==About OnePager Version 6.1==
+
==Overview==
  
OnePager Pro ('''OPP''') and Express ('''OPX''') version 6.1 provides two new capabilities summarized in this article. The sub-sections below provide introductory material and links to more detailed discussions of these two new features:
+
OnePager Pro ('''OPP''') and Express ('''OPX''') version 6.1 provides four new capabilities and enhancement summarized in this article:  
  
:(1) Task Link Upgrades.
+
(1) Task Link Upgrade
  
:(2) Time Axis Upgrades.
+
(2) Time Axis Upgrade
  
==Task Link Upgrades==
+
(3) Honoring Non-Working Time for Percent Complete (%Complete)
  
With OnePager 6.1, you can now show data-driven dependencies by importing predecessor information directly from Microsoft Project or Excel.  In previous versions, you could only manually insert links between tasks and milestones, a sometimes tedious undertaking.
+
(4) New Shapes and Color Palettes
  
In OnePager Pro/Express version 6.1 you can now import predecessor data from your '''source plans'''.  You can manipulate '''Task Link''' representations in your project views; exercise controls by defining '''Task Link''' '''show/hide''' filter rules; and use enhanced graphics  to alter '''Task Link''' colors, arrow heads, and line styles.  As with previous versions of OnePager, you can still manually create and edit '''Task Links''' as you’ve probably done before.
+
(5) Auto-Save
  
Supporting this new capability is a new tab on the '''Template''' and '''Project-View Properties''' ('''PVP''') forms. The forms give you global control over the '''Task Link''' import and formatting.  Additionally, you have enhanced manual capabilities to select individual '''Task Links''' in the project  view and edit them with enhanced controls in the '''Project View Editor'''.  There are also a couple of enhancements to OnePager's '''Home''' tab supporting this upgrade with convenient controls.
+
The subsections below provide an overview and links to more detailed descriptions of these new capabilities and enhancements:
  
Detailed articles for using the new '''Task Links Upgrades''' can be found at this link:  [[Linking Tasks and Milestones (Adding, Deleting, Modifying) for Version 6.1 | Linking Tasks and Milestones (Adding, Deleting, Modifying)]] 19.0.1-61.
+
==Task Link Upgrade==
  
Please take a moment to look at the Read More… article below which provides an overview of these new '''Task Link''' capabilities in summary form.
+
In previous OnePager versions, you could only manually '''insert Event Links '''between tasks/milestones, a sometimes tedious effort.
  
:Read More... [[Task Link Upgrades for OnePager 6.1 | Task Link Upgrades for OnePager 6.1]] 0.4.1.7-61
+
With OnePager 6.1, you can directly '''import''' '''predecessor information '''from Microsoft Project or Microsoft Excel '''source plans '''and '''show '''them as '''Data-driven Task Links'''.
  
(0.4-61 – Task Link Upgrades)
+
In OnePager Pro and Express 6.1 you can:
  
 +
1) '''Import''' '''predecessor''' information from your '''source plans'''. 
  
[[Category:Version 6.1]]
+
2) Manipulate these '''Data-driven Task Link''' representations in your project views.
[[Category:Task Links]]
+
  
==Time Axis Upgrades==
+
3) Use new controls to '''show''' or '''hide''' '''Task Links '''in the project view using manual '''editing''' controls and the new '''Task Link Filter rules '''capability.
  
TBD
+
4) Use enhanced graphics to alter '''Task Link connection line colors''', '''arrow head shapes''',''' '''and '''connection line styles'''. 
  
An example showing the usage of the '''Time Axis Upgrades''' feature is given in the article whose link is below:
+
5) Manually '''create and edit''' '''Task Links '''in the project view as you did with '''Event Links'''.
  
:Read More... [[Time Axis Upgrades for OnePager 6.1  | Time Axis Upgrades for OnePager 6.1 ]] 0.4.1.9-61
+
===New Template and Project-View Properties Form New Task Link Tab===
<!--
+
==Legend Upgrades==
+
  
 +
6) Supporting these new features is a new tab (the '''Task Links '''tab) in the '''Template''' and '''Project-View Properties '''('''PVP''')''' '''forms. These new tabs give you global control over the '''Data-driven Task Link import''' and '''formatting''' of both '''Data-driven''' and manual '''Task Links'''.  The new '''Task Links''' tab for the OnePager Pro 6.1 '''Template''' form is shown below:
  
The link shown below provides more details on the '''Legend Upgrades''' feature and should be read before attempting to utilize this feature:
+
<center>[[File:P61-0_4_1_7-61-(3)-06092018.png]]</center>
 +
<!--center>&lt;P61-0_4_1_7-61-(3)-06092018.png&gt;</center-->
  
:Read More... [[Legend Upgrades for OnePager 6.1 | Legend Upgrades for OnePager 6.1]] 0.4.1.11-61 -->
+
7) Additionally, you have enhanced manual capabilities to select individual '''Task Links '''(e.g., '''Data-driven''' and manual) in the project view and '''edit''' them individually with enhanced controls in the '''Project View Editor '''('''PVE''').   
  
