Line 1: Line 1:
==Upgrading to OnePager Express Version 7.0 Requires Re-Licensing==
+
==Overview==
  
===New and Trial Users of OnePager Express Version 7.0===
+
As with previous version of OnePager Pro, version 7.0 of '''OPP''' you can launch '''OPP''' from a '''Desktop Icon''' as well as from within Microsoft Project ('''Add-in'''). Please note that after selecting the '''Add-in''' launch option that you are not be able to launch the OnePager '''Desktop''' application. 
  
Customers using OnePager Express Version 7.0 for the first time and those converting from a '''Trial User''' to a '''Licensed User''' can '''skip this section and go immediately to''': [[Activating Your OnePager License for Version 7.0#About Your OnePager Express License | About Your OnePager Express License]] <!--2.6.1-70 -->
+
Only one of these applications ('''Add-in''' or '''Desktop''') can be launched at a time.  If you attempt to launch both, a warning message appears as shown below:
  
===Users Upgrading to OnePager Express Version 7.0 from Previous OnePager Express Versions===
+
<center>[[File:P70-3_0_1-70-(1)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1-70-(1)-07052019.png</center>-->
  
If you are a user of OnePager Express versions prior to Version 7.0 you are required to '''re-key your license''' by requesting a OnePager Express Version 7.0 '''license key''' from our website. After installing Version 7.0 on your computer using the standard '''installation procedure''', you will be presented with this screen:
+
If you need further information, please consult this link: [https://www.onepager.com/support/faq.php?id=77 OnePager Doesn't Launch when the Desktop Icon is Clicked].
  
<center>[[File:P70-2_6_1-70-(0A)-09082020.png]]</center>
+
This article provides the basic information needed to '''Getting Started''' and use OnePager Pro ('''OPP''') after you launch '''OPP''' from Microsoft Project. The article providing '''Getting Started''' guidance when launching from the '''OPP Desktop Icon''' is at: [[Getting Started with OnePager Pro Version 7.0 Desktop | Getting Started with OnePager Pro Desktop]] <!--3.0.1.2-70
<!--<center>P70-2_6_1-70-(0A)-09082020.png</center>-->
+
  
There are two options available for '''re-keying''' your OnePager Express Version 7.0 license:  (1) '''Re-Key Now''' and (2) '''Snooze'''.
+
==Launching OnePager Pro for the First Time==
  
====Re-Key Now Option====
+
The '''OPP Add-in''' automatically displays the '''OnePager Icon''' on the Microsoft Project '''Add-in''' ribbon tool bar tab once OnePager is installed. That '''OPP Add-in''' ribbon tool bar button set looks like this:
  
To '''re-key''' your OnePager Express Version 7.0 '''license''' on your '''first launch''' access to OnePager Express Version 7.0, follow the instructions in the above form, click the '''Re-Key Now''' button to be taken to the OnePager.com website where a OnePager Express Version 7.0 '''Replacement Key''' is provided.
+
<center>[[File:P70-1_6_1-70-(1)-07012019.png]]</center>
 +
<!--<center>P70-1_6_1-70-(1)-07012019.png</center>-->
  
Return to the above form and click the '''Next''' button which takes you to the ''' OnePager Express License form shown below:
+
Clicking the '''OnePager Pro''' button launches the '''Chart Editor'''. Clicking the '''Templates…''' button lets you '''edit''' the '''Template Properties''' form provided with the product. For now, it is simplest to use the default '''Template Properties''' form.  You can learn how '''Template Properties''' forms let you customize and standardize graph features later at: [[Managing Templates for Version 7.0 (Portal) | Managing Templates (Portal)]] <!--24.0.1-70.
  
<center>[[File:P70-2_6_1-70-(0B)-09082020.png]]</center>
+
Before you launch '''OPP''', it is a good idea to '''unhide''' the Microsoft Project '''Flag''' field that tells OnePager which Microsoft Project '''Flag''' field you intend to use to control the import of '''source plan''' data. '''Caution:''' When you '''unhide''' a field in Microsoft Project, that field can now appear in some of Microsoft Project’s standard reports. Do not forget to '''hide''' the field again before generating such reports if you do not want the field to appear in those reports.  The selected Microsoft Project '''Flag''' field allows you to control which tasks get '''imported''' and appear in the chart and are '''saved''' in Microsoft Project for future use. For example, the '''Flag''' field (e.g., Flag20) is shown below:
<!--<center>P70-2_6_1-70-(0B)-09082020.png</center>-->
+
  
Follow the instructions in the form and '''paste''' the '''Replacement Key''' in the '''License Key:''' in the above form and click the '''Close''' button. When the '''OnePager Express license form''' closes you are ready to use OnePager Express in the '''NEW''', '''UPDATE''', or '''OPEN''' modes.
+
<center>[[File:P61-3_0_1-61-(2)-10232017.png]]</center>
 +
<!--<center>P61-3_0_1-61-(2)-10232017.png</center>-->
  
If, however, you close the above form without '''re-keying''' you do have access to OnePager Express Version 7.0 on a fifteen (15) day trial basis as indicated at the bottom of the '''OnePager Express Start''' form.
+
To control which tasks are '''imported''', specify the Microsoft Project '''Flag''' field (e.g. Flag1, Flag2 … Flag20) that you wish to use. '''Number''' fields can also be used the same as the '''Flag''' fields where a '''1''' in a '''Number''' field indicates '''Yes''' and a '''0''' in a '''Number''' field indicates '''No'''. '''Un-hide''' that field in Microsoft Project by right-clicking in the field header area and selecting '''Insert Column''':
  
====Snooze Option====
+
<center>[[File:P61-3_0_1-61-(3)-10232017.png]]</center>
 +
<!--<center>P61-3_0_1-61-(3)-10232017.png</center>-->
  
If you selected the '''Snooze''' option from the '''OnePager Message form''', you are provided with a fifteen (15) day '''trial license''' to OnePager Express Version 7.0.  Clicking the '''Snooze''' button also takes you to the '''OnePager Express Start''' form.  You can continue to use OnePager Express Version 7.0 with the '''trial license''' until the '''fifteen (15) day''' trial period expires. Each day during the '''trial period''' OnePager Express Version 7.0 will ask you if you want to '''Re-Key Now'''.  You have the option to do so by clicking the '''Re-Key Now''' button or continue on with the '''trial license''' by clicking the '''Snooze''' button. Two days before the '''trial license period''' ends another '''OnePager Message''' appears when OnePager Express Version 7.0 is '''launched''' as shown below:
+
Now put a '''Yes''' in this '''Flag''' field for any task that you want to graph:
  
<center>[[File:P70-2_6_1-70-(0C)-09082020.png]]</center>
+
<center>[[File:P61-3_0_1-61-(4)-10232017.png]]</center>
<!--<center>P70-2_6_1-70-(0C)-09082020</center>
+
<!--<center>P61-3_0_1-61-(4)-10232017.png</center>-->
  
