them to set up dropdown lists of '''imported columns''' that are available within OnePager’s control scheme.
+
OnePager '''imports''' all Wrike '''columns''' at the beginning of the chart building process and analyzes them for '''data type''' and how they may be used in charts.  Wrike has many '''predefined columns'''. Wrike also supports '''User Defined Columns'''.  The OnePager intelligent preprocessor '''imports''' all available '''columns''' and analyzes them to set up dropdown lists of '''imported columns''' that are available within OnePager’s control scheme.
  
'''OnePager '''also builds additional '''“virtual” columns''' for use in your charts that are '''constructed '''based upon data '''imported '''from your Wrike '''Project formatted''' file.  These '''virtual columns''' are provided in '''OnePager '''so that you can use all the features of '''OnePager''' when designing your charts.
+
OnePager also builds additional '''“virtual” columns''' for use in your charts that are '''constructed '''based upon data '''imported '''from your Wrike '''Project formatted''' file.  These '''virtual columns''' are provided in OnePager so that you can use all the features of OnePager when designing your charts.
  
 
===Levels 1 through 10 Summary ID/Name Virtual Columns for Wrike===
 
===Levels 1 through 10 Summary ID/Name Virtual Columns for Wrike===
Line 225: Line 225:
 
<!--<center>P72-4_0_1_15-72-(6-1)-05012023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(6-1)-05012023.png</center>-->
  
Creating the '''OnePager''' chart from the Wrike '''source plan''' above, we get this:
+
Creating the OnePager chart from the Wrike '''source plan''' above, we get this:
  
 
<center>[[File:P72-4_0_1_15-72-(11E)-09132023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(11E)-09132023.png]]</center>
Line 232: Line 232:
 
This is just one example of the use of '''OnePager virtual columns'''.   
 
This is just one example of the use of '''OnePager virtual columns'''.   
  
The '''OnePager virtual columns '''used in the example above represent only three of the '''virtual columns '''available for use in charts.  '''OnePager '''can represent up to ten (10) levels for '''Summary name '''and '''Summary ID'''.  The list of '''Level “x” Summary name '''and '''Level “x” Summary ID''' is shown in this illustration of a '''Swimlane Group by '''dropdown list:
+
The '''OnePager virtual columns '''used in the example above represent only three of the '''virtual columns '''available for use in charts.  OnePager can represent up to ten (10) levels for '''Summary name '''and '''Summary ID'''.  The list of '''Level “x” Summary name '''and '''Level “x” Summary ID''' is shown in this illustration of a '''Swimlane Group by '''dropdown list:
  
 
<center>[[File:P72-4_0_1_15-72-(8-1)-08112023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(8-1)-08112023.png]]</center>
Line 249: Line 249:
 
===Other OnePager Virtual Column for Wrike===
 
===Other OnePager Virtual Column for Wrike===
  
As mentioned above, '''OnePager '''adds '''virtual columns''', and in most cases, populates these '''virtual column '''cells with data '''imported '''from your Wrike '''source plan''' as illustrated above.
+
As mentioned above, OnePager adds '''virtual columns''', and in most cases, populates these '''virtual column '''cells with data '''imported '''from your Wrike '''source plan''' as illustrated above.
  
There are additional '''virtual columns''' available in '''OnePager '''charts built with Wrike '''source plans''' are discussed in the sub-section below:
+
There are additional '''virtual columns''' available in OnePager charts built with Wrike '''source plans''' are discussed in the sub-section below:
  
 
:* Outline level
 
:* Outline level
Line 278: Line 278:
 
<!--<center>P72-4_0_1_15-72-(11A)-09132023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(11A)-09132023.png</center>-->
  
The '''Summary''' '''column''' is a '''Boolean column''' taking on the value of '''TRUE''' if the associated task is a '''summary '''task, that is, with subordinate-tasks organized below it and '''FALSE''' if the associated task does not have subordinate-tasks organized below it.  Using the above Wrike '''source plan''' to create the '''OnePager '''chart, we can show the values from the '''Summary column''' as shown below:
+
The '''Summary''' '''column''' is a '''Boolean column''' taking on the value of '''TRUE''' if the associated task is a '''summary '''task, that is, with subordinate-tasks organized below it and '''FALSE''' if the associated task does not have subordinate-tasks organized below it.  Using the above Wrike '''source plan''' to create the OnePager chart, we can show the values from the '''Summary column''' as shown below:
  
