Task/Milestone Links Tab for Version 7.0 (OnePager Pro)

From OnePager Documentation
Revision as of 20:09, 31 October 2019 by Rfeingold (Talk | contribs) (About the Task Links Tab)

Jump to: navigation, search

About the Task Links Tab

1) This tab controls the global editing of data-driven and manual Task Links in the chart. The tab is shown below:

File:P70-21 12 1-70-(1)-10312019.png
P70-21_12_1-70-(1)-10312019.png
P61-0 4 1 7-61-(3A)-06092018.png
P61-0_4_1_7-61-(3A)-06092018.png

2) The control groups and individual settings in the PVP form's Task Links tab are described in detail at: Editing Task Links with the Chart Properties Form for OnePager Pro. 19.3.1-61

Related Link

Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal) 19.0.1-61

(21.12.1-70)