Using the form's '''Re-Key Now''' button you can request a '''Replacement Key''' at this point as described above. The '''Snooze''' button remains '''enabled''' so you can click the '''Snooze''' button to continue using OnePager Express Version 7.0 on this day. Clicking the '''Next''' button allows you to use your '''trial license''' for OnePager Express Version 7.0 for one more day.   If, however, you close the above form without '''re-keying''' you do have access to OnePager Express Version 7.0 for two (2) day more as indicated at the bottom of the '''OnePager Express Start''' form. If you need assistance, please contact the OnePager '''License Department''' at [http://www.onepager.com/about/contact_us.php Contact Us].
+
When making your first chart, we strongly recommend that you select 50 or fewer tasks with '''Yes'''. Please note that '''OPP''' is shipped with a number of fully populated '''Template Properties''' forms that are based on the Microsoft Project '''source plan''' used in the '''OnePager Tutorial''' shipped with the product – BlueGrass Project Plan. Note that three field heading types must always be present: '''Name''', '''Start''', and '''Finish'''. '''Caution'''. Starting in Microsoft Project 2010, there is a '''Manual Scheduling''' mode that allows you to leave '''dates blank''' in your schedule. However, behind the scenes, these dates are still being automatically assigned to the project '''Start Date''', or to '''Today's Date''' if the project '''Start Date''' is not defined. Even though the dates appear to be undefined, they are defined behind the scenes, and are being passed to '''OPP'''. Because '''Today's Date''' often equals your '''Snapshot date''', it is not surprising to see all of these '''dateless tasks''' appearing near the '''time cursor'''. '''Solutions'''. There are two solutions available:
  
With one day remaining in your '''trial period''',  launching OnePager Express Version 7.0 causes this '''OnePager Message''' form to appear as shown below:
+
:1) Define the dates for your tasks and milestones in Microsoft Project. This overwrites any default dates that Microsoft Project is assigning, and makes your project schedule more consistent with your '''OPP''' timeline. As a rule of thumb, we recommend defining dates for all tasks and milestones in your '''source plan''', especially when it comes to creating a '''OPP''' chart.
 +
:2) Or, remove the '''dateless tasks''' from your '''OPP graph'''. You can leave them in your Microsoft Project '''source plan''', but by removing them from the '''OPP graph''', you won't have to explain why certain task bars and milestone symbols are appearing in weird places when they really should not. 
  
<center>[[File:P70-2_6_1-70-(0D)-009082020.png]]</center>
+
To launch '''OPP''' and make a chart, click the '''OPP''' button on the Microsoft Project ribbon tool bar’s '''Add-ins''' tab, which accesses the '''OnePager Pro Start''' form:
<!--<center>P70-2_6_1-70-(0D)-09082020</center>
+
  
It is recommended that you use the '''Re-Key Now''' option button and complete the '''Replacement Key''' process. However, you can still use OnePager Express Version 7.0 throughout the day by clicking the '''Snooze''' button on the form. 
+
<center>[[File:P70-1_6_1-70-(2)-07012019.png]]</center>
 +
<!--<center>P70-1_6_1-70-(2)-07012019.png</center>-->
  
On the last day of the '''trial period''', launching OnePager Express Version 7.0 causes this final '''OnePager Message''' form to appear as shown here:
+
The '''OnePager Pro Start''' form provides you with three options:
  
<center>[[File:P70-2_6_1-70-(0E-1)-08312020.png]]</center>
+
:1) '''NEW'''  Clicking the '''NEW''' button accesses the '''OnePager Pro choices''' ('''OPC''') form.
<!--<center>P70-1_6_1-70-(0E-1)-08312020</center>
+
:2) '''UPDATE'''  Clicking the '''UPDATE''' button allows you to '''BROWSE FILES''' for an existing chart or select a recently-opened chart.
 +
:3) '''OPEN'''  Clicking the '''OPEN''' button allows you to '''BROWSE FILES''' for an existing chart or select a recently-opened chart. 
  
The intent of this message is to advise you that this is the '''last day of the fifteen (15) day trial period''' and that OnePager Express Version 7.0 will be '''locked''' and unavailable for you to use if you do not obtain a OnePager Express Version 7.0 '''Replacement Key''' before the end of the day. If, however, you click the '''Next''' button the above form without '''re-keying''' you do have access to OnePager Express Version 7.0 for one (1) more day as indicated at the bottom of the '''OnePager Express Start''' form.
+
Once selected and opened, the chart is available for '''editing'''.
  
Although the above form provides instructions on how to revert and save your work should you not choose to upgrade to OnePager Express Version 7.0, we recommend that you click the '''Re-Key Now''' button to continue using OnePager Express Version 7.0. At this point, the '''Snooze''' option is not available. After the fifteen (15) '''trial period''' has expired and you attempt to launch OnePager Express Version 7.0, the '''OnePager Message''' form shown below appears:
+
==Creating a New Chart==
  
<center>[[File:P70-2_6_1-70-(0F)-09082020.png]]</center>
+
Clicking the '''NEW''' button accesses the '''OnePager choices''' ('''OPC''') form as shown below:
<!--<center>P70-2_6_1-70-(0F)-09082020</center>
+
  
The form above notifies you that OnePager Express Version 7.0 is not available for you to use. You may click the '''Re-Key Now''' button to obtain your '''Replacement Key''' as described above or you can  '''uninstall''' OnePager Express Version 7.0 and '''install''' the version of OnePager Express you purchased. When you complete the '''re-keying'''  process you do have access to OnePager Express Version 7.0 as indicated at the bottom of the '''OnePager Express Start''' form shown here:
+
<center>[[File:P61-3_0_1_1-61-(6)-04302018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(6)-04302018.png</center>-->
  
<center>[[File:X70-2_6_1-70-(0FA-1)-09252020.png]]</center>
+
===Options on the New OnePager Choices form===
<center>X70-2_6_1-70-(0FA-1)-09252020.png</center>-->
+
  
If you need assistance, please contact the OnePager '''License Department''' at [http://www.onepager.com/about/contact_us.php Contact Us].
+
The '''OPC''' form gives you more options for selecting '''source plans'''.  The illustration above shows that '''OPP''' is initiated from Microsoft Project with the '''source plan''' shown in the '''Selected File(s)''' group shown above. The '''Add/Remove''' button gives you the capability to '''add''' more '''source plans''' to the '''source packet''' or, for multiple file packets, to '''remove''' files. Clicking the '''Add/Remove''' button accesses the '''Data source selection''' form as shown below:
  
==Upgrading to OnePager Express Version 7.0 Requires Re-Licensing==
+
<center>[[File:P70-3_0_1_1-70-(7)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(7)-07052019.png</center>-->
  
===New and Trial Users of OnePager Express Version 7.0===
+
The '''Data source selection''' form displays the current '''source plan''' that was loaded with Microsoft Project when you clicked the '''OnePager Pro''' button.  This form lets you '''Add''' more Microsoft Project '''source plan''' to create a '''multi-project''' chart or '''Remove''' a '''source plan''' from a '''multi-file source packet'''.  These options are detailed below.
  