==Other Enhancements==
+
8) There are also a couple of enhancements to the OnePager ribbon's '''Home''' tab supporting this upgrade with convenient controls.  These include a new '''Where Are My Links?''' form and a way to select '''all''' '''Task Links''' for global '''editing''' from the OnePager 6.1 '''Home''' ribbon.
  
OnePager Pro and Express version 6.1 has some other enhancement, including the following:
+
9) As an example of '''Data-driven Task Links''' in the '''Graph''', below is the standard '''BlueGrass Project Plan Report''' project view with '''predecessors imported''' and '''shown''':  
  
===TBD 1 Upgrade to Color Palettes=== 
+
<center>[[File:P61-0_4_1_7-61-(3D)-06092018.png]]</center>
 +
<!--center>&lt;P61-0_4_1_7-61-(3D)-06092018.png&gt;</center-->
  
 +
===More Information===
  
:Read More... <!--[[TBD 1 for Version 6.1 | TBD 1 for Version 6.1]] xx.xx.61-->
+
10) Detailed articles for using the new '''Task Links Upgrade’s''' features and enhancements can be found at these links: [[Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 6.1 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]]. <!--19.0.1-61.-->
  
===TBD 2 Moving Controls from the Advanced Tab to the Main Tab===
+
11) Please take a moment to look at the Read More… article below which provides an introduction to these new '''Task Link''' features and enhancements with examples.
  
TBD 2
+
:Read More... [[Task Link Upgrades for OnePager 6.1 | Task Link Upgrades for OnePager 6.1]] <!--0.4.1.7-61-->
  
===TBD 3 Terminology Changes Cropping Rows to Hiding Rows=== 
+
==Time Axis Upgrade==
  
TBD 3
+
In prior versions of OnePager you had limited '''editing''' control over the '''Time Axes''', their '''Levels''', and individual '''Cells'''. 
  
===TBD 4===  
+
With OnePager 6.1 there are new features and enhancement that help you to dramatically tailor the '''Time Axis''' to visually enhance your schedule presentations.  
  
TBD 4
+
In OnePager Pro and Express 6.1 you can:
  
 +
1) Control the '''Start/Finish boundaries''' of the project view in the '''Template''' and '''PVP''' form’s new '''Time Axis '''tabs and in the OnePager 6.1 ribbon’s '''View '''tab.
  
<!--
+
2) Control the '''showing '''and '''hiding '''of '''Time Axis Levels '''and '''Cells '''in the project view thus changing the visibility of information displayed in the '''graph'''.
==Event Link Upgrades==
+
  
The '''Event Link''' presentation capabilities are enhanced in OnePager version 6.0 in three ways:
+
3) Use centralized global controls to set and '''edit''' '''Time Axis Level Labels''' and individual '''Time Axis Level '''and '''Cell''' '''formats''' that include '''border properties''', '''background colors''', '''fill patterns''', and '''Time Axis Level heights'''.
  
:(1) The formatting of '''event links''' is enhanced by providing more options for link line styles (e.g., solid, dashed, dotted, dash-dotted, etc.) and arrow styles (e.g., flat arrow, square arrow, rounded arrow, one direction, and two direction).  Additional controls are available to controlling the path of the link and the formatting of the link label or comment.
+
4) Use controls to '''Re-order '''the positions of individual '''Time Axis Levels''' with respect to one another at the top and bottom of the project view.
  
:(2) Most important, we are providing a mechanism by which you may control the import of event links from your Microsoft Project source plan and format the data drive link presentation in the project view.
+
5) Create '''Floating Time Axis Levels''' and '''Cells''' within the '''graph''', change '''their positions''', '''show''' and '''hide Floating Time Axis Levels''', and '''edit''' their '''format properties'''.
  
:Read More... [[Event Link Upgrades for OnePager 6.0 | Event Link Upgrades]] 0.4.1.7-60
+
6) Create '''Non-Linear Time Axis Level Cells''' by manually selecting these '''Cells''' and '''stretching '''or '''compressing '''their '''widths''' as required to change the appearance of '''timespans''' in the project view.
  