 
<center>[[File:P72-4_0_1_15-72-(11B)-09132023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(11B)-09132023.png]]</center>
Line 318: Line 318:
 
<!--<center>P72-4_0_1_15-72-(12HA)-09132023.png</center>-->
 
<!--<center>P72-4_0_1_15-72-(12HA)-09132023.png</center>-->
  
The '''OnePager '''chart created from the above Wrike '''source plan''' showing the '''percent complete bars''' within the task bars and the '''percent complete numeric values''' with the '''task bar name labels''' looks like this:
+
The OnePager chart created from the above Wrike '''source plan''' showing the '''percent complete bars''' within the task bars and the '''percent complete numeric values''' with the '''task bar name labels''' looks like this:
  
 
<center>[[File:P72-4_0_1_15-72-(12I-2)-09132023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(12I-2)-09132023.png]]</center>
Line 335: Line 335:
 
<!--===Representing Multiple Resources===
 
<!--===Representing Multiple Resources===
  
'''OnePager''' can represent as many resources in the chart as are assigned to a task in Wrike.  For example, the Wrike spreadsheet below show three tasks with two resources assigned to each task:
+
OnePager can represent as many resources in the chart as are assigned to a task in Wrike.  For example, the Wrike spreadsheet below show three tasks with two resources assigned to each task:
  
  
Line 378: Line 378:
 
===Using the OnePager Deadline Representation Feature===
 
===Using the OnePager Deadline Representation Feature===
  
'''OnePager '''has a feature that lets you display a '''deadline symbol '''in the chart that represents the '''latest finish date''' for the task or when the milestone must be met.  A portion of a chart with '''deadline symbols''' looks like this:
+
OnePager has a feature that lets you display a '''deadline symbol '''in the chart that represents the '''latest finish date''' for the task or when the milestone must be met.  A portion of a chart with '''deadline symbols''' looks like this:
  
 
<center>[[File:P70-10_9_1-(2)-06032020.png]]</center>
 
<center>[[File:P70-10_9_1-(2)-06032020.png]]</center>
Line 389: Line 389:
 
Controls for displaying '''deadline symbols '''are provided in the '''Template Properties '''and '''Chart Properties '''form’s '''Task Bars '''and '''Milestones''' tabs where you can specify the Wrike '''source plan''' '''column''' to represent '''deadline dates''' and specify their graphical representation in the chart.
 
Controls for displaying '''deadline symbols '''are provided in the '''Template Properties '''and '''Chart Properties '''form’s '''Task Bars '''and '''Milestones''' tabs where you can specify the Wrike '''source plan''' '''column''' to represent '''deadline dates''' and specify their graphical representation in the chart.
  
For convenience, '''OnePager '''assumes that the Wrike '''Project formatted '''file’s '''Planned Finish column''' is the '''default column''' that '''OnePager '''uses to represent '''deadline symbols '''in the chart.  This setting is established in all Wrike '''distributed Template Properties '''forms.
+
For convenience, OnePager assumes that the Wrike '''Project formatted '''file’s '''Planned Finish column''' is the '''default column''' that OnePager uses to represent '''deadline symbols '''in the chart.  This setting is established in all Wrike '''distributed Template Properties '''forms.
  
 
The '''deadline''' setting is established in all Wrike '''distributed Template Properties '''form’s '''Field Mappings '''tab as shown below:
 
The '''deadline''' setting is established in all Wrike '''distributed Template Properties '''form’s '''Field Mappings '''tab as shown below:
Line 408: Line 408:
 
===Using the OnePager Endpoints Representation Feature===
 
===Using the OnePager Endpoints Representation Feature===
  
'''OnePager '''also has a feature that lets you display a '''multiple endpoint symbols '''in the chart that represent potentially important dates for a task.  A portion of a chart with four (4) '''endpoint symbols''' associated with each task bar looks like this:
+
OnePager also has a feature that lets you display a '''multiple endpoint symbols '''in the chart that represent potentially important dates for a task.  A portion of a chart with four (4) '''endpoint symbols''' associated with each task bar looks like this:
  
 
<center>[[File:P70-10_11_1-(7-1)-06042020.png]]</center>
 
<center>[[File:P70-10_11_1-(7-1)-06042020.png]]</center>
Line 417: Line 417:
 
Controls for displaying '''endpoint symbols '''are provided in the '''Template Properties '''and '''Chart Properties '''form’s '''Task Bars '''and '''Milestones''' tabs where you can specify the Wrike '''source plan column''' to represent '''endpoint dates''' and specify their graphical representation in the chart.
 