Customers using OnePager Express Version 7.0 for the first time and those converting from a '''Trial User''' to a '''Licensed User''' can '''skip this section and go immediately to''': [[Activating Your OnePager License for Version 7.0#About Your OnePager Express License | About Your OnePager Express License]] <!--2.6.1-70 -->
+
===Adding a New Source Plan===
  
===Users Upgrading to OnePager Express Version 7.0 from Previous OnePager Express Versions===
+
When you click the '''Add''' button, '''OPP''' gives you the option to bring up a Windows '''Open''' form when you select the '''BROWSE FILES…''' option as shown here:
  
If you are a user of OnePager Express versions prior to Version 7.0 you are required to '''re-key your license''' by requesting a OnePager Express Version 7.0 '''license key''' from our website. After installing Version 7.0 on your computer using the standard '''installation procedure''', you will be presented with this screen:
+
<center>[[File:P70-3_0_1_1-70-(8)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(8)-07052019.png</center>-->
  
<center>[[File:P70-2_6_1-70-(0A)-09082020.png]]</center>
+
Clicking the '''BROWSE FILES…''' option displays a Window’s '''Open''' form so you can select a Microsoft Project '''source plan''' to '''add''' to the '''source packet'''.  A sample '''Open''' form is shown below:
<!--<center>P70-2_6_1-70-(0A)-09082020.png</center>-->
+
  
There are two options available for '''re-keying''' your OnePager Express Version 7.0 license: (1) '''Re-Key Now''' and (2) '''Snooze'''.
+
<center>[[File:P70-3_0_1_1-70-(9)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(9)-07052019.png</center>-->
  
====Re-Key Now Option====
+
When you select a desired Microsoft Project '''source plan''' and click the '''Open''' button as shown above, '''OPP''' adds the '''source plan''' to the '''source packet''' and displays it in the '''Data source selection''' window as shown below:
  
To '''re-key''' your OnePager Express Version 7.0 '''license''' on your '''first launch''' access to OnePager Express Version 7.0, follow the instructions in the above form, click the '''Re-Key Now''' button to be taken to the OnePager.com website where a OnePager Express Version 7.0 '''Replacement Key''' is provided.
+
<center>[[File:P70-3_0_1_1-70-(10)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(10)-07052019.png</center>-->
  
Return to the above form and click the '''Next''' button which takes you to the ''' OnePager Express License form shown below:
+
The selected '''source plan''' is '''added''' to the '''source packet''' as shown above.  '''OPP''' shows the '''path name''' of the '''source plan''' in the window if you hover the mouse over the '''source plan''' name. If you select a recently used '''source plan''' from the dropdown menu displayed when the '''Add''' button is clicked ('''Data source selection''' form), '''OPP'''  adds that '''source plan''' to the '''source packet'''.
  
<center>[[File:P70-2_6_1-70-(0B)-09082020.png]]</center>
+
===Removing a Source Plan===
<!--<center>P70-2_6_1-70-(0B)-09082020.png</center>-->
+
  
Follow the instructions in the form and '''paste''' the '''Replacement Key''' in the '''License Key:''' in the above form and click the '''Close''' button. When the '''OnePager Express license form''' closes you are ready to use OnePager Express in the '''NEW''', '''UPDATE''', or '''OPEN''' modes.
+
The '''Remove''' button allows you to remove a '''source plan''' from a '''source packet''' if that '''source plan''' is not needed to create the new chart.  To remove a '''source plan''', first select the '''source plan''' in the '''Data source selection''' form’s window so that it is highlighted in blue then click the '''Remove''' button as shown in the sequence below:
  
If, however, you close the above form without '''re-keying''' you do have access to OnePager Express Version 7.0 on a fifteen (15) day trial basis as indicated at the bottom of the '''OnePager Express Start''' form.
+
<center>[[File:P70-3_0_1_1-70-(11)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(11)-07052019.png</center>-->
  
====Snooze Option====
+
<center>[[File:P70-3_0_1_1-70-(12)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(12)-07052019.png</center>-->
  
If you selected the '''Snooze''' option from the '''OnePager Message form''', you are provided with a fifteen (15) day '''trial license''' to OnePager Express Version 7.0.  Clicking the '''Snooze''' button also takes you to the '''OnePager Express Start''' form.  You can continue to use OnePager Express Version 7.0 with the '''trial license''' until the '''fifteen (15) day''' trial period expires. Each day during the '''trial period''' OnePager Express Version 7.0 will ask you if you want to '''Re-Key Now'''.  You have the option to do so by clicking the '''Re-Key Now''' button or continue on with the '''trial license''' by clicking the '''Snooze''' button. Two days before the '''trial license period''' ends another '''OnePager Message''' appears when OnePager Express Version 7.0 is '''launched''' as shown below:
+
===Other Choices to Make===
  
<center>[[File:P70-2_6_1-70-(0C)-09082020.png]]</center>
+
Moving on to the other groups of the '''OPC''' form, you are asked to confirm a few things before you build the chart. '''OPP''' makes good guesses for each of these choices, but you can change any of them:
<!--<center>P70-2_6_1-70-(0C)-09082020</center>
+
  
Using the form's '''Re-Key Now''' button you can request a '''Replacement Key''' at this point as described above. The '''Snooze''' button remains '''enabled''' so you can click the '''Snooze''' button to continue using OnePager Express Version 7.0 on this day. Clicking the '''Next''' button allows you to use your '''trial license''' for OnePager Express Version 7.0 for one more day.  If, however, you close the above form without '''re-keying''' you do have access to OnePager Express Version 7.0 for two (2) day more as indicated at the bottom of the '''OnePager Express Start''' form. If you need assistance, please contact the OnePager '''License Department''' at [http://www.onepager.com/about/contact_us.php Contact Us].
+
<center>[[File:P70-3_0_1_1-70-(15)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15)-07052019.png</center>-->
  
With one day remaining in your '''trial period''',  launching OnePager Express Version 7.0 causes this '''OnePager Message''' form to appear as shown below:
+
====Starting Template====
  
<center>[[File:P70-2_6_1-70-(0D)-009082020.png]]</center>
+
The current '''Template Properties''' form determines which fields are '''imported''' from Microsoft Project and how the initial chart looks. '''OPP''' ships with many sample '''Templates Properties''' forms, but you can also customize your own '''Template Properties''' form. To choose which '''Template Properties''' form to use in building your chart, click the '''Change…''' button in the top group of the '''OPC''' form  as shown here:
<!--<center>P70-2_6_1-70-(0D)-09082020</center>
+
  
It is recommended that you use the '''Re-Key Now''' option button and complete the '''Replacement Key''' process.  However, you can still use OnePager Express Version 7.0 throughout the day by clicking the '''Snooze''' button on the form.
+
<center>[[File:P70-3_0_1_1-70-(15A)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15A)-07052019.png</center>-->
 +
 +
For now, just stick with the default '''Template Properties''' form entitled '''Single Project Gantt View – Detailed''', but you can always use a different '''Template Properties''' form to get a different type of chart.
  
