Difference between revisions of "TEMPzz3"

From OnePager Documentation
Jump to: navigation, search
Line 1: Line 1:
==Introduction to the Critical Path Feature in OnePager==
+
==Introduction to the Deadlines Feature in OnePager==
  
This article describes OnePager’s '''Critical Path''' feature.  The article covers the '''Add-in''' and '''Standalone''' editions of OnePager Pro, and OnePager 360.  Illustrations used in this article are from OnePager Pro but the feature's function, controls, and manual edits apply equally to OnePager 360.
+
This article describes OnePager’s '''Deadlines''' feature.  The article covers the '''Add-in''' and '''Standalone''' editions of OnePager Pro, OnePager Express, and OnePager 360.  Illustrations used in this article are from OnePager Pro but the feature's function, controls, and manual edits apply equally to OnePager Express and OnePager 360.
  
==About Editing The Critical Path==
+
==About Editing Deadlines==
  
A powerful feature of OnePager is the ability to display the '''critical path''' on task bar in the OnePager '''graph''''''Critical Path''' information is generated in your '''source plan''' and made available to OnePager when your '''source plan''' data are '''imported'''. When you '''enable''' the '''critical path''' capability, OnePager displays '''critical path''' information within the displayed task bars. Below is a sample chart with the '''critical path''' feature '''enabled''':
+
OnePager translates '''Deadlines''' from your '''source plan''' into '''deadline''' shapes in the '''graph''' to indicate the '''deadline date''' for a task bar or milestone symbol.  To illustrate with a simple example, consider the Microsoft Project '''source plan''' given below with three tasks containing '''Start and Finish dates''', a '''deadline date''', and the Microsoft Project '''Flag20''' field set to '''Yes''' so that OnePager '''imports''' the data for all three task bars:
  
<center>[[File:P70-10_7_1-(1)-06022020.png]]</center>
+
<center>[[File:P70-10_9_1-(1)-06032020.png]]</center>
<!--<center>P70-10_7_1-(1)-06022020.png</center>-->
+
<!--<center>P70-10_9_1-70-(1)-09182019.png</center>-->
  
==Critical Path Representation==
+
When a simple chart is created from the '''source plan''' above and '''Deadlines''' are turned '''ON''', the example chart looks like this:
  
This feature displays '''critical path segments''' on the top of each task bar showing where the '''source plan's''' '''critical path''' intersects with each task bar on the '''path''' as illustrated above.
+
<center>[[File:P70-10_9_1-(2)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(2)-09182019.png</center>-->
  
===Critical Paths in Virtual Summary Tasks===
+
When '''deadlines''' are turned '''ON''', they appear (by default) as '''red down-arrow shape''' in each task bar's row at the '''deadline date''' position with respect to the '''time axis'''. Above, '''deadline shapes''' that are not contained within their respective task bar are shown with '''back dash-dot connecting lines''' to illustrate the capability.
  
The '''critical path segments''' for a '''summary task''' are '''computed''' by finding sub-task bars that are on the '''critical path''' and have no sub-task bars of their own. OnePager then applies the same rule to sub-task bars of sub-task bars, if any. OnePager repeats this search until it examines the entire '''work breakdown structure''' beneath the '''summary task'''.  To determine whether a given sub-task bar is on the '''critical path''', OnePager can use the Microsoft Project '''critical path''' indicator '''Critical''' field in your '''source plan'''. Alternatively, OnePager can use any '''Flag''' or '''Number''' fields in your '''source plan''' as a '''critical path''' indicator. A '''virtual summary task (VST)''' constructed from several individual task bars in the chart with '''critical path segments''' looks like this:
+
==Editing All Deadline Properties==
  
<center>[[File:P70-10_7_1-(2)-06022020.png]]</center>
+
To display '''deadline dates''' in your charts you must first assure that the '''source plan''' has its '''Deadline''' field populated with valid '''dates'''. When '''deadline dates''' are present in the '''source plan''' they must first be turned '''ON''' as the '''default setting''' in most distributed '''Template Properties''' form is for '''deadlines''' to be turned '''OFF'''. To do this, click the '''Chart Properties''' button on the OnePager '''Home''' ribbon tool bar tab to access the '''Chart Properties''' form. Next, navigate to the '''Chart Properties''' '''Task Bars''' tab and to the '''Task Bars Decoration''' control group. Check the '''Deadline markers''' checkbox '''ON''' to '''enable''' the '''Deadline Properties...''' button to the immediate right of the checkbox as shown below:
<!--<center>P70-10_7_1-(2)-06022020.png</center>-->
+
  