Controls for displaying '''endpoint symbols '''are provided in the '''Template Properties '''and '''Chart Properties '''form’s '''Task Bars '''and '''Milestones''' tabs where you can specify the Wrike '''source plan column''' to represent '''endpoint dates''' and specify their graphical representation in the chart.
  
For convenience, '''OnePager '''assumes that the following Wrike '''Project formatted date columns''' are the '''default columns''' that '''OnePager '''uses to represent '''endpoint symbols '''in the chart:
+
For convenience, OnePager assumes that the following Wrike '''Project formatted date columns''' are the '''default columns''' that OnePager uses to represent '''endpoint symbols '''in the chart:
  
 
:* '''Endpoint 1''': '''Planned Start'''
 
:* '''Endpoint 1''': '''Planned Start'''
Line 436: Line 436:
 
===Representing Task Links===
 
===Representing Task Links===
  
'''OnePager''' displays '''Task Links''' in the chart when the '''“master switch” '''for '''Task Links '''in the '''Template Properties '''form’s '''Task Link '''tab is checked '''ON''' as shown below:
+
OnePager displays '''Task Links''' in the chart when the '''“master switch” '''for '''Task Links '''in the '''Template Properties '''form’s '''Task Link '''tab is checked '''ON''' as shown below:
  
 
<center>[[File:P72-4_0_1_15-72-(14-1)-09132023.png]]</center>
 
<center>[[File:P72-4_0_1_15-72-(14-1)-09132023.png]]</center>

Latest revision as of 17:37, 19 January 2024

Contents

Introduction

The purpose of this article is to provide you one place with as much information as possible about how OnePager is used to create OnePager charts with data imported from Wrike.

In most cases OnePager handles data fields from Wrike very much like data coming from Microsoft Excel. This article focuses on two major topics:

1) Connecting to and importing Wrike data into OnePager.
2) OnePager’s handling of specific Wrike column data once those data are imported.

As a convention, whenever we refer to the OnePager in the context of Wrike, we'll just say OnePager when it’s absolutely clear that we are discussing OnePager with Wrike. Since only the Standalone edition of OnePager connects to Wrike files online, we'll just leave the suffix "Standalone" off.

About Connecting and Importing Wrike Data to OnePager

OnePager imports data from Wrike by first making the connection from OnePager to your Wrike account online. Therefore, you must first have a Wrike account and login credentials so OnePager can access your account, your Wrike files, and be able to download selected file or files to your computer.

Detailed information on setting up you Wrike data for import to OnePager and other topics related to getting started using OnePager Bundle can be found at this article:

Using Wrike with OnePager

Data Imports to OnePager

OnePager expects that you created a Wrike Project formatted file from one of the many available Wrike templates. In most cases, the column headings for the Project formatted file look like this:

P72-4 0 1 15-72-(1)-04282023.png

Minimum Column Names and Flag Column Definition

The minimum Column names needed by OnePager are the Name, Start date, and Due date. Additionally, You should add a user defined field as a Boolean field specifically to facilitate the interface between Wrike and OnePager. Setting the checkboxes for tasks that you want to import to OnePager ON assures that OnePager can identify these tasks and successfully import them. An example is shown here:

P72-4 0 1 15-72-(2)-04282023.png

In the example above, the OnePager column’s purpose is to instruct OnePager on which rows to process when importing the Wrike Project formatted file. OnePager expects to see either ON or OFF appropriately entered in the cells of the OnePager column indicating which rows to import (ON) and which rows not to import (OFF or blank).