===Line Styles, Arrow Styles, Path Controls, and Link Labeling===
+
7) Create '''Curtains''' in the project view corresponding to '''Time Axis Level Cell(s)''' '''widths '''and '''edit Curtain format properties'''.
  
1) The illustration below shows all the line styles and arrow styles now available with OnePager Pro version 6.0.
+
8) Create and '''edit Daily Curtains '''with selective '''colors '''for '''weekdays''' and '''weekends''', control their '''transparency''' percentage, and their '''border properties'''.
  
<center>'''Place Table of Line Styles, Arrow Styles Here'''</center>
+
9) Define '''Working '''and '''Non-Working Hour timespans''' for each day of the week, control how these '''timespans''' are '''shown''' in the project view,''' '''and establish a specific '''Color '''for '''Non-Working Hours'''.
  
2) These options are available by the standard method of right clicking on an '''event link''' and making the desired changes in the '''Event Link Properties''' form that appears.
+
10) Create your own '''Custom Date''' '''Formats''' as extensions to those standard '''date formats''' provided by OnePager 6.1 for '''Years, Quarters, Months, Weeks, Days, Hours, and below'''.
  
3) Additionally, you may make global '''event link''' property selections via the '''Template''' form or the '''Project-View Properties''' form's '''Event Link''' tabs
+
11) Manage your created '''Curtains''' and '''Non-Linear Time Axis Level Cell’s timespans''' in a centralized '''Curtains and Timespans Grid (The Grid)'''.
  
4) '''Event Link Path''' controls are provided by way of slide bars available at the '''Event Link''' tab in both the '''Project-View Properties''' form and the '''Template''' form.  
+
12) Modify the '''Percent Complete''' ('''%Complete''') representation in the project view to take account of '''Non-Working times'''.
  
===Data Driven Event Links===
+
===Redesigned Template and Project-View Properties Forms===
  
1) With OnePager Pro version 6.0 we are not only supporting the manually inserted '''Event Links''' but are providing the capability to import '''event links''' from your Microsoft Project source plan under the control of OnePager Pro.
+
To implement these new features and enhancements OnePager 6.1’s '''Template '''and '''PVP '''form’s tabs associated with the '''Time Axis''' are redesigned to centralize all controls and access to '''Time Axis '''related forms in a single '''Template '''and '''PVP''' form '''Time Axis '''tab.
  
2) OnePager Pro version 6.0 will import but not necessarily display all '''event links''' from the selected '''tasks''' coming from your Microsoft Project source planThe capability to import links or not from Microsoft Project can be turned on and off.
+
1) The '''Time Axis Upgrade''' includes a redesigned '''Time Axis Properties''' form previously titled the '''Advanced time-axis features''' form.   
  
3) When the feature is turned on via a checkbox in the Project-View Properties form's '''Event Links''' tab, you may specify the conditions under which you want OnePager Pro to import links.  Various filtering mechanisms are provided to assist you where a large number of tasks in your Microsoft Project source plan contain '''event links''' otherwise know as '''Predecessors'''.
+
2) As you recall, the '''Advanced time-axis features''' form was accessible by either right-clicking on a '''Time Axis Cell''' or by clicking the '''Configure time-axis''' button on the '''Template/PVP''' form’s '''Main''' tab.  
  
4) Once the source plan's '''event links''' are imported and displayed, you have the ability to edit them as you would a manually inserted '''event link'''.
+
3) The redesign places all '''Time Axis '''related global controls on one '''Template/PVP '''form tab as shown here for the '''PVP''' form's '''Time Axis''' tab:
  
5) There is an example provided in the article link below:
+
<center>[[File:P61-0_0_4-61-(5)-12102018.png]]</center>
 +
<!--center>&lt;P61-0_0_4-61-(5)-12102018.png&gt;</center-->
  
:Read More... [[OnePager 6.0 Event Link Upgrades | Event Link Upgrades]] 0.4.1.7-60
+
4) The '''Time Axis Upgrade''' also includes enhancements to '''manual editing''' of '''Time Axis Level Cell format properties'''.  
  