===Virtual Summary Tasks with Critical Path Segments Turned OFF===
+
<center>[[File:P70-10_9_1-(3)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(3)-09182019.png</center>-->
  
When a task bar is '''edited''' to not display the '''critical path segment''' and that task bar is included in a Virtual Summary Task ('''VST'''). The task bar with the '''maverick critical path segment''' is '''still represented''' in the '''virtual summary task''' with the '''critical path''' displayed as shown in the two illustrations that follow. Five tasks in the chart before construction in '''Virtual Summary Task''':
+
By default, '''deadlines''' are mapped to the '''Deadline date''' field in Microsoft Project.
  
<center>[[File:P70-10_7_1-(3)-06022020.png]]</center>
+
===Set Deadline Properties Form===
<!--<center>P70-10_7_1-(3)-06022020.png</center>-->
+
  
The constructed '''Virtual Summary Task''' from the five task bars shown above is shown here:
+
To '''edit''' the format of all '''deadlines''', click the '''Deadline Properties...''' button, to access the '''Set deadline properties''' form shown below:
  
<center>[[File:P70-10_7_1-(4)-06022020.png]]</center>
+
<center>[[File:P70-10_9_1-(4)-06032020.png]]</center>
<!--<center>P70-10_7_1-(4)-06022020.png</center>-->
+
<!--<center>P70-10_9_1-70-(4)-09182019.png</center>-->
  
Although the chart before the construction of the '''Virtual Summary Task''' shows a '''gap''' in the '''critical path''', nevertheless, the actual '''critical path''' for the constructed '''Virtual Summary Task''' is contiguous.  In effect, '''Virtual Summary Tasks''' are constructed to ignore any '''maverick critical path segment''' that are not displayed in the chart.  
+
The form above provides all the '''editing''' controls for '''all deadline shapes''' that can be displayed in the chart.
  
For more information on '''Virtual Summary Tasks''', please see the article at:  [[Creating and Managing Virtual Summary Tasks for Version 7.1 | Creating and Managing Virtual Summary Tasks]] 18.0.1-71
+
====Standard Basic Deadline Shape Controls====
  
==Editing All Task Critical Path Properties==  
+
As stated previously, many of the controls in this group of the '''Set deadline properties''' form are standard.  
  
'''All''' task bar '''critical path properties''' can be '''edited''' without changing the settings in the current '''Template Properties''' form by using these steps.
+
The '''deadline shapes''' available are the same as '''Milestone symbols''' found in the '''Milestones''' tab of the '''Template Properties''' and '''Chart Properties''' forms. Likewise, the '''Fill patterns''' available are the same for task bars and milestone symbols also found on their respective tabs of the '''Template Properties''' and '''Chart Properties''' forms.  
  
===Chart Properties Form's Task Bars Tab===
+
The '''Height percentage''' control represents the '''percentage''' of the total task bar/milestone symbol's '''height''' itself, is covered elsewhere and behaves in a standard way.  The default '''Height percentage''' is 100% meaning that the '''deadline shape''' is the same '''height''' as the task bar/milestone symbol.
  
Click the '''Chart Properties''' button on the '''Home''' ribbon tool bar tab in the '''Settings''' group. Next, navigate to either the '''Task Bars''' tab. Ensure that the '''Critical-Path Segments''' checkbox is checked '''ON''' as shown below:
+
Similarly, the '''Transparency''' control for the '''deadline''' operates in the same way as '''transparency''' controls for other objects. The higher the value selected, the greater the '''transparency'''. Conversely, the low the value selected, the more solid the '''deadline shape''' appears.
  
<center>[[File:P70-10_7_1-(5)-06032020.png]]</center>
+
The '''Field''' dropdown in the upper right of the form allows you to select another '''source plan date field''' instead of the default '''Deadline''' field typically used in Microsoft Project.  Contents of the '''Field''' dropdown list is shown below:
<!--<center>P70-10_7_1-(5)-06032020.png</center>-->
+
  
===Set Critical-Path Properties Form===
+
<center>[[File:P70-10_9_1-(5)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(5)-09182019.png</center>-->
  
You can control the '''critical-path segments''' property's by clicking the '''Critical Path Properties''' button which accesses the '''Set critical-path properties''' form shown below:
+
The '''Position''' of the '''deadline''' has a unique meaning. '''Deadlines''' are always associated with a task bar/milestone symbol and can be to the left, within, or to the right of the task bar/milestone symbol itself depending on your  '''source plan''' data for the task bar’s '''start''', '''finish''' and '''deadline dates'''.  The position in this context is about where within the task bar/milestone symbol’s row area vertically the '''deadline''' should be placed. There are three (3) available positions for the placement of the '''deadline shapes''' with respect to the task bar:  
  