OnePager Recognized Data Types

What follows is a short discussion of how OnePager applies it’s built in intelligence functions with respect to Wrike’s Internally Defined Columns. The goal here is to provide an understanding of the process so you know what to expect from OnePager when various column heading names and data (column) types are encountered by OnePager in your Wrike source plan. There are four (4) column types that OnePager looks for when importing data from Wrike:

  • Dates
  • Numbers
  • Boolean (TRUE or FALSE)
  • Text Strings (A through Z, 0-9, special characters)

All data provided by the Wrike interface to OnePager, regardless of data type, are imported from Wrike Project formatted files. OnePager begins this analysis from top-left to bottom-right. Once the column headers are located and the data types are analyzed, OnePager associates these columns with specific usages in the OnePager choices (OPC) form as illustrated below. Using the second page of the OPC form shown below, you can change the column usage by selecting another column to serve the function from the dropdown list provided. The dropdown list is built from all the column headers that OnePager found during its analysis pass. An example of a dropdown list of column header names taken from a Wrike source plan is shown here:

P72-4 0 1 15-72-(4)-04272023.png

Highlighted above is the second page of the OnePager choices form showing a dropdown list of Wrike available column names along with virtual column names created by OnePager.

Selecting Tasks for Import into OnePager

Since OnePager is connected to your Wrike account, it has access to your Project formatted files. Anyone of these files can be imported into OnePager and a chart created. The benefit derived from OnePager is that you can select the tasks you which to display in your OnePager chart along with other decorations and features that are best for presentation in a schedule discussion.

A way to set up a Wrike Project formatted file for import to OnePager is to include the Wrike OnePager field in your source plan and set the Boolean value of ON in the cells for each row in your source plan that you want OnePager to import. For illustration here we’ve define the Wrike defined column called OnePager as a checkbox column and with inserted “Checkmarks” and “Unchecked Boxes” to indicate to OnePager which tasks we wish to import. This is illustrated in the source plan portion below:

P72-4 0 1 15-72-(4A)-04282023.png

When making your first chart, we strongly recommend that you import 50 or fewer Tasks. Please note that OnePager is shipped with a number of fully populated templates that are based on the Wrike source plan used in the Tutorial shipped with the product – BlueGrass Project Plan. Three column headings must always be present as a minimum: Name, Start date, and Due date.

Once you’ve made the determination which source plan tasks to import you can launch OnePager and create your OnePager chart.

This discussion continues at this link:

Launching OnePager Using Wrike for the First Time

There are three (3) selection options available for controlling OnePager’s import of task data. These are discussed in the subsections that follow:

Task Selection Option (1): Select All Tasks

Wrike source plans like the one shown above with many tasks results in a very large OnePager chart usually not suitable for detailed schedule conversations. Accordingly, we do not recommend importing more than 50 tasks so that the resulting chart is a useful one page rendering of the source plan. However, for small projects where the number of tasks falls below the recommended maximum, using the Select all tasks shown in the Task Selection sub-control group of the OnePager choice form below is an easy way to specify this option:

P72-4 0 1 15-72-(4B)-04282023.png

Task Selection Option (2): Select Tasks with ‘Yes’ in field:

As mentioned above, one method for telling OnePager which tasks to import is to use a Flag column. As shown in the previous section, the Wrike source plan has a User Defined Column Boolean field named OnePager and when the associated checkbox is checked ON that task is imported into OnePager. Here is an illustration of the OnePager choices form where a Flag column is used to select tasks from the source plan:

P72-4 0 1 15-72-(4C)-04272023.png

When this is done for the source plan shown above, and other appropriate settings are made for OnePager, the resulting chart looks like this:

P72-4 0 1 15-72-(4D)-04282023.png

As mentioned earlier, you can also use a Wrike checkbox with a unique column header name. OnePager recognizes the checkbox column as a possible flag column and makes it available in the OnePager choices form in the dropdown list for the Select task with ‘Yes’ in field: option as shown below:

P72-4 0 1 15-72-(4J)-04282023.png

When the column heading called OnePager is selected in the form above, OnePager imports rows where the OnePager checkbox is checked ON.