On the last day of the '''trial period''', launching OnePager Express Version 7.0 causes this final '''OnePager Message''' form to appear as shown here:
+
====Title of the New Chart====
  
<center>[[File:P70-2_6_1-70-(0E-1)-08312020.png]]</center>
+
This is the '''Title''' of the chart and also the suggested '''save''' name. You can change the '''save''' name when you save it.  We recommend that you enter a '''Title''' that helps you identify the chart later on as shown here:
<!--<center>P70-1_6_1-70-(0E-1)-08312020</center>
+
  
The intent of this message is to advise you that this is the '''last day of the fifteen (15) day trial period''' and that OnePager Express Version 7.0 will be '''locked''' and unavailable for you to use if you do not obtain a OnePager Express Version 7.0 '''Replacement Key''' before the end of the day. If, however, you click the '''Next''' button the above form without '''re-keying''' you do have access to OnePager Express Version 7.0 for one (1) more day as indicated at the bottom of the '''OnePager Express Start''' form.
+
<center>[[File:P70-3_0_1_1-70-(15B)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15B)-07052019.png</center>-->
  
Although the above form provides instructions on how to revert and save your work should you not choose to upgrade to OnePager Express Version 7.0, we recommend that you click the '''Re-Key Now''' button to continue using OnePager Express Version 7.0. At this point, the '''Snooze''' option is not available. After the fifteen (15) '''trial period''' has expired and you attempt to launch OnePager Express Version 7.0, the '''OnePager Message''' form shown below appears:
+
For each chart you create, OnePager remembers '''colors, titles, legends, font sizes''', and all other '''graph properties''' so that your work is saved. Later, you can '''update''' the chart with a snapshot of how the project looks on a different date. Then you can '''browse''' through the snapshots to see how the project is changing over time. '''OPP''' also '''saves''' the '''path name''' associated with the '''save''' name ('''.TAM''')'''Path names''' are not available in '''.TAMs''' produced with versions of '''OPP''' prior to version 6.0.
  
<center>[[File:P70-2_6_1-70-(0F)-09082020.png]]</center>
+
====Task Selection====
<!--<center>P70-2_6_1-70-(0F)-09082020</center>
+
  
The form above notifies you that OnePager Express Version 7.0 is not available for you to use. You may click the '''Re-Key Now''' button to obtain your '''Replacement Key''' as described above or you can  '''uninstall''' OnePager Express Version 7.0 and '''install''' the version of OnePager Express you purchased. When you complete the '''re-keying'''  process you do have access to OnePager Express Version 7.0 as indicated at the bottom of the '''OnePager Express Start''' form shown here:
+
This is how you tell '''OPP''' which tasks to '''import''' from your Microsoft Project '''source plan''' as indicated below:
  
<center>[[File:X70-2_6_1-70-(0FA-1)-09252020.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(15C)-07052019.png]]</center>
<!--<center>X70-2_6_1-70-(0FA-1)-09252020.png</center>-->
+
<!--<center>P70-3_0_1_1-70-(15C)-07052019.png</center>-->  
  
If you need assistance, please contact the OnePager '''License Department''' at [http://www.onepager.com/about/contact_us.php Contact Us].
+
Either click the '''Select all tasks''' radio button to create a chart with everything or choose a '''Flag''' field. You can make several charts from a single Microsoft Project '''source plan''', each using a different '''Flag''' or '''Number''' field. In '''OPP''', if no '''Flags''' are set to '''Yes''', '''OPP''' provides you with a warning message shown below:
  
==About Your OnePager Express License==
+
<center>[[File:P70-3_0_1_1-70-(15D)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15D)-07052019.png</center>-->
  
OnePager is an '''add-in''' to Microsoft Excel, which automatically displays the '''OnePager icon''' once OnePager is installed. The '''icons''' on the Microsoft Excel tool bar looks like this:
+
Clicking the '''Select tasks by custom filter''' button enables the '''Edit filters...''' button. Clicking the '''Edit filters...''' button takes you to a form that controls the '''Conditional Import Filters''' feature as shown here. 
  
<center>[[File:X70-2_6_1-70-(1)-07032019.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(15E)-07052019.png]]</center>
<!--<center>70-2_6_1-70-(1)-07032019.png</center>-->
+
<!--<center>P70-3_0_1_1-70-(15E)-07052019.png</center>-->  
  
To activate your license, click on the '''OnePager icon''' button.  This accesses the '''OnePager Express Start''' form shown below:
+
For more detailed information, please see the article at: [[Conditional Import for Version 7.0 (Portal) | Conditional Import Filters (Portal)]] <!--7.18.1-70.
  
<center>[[File:X70-2_6_1-70-(2)-07032019.png]]</center>
+
====Snapshot Date====
<!--<center>X70-2_6_1-70-(2)-07032019.png</center>-->
+
  
===OnePager Licensing Form===
+
This is the date of the chart and lets you keep track of how schedules change over time. The snapshot date is set by default from your Microsoft Project '''source plan's''' Project Information tab's '''Current date'''. You can change the snapshot date by clicking on the dropdown button at the window shown in the illustration below:
  
To start the licensing process,  click the '''License''' tab on the OnePager '''File''' form to access the tab shown below:
+
<center>[[File:P70-3_0_1_1-70-(15F)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15F)-07052019.png</center>-->
  
<center>[[File:X70-2_6_1-70-(5-1)-09252020.png]]</center>
+
Making a calendar date selection as shown above establishes the '''snapshot date''' for the chart and the '''snapshot''' being created. Each chart can have many snapshots. Snapshots and their management are important topics.  Snapshots are the basis of how OnePager Pro helps you track the progress of your project.  For more information, please see the articles at:  [[Managing Chart Data for Version 7.0 | Managing Chart Data (Portal)]] <!--23.0.1-70.
<!--<center>X70-2_6_1-70-(5-1)-009252020.png</center>-->
+
  
The '''Get Standard License''' button accesses the '''OnePager Express license form''' which you can use to access your OnePager software license from Chronicle Graphics, Inc. This accesses the '''OnePager Express licensing form''' as shown below:
+
====Show Field Mappings====
  
<center>[[File:X70-2_6_1-70-(4)-07032019.png]]</center>
+
The '''Show field mappings''' checkbox is near the bottom of the form. When this box is checked '''ON''' you have a chance to review and change the Microsoft Project '''field mappings''' to '''OPP''' before you make your first chart. To do this, click the '''Next&gt;''' button as shown here:
<!--<center>X70-2_6_1-70-(4)-07032019.png</center>-->
+
  
===Request License Key===
+
<center>[[File:P70-3_0_1_1-70-(15G)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15G)-07052019.png</center>-->
  
Clicking the '''Request License Key''' button takes you to the Chronicle Graphics’ website ([http://www.chroniclegraphics.com/support/license.php Request a License Key]) where the installation code and product type are automatically filled in.  The OnePager website’s '''Request a License Key''' page looks like this:
+
You now see the following form:
  
<center>[[File:P70-1_6_1-70-(5)-07012019.png]]</center>
+
<center>[[File:P61-3_0_1_1-61-(16)-04302018.png]]</center>
<!--<center>P70-1_6_1-70-(5)-07012019.png</center>-->
+
<!--<center>P61-3_0_1_1-61-(16)-04302018.png</center>-->
  