==Time Axis Upgrades==
+
5) As an example of just one of the new capabilities, the illustration below shows a '''Floating Time Axis''' within the '''Graph''': :
  
There are two major enhancements associated with the management of time axes in OnePager version 6.0 project views:
+
<center>[[File:P61-0_0_4-61-(4-1)-08012018.png]]</center>
 +
<!--center>&lt;P61-0_0_4-61-(4-1)-08012018.png&gt;</center-->
  
:(1) The redesign and enhancement of the '''Time Axis Properties''' form previously titled the '''Advanced time-axis features" form.  Recall that the '''Advanced time-axis features''' form was accessible by either right clicking on the project view's time axis itself or by clicking the '''Configure time-axis''' button on the '''Main''' tab of the Project-View Properties and Template forms.
+
===More Information===
  
:(2) The addition of '''manual editing''' for the time axis. This enhancement allows you to left click on a time axis row and move that time axis row up and down on the project view with your mouse using drag and drop. Where your project view displays a time axis on the top and bottom of the project view you may drag and drop time axis rows on either time axis displayed independently of one another. Further, using the left click on the mouse you can select an individual cell or cells of the time axis and make changes to the cell's background color and font properties,
+
6) Detailed articles for using the new '''Time Axis Upgrade’s''' features and enhancements can be found at this link: [[Modifying the Time Axis for Version 6.1 (Portal) | Modifying the Time Axis (Portal)]]. <!--22.0.1-61.-->
  
===Enhanced Time Axis Properties Form===
+
7) Please take a moment to look at the Read More… article below which provides an introduction of these new '''Time Axis''' features and enhancements with examples.
  
1) The new '''Time Axis Properties''' form is shown below. It has four (4) tabs just like its previous counterpart but it is reorganized into two major groups. An example of the first three tabs is shown below:
+
:Read More... [[Time Axis Upgrades for OnePager 6.1 | Time Axis Upgrades for OnePager 6.1]] <!--0.4.1.9-61-->
  
<center>'''Place Time Axis Properties form Middle Tab here'''</center>
+
==The Honoring Non-Working Time Feature for Percent Complete (%Complete) in Microsoft Project and Excel Source Plans==
  
2) Note that the '''Labels''' group is reorganized but the basic controls labeling elements of the time axis at the tab's designated level remain.
+
1) The '''Honor Non-Working Time '''feature is an '''advanced feature''' provided in OnePager Pro 6.1 so that you can accurately display '''%Complete''' bars in your project views that match the '''%Complete''' bars in Microsoft Project’s Gantt Charts when you configure the Microsoft Project Calendar with appropriate '''Working '''and '''Non-Working Time'''.  This '''advanced feature is also adapted to Microsoft Excel '''source files'''.
  
3) The '''Formatting''' group of controls is significantly enhanced specifically with a greater number of controls over the '''borders''' associated with that time axis' level. Note that '''border''' line styles and colors are now available for use.
+
2) Specifying precise '''Working Hours '''and '''Non-Working Hours''' has an impact on how OnePager Pro 6.1 expresses '''Percent Complete''' ('''%Complete''') when you decide to '''Honor non-working time '''in the calculations.
  
4) The '''Advanced''' tab of the '''Time Axis Properties''' form is shown here:
+
:a) This feature assures that you can apply your Microsoft Project '''Calendar''' and have the OnePager Pro 6.1 '''graph''' accurately reflect the '''percent complete''' information from the '''source plan'''.
  
<center>'''Place Time Axis Properties form Advanced Tab here'''</center>
+
:b) You have the capability to select whether you want to take into account '''source plan''' '''Working Hours''' or '''Elapsed Time''' as is the case with previous versions of OnePager.
  
5) The  tab is reorganized so that calendar related controls are in the top group - '''Calendar Settings'''.
+
4) Please take a moment to look at the Read More… article below which provides more details of these new '''Honor Non-Working Time''' features and enhancements with examples.
  
6) The primary enhancement is a new feature which allows you to highlight selected days of the weekFor example, if your project team meeting is always on a Wednesday, you may just check the Wednesday checkbox and specify a color and OnePager will display that color vertically in the project view.. This feature may also be used to highlight weekend days by checking the Saturday and Sunday checkboxes.
+
:Read More... [[Managing Working Hours and Non-Working Hours for OnePager Pro for Version 6.1#The Honor Non-Working Time Feature | The Honor Non-Working Time Feature for OnePager Pro]] <!--22.5.3-61--> and [[Managing Working Hours and Non-Working Hours for OnePager Express for Version 6.1#The Honor Non-Working Time Feature | The Honor Non-Working Time Feature for OnePager Express]]. <!--22.5.4-61.-->
  
7) In the '''Project Settings''' group we've retained the controls by which you may set the boundaries of the count up or down from the beginning or end of the project.  You may also access the projects start and finish date controls on the '''Main''' tab of the Project-View Properties form by clicking the '''click here''' hot spot.  This will close the '''Time Axis Properties''' form and take you to the '''Main''' tab of the Project-View Properties form.
+
==New Shapes and Color Palette==
  
===Manual Editing of the Time Axis===
+
For OnePager Pro and Express 6.1 there are additional '''Task Bar shapes '''provided in the '''Template/PVP '''form '''Task Bars '''tab’s '''Default Task Bar Styles''' control group at the '''Shape''' dropdown menu and a new '''Color Chooser '''form '''Standard palette '''provided as well.
  