Task Selection Option (3): Select Tasks by custom filter: (Conditional Import Rules)

You can use the Conditional Import feature to fine tune the tasks you want to import. Assuming that you’re familiar with the Conditional Import feature, the Conditional Import Rules form can be accessed by selecting the Select tasks by custom filter: radio button as shown in the illustration below. Using the Conditional Import Rules form as shown here, it is possible to select tasks between specified Start Dates and Due Dates including those where OnePager is TRUE.

P72-4 0 1 15-72-(4E-5)-06232023.png

When the above Conditional Import rules are used in the selection process, the resulting chart looks like this:

P72-4 0 1 15-72-(4F-1)-06232023.png

Any Wrike column found in your source plan can be used as a Field in a Conditional Import rule.

For more detailed information on the Conditional Import feature, we recommend that you read the articles on this subject under:

Conditional Import Filters (Portal)

Using Other Columns as Flag Columns in Wrike

OnePager offers a wide range of Wrike column and data types to be used as a flag for controlling the import of rows for making OnePager charts as shown below:

P72-4 0 1 15-72-(4J-A)-005012023.png

OnePager is set to recognize only “Boolean” situations that resolve to either TRUE import to OnePager or FALSE do not import to OnePager.

Integers Used as Flag Columns in Wrike

You can use a Wrike number column with an integer as a flag if its contents are 1’s in those cells that are intended to be imported as tasks. Similarly you can use 0’s as flags for those tasks that you do not wish to import.

Decimal Numbers Used as Flag Columns in Wrike

Number columns that contain an integer and decimal fraction are eligible to become flag when their contents are either 1.0 or 0.0. However, such fields are not picked up by OnePager as a flag as discussed above for Wrike text fields. Therefore, we do not recommend that Number columns be used for the purpose of general task selection. Accordingly, it is still useful to consider number columns for task selection if the values contained in these number column cells need to be used for decision making on which tasks should be imported.

Checkboxes Used as Flag Columns in Wrike

As an alternative you can use a Wrike checkbox where the row to import is represented by the box checked ON as shown here:

P72-4 0 1 15-72-(4A)-04282023.png

OnePager recognizes Checkbox columns in Wrike as possible flag columns and makes the column available in the flag column selection process discussed later in this article.

Intelligent Changes Made to OnePager Current Template Properties Forms

OnePager is shipped to you with a predefined set of Template Properties forms. This means that all column usage settings within these shipped Template Properties forms are based upon a typical Wrike source plan. Since the flexibility of Wrike is considered in the design of OnePager, it is necessary to update the current Template Properties form based upon your Wrike source plan. Accordingly, OnePager uses the analysis techniques discussed above to modify the current Template Properties form. OnePager makes intelligent choices and recommendations on Wrike source plan column usage based on the findings of the intelligent engine.

You can change or override these findings as follows:

1) You can click the Edit current Template… button on the second page of the OnePager choices (OPC) form shown here:
P72-4 0 1 15-72-(4H)-05012023.png
2) Clicking this button accesses the Template Properties form so you can navigate to the Rows and Swimlanes tab.
3) The settings found in the Row & Swimlanes tab are determined by the current Template Properties form and by the intelligent analysis described above.
4) If your Wrike source plan contains a column heading that exists in the Template Properties form, OnePager uses that column.
5) Otherwise, it makes an intelligent recommendation from the column headings it discovers.

The illustration below shows that several of the settings in the Template Properties form’s Rows & Swimlanes tab reflect the decisions that OnePager made concerning column usage. These settings are consistent with the selections displayed in the OPC form.

P72-4 0 1 15-72-(3-1)-08112023.png

The illustration above shows that the Start Date column from the Wrike source plan is selected as the text column to appear in the chart. You can change the Row & Swimlanes tab settings as well as settings in any of the other tabs. When you are ready, click Save and use button to make these changes part of the current Template Properties form.

In other tabs of the Template Properties form, OnePager has adjusted settings in a similar way to be consistent with its intelligent engine’s analysis of the Wrike source plan column headers and data types. If OnePager cannot find a column header name in the Wrike source plan that can be correlated with a specific OnePager purpose, it makes as intelligent a choice as possible and you are then able to make any change necessary. You are cautioned that all current Template Properties forms are altered when used in this way. We recommend that unique Template Properties form names be subsequently given to such modified Template Properties form for future reference and for sharing these modified Template Properties form with others.