Enter your name, company, e-mail address, and Order Number. Your '''installation code''' is filled in for you along with the Product Name. Your Order Number can be found in the e-mail from which you downloaded the .zip file.
+
Notice in the above form that '''OPP''' has relied on the current '''Template Properties''' form to make some guesses on which Microsoft Project '''source plan''' fields should be used in making the chart. You can easily change any of these '''field mappings''' by making selections from the dropdown menus. For example, shown below is how to change which '''Finish Date''' in Microsoft Project is used to create the chart's Finish Date:
  
Specify your Reason for Request (New or Replacement key), then click the '''Request Key'''.
+
<center>[[File:P61-3_0_1_1-61-(17)-04302018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(17)-04302018.png</center>-->
  
When you receive the email, simply copy ('''CTL+C''') and paste ('''CTL+V''') the '''License Key''' provided in the email into the '''License Key''' window of the OnePager license form, shown above, and click the “Activate License” button.
+
===Making the Graph===
  
If for any reason you are not able to access the Internet from OnePager Express, follow the instructions above to get to the '''OnePager Express License form'''.
+
Once you are satisfied with the '''field mappings''', click the '''Create new chart''' button to '''import''' the desired Microsoft Project '''source plan''' data and create a OnePager Pro chart. After a second or two you see the '''Chart Editor''' form that looks like this:
  
Once there, copy ('''CTRL+C''') the '''Installation code''' and paste ('''CTRL+V''') it into an email message with your identifying information, including your Order Number, and send it to [mailto:licenses@onepager.com Licensing Department].  The License Department returns your '''License Key''' shortly via email.  When this email is received, copy ('''CTRL+C''') the '''License Key''' and paste ('''CTRL+V''') the '''license key''' received into the '''License key''' window of the above '''OnePager Express license form'''.
+
<center>[[File:P70-3_0_1_1-70-(18-1)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(18-1)-07052019.png</center>-->
  
Make sure to completely overlay everything including the braces when pasting ('''CTRL+V''') the '''License Key''' provided into this window. To complete the activation, press '''Activate License'''.
+
Note that each task bar or milestone symbol is '''color''' coded based on the value in the '''Resource Names''' field. The '''Legend''' contains an optional diagram near the bottom explaining that the bars inside the task bars represent '''percent complete''' extracted from Microsoft Project. '''Percent complete''' comes from a Microsoft Project field that you specified in the '''field mappings''' form. Note that the current '''Template Properties''' form is the '''Template''' use by OnePager Pro to create the first chart and determines how your data looks in the new chart. The '''Template Properties''' form's '''Task Bars''' tab shows where the '''color''' control is located is shown below:
  
After your '''License Key''' is update, the '''License''' sub-tab on the OnePager Express 7.0 ribbon's '''File''' tab looks like this:
+
<center>[[File:P70-3_0_1_1-70-(19-1)-09252020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(19-1)-09252020.png</center>-->
  
<center>[[File:X70-2_6_1-70-(5-1)-09252020.png]]</center>
+
===Copying the Chart to Microsoft PowerPoint===
<!--<center>X70-2_6_1-70-(5-1)-009252020.png</center>-->
+
  
===Request to Transfer a License to Another Computer or User===
+
OnePager provides access to the Windows clipboard so you can '''copy''' the chart and '''paste''' it into another application. To copy the current chart snapshot to the clipboard click the '''Copy''' button on the '''Home''' ribbon tool bar tab as shown below: 
  
It may be necessary from time to time to transfer a OnePager Express license from a licensed computer to a new computer and/or new OnePager Express user. If this is needed, please contact the '''OnePager Licensing Department''' at this email address: [mailto:licenses@onepager.com Licensing Department].
+
<center>[[File:P70-3_0_1_1-70-(37A)-07082019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(37A)-07052019.png</center>-->
  
==Special Situations==
+
Then launch Microsoft PowerPoint and paste the clipboard copy of the chart into a Microsoft PowerPoint slide, as shown below:
  
Sometimes there are special environments where Chronicle Graphics’ automated licensing system cannot be accessed, making it necessary to manually copy the '''Installation Code''' into an email.  In these situations it is often easy to confuse certain characters (e.g. the letter ‘l’ and the number ‘1’), resulting in an invalid '''Installation Code'''. To help mitigate this, we added a checkbox titled '''Use colors on look-alike characters'''. Checking this checkbox alters the appearance of the '''Installation Code''' as shown below:
+
<center>[[File:P61-3_0_1_1-61-(37)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(37)-05012018.png</center>-->
  
<center>[[File:X70-2_6_1-70-(6)-07032019.png]]</center>
+
That’s it! You’ve created a professional 1-page schedule summary from a complex Microsoft Project schedule and copied it into a Microsoft PowerPoint presentation. You can also print the chart by selecting the '''Print''' button on the '''File''' tab. OnePager has other features that let you move task bars vertically to different '''rows and swimlanes''', change the number and levels of swimlanes, add swimlane titles, show graphic dependencies among tasks, change task bar colors, hide task bars, edit text items, add floating comment boxes, add comment boxes to task bars, and standardize on chart styles across organizations. To learn more about these features, read about the specific workflows in this Wiki at: [[Basic Workflows for Version 7.0 (Portal) | Basic Workflows (Portal)]] <!--7.0.1-70 and [[Manual Editing for Version 7.0 (Portal) | Manual versus Data-Driven Editing (Portal)]]. <!--9.0.1-70-->
<!--<center>X70-2_6_1-70-(6)-07032019.png</center>-->
+
  
As shown above, there is a legend next to the checkbox that helps you make sure you have the right characters when you are in this situation. When, despite the color coding, you email us an '''Installation Code''' that is invalid, we can use '''fuzzy logic''' processing to check for similar codes differing only by these look-alike characters.  If we find a valid '''Installation Code''', we email you the resulting '''License Key'''.  Otherwise, we notify you that your '''Installation Code''' was invalid for other reasons and help you resolve the issue. As an added support measure, we upgraded to our licensing system to support computers that have the '''FIPS algorithm policy''' enabled.
+
==Opening a Chart==
  
==OnePager Express Desktop Application==
+
The right-most button on the '''OPC''' form is the '''OPEN''' button. Clicking the '''OPEN''' button displays a dropdown menu which is the same for the '''UPDATE''' button. The options in the dropdown are discussed below:
  
The OnePager Express ('''OPX''') '''Desktop''' application using the same methodology to activate a valid '''Installation Code''' as does the '''Add-in''' application.
+
<center>[[File:P70-3_0_1_1-70-(19A)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(19A)-07052019.png</center>-->
  
==Related Links==
+
Clicking the '''BROWSE FILES...''' option accesses a Windows '''Open''' form from which you can select a '''.TAM''' that you want to open.  Selecting the desired '''.TAM''' causes '''OPP''' to display the selected chart in the '''Chart Editor'''.  From the '''Chart Editor''', you can '''edit''' the chart, '''save it''', or '''share it''' with others. Clicking any of the '''RECENT charts''' items in the dropdown menu above causes '''OPP''' to load the associated '''.TAM''' into the '''Chart Editor'''.
  