<center>[[File:P70-10_7_1-(6)-06032020.png]]</center>
+
:* '''Centered''' in the task bar/milestone symbol.
<!--<center>P70-10_7_1-(6)-06032020.png</center>-->
+
:* '''Above''' the task bar/milestone symbol.  
 +
:* '''Below''' the task bar/milestone symbol
  
The default '''Critical-path field''' setting is '''Critical''', that is, the field that OnePager uses to access '''critical path segment''' information from your Microsoft Project '''source plan''' for its '''computations'''. As shown below, you can select from other Microsoft Project '''source plan''' fields that are either '''Boolean''' or '''Numeric''':
+
The three available positions are shown here:
  
<center>[[File:P70-10_7_1-(7)-06032020.png]]</center>
+
<center>[[File:P70-10_9_1-(6)-06032020.png]]</center>
<!--<center>P70-10_7_1-(7)-06032020.png</center>-->
+
<!--<center>P70-10_9_1-70-(6)-09182019.png</center>-->
  
In the '''Set critical-path properties''' form, you can '''edit''' the '''color''' of the '''critical path segment''' represented in a task bar by clicking the '''Critical-path color''' dropdown button which accesses the standard '''Color Chooser''' form. Additionally, you can adjust the '''height''' of the '''critical-path segment''' within the task bar by '''editing''' the percentage value in the '''Critical-path height''' control of the above form.  The '''Critical-path height''' is a percentage of the total '''task bar height'''.  The default setting is '''20 percent'''. Here is an example of task bar with the '''Critical-path height''' set to 50%:
+
The '''Use custom color''' checkbox can be checked '''ON''' when it is desired to select a '''color''' for the '''deadline shape''' other than the '''color''' for its parent task bar/milestone symbol.  When the '''Use custom color''' checkbox is checked '''ON''', the standard '''Custom color''' dropdown is '''enabled. Clicking the dropdown button shows the standard '''Color Chooser''' form.
  
<center>[[File:P70-10_7_1-(8)-06032020.png]]</center>
+
====Showing Deadline Delays====
<!--<center>P70-10_7_1-(8)-06032020.png</center>-->
+
  
===Import Rules for Source Plan Critical Path Data===
+
The purpose of the display of '''Deadline Delays''' is to provide you with the capability to highlight '''deadlines''' that are '''missed''' as shown in the chart. When the '''Color-code delays''' checkbox is checked '''On''', OnePager uses the selected '''Delay color''' (determined by the selection of the '''delay color''' from the standard '''Color Chooser''' form) to show all '''deadlines''' that are '''missed''':
  
If you did not previously check the '''Critical-Path Segments''' checkbox '''ON''' in the '''Task Bar''' tab of the '''Chart Properties''' form before '''importing''' your '''source plan''' data to OnePager, you are not able to display the '''critical path segments''' because OnePager did not '''compute''' the '''critical path segments''' when '''importing''' the '''source plan'''.  As discussed above, it is recommended that you turn '''ON''' the '''critical-path segment''' display controls in the '''Template Properties''' form before '''importing''' the '''source plan'''.  However, you can subsequently use the controls above in the '''Chart Properties''' form to display '''critical-path segments''' in follow on snapshots. This is done by checking the '''Critical-Path Segments''' checkbox '''ON''' in the '''Task Bars''' tab of the '''Chart Properties''' form.  With this control checked '''ON''', all subsequent snapshots display '''critical path segments''' depending on the '''source plan''' data '''imported'''.
+
<center>[[File:P70-10_9_1-(7)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(7)-09182019.png</center>-->
  
===Milestone Symbols And Critical Path Segments Representation===
+
The '''deadline''' is set to the selected '''Delay color''' if, for any '''deadline shape''':
  
OnePager does not support the representation of '''critical-path segments''' for milestone symbols.  Accordingly, there are no '''Critical Path Segment Controls''' on the '''Milestone''' tab of the '''Template Properties''' form or the '''Chart Properties''' form which is shown below in the highlighted '''Milestone Symbols Decorations''' control group:
+
:* The '''Color-code delays''' checkbox is checked '''ON''',
 +
:* The '''deadline date''' is '''earlier than the current snapshot date''',
 +
:*  And the '''percent (%) complete''' for the parent task bar/milestone symbols less than 100%.
  