For more information on the management of Template Properties forms, please see the article at:

Managing Templates (Portal)

Missing Columns, Column Headers, or Misspelled Column Headings

OnePager also checks column headings when importing data in UPDATE mode. If the column was used in previous snapshots for any purpose, OnePager checks to assure that the new import for the snapshot has those same columns. When OnePager cannot find the expected columns, one or more column heading names are missing or blank, the column heading is recognizably misspelled, or the data type is different from the previous snapshot, OnePager provides a warning message as shown in the example below:

P71-4 0 1 7-71-(5)-09272021.png

This can occur when you inadvertently attempt to update a chart from the incorrect Wrike source plan or the desired Wrike source plan was altered to the extent that OnePager cannot find the columns needed to accomplish the UPDATE functions. You are given two choices when the message above is displayed:

Continue with missing field(s)

By selecting the Continue… button, the import proceeds. OnePager blanks some values that it cannot find. Note: The results can be unexpected.

Go back and fix field(s)

Selecting the Go back… button tells OnePager to stop the import process and return control to Wrike. You can now correct the Wrike source plan or select another one and start the UPDATE process again.

Missing Task Start/Finish Dates

OnePager requires that, at a minimum, a row from Wrike needs to have a task Name, a Start Date date, and a Due Date date. The row is ignored if the Name is not provided even if Start Date and Due Date dats are present. When a row is missing either a Start Date date or a Due Date date, even if the Name is provided, OnePager provides the warning message shown below:

P71-4 0 1 7-71-(5A)-02252022.png

OnePager Chart Representation of Virtual Columns

OnePager imports all Wrike columns at the beginning of the chart building process and analyzes them for data type and how they may be used in charts. Wrike has many predefined columns. Wrike also supports User Defined Columns. The OnePager intelligent preprocessor imports all available columns and analyzes them to set up dropdown lists of imported columns that are available within OnePager’s control scheme.

OnePager also builds additional “virtual” columns for use in your charts that are constructed based upon data imported from your Wrike Project formatted file. These virtual columns are provided in OnePager so that you can use all the features of OnePager when designing your charts.

Levels 1 through 10 Summary ID/Name Virtual Columns for Wrike

OnePager Pro and OnePager Express users have found it beneficial to use many of the OnePager virtual columns in their charts as shortcuts. For example, take the Wrike source plan below that has indented task names that establishes a Work Breakdown Structure:

P72-4 0 1 15-72-(6-1)-05012023.png

Creating the OnePager chart from the Wrike source plan above, we get this:

P72-4 0 1 15-72-(11E)-09132023.png

This is just one example of the use of OnePager virtual columns.

The OnePager virtual columns used in the example above represent only three of the virtual columns available for use in charts. OnePager can represent up to ten (10) levels for Summary name and Summary ID. The list of Level “x” Summary name and Level “x” Summary ID is shown in this illustration of a Swimlane Group by dropdown list:

P72-4 0 1 15-72-(8-1)-08112023.png

For more information on the use of Rows and Swimlanes, please see the articles at:

Creating and Editing Rows and Swimlanes (Portal)
Rows/Swimlane Tab

Other OnePager Virtual Column for Wrike

As mentioned above, OnePager adds virtual columns, and in most cases, populates these virtual column cells with data imported from your Wrike source plan as illustrated above.

There are additional virtual columns available in OnePager charts built with Wrike source plans are discussed in the sub-section below:

  • Outline level
  • Summary
  • Level n summary ID
  • Level n summary name
  • Project name

Outline level Virtual Column for Wrike

The Outline level virtual column is populated from your Wrike source plan from imported data. The illustration below shows a source plan with defined Outline Level noted:

P72-4 0 1 15-72-(12B)-09132023.png

In the chart created from the above source plan the Outline Level is shown in the text column below:

P72-4 0 1 15-72-(12C)-09132023.png

Summary Virtual Column for Wrike

In Wrike Summary tasks are tasks that have sub-tasks below them as shown here:

P72-4 0 1 15-72-(11A)-09132023.png

The Summary column is a Boolean column taking on the value of TRUE if the associated task is a summary task, that is, with subordinate-tasks organized below it and FALSE if the associated task does not have subordinate-tasks organized below it. Using the above Wrike source plan to create the OnePager chart, we can show the values from the Summary column as shown below:

P72-4 0 1 15-72-(11B)-09132023.png

The above chart shows which displayed task bars are Summary tasks (TRUE) and which are Non-Summary tasks (FALSE).