[[Uninstalling OnePager Express for Version 7.0 | Uninstalling OnePager Express]] <!--2.4.1-70 -->
+
==Replacing A Snapshot - Updating a Chart with Changes Made to the Microsoft Project Source Plan's Data==
  
[[Temporarily Disabling and Re-enabling OnePager Express for Version 7.0 | Temporarily Disabling and Re-enabling OnePager Express]] <!--2.5.1-70 -->
+
Suppose, after examining the chart you created and '''saved''', you realize that it might be best to show more task bars. This, you think, would greatly improve your schedule presentation.  '''Updating''' the chart at this point is simple.  Recall that '''OPP''' is active and the '''Chart Editor''' is displaying the current chart you want to update. Additionally, the Microsoft Project '''source plan''' and the application are active. The original chart looked like this:
  
[[Getting Support and Contacting Chronicle Graphics for Version 7.0 | Getting Support and Contacting Chronicle Graphics]] <!--30.0.1-70 -->
+
<center>[[File:P70-3_0_1_1-70-(18-1)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(18-1)-07052019.png</center>-->
  
(2.6.1-70)
+
Since Microsoft Project is still an active program and the Microsoft Project '''source plan''' you are using is still being displayed, go back to the Microsoft Project application and change the '''Flag20''' field setting from '''No''' to '''Yes''' for the tasks you want to now '''import''' and display. A section of the Microsoft Project '''source plan''' where this is done is shown below:
  
[[Category:Version 7.0]]
+
<center>[[File:P61-3_0_1-61-(19A)-10232017.png]]</center>
[[Category:Installation]]
+
<!--<center>P61-3_0_1-61-(19A)-10232017.png</center>-->
[[Category:Installation Code]]
+
[[Category:Licensing and Activation]]
+
[[Category:License Key]]
+
[[Category:Help]]
+
[[Category:Support]]
+
[[Category:OnePager Express]]
+
  
==Special Situations==
+
Once you’ve made the '''Flag20''' changes lines 8 through 15 in the Microsoft Project the '''source plan'''  looks like this:
  
Sometimes there are special environments where Chronicle Graphics’ automated licensing system cannot be accessed, making it necessary to manually copy the '''Installation Code''' into an email.  In these situations it is often easy to confuse certain characters (e.g. the letter ‘l’ and the number ‘1’), resulting in an invalid '''Installation Code'''. To help mitigate this, we added a checkbox titled '''Use colors on look-alike characters'''. Checking this checkbox alters the appearance of the '''Installation Code''' as shown below:
+
<center>[[File:P61-3_0_1-61-(19B)-10232017.png]]</center>
 +
<!--<center>P61-3_0_1-61-(19B)-10232017.png</center>-->
  
<center>[[File:X70-2_6_1-70-(6)-07032019.png]]</center>
+
With the Microsoft Project '''source plan''' updated, go back to '''OPP''' and navigate to the '''Data''' ribbon tool bar tab where you see several buttons.  To '''update''' your chart to show the additional task bars from your Microsoft Project '''source plan''', click the '''Replace Snapshot''' button as shown below:
<center>X70-2_6_1-70-(6)-07032019.png</center>-->
+
  
As shown above, there is a legend next to the checkbox that helps you make sure you have the right characters when you are in this situation. When, despite the color coding, you email us an '''Installation Code''' that is invalid, we can use '''fuzzy logic''' processing to check for similar codes differing only by these look-alike characters.  If we find a valid '''Installation Code''', we email you the resulting '''License Key'''.  Otherwise, we notify you that your '''Installation Code''' was invalid for other reasons and help you resolve the issue. As an added support measure, we upgraded to our licensing system to support computers that have the '''FIPS algorithm policy''' enabled.
+
<center>[[File:P70-3_0_1_1-70-(19C)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(19C)-07052019.png</center>-->
  
==OnePager Express Desktop Application==
+
When you click the '''Replace Snapshot''' button, '''OPP''' goes back to the Microsoft Project '''source plan''' that you just changed, '''imports''' all the tasks that changed, and updates your chart. At the conclusion of the operation, the updated chart looks like this:
  
The OnePager Express ('''OPX''') '''Desktop''' application using the same methodology to activate a valid '''Installation Code''' as does the '''Add-in''' application.
+
<center>[[File:P61-3_0_1_1-61-(19D)-04302018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(19D)-04302018.png</center>-->
 +
 
 +
The example above is just one of many uses of the '''Data''' ribbon tool bar tab’s '''Replace Snapshot''' button when you need to update a chart.  You can do this as many times as necessary until the chart is the way you need it.  In addition to adding and removing tasks by changing the Microsoft Project '''Flag20''' field, you can change '''source plan''' task '''Start Dates''', '''Finish Dates''', or '''Percent Complete''' and display these data changes in the chart.  Using the procedure above you can do this very efficiently. You can now '''save''' the chart by giving it a '''save''' name.  When you '''save''' the chart in '''OPP''', OnePager saves the '''.TAM''' and '''saves''' the Microsoft Project '''source plan name''' and '''path''' information.  This is useful when you want to further update the chart or when you want to add a snapshot later on.  In the examples below we assume that the chart is '''saved''' as '''BlueGrass Project Report - Pro'''.
 +
 
 +
==Adding a Snapshot - Adding to the Chart with Changes Made to the Microsoft Project Source Plan's Data==
 +
 
 +
The power of '''OPP''' is illustrated when, after a period of progress on the project, it is time to produce another chart.  OnePager produces your next snapshot with the same look and feel as the original.  ssuming that the Microsoft Project '''source plan''' was updated with '''actual start and finish, percent complete''', and other relevant data during the reporting interval, '''OPP''' can easily generate a new snapshot.  Suppose we have the following chart created on 7/1/2019 and we want to create another graph from the updated Microsoft Project '''source plan''' on 8/1/2019.
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(20)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(20)-05012018.png</center>-->
 +
 
 +
Before creating a new snapshot for 8/1/2019 as planned, we need to update the Microsoft Project '''source plan''' say by updating the '''Percent Complete''' for the ADONIS Subcontractor Selection task to 75%.  When the '''source plan''' is updated with this revised information we can proceed. Launch '''OPP''' either from Microsoft Project ('''Add-in''') or from the '''Desktop Icon''' and click the '''UPDATE''' button on the '''OnePager Pro Start''' form. Doing so accesses the following '''OnePager choices''' ('''OPC''') form shown here:
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(20A)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(20A)-05012018.png</center>-->
 +
 
 +
In the '''OPC''' form select the '''NEW snapshot at date:''' as shown above.  You can also select a date for the snapshot so that this snapshot represents the project at the status date point in time.  To see which snapshot dates already exist, just position your mouse over the '''NEW snapshot at date:''' window to see a list of the existing dates. 
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(20B)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(20B)-05012018.png</center>-->
 +
 
 +
You can use the built in calendar dropdown or type in the new snapshot’s month, day, and year in the window provided as shown below:
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(20C)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(20C)-05012018.png</center>-->
 +
 
 +
Un-check the '''Show field mappings''' checkbox '''OFF''' if you want to use the same '''field mappings''' as you used before. The bottom of the screen now looks like this:
 +
 
 +
<center>[[File:P60-3_0_1-60-(26)-01252017.png]]</center>
 +
<!--<center>P60-3_0_1-60-(26)-01252017.png</center>-->
 +
 