<center>[[File:P70-10_7_1-(9)-06032020.png]]</center>
+
If any of the conditions stated above are '''not met''', the '''color''' of the '''deadline''' is set to the '''default color''', unless a '''custom color''' is otherwise specified.  
<!--<center>P70-10_7_1-(9)-06032020.png</center>-->
+
  
==Editing Individual Task/Milestone Critical Path Properties==  
+
====Example Deadline Date Delay====
  
The '''default settings''' for displaying '''critical path''' information for individual task bars (milestones do not have '''critical path segments''') can be minimally '''edited''' by using these steps. Select the task bar and right-click to access the '''task bar''' right-click '''context menu''' with the '''Format…''' command, or right-click the '''task bar name label''', or click the '''Format…''' button on the OnePager '''Home''' ribbon tool bar tab after selecting the desired task bar/milestone symbols.  Clicking the '''Format...''' button accesses the '''Change Task/Milestone Properties''' form. Now, click the '''Critical Segments''' tab in the '''Change Task/Milestone Properties''' form which looks like this:
+
To illustrate the operation of the '''Color-code delay''' feature, let's set the stage by supposing that a project of three task bar is has the following initial conditions:
  
<center>[[File:P70-10_7_1-(10)-06032020.png]]</center>
+
:* Project Start Date – 10/1/2020
<!--<center>P70-10_7_1-(10)-06032020.png</center>-->
+
:* Project Finish Date (Estimated) – 10/18/2020
 +
:* First Status Date – 9/11/2020
 +
:* Task A Deadline Date – 10/15/2020 (Task A Finish Date projected before Deadline Date)
 +
:* Task B Deadline Date – 10/10/2020 (Task B Finish Date beyond Deadline Date)
 +
:* Task C Deadline Date- 10/1/2020 (Task C Start Date beyond Deadline Date)
  
The '''Show Critical-Path Segments''' checkbox allows you to turn the '''critical path'''  '''ON''' and '''OFF''' for the selected task bar. Clicking the '''Use Critical-Segments Defaults''' button changes the selected task bar’s '''critical path segment properties''' to the '''critical path''' settings current in the '''Chart Properties''' form. Here is an example of a chart with one task bar’s '''critical path''' turned '''OFF''':
+
With these initial conditions, the Microsoft Project '''source plan''' looks like this:
  
<center>[[File:P70-10_7_1-(11)-06032020.png]]</center>
+
<center>[[File:P70-10_9_1-(8)-06032020.png]]</center>
<!--<center>P70-10_7_1-(11)-06032020.png</center>-->
+
<!--<center>P70-10_9_1-70-(8)-09182019.png</center>-->
  
===Individual Editing of Other Task Bar Critical Path Properties===
+
If we take a snapshot using the above '''source plan''' as of '''10/10/2019''' the chart looks like this:
  
There are no controls in the '''Critical Segments''' tab of the '''Change Task/Milestone Properties''' form to '''edit''' other '''critical path properties''' for an individually selected task bars such as '''critical-path field''', '''color''', and '''critical-path height'''.
+
<center>[[File:P70-10_9_1-(9)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(9)-09182019.png</center>-->
  
===Critical Path Segments and Milestone Symbols===
+
OnePager recognizes the '''snapshot date''' similar to the way Microsoft Project recognizes its '''Status date'''.
  
As mentioned earlier, OnePager does not support the representation of '''critical-path segments''' for milestone symbols. If you select a milestone symbol with a right-click to access its right-click '''context menu''' and subsequently click the '''Format...''' command, the version of the '''Change Task/Milestone Properties''' form accessed does not have the '''Critical Segment''' tab as shown below:
+
====Connecting Lines====
  
<center>[[File:P70-10_7_1-(12)-06032020.png]]</center>
+
The '''Connecting Lines''' control group of the '''Set deadline properties''' form deals with '''connecting lines properties''' when you require that '''deadline shapes''' are tied to their parent task bar/milestone symbol. The controls available are shown below:
<!--<center>P70-10_7_1-(12)-06032020.png</center>-->
+
 
 +
<center>[[File:P70-10_9_1-(10)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(10)-09182019.png</center>-->
 +
 
 +
To '''enable deadline shape connection lines''', check the '''Connect deadline markers to current markers''' checkbox '''ON''' as shown above. A default '''color''', '''line style''', and '''line width''' is established from your '''current Template Properties''' form. If you wish to specify a '''custom color''', check the '''Use custom color''' checkbox '''ON''' and use the '''Custom color''' dropdown button to access the standard '''Color Chooser''' form. 
 +
 