Level n Summary ID and Level n Summary Name Virtual Columns for Wrike

There are up to ten (10) Level n summary ID and Level n summary name virtual fields available in OnePager. The number available in your OnePager chart is determined by the amount of indention or Outline levels in your source plan. Outline levels are discussed above. Typically, Level n summary names are used to designate swimlanes in the chart for organizational purposes. The chart shown below, has it's three swimlane levels designated by the Level 1 summary name, the Level 2 summary name, and the Level 3 summary name:

P72-4 0 1 15-72-(11E)-09132023.png

Project name Virtual Column for Wrike

The Project name virtual field is usually taken from the first line of the Wrike source plan as shown below:

P72-4 0 1 15-72-(11C)-09132023.png

Although the Project name virtual field is a single value it still can be shown in the chart as a text column entity as shown here:

P72-4 0 1 15-72-(11D)-09132023.png

Representation of Project Scheduling Data Columns from Wrike Source Plans

Representing Percent Complete

Wrike projects represent progress at the project level and not at the task level. For that reason OnePager Bundle does not have the Wike generated percent complete data available to display percent complete at the task bar level. We do support controls whereby you can define a User custom field in Wrike as a numeric field and populate that field with your own percent complete data. Using the Set percent-complete properties form accessed from the Chart Properties form's Task Bars or Milestones tabs you can establish the relationship between the Wrike source plan's user custom field and OnePager Bundle as shown below:

P72-4 0 1 15-72-(12H-1)-09132023.png

A sample portion of a Wrike source plan looks like this with the Custom Percent Field column highlighted:

P72-4 0 1 15-72-(12HA)-09132023.png

The OnePager chart created from the above Wrike source plan showing the percent complete bars within the task bars and the percent complete numeric values with the task bar name labels looks like this:

P72-4 0 1 15-72-(12I-2)-09132023.png

Since Wrike has a defined column called Percent Complete, it is our recommendation that you use this Wrike defined column in your charts to represent percent complete for tasks and milestones.

For more information on using the percent complete feature, please see the article at:

Percent complete for OnePager


Representing Baseline Data

Wrike does not specifically appear to support baseline related fields for baseline start or baseline finish dates. OnePager Bundle attempts to build a list of dates that it imports from the source plan. The options look like this:

P72-4 0 1 15-72-(17AA-1)-09142023.png

When the Wrike source plan is configured with baseline start/finish dates, OnePager can represent them in the chart when the Chart Properties form’s Task Bars and/or Milestones tabs are configured to do so as shown below:

P72-4 0 1 15-72-(17-2)-09142023.png

When the Baselines function is enabled and the Start Date/Due Date combination are displaced to the right of the baseline shape, the chart looks like this:

P72-4 0 1 15-72-(18-1)-09142023.png

For more information on Baseline representation, please see the article:

Baselines for OnePager

OnePager Bundle Cannot Represent Critical Path Segments with Wrike

Wrike's exterior interface does not provide their critical-path segment data to OnePager. As a result, OnePager cannot import critical-path segment data and does not provide the capability to represent critical-path segments in the chart.

Using the OnePager Deadline Representation Feature

OnePager has a feature that lets you display a deadline symbol in the chart that represents the latest finish date for the task or when the milestone must be met. A portion of a chart with deadline symbols looks like this:

P70-10 9 1-(2)-06032020.png

When deadlines are turned ON, they appear (by default) as down-arrow symbols in each task bar's row at the deadline date position with respect to the time axis. Above, deadline symbols that are not contained within their respective task bar are shown with black dash-dot connecting lines to illustrate the capability.

It is highly recommended that if you want to use the deadlines feature that you define a Deadlines column in your Wrike source plan and populate it with appropriate dates. When OnePager imports your source plan the intelligent engine recognizes “Deadline” as containing the dates for this purpose and populates the appropriate dropdown lists.