 +
Pressing the large '''New''' button creates a new snapshot for the chart.  The chart opens at the new snapshot. The '''color''', '''fonts''', '''title''', and '''swimlane''' assignments are consistent between the two snapshots:
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(20D)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(20D)-05012018.png</center>-->
 +
 
 +
You can go back and forth between the two snapshots by using the '''snapshot forward/backward''' buttons on the '''View''' ribbon tool bar tab as shown below:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(20E)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(20E)-07052019.png</center>-->
 +
 
 +
==Editing the Chart==
 +
 
 +
===Editing Task Bar Name Label Font Sizes===
 +
 
 +
You can always '''edit''' the '''font sizes''' and '''label positions''' on task bars and milestone symbols to optimize readability.  To do this, hold down the left mouse button and '''drag''' a selection box ('''Lasso''') that encloses many task bars and milestone symbols at once:
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(29)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(29)-05012018.png</center>-->
 +
 
 +
When you release the mouse, the enclosed task bars and milestone symbols are all be selected:
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(30)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(30)-05012018.png</center>-->
 +
 
 +
Click the '''Increase Font Size''' button on the '''Home''' ribbon tool bar tab shown below:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(31)-07082019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(31)-07082019.png</center>-->
 +
 
 +
The chart now looks something like this:
 +
 
 +
<center>[[File:P61-3_0_1_1-61-(32)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(32)-05012018.png</center>-->
 +
 
 +
Repeating this operation for the remaining task bars and milestone symbols (we could have done '''Select All''' and done it all at once!), we obtain a chart with larger '''fonts''' on all the task bars and milestone symbols:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(33)-07082019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(33)-07082019.png</center>-->
 +
 
 +
===Editing Task Bar Name Label Positions===
 +
 
 +
Another common '''editing''' action is to move the task bar's '''name label''' from their current positions to positions elsewhere around or on the task bar.  To do this, click the '''name label''' to select it and then click the '''Label Position''' button on the '''Home''' ribbon tool bar tab.  This action accesses the '''Label Position''' dropdown list where you can select one of the '''label positioning''' buttons as shown here:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(34)-04292020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(34)-04292020.png</center>-->
 +
 
 +
At this point, as an example, click the '''Left''' option in the dropdown and the selected '''name label''' is moved to the left side of the task bar as shown here:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(34A)-004292020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(34A)-004292020.png</center>-->
 +
 
 +
In case you change your mind about the '''last editing action''' you took, you can '''UNDO''' the '''last editing action''' by clicking the '''UNDO''' button above the OnePager ribbon tool bar tabs.  Successive clicking the '''UNDO''' button undoes '''editing''' actions in the reverse order that they were applied.
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(35)-04292020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(35)-04292020.png</center>-->
 +
 
 +
'''Save''' the '''edited''' chart by pressing the '''Save''' button above the ribbon tool bar tab next to the '''UNDO''' button.   All of the '''font size''' changes, '''text-position''' '''edits''', and the new '''Legend''' position are now '''saved''' in case you need to '''update''' this chart with new data at a later time.
 +
 
 +
===Editing Other Chart Contents===
 +
 
 +
The examples above are just samples of '''Chart Editor''' capabilities provided for '''editing''' within the chart.  Making other '''edits''' to task bars and milestone symbols and '''name labels''' are covered in more detail in this article:  [[Manual Editing Task/Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
 +
 
 +
Additionally, you can add task bar and milestone symbol information related to each task and milestone '''imported''' such as '''baseline data''', '''percent complete''' information, and '''critical path information'''.  You can add '''comment boxes''' to task bars, '''free floating comment boxes in the chart''', vertical '''curtains''', '''task links''' to show dependencies, '''multiple swimlane levels''' and '''background images'''. And you can change the chart's '''Start/End Dates''', '''add''' or '''hide''' the '''Legend''', and add '''time axis levels''' at the top, bottom, and within the '''graph'''. Further, you are able to '''edit''' task bar and milestone symbol '''shapes'''; you have controls for '''editing''' '''rows/swimlanes''', '''headers and footers''' in the chart, '''background colors''', and other text information shown in the '''graph'''. These capabilities and the articles that provide the detailed information on how to use them can be found  at:  [[OnePager Version 7.0#Ways to Make Changes to Your Chart | Ways to Make Changes to Your Chart]] <!--0.04-70-->
 +
 
 +
==Enhanced Capabilities Provided in OnePager Pro Version 7.0==
 +
 
 +
===Multiple Swimlane Levels===
 +
 
 +
Previous versions of OnePager Pro and Express supported one level of '''swimlanes''' which allowed you to group '''rows''' together based on a particular '''source plan''' data field and its values. OnePager Pro and Express version 7.0 now supports '''three  swimlane levels''' which can be '''nested''' inside one another to better display a hierarchy relationship for a Program, it’s Projects, and their Phases as shown here:
 +
 
 +
<center>[[File:P70-0_4-70-(20)-03102020.png]]</center>
 +
<!--<center>P70-0_4-70-(20)-03102020.png</center>-->
 +
 
 +
In the illustration above, the '''first swimlane level''' is “Program” and under it as the '''second swimlane level''' are its “Projects”.  The '''third swimlane level''' under each “Project” are “Phases” and the '''rows''' within each '''Phase''' show the '''task bars''' at their appropriate '''start/end dates'''. Definition and '''editing''' of these '''multiple swimlane levels''' is accomplished in the '''Template Properties''' and '''Chart Properties '''form’s '''Rows/Swimlanes '''tab that is modified to provide all the controls necessary to manage these '''multiple swimlane levels''' in the chart.  The '''Rows/Swimlanes '''tab  of the '''Chart Properties '''form is shown below:
 +
 
 +
<center>[[File:P70-0_4-70-(21-1)-08282020.png]]</center>
 +
<!--<center>P70-0_4-70-(21-1)-08282020.png</center>-->
 +
 
 +
In addition to adding '''multiple swimlane levels''', the tab shown above is simplified by reorganizing the controls associated with '''Rows''' and '''Text Columns'''. '''Sorting''' controls for '''rows''' and '''swimlanes''' are in separate sub-control groups as shown above. There is a '''Row Borders Formatting… '''button in the '''Rows '''control group with the controls for defining and '''global editing''' of '''row borders''' and access buttons for '''Swimlane Formatting… '''and '''Text Column Formatting…'''  The controls shown above for the '''Chart Properties '''form are also found in the distributed '''Template Properties '''form’s '''Rows/Swimlanes''' tab. More detailed introductory information on the new '''Multiple Swimlane Levels''' feature can be found at these links:
 +
 
 +
<center>
 +
{| class="wikitable"
 +
| [[Using Rows and Swimlanes for OnePager Version 7.0 | Using Rows and Swimlanes]] <!--4.0.1.5-70 -->
 +
|-
 +
| [[Creating and Editing Rows and Swimlanes for Version 7.0 (Portal) | Creating and Editing Rows and Swimlanes (Portal)]] <!--12.0.1-70 -->
 +
|}
 +
</center>
 +
 