8) Version 6.0 of OnePager has a limited drag and drop capability for the time axes, both top and bottom.  When all three (3) levels are displayed, you may use your mouse to left click on a level and move it up or down as you desire.  If the '''Corner''' is being used to display the time axis level the time axis labels will be automatically moved to match your drag and drop action. You may independently drag and drop levels on both the top and bottom time axes if both are displayed.
+
1) The fifteen (15) new '''Task Bar shapes''' provided with OnePager Pro and Express 6.1 are shown below:
  
9) As mentioned above, you may left click on any time axis '''cell''' or '''cells''' and change the background color of the cell or the font color or both. It should be noted that making such changes will make the '''cell''' or '''cells''' so change a '''maverick''' cell in the same sense that making changes to an individual task will make that task a maverick.  Controls are provided to reset mavericked cells back to their default property values.
+
<center>[[File:P61-0_0_4-61-(2)-07262018.png]]</center>
 +
<!--center>&lt;P61-0_0_4-61-(2)-07262018.png&gt;</center-->
  
10) The article found at the link below provides some interesting examples of what can be done with these '''Time Axis Upgrades'''.
+
2) The updated '''Color Chooser '''form with the default '''Standard palette''' looks like this:
  
:Read More... [[OnePager 6.0 Time Axis Upgrades | Time Axis Upgrades]] 0.4.1.9-60
+
<center>[[File:P61-0_0_4-61-(3)-07262018.png]]</center>
 +
<!--center>&lt;P61-0_0_4-61-(3)-07262018.png&gt;</center-->
  
==Comment Box Upgrades==
+
===More Information===
  
We've made some artful upgrades to '''comment boxes''' in OnePager version 6.0. There are not only additional '''comment box''' shapes provided but we've added a host of new border styles, fill patterns, background colors, and shadows.
+
3) Detailed articles concerning the new '''Task Bar Shapes '''for OnePager Pro and Express 6.1 can be found at these links:  [[Task Bars Tab for Version 6.1 (OnePager Pro) | Task Bars Tab for OnePager Pro]] <!--21.3.1-61--> and [[Task Bars Tab for Version 6.1 (OnePager Express) | Task Bars Tab for OnePager Express]]. <!-- 21.4.1-61-->
  
Examples of the new '''comment box''' shapes are shown in the illustration below:
+
4) A detailed article concerning the new '''Color Palette Upgrade’s''' features and enhancements can be found at this link: [[Creating and Saving Color Palettes for Version 6.1 | Creating and Saving Color Palettes]]. <!--25.0.1-61.-->
  
<center>'''Insert Graphic of New Comment Box Shapes here'''</center>
+
==Auto-Save==
  
===Enhanced Comment Box Properties Form===
+
In OnePager 6.1 there is a new '''Auto-Save '''feature to assist you with recovering from operating system crashes, laptop battery outages, and other errors where you cannot recover your work effectively.
  
1) The '''Comment Box Properties''' form is redesigned to provide all the controls necessary to manipulate a '''comment box''' once it's created.
+
1) The feature is automatically turned '''ON''' when you launch OnePager Pro or Express6.1 either the '''Add-in''' or '''Desktop''' application.
  
2) When you right click on a '''comment box''' the '''Comment Box Properties''' form shown below will appear:
+
2) During the operation of OnePager 6.1, the '''Auto-Save''' feature saves your project view as a '''.TAM''' file in your '''default project view directory'''.  This is normally in the '''Documents''' folder under either OnePager Pro or OnePager Express.
  
<center>'''Insert New Comment Box Properties Form here'''</center>
+
3) The '''Auto-Save''' file name is in the form of '''_AutoSave_projectviewname.TAM'''. Only the last '''Auto-Save''' file saved exists in your '''default project view directory'''.
  
3) In addition to the previous controls available as shown in the '''Text''' group above, the primary enhancement here is the '''Data-driven''' feature.  This checkbox turns the '''Data-driven''' feature on and off as will be explained a bit more in the next sub-section below.  The '''Comment:''' field is the window where you provide your own text for the content of the '''comment box'''.
+
4) An '''Auto-Save''' file is written to this folder every five (5) minutes of OnePager Pro or Express 6.1’s operation.
  
4) The '''Formatting''' group of controls provides control over '''comment box''' shapes; anchor shapes; background colors for the box itself, connectors, and anchors; and border properties similar to the new features for the time axis borders.
+
5) When you '''Close''' OnePager 6.1 under normal conditions, the '''Auto-Save''' file is '''deleted '''so as not to occupy unnecessary storage space.
  