Controls for displaying deadline symbols are provided in the Template Properties and Chart Properties form’s Task Bars and Milestones tabs where you can specify the Wrike source plan column to represent deadline dates and specify their graphical representation in the chart.

For convenience, OnePager assumes that the Wrike Project formatted file’s Planned Finish column is the default column that OnePager uses to represent deadline symbols in the chart. This setting is established in all Wrike distributed Template Properties forms.

The deadline setting is established in all Wrike distributed Template Properties form’s Field Mappings tab as shown below:

P72-4 0 1 11-72-(13-1)-09132023.png

As shown above, the Deadline date column name can be changed before the chart is created by using the Template Properties form’s Field Mappings tab to select another preferred Project formatted date column. Changing the Deadline date column name after the chart is created requires using the Field Mappings tab in the Chart Properties form.

For more information on using Deadline symbols, please see the article at:

Deadlines for OnePager

Using the OnePager Endpoints Representation Feature

OnePager also has a feature that lets you display a multiple endpoint symbols in the chart that represent potentially important dates for a task. A portion of a chart with four (4) endpoint symbols associated with each task bar looks like this:

P70-10 11 1-(7-1)-06042020.png

When one or more endpoints are turned ON, they appear (by default) as down-arrow symbols in each task bar's row at the endpoint’s date position. Above, endpoint symbols that are not contained within their respective task bar are shown with black dash-dot connecting lines to illustrate the capability.

Controls for displaying endpoint symbols are provided in the Template Properties and Chart Properties form’s Task Bars and Milestones tabs where you can specify the Wrike source plan column to represent endpoint dates and specify their graphical representation in the chart.

For convenience, OnePager assumes that the following Wrike Project formatted date columns are the default columns that OnePager uses to represent endpoint symbols in the chart:

  • Endpoint 1: Planned Start
  • Endpoint 2: Planned Finish
  • Endpoint 3: Budget Start
  • Endpoint 4: Budget Finish

These setting are established in all Wrike distributed Template Properties form’s Task Bars tab in the Task Bar Decorations sub-control group at the Endpoints button. (Milestones do not display Endpoint symbols.) Checking the Endpoints checkbox ON and clicking the Endpoints Properties… button accesses the Set endpoint properties form where the default endpoint dates can be changed before the chart is created. Following the same path in the Chart Properties form to the Set endpoint properties form can accomplish the same result after the chart is created.

For more information on using Endpoint symbols, please see the article at:

Endpoints for OnePager

Representing Task Links

OnePager displays Task Links in the chart when the “master switch” for Task Links in the Template Properties form’s Task Link tab is checked ON as shown below:

P72-4 0 1 15-72-(14-1)-09132023.png

When the “master switch” is checked ON, Task Links are enabled and can be shown in the chart after the Show data-driven links checkbox is checked ON in the Chart Properties form’s Task Link tab and the source plan column containing the task link predecessor data is set in the from window as shown below:

P72-4 0 1 15-72-(15-1)-09132023.png

You can use the above form to change the properties of the Task Links to meet your schedule discussion needs. When the chart is created, the Task Links look like this:

P72-4 0 1 15-72-(16-1)-09132023.png

In the chart shown above, the Predecessor column is shown as a Left#1 text column to indicate the task bar that is the predecessor for the task link. The Line identifier column is shown as the Left#2 text column to help identify the predecessor row.

For more information on Task Links, please see the articles at:

Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)

Related Links

OnePager Video Tutorials Getting Started with OnePager and Microsoft Project Getting Started with OnePager and Microsoft Excel
Getting Started with OnePager and Smartsheet Getting Started with OnePager and Primavera P6 Getting Started with OnePager and Planisware Enterprise
Frequently Asked Questions How-to Articles The OnePager Blog
Contact OnePager Support
Getting Started with OnePager Bundle Using Wrike Source Plans with OnePager
Basic Workflows (Portal) Conditional Import Filters (Portal)
Merging the Wrong Tasks into a Chart - OnePager Bundle - Wrike Percent complete for OnePager
Baselines for OnePager Deadlines for OnePager
Endpoints for OnePager Creating and Editing Rows and Swimlanes (Portal)
Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal) Data-Driven Task Links for Wrike
Rows/Swimlane Tab Managing Templates (Portal)

(4.0.1.15-72)