 +
===Displaying Data-Driven Task Links===
 +
 
 +
OnePager Pro 7.0 is enhanced to assist you with displaying Microsoft Project '''Predecessor''' fields in your chart.  Typically, this feature is turned '''OFF''' in all '''Template Properties''' forms distributed with OnePager.  However, the feature can be turned '''ON''' either before or after the creation of a chart. To turn the '''Data-Driven Task Link''' feature '''ON''' prior to creating a chart, go to the '''Template Properties''' form you plan to uses and click on the '''Task Links''' tab and then click the '''Import predecessors''' checkbox in the '''Data-Driven Task Links''' control group as shown below:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(38-1)-09252020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(38-1)-09252020.png</center>-->
 +
 
 +
With the '''Import predecessors''' checkbox checked '''ON''' in the '''Template Properties''' form, the chart first created looks like this:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(39)-07082019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(39)-07082019.png</center>-->
 +
 
 +
To turn the '''Data-Driven Task Link''' feature '''ON''' after the chart is created, go to the '''Chart Properties''' form's '''Task Links''' tab and then click the '''Import predecessors''' checkbox '''ON''' in the '''Data-Driven Task Links''' control group as shown below:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(40-1)-09252020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(40-1)-09252020.png</center>-->
 +
 
 +
Once imported, '''Data-Driven Task Links''' can be '''shown''' or '''hidden''' and can be '''edited''' globally using the '''Template Properties or Chart Properties''' forms as shown above or individually using a '''task link'''right-click '''context menu'''. OnePager Pro 7.0 continues to support manual '''Task Links''' which in previous OnePager Pro versions were called '''Event Links'''. The OnePager version 7.0 '''Data-Driven Task Links''' feature is flexible and powerful.  More details are provided in the series of articles at:  [[Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 7.0 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]]. 19.0.1-70 -->
 +
 
 +
===Editing the Time Axis===
 +
 
 +
OnePager Pro is also enhanced with new capabilities and feature so you can '''edit''' the '''time axis''' and configure it to focus on specific time periods of interest in your project schedule presentation. As an example of the enhancements made to the '''time axis''' is the addition of the '''time axis cell stretch''' feature where you can lengthen the horizontal extend of any '''time axis cell''' so as to provide more space to focus on details within that time period.  An example of a stretched '''lower level time axis cell''' is shown below:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(41)-07082019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(41)-07082019.png</center>-->
 +
 
 +
For additional detailed information on the '''editing''' of '''time axis cells''' and other related capabilities please see this article at:  [[Modifying the Time Axis for Version 7.0 (Portal) | Modifying the Time Axis (Portal)]] <!--22.0.1-70 -->
  
 
==Related Links==
 
==Related Links==
  
[[Uninstalling OnePager Express for Version 7.0 | Uninstalling OnePager Express]] <!--2.4.1-70 -->
+
[[What's New with OnePager Release 7.0?]] <!--0.4-70 -->
 +
 
 +
[[Getting Started with OnePager Pro Version 7.0 Desktop | Getting Started with OnePager Pro Desktop]] <!--3.0.1.2-70 -->
 +
 
 +
[[Conditional Import for Version 7.0 (Portal) | Conditional Import Filters (Portal)]] <!--7.18.1-70 -->
 +
 
 +
[[Basic Workflows for Version 7.0 (Portal) | Basic Workflows (Portal)]] <!--7.0.1-70 -->
 +
 
 +
[[Manual Editing Task/Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70 -->
 +
 
 +
[[Using Rows and Swimlanes for OnePager Version 7.0 | Using Rows and Swimlanes]] <!--4.0.1.5-70 -->
 +
 
 +
[[Creating and Editing Rows and Swimlanes for Version 7.0 (Portal) | Creating and Editing Rows and Swimlanes (Portal)]] <!--12.0.1-70 -->
 +
 
 +
[[Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 7.0 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]] <!--19.0.1-70 -->
 +
 
 +
[[Modifying the Time Axis for Version 7.0 (Portal) | Modifying the Time Axis (Portal)]] <!--22.0.1-70 -->
  
[[Temporarily Disabling and Re-enabling OnePager Express for Version 7.0 | Temporarily Disabling and Re-enabling OnePager Express]] <!--2.5.1-70 -->
+
[[Managing Chart Data for Version 7.0 | Managing Chart Data (Portal)]] <!--23.0.1-70 -->
  
[[Getting Support and Contacting Chronicle Graphics for Version 7.0 | Getting Support and Contacting Chronicle Graphics]] <!--30.0.1-70 -->
+
[[Managing Templates for Version 7.0 (Portal) | Managing Templates (Portal)]] <!--24.0.1-70 -->
  
(2.6.1-70)
+
(3.0.1.1-70)
  
 
[[Category:Version 7.0]]
 
[[Category:Version 7.0]]
[[Category:Installation]]
+
[[Category:Getting Started with Version 7.0]]
[[Category:Installation Code]]
+
[[Category:Add-in]]
[[Category:Licensing and Activation]]
+
[[Category:Launching From Microsoft Project]]
[[Category:License Key]]
+
[[Category:OnePager Choices Form]]
 +
[[Category:Snapshots]]
 +
[[Category:Charts]]
 +
[[Category:Templates]]
 +
[[Category:Editing the Chart]]
 +
[[Category:Sharing Output]]
 +
[[Category:Task Links]]
 +
[[Category:Time Axis]]
 +
[[Category:Multiple Swimlane Levels]]
 +
[[Category:OnePager - Tool Bar]]
 
[[Category:Help]]
 
[[Category:Help]]
[[Category:Support]]
+
[[Category:OnePager Pro]]
[[Category:OnePager Express]]
+

Revision as of 19:01, 10 January 2021

Overview

As with previous version of OnePager Pro, version 7.0 of OPP you can launch OPP from a Desktop Icon as well as from within Microsoft Project (Add-in). Please note that after selecting the Add-in launch option that you are not be able to launch the OnePager Desktop application.

Only one of these applications (Add-in or Desktop) can be launched at a time. If you attempt to launch both, a warning message appears as shown below:

P70-3 0 1-70-(1)-07052019.png

If you need further information, please consult this link: OnePager Doesn't Launch when the Desktop Icon is Clicked.

This article provides the basic information needed to Getting Started and use OnePager Pro (OPP) after you launch OPP from Microsoft Project. The article providing Getting Started guidance when launching from the OPP Desktop Icon is at: Getting Started with OnePager Pro Desktop

Clicking the OnePager Pro button launches the Chart Editor. Clicking the Templates… button lets you edit the Template Properties form provided with the product. For now, it is simplest to use the default Template Properties form. You can learn how Template Properties forms let you customize and standardize graph features later at: Managing Templates (Portal)

To control which tasks are imported, specify the Microsoft Project Flag field (e.g. Flag1, Flag2 … Flag20) that you wish to use. Number fields can also be used the same as the Flag fields where a 1 in a Number field indicates Yes and a 0 in a Number field indicates No. Un-hide that field in Microsoft Project by right-clicking in the field header area and selecting Insert Column:

P61-3 0 1-61-(3)-10232017.png

Now put a Yes in this Flag field for any