 +
You also have the option of selecting from a variety of '''line styles''' by clicking on the '''Line style''' dropdown button.
 +
 
 +
There are five (5) standard '''line styles''' to select from which are the same as used to connect '''Baselines''' to their parent task bar/milestone symbols as described in the section of the article at: [[Baselines for OnePager for Version 7.1#Connect Baselines and Actual Task Bars/Milestone Symbols | Baselines for OnePager - Connect Baselines and Actual Task Bars/Milestone Symbols]] 10.5.1-71 
 +
 
 +
The value dial to the right of the '''Line style''' dropdown provides the capability to '''edit''' the '''width''' of the '''deadline shape connection line'''. The form above shows the extent of control that you have over the '''connecting lines'''.  These include the specification of a '''custom color''', '''line width''' and '''line style'''.
 +
 
 +
====Deadline Dates====
 +
 
 +
The '''Deadline Dates''' control group in the '''Set deadline properties''' form provides the controls for turning '''ON''' and '''positioning''' the '''deadline date text labels''' as shown below:
 +
 
 +
<center>[[File:P70-10_9_1-(11)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(11)-09182019.png</center>-->
 +
 
 +
The form above shows the extent of control that you have over the display of '''date labels''' for '''deadline shapes'''.  These are the same controls as for other '''decoration date''' specifications and include controls for '''date format''', the use of the '''fiscal year''' feature, the positioning of the '''date label/text''', and the '''font properties''' for the '''date label''' text. 
 +
 
 +
For more specific information about the controls in this control group, please reference the corresponding section for '''Baseline Decorations''' at: [[Baselines for OnePager for Version 7.1#Showing Baseline Dates | Baselines for OnePager - Showing Baseline Dates]] 10.5.1-71
 +
 
 +
==Editing Individual Task Deadline Properties==
 +
 
 +
'''Deadline shape''' displays are normally turned '''OFF''' in distributed '''Template Properties''' forms. In addition to the capabilities for '''editing all Deadline properties''' using the '''Template Properties''' and/or '''Chart Properties''' forms, you can select and individually '''edit Deadline properties''' showing in the chart. As a prerequisite for '''editing''' individual '''deadline''' properties it is the necessity for '''deadline''' data to be '''imported''' from the Microsoft Project '''source plan'''.
 +
 
 +
===Selecting Individual Task Bar or Bars===
 +
 
 +
Some individual task bar '''deadline''' properties can be '''edited''' by selecting the desired task bar or bars with a left-click operation, then right-clicking one of the selected task bars to access the task bar right-click '''context menu''', and click the '''Format...'''button. This action accesses the '''Change Task/Milestone Properties''' form at the '''Format''' tab. Navigate to the '''Deadlines''' tab as shown below:
 +
 
 +
<center>[[File:P70-10_9_1-(12)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(12)-09182019.png</center>-->
 +
 
 +
Before you can do so, you must confirm that the '''Deadline markers''' checkbox in either the '''Template Properties''' or '''Chart Properties''' form's '''Task Bars''' and/or '''Milestones''' tab is checked '''ON'''.
 +
 
 +
===Accessing the Change Task/Milestone Properties Form===
 +
 
 +
Select the '''Format…''' command which access the '''Change Task/Milestone Properties''' form. Next, navigate to the '''Deadlines''' tab, which displays the '''deadline''' control options shown below:
 +
 
 +
<center>[[File:P70-10_9_1-(13)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(13)-09182019.png</center>-->
 +
 
 +
The '''Deadlines''' tab, shown above controls the display of '''deadline connectors''' and '''deadline text dates''' for the selected task bar/milestone symbol and the placement of the '''deadline date labels/text''' with respect to the '''deadline shape'''.  The '''Show Deadline''' checkbox allows you to turn '''ON''' and '''OFF''' the display of '''deadline shape''' information. When the '''Show Deadline''' checkbox is checked '''ON''', you have the option to specify the display of the '''connector''' and the display of '''deadline date''' for the selected task bar/milestone symbol. When the '''Show Deadline Date Label''' checkbox is checked '''ON''', you have access to control over the '''Deadline Date Position''' selection dropdown and '''Deadline Date Font''' selection button as discussed above related to '''editing''' all task bar/milestone symbol '''deadline information'''. There are seven (7) standard '''deadline date label''' positions to select from as shown below:
 +
 