===Comment Box Tab of the Project View Properties Form===
+
6) You have the option to turn the '''Auto-Save '''feature '''OFF '''by unchecking the checkbox found on the '''File''' tab of the OnePager 6.1 ribbon at the '''Options''' sub-tab. 
  
5) The controls on the '''Comment Box''' tab of the Project-View Properties form (and the Template form as well) are the same as discussed above for the '''Comment Box Properties''' form. The '''Comment Box''' tab of the Project-View Properties form are shown below:
+
7) Turning the '''Auto-Save''' feature '''OFF''' causes the feature to remain '''OFF''' until the next OnePager 6.1 launch where you turn the feature back '''ON''' as shown below:
  
<center>'''Insert  New Comment Box Tab of Project-View Properties Form here'''</center>
+
<center>[[File:P61-0_0_4-61-(1)-07262018.png]]</center>
 +
<!--center>&lt;P61-0_0_4-61-(1)-07262018.png&gt;</center-->
  
6) As mentioned above, the primary enhancement is the '''Data-driven''' feature which allows you import data from your Microsoft Project or Excel source plan and populate '''comment boxes''' in your project view.
+
8) For more information, please see the following article: [[Troubleshooting for Version 6.1 (Redraw, Re-Starting, Feedback, Log Reporting) | Troubleshooting (Redraw, Re-Starting, AutoSave, Feedback, Log Reporting)]]. <!--26.0.1-61.-->
 
+
7) OnePager will generate a '''comment box''' on a task/milestone depending on the contents of the Microsoft Project or Excel column you specify.  If no data are present for a task/milestone in the specified source plan field a '''comment box''' will not be created.  Recall that individual '''comment boxes''' can be toggled on or off by right clicking on the '''comment box''' an unchecking the '''Data-driven''' checkbox in the '''Comment Box Properties''' form.
+
 
+
8)  Please take a look at the article whose link is below to see some examples of '''comment box''' shapes and usage within a sample project view.
+
 
+
:Read More... [[OnePager 6.0 Comment Box Upgrades | Comment Box Upgrades]] 0.4.1.11-60
+
 
+
==Enhanced Project View Editing Assistance==
+
 
+
Rounding off the enhancement included in OnePager 6.0 are some editing features for text that attempt to make '''smart''' changes where such text would make the project view cluttered.
+
 
+
1) In this version we've attempted to anticipate where text should be wrapped before hand so that you do not have to change the width of row or swimlane labels for example.  The text wrap analysis is also applied to '''comment boxes''', '''free boxes''', headers, footers, titles, the time axis cells.
+
 
+
2) We've also added '''smart''' processes to anticipate where text might collide such as when task labels in the same row might overlap.  In such cases OnePager 6.0 will attempt to avoid these text collisions without truncating text or otherwise make the project view look cluttered.
+
 
+
3)  The article linked below has a couple of examples where '''smart''' text wrapping and text collision avoidance were involved in formatting text in the project view.
+
 
+
:Read More... [[OnePager 6.0 Enhanced Project View Editing Assistance | Enhanced Project View Editing Assistance]] 0.4.1.13-60
+
 
+
==Integration with OnePager Live==
+
 
+
1) As many of you know, we are building a '''cloud''' version of OnePage called '''OnePager Live'''.  This produce is a browser based application connected to an Internet server that can take your Microsoft Project or Excel source plans and create a project view which will be returned for display in your browser.  Additionally, OnePager Live has the necessary management controls to allow you access and update to project views as your source plans are updated or changed.  Finally, OnePager Live is specifically designed to work with Microsoft Project Server and Microsoft Project Online.
+
 
+
2) Our goal in OnePager 6.0 is to assure that our desktop applications of OnePager Pro and Express are fully compatible and inter-operate with OnePager Live.
+
 
+
3)  The article with the link below provides some additional background an information on the relationship between our desktop products and OnePager Live.
+
 
+
:Read More... [[OnePager 6.0 Integration with OnePager Live | Integration with OnePager Live]] 0.4.1.15-60
+
-->
+
  
 
(0.4-61)
 
(0.4-61)
  
 
[[Category:Version 6.1]]
 
[[Category:Version 6.1]]
 +
[[Category:Task Links]]
 +
[[Category:Time Axis]]
 +
[[Category:Task/Milestone Editing]]
 +
[[Category:Color Palettes]]
 +
[[Category:Auto Save]]
 +
[[Category:Ribbon]]
 +
[[Category:Project Views]]
 +
[[Category:Snapshots]]
 +
[[Category:Project-View Properties Form]]
 +
[[Category:Editing a Project View]]
 +
[[Category:Templates]]
 +
[[Category:OnePager Pro]]
 +
[[Category:OnePager Express]]