 +
<center>[[File:P70-10_9_1-(14)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(14)-09182019.png</center>-->
 +
 
 +
Clicking the '''Deadline Date Font''' button accesses the standard '''Font properties''' form where '''edits''' of the '''deadline date text''' can be made.
 +
 
 +
===Individually Edited Deadline Shape Example===
 +
 
 +
Below is an example of a single task bar's '''deadline information using the chart previously shown in this article:
 +
 
 +
<center>[[File:P70-10_9_1-(15)-06032020.png]]</center>
 +
<!--<center>P70-10_9_1-70-(15)-09182019.png</center>-->
 +
 
 +
The controls at the '''Deadline''' tab of the '''Change Task/Milestone Properties''' form for the '''Show Deadline Date''', that is, the '''Position''' and '''Font''' controls operate exactly as described for other '''start/finish date''' displays in OnePager.
 +
 
 +
For more information describing the use of these controls for the '''Percent Complete''' tab of this form, please see the section in the article at: [[Percent complete for OnePager for Version 7.1#Example | Percent complete for OnePager - Example]] 10.3.1-71 
 +
 
 +
There are no controls available in the '''Deadline''' tab of the '''Change Task/Milestone Properties''' form to '''edit''' the properties of the '''connector line''' for an '''individually''' selected task/milestone shape.
  
 
==Related Links==
 
==Related Links==
  
[[Creating and Managing Virtual Summary Tasks for Version 7.1 | Creating and Managing Virtual Summary Tasks]] 18.0.1-71
+
[[Manual Editing Task/Milestone Shapes and Text Labels for Version 7.1 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] 9.0.1-71
 +
 
 +
[[Changing Individual Task/Milestone Properties (Color, Shape, Labels, etc.) for Version 7.0 | Changing Individual Task/Milestone Properties (Color, Shapes, Labels, etc.)]] 9.2.1-70
 +
 
 +
[[Labeling Task/Milestone Dates for OnePager for Version 7.1 | Labeling Task/Milestone Dates for OnePager]] 10.1.1-71
 +
 
 +
[[Percent complete for OnePager for Version 7.1 | Percent complete for OnePager]] 10.3.1-71
 +
 
 +
[[Baselines for OnePager for Version 7.1 | Baselines for OnePager]] 10.5.1-71
 +
 
 +
[[Editing with the Chart Properties form for Version 7.1 (Portal) | Editing with the Chart Properties form (Portal)]] 121.0.1-71
 +
 
 +
[[Managing Templates for Version 7.1 (Portal) | Managing Templates (Portal)]] 124.0.1-71
  
(10.7.1-71)
+
(10.9.1-71)
  
 
[[Category:Version 7.1]]
 
[[Category:Version 7.1]]
Line 111: Line 191:
 
[[Category:Task/Milestone Editing]]
 
[[Category:Task/Milestone Editing]]
 
[[Category:Task/Milestone Decorations]]
 
[[Category:Task/Milestone Decorations]]
[[Category:Critical Path]]
+
[[Category:Deadlines]]
 
[[Category:Mavericks]]
 
[[Category:Mavericks]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Express]]
 
[[Category:OnePager Express]]
 
[[Category:OnePager 360]]
 
[[Category:OnePager 360]]

Revision as of 17:14, 19 February 2021

Introduction to the Deadlines Feature in OnePager

This article describes OnePager’s Deadlines feature. The article covers the Add-in and Standalone editions of OnePager Pro, OnePager Express, and OnePager 360. Illustrations used in this article are from OnePager Pro but the feature's function, controls, and manual edits apply equally to OnePager Express and OnePager 360.

About Editing Deadlines

OnePager translates Deadlines from your source plan into deadline shapes in the graph to indicate the deadline date for a task bar or milestone symbol. To illustrate with a simple example, consider the Microsoft Project source plan given below with three tasks containing Start and Finish dates, a deadline date, and the Microsoft Project Flag20 field set to Yes so that OnePager imports the data for all three task bars:

P70-10 9 1-(1)-06032020.png

When a simple chart is created from the source plan above and Deadlines are turned ON, the example chart looks like this:

P70-10 9 1-(2)-06032020.png

When deadlines are turned ON, they appear (by default) as red down-arrow shape in each task bar's row at the deadline date position with respect to the time axis. Above, deadline shapes that are not contained within their respective task bar are shown with back dash-dot connecting lines to illustrate the capability.

Editing All Deadline Properties

To display deadline dates in your charts you must first assure that the source plan has its Deadline field populated with valid dates. When deadline dates are present in the source plan they must first be turned ON as the default setting in most distributed Template Properties form is for deadlines to be turned OFF. To do this, click the Chart Properties button on the OnePager Home ribbon tool bar tab to access the Chart Properties form. Next, navigate to the Chart Properties Task Bars tab and to the Task Bars Decoration control group. Check the Deadline markers checkbox ON to enable the Deadline Properties... button to the immediate right of the checkbox as shown below:

P70-10 9 1-(3)-06032020.png

By default, deadlines are mapped to the Deadline date field in Microsoft Project.

Set Deadline Properties Form

To edit the format of all deadlines, click the Deadline Properties... button, to access the Set deadline properties form shown below:

P70-10 9 1-(4)-06032020.png

The form above provides all the editing controls for all deadline shapes that can be displayed in the chart.

Standard Basic Deadline Shape Controls

As stated previously, many of the controls in this group of the Set deadline properties form are standard.

The deadline shapes available are the same as Milestone symbols found in the Milestones tab of the Template Properties and Chart Properties forms. Likewise, the Fill patterns available are the same for task bars and milestone symbols also found on their respective tabs of the Template Properties and Chart Properties forms.

The Height percentage control represents the percentage of the total task bar/milestone symbol's height itself, is covered elsewhere and behaves in a standard way. The default Height percentage is 100% meaning that the deadline shape is the same height as the task bar/milestone symbol.

Similarly, the Transparency control for the deadline operates in the same way as transparency controls for other objects. The higher the value selected, the greater the transparency. Conversely, the low the value selected, the more solid the deadline shape appears.

The Field dropdown in the upper right of the form allows you to select another source plan date field instead of the default Deadline field typically used in Microsoft Project. Contents of the Field dropdown list is shown below:

P70-10 9 1-(5)-06032020.png

The Position of the deadline has a unique meaning. Deadlines are always associated with a task bar/milestone symbol and can be to the left, within, or to the right of the task bar/milestone symbol itself depending on your source plan data for the task bar’s start, finish and deadline dates. The position in this context is about where within the task bar/milestone symbol’s row area vertically the deadline should be placed. There are three (3) available positions for the placement of the deadline shapes with respect to the task bar:

  • Centered in the task bar/milestone symbol.
  • Above the task bar/milestone symbol.
  • Below the task bar/milestone symbol

The three available positions are shown here:

P70-10 9 1-(6)-06032020.png

The Use custom color checkbox can be checked ON when it is desired to select a color for the deadline shape other than the color for its parent task bar/milestone symbol. When the Use custom color checkbox is checked ON, the standard Custom color dropdown is enabled. Clicking the dropdown button shows the standard Color Chooser form.

Showing Deadline Delays

The purpose of the display of Deadline Delays is to provide you with the capability to highlight deadlines that are missed as shown in the chart. When the Color-code delays checkbox is checked On, OnePager uses the selected Delay color (determined by the selection of the delay color from the standard Color Chooser form) to show all deadlines that are missed:

P70-10 9 1-(7)-06032020.png

The deadline is set to the selected Delay color if, for any deadline shape:

  • The Color-code delays checkbox is checked ON,
  • The deadline date is earlier than the current snapshot date,
  • And the percent (%) complete for the parent task bar/milestone symbols less than 100%.

If any of the conditions stated above are not met, the color of the deadline is set to the default color, unless a custom color is otherwise specified.

Example Deadline Date Delay

To illustrate the operation of the Color-code delay feature, let's set the stage by supposing that a project of three task bar is has the following initial conditions:

  • Project Start Date – 10/1/2020
  • Project Finish Date (Estimated) – 10/18/2020
  • First Status Date – 9/11/2020
  • Task A Deadline Date – 10/15/2020 (Task A Finish Date projected before Deadline Date)
  • Task B Deadline Date – 10/10/2020 (Task B Finish Date beyond Deadline Date)
  • Task C Deadline Date- 10/1/2020 (Task C Start Date beyond Deadline Date)

With these initial conditions, the Microsoft Project source plan looks like this:

P70-10 9 1-(8)-06032020.png

If we take a snapshot using the above source plan as of 10/10/2019 the chart looks like this:

P70-10 9 1-(9)-06032020.png

OnePager recognizes the snapshot date similar to the way Microsoft Project recognizes its Status date.