Latest revision as of 13:43, 10 December 2018

Overview

OnePager Pro (OPP) and Express (OPX) version 6.1 provides four new capabilities and enhancement summarized in this article:

(1) Task Link Upgrade

(2) Time Axis Upgrade

(3) Honoring Non-Working Time for Percent Complete (%Complete)

(4) New Shapes and Color Palettes

(5) Auto-Save

The subsections below provide an overview and links to more detailed descriptions of these new capabilities and enhancements:

Task Link Upgrade

In previous OnePager versions, you could only manually insert Event Links between tasks/milestones, a sometimes tedious effort.

With OnePager 6.1, you can directly import predecessor information from Microsoft Project or Microsoft Excel source plans and show them as Data-driven Task Links.

In OnePager Pro and Express 6.1 you can:

1) Import predecessor information from your source plans.

2) Manipulate these Data-driven Task Link representations in your project views.

3) Use new controls to show or hide Task Links in the project view using manual editing controls and the new Task Link Filter rules capability.

4) Use enhanced graphics to alter Task Link connection line colors, arrow head shapes, and connection line styles.

5) Manually create and edit Task Links in the project view as you did with Event Links.

New Template and Project-View Properties Form New Task Link Tab

6) Supporting these new features is a new tab (the Task Links tab) in the Template and Project-View Properties (PVP) forms. These new tabs give you global control over the Data-driven Task Link import and formatting of both Data-driven and manual Task Links. The new Task Links tab for the OnePager Pro 6.1 Template form is shown below:

P61-0 4 1 7-61-(3)-06092018.png

7) Additionally, you have enhanced manual capabilities to select individual Task Links (e.g., Data-driven and manual) in the project view and edit them individually with enhanced controls in the Project View Editor (PVE).

8) There are also a couple of enhancements to the OnePager ribbon's Home tab supporting this upgrade with convenient controls. These include a new Where Are My Links? form and a way to select all Task Links for global editing from the OnePager 6.1 Home ribbon.

9) As an example of Data-driven Task Links in the Graph, below is the standard BlueGrass Project Plan Report project view with predecessors imported and shown:

P61-0 4 1 7-61-(3D)-06092018.png

More Information

10) Detailed articles for using the new Task Links Upgrade’s features and enhancements can be found at these links: Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal).

11) Please take a moment to look at the Read More… article below which provides an introduction to these new Task Link features and enhancements with examples.

Read More... Task Link Upgrades for OnePager 6.1

Time Axis Upgrade

In prior versions of OnePager you had limited editing control over the Time Axes, their Levels, and individual Cells.

With OnePager 6.1 there are new features and enhancement that help you to dramatically tailor the Time Axis to visually enhance your schedule presentations.

In OnePager Pro and Express 6.1 you can:

1) Control the Start/Finish boundaries of the project view in the Template and PVP form’s new Time Axis tabs and in the OnePager 6.1 ribbon’s View tab.

2) Control the showing and hiding of Time Axis Levels and Cells in the project view thus changing the visibility of information displayed in the graph.

3) Use centralized global controls to set and edit Time Axis Level Labels and individual Time Axis Level and Cell formats that include border properties, background colors, fill patterns, and Time Axis Level heights.

4) Use controls to Re-order the positions of individual Time Axis Levels with respect to one another at the top and bottom of the project view.

5) Create Floating Time Axis Levels and Cells within the graph, change their positions, show and hide Floating Time Axis Levels, and edit their format properties.

6) Create Non-Linear Time Axis Level Cells by manually selecting these Cells and stretching or compressing their widths as required to change the appearance of timespans in the project view.

7) Create Curtains in the project view corresponding to Time Axis Level Cell(s) widths and edit Curtain format properties.

8) Create and edit Daily Curtains with selective colors for weekdays and weekends, control their transparency percentage, and their border properties.

9) Define Working and Non-Working Hour timespans for each day of the week, control how these timespans are shown in the project view, and establish a specific Color for Non-Working Hours.

10) Create your own Custom Date Formats as extensions to those standard date formats provided by OnePager 6.1 for Years, Quarters, Months, Weeks, Days, Hours, and below.

11) Manage your created Curtains and Non-Linear Time Axis Level Cell’s timespans in a centralized Curtains and Timespans Grid (The Grid).

12) Modify the Percent Complete (%Complete) representation in the project view to take account of Non-Working times.