Connecting Lines

The Connecting Lines control group of the Set deadline properties form deals with connecting lines properties when you require that deadline shapes are tied to their parent task bar/milestone symbol. The controls available are shown below:

P70-10 9 1-(10)-06032020.png

To enable deadline shape connection lines, check the Connect deadline markers to current markers checkbox ON as shown above. A default color, line style, and line width is established from your current Template Properties form. If you wish to specify a custom color, check the Use custom color checkbox ON and use the Custom color dropdown button to access the standard Color Chooser form.

You also have the option of selecting from a variety of line styles by clicking on the Line style dropdown button.

There are five (5) standard line styles to select from which are the same as used to connect Baselines to their parent task bar/milestone symbols as described in the section of the article at: Baselines for OnePager - Connect Baselines and Actual Task Bars/Milestone Symbols 10.5.1-71

The value dial to the right of the Line style dropdown provides the capability to edit the width of the deadline shape connection line. The form above shows the extent of control that you have over the connecting lines. These include the specification of a custom color, line width and line style.

Deadline Dates

The Deadline Dates control group in the Set deadline properties form provides the controls for turning ON and positioning the deadline date text labels as shown below:

P70-10 9 1-(11)-06032020.png

The form above shows the extent of control that you have over the display of date labels for deadline shapes. These are the same controls as for other decoration date specifications and include controls for date format, the use of the fiscal year feature, the positioning of the date label/text, and the font properties for the date label text.

For more specific information about the controls in this control group, please reference the corresponding section for Baseline Decorations at: Baselines for OnePager - Showing Baseline Dates 10.5.1-71

Editing Individual Task Deadline Properties

Deadline shape displays are normally turned OFF in distributed Template Properties forms. In addition to the capabilities for editing all Deadline properties using the Template Properties and/or Chart Properties forms, you can select and individually edit Deadline properties showing in the chart. As a prerequisite for editing individual deadline properties it is the necessity for deadline data to be imported from the Microsoft Project source plan.

Selecting Individual Task Bar or Bars

Some individual task bar deadline properties can be edited by selecting the desired task bar or bars with a left-click operation, then right-clicking one of the selected task bars to access the task bar right-click context menu, and click the Format...button. This action accesses the Change Task/Milestone Properties form at the Format tab. Navigate to the Deadlines tab as shown below:

P70-10 9 1-(12)-06032020.png

Before you can do so, you must confirm that the Deadline markers checkbox in either the Template Properties or Chart Properties form's Task Bars and/or Milestones tab is checked ON.

Accessing the Change Task/Milestone Properties Form

Select the Format… command which access the Change Task/Milestone Properties form. Next, navigate to the Deadlines tab, which displays the deadline control options shown below:

P70-10 9 1-(13)-06032020.png

The Deadlines tab, shown above controls the display of deadline connectors and deadline text dates for the selected task bar/milestone symbol and the placement of the deadline date labels/text with respect to the deadline shape. The Show Deadline checkbox allows you to turn ON and OFF the display of deadline shape information. When the Show Deadline checkbox is checked ON, you have the option to specify the display of the connector and the display of deadline date for the selected task bar/milestone symbol. When the Show Deadline Date Label checkbox is checked ON, you have access to control over the Deadline Date Position selection dropdown and Deadline Date Font selection button as discussed above related to editing all task bar/milestone symbol deadline information. There are seven (7) standard deadline date label positions to select from as shown below:

P70-10 9 1-(14)-06032020.png

Clicking the Deadline Date Font button accesses the standard Font properties form where edits of the deadline date text can be made.

Individually Edited Deadline Shape Example

Below is an example of a single task bar's deadline information using the chart previously shown in this article:

P70-10 9 1-(15)-06032020.png

The controls at the Deadline tab of the Change Task/Milestone Properties form for the Show Deadline Date, that is, the Position and Font controls operate exactly as described for other start/finish date displays in OnePager.

For more information describing the use of these controls for the Percent Complete tab of this form, please see the section in the article at: Percent complete for OnePager - Example 10.3.1-71

There are no controls available in the Deadline tab of the Change Task/Milestone Properties form to edit the properties of the connector line for an individually selected task/milestone shape.

Related Links

Manual Editing Task/Milestone Shapes and Text Labels (Portal) 9.0.1-71

Changing Individual Task/Milestone Properties (Color, Shapes, Labels, etc.) 9.2.1-70

Labeling Task/Milestone Dates for OnePager 10.1.1-71

Percent complete for OnePager 10.3.1-71

Baselines for OnePager 10.5.1-71

Editing with the Chart Properties form (Portal) 121.0.1-71

Managing Templates (Portal) 124.0.1-71

(10.9.1-71)