Redesigned Template and Project-View Properties Forms

To implement these new features and enhancements OnePager 6.1’s Template and PVP form’s tabs associated with the Time Axis are redesigned to centralize all controls and access to Time Axis related forms in a single Template and PVP form Time Axis tab.

1) The Time Axis Upgrade includes a redesigned Time Axis Properties form previously titled the Advanced time-axis features form.

2) As you recall, the Advanced time-axis features form was accessible by either right-clicking on a Time Axis Cell or by clicking the Configure time-axis button on the Template/PVP form’s Main tab.

3) The redesign places all Time Axis related global controls on one Template/PVP form tab as shown here for the PVP form's Time Axis tab:

P61-0 0 4-61-(5)-12102018.png

4) The Time Axis Upgrade also includes enhancements to manual editing of Time Axis Level Cell format properties.

5) As an example of just one of the new capabilities, the illustration below shows a Floating Time Axis within the Graph: :

P61-0 0 4-61-(4-1)-08012018.png

More Information

6) Detailed articles for using the new Time Axis Upgrade’s features and enhancements can be found at this link: Modifying the Time Axis (Portal).

7) Please take a moment to look at the Read More… article below which provides an introduction of these new Time Axis features and enhancements with examples.

Read More... Time Axis Upgrades for OnePager 6.1

The Honoring Non-Working Time Feature for Percent Complete (%Complete) in Microsoft Project and Excel Source Plans

1) The Honor Non-Working Time feature is an advanced feature provided in OnePager Pro 6.1 so that you can accurately display %Complete bars in your project views that match the %Complete bars in Microsoft Project’s Gantt Charts when you configure the Microsoft Project Calendar with appropriate Working and Non-Working Time. This advanced feature is also adapted to Microsoft Excel source files.

2) Specifying precise Working Hours and Non-Working Hours has an impact on how OnePager Pro 6.1 expresses Percent Complete (%Complete) when you decide to Honor non-working time in the calculations.

a) This feature assures that you can apply your Microsoft Project Calendar and have the OnePager Pro 6.1 graph accurately reflect the percent complete information from the source plan.
b) You have the capability to select whether you want to take into account source plan Working Hours or Elapsed Time as is the case with previous versions of OnePager.

4) Please take a moment to look at the Read More… article below which provides more details of these new Honor Non-Working Time features and enhancements with examples.

Read More... The Honor Non-Working Time Feature for OnePager Pro and The Honor Non-Working Time Feature for OnePager Express.

New Shapes and Color Palette

For OnePager Pro and Express 6.1 there are additional Task Bar shapes provided in the Template/PVP form Task Bars tab’s Default Task Bar Styles control group at the Shape dropdown menu and a new Color Chooser form Standard palette provided as well.

1) The fifteen (15) new Task Bar shapes provided with OnePager Pro and Express 6.1 are shown below:

P61-0 0 4-61-(2)-07262018.png

2) The updated Color Chooser form with the default Standard palette looks like this:

P61-0 0 4-61-(3)-07262018.png

More Information

3) Detailed articles concerning the new Task Bar Shapes for OnePager Pro and Express 6.1 can be found at these links: Task Bars Tab for OnePager Pro and Task Bars Tab for OnePager Express.

4) A detailed article concerning the new Color Palette Upgrade’s features and enhancements can be found at this link: Creating and Saving Color Palettes.

Auto-Save

In OnePager 6.1 there is a new Auto-Save feature to assist you with recovering from operating system crashes, laptop battery outages, and other errors where you cannot recover your work effectively.

1) The feature is automatically turned ON when you launch OnePager Pro or Express6.1 either the Add-in or Desktop application.

2) During the operation of OnePager 6.1, the Auto-Save feature saves your project view as a .TAM file in your default project view directory. This is normally in the Documents folder under either OnePager Pro or OnePager Express.

3) The Auto-Save file name is in the form of _AutoSave_projectviewname.TAM. Only the last Auto-Save file saved exists in your default project view directory.

4) An Auto-Save file is written to this folder every five (5) minutes of OnePager Pro or Express 6.1’s operation.

5) When you Close OnePager 6.1 under normal conditions, the Auto-Save file is deleted so as not to occupy unnecessary storage space.

6) You have the option to turn the Auto-Save feature OFF by unchecking the checkbox found on the File tab of the OnePager 6.1 ribbon at the Options sub-tab.

7) Turning the Auto-Save feature OFF causes the feature to remain OFF until the next OnePager 6.1 launch where you turn the feature back ON as shown below:

P61-0 0 4-61-(1)-07262018.png

8) For more information, please see the following article: Troubleshooting (Redraw, Re-Starting, AutoSave, Feedback, Log Reporting).

(0.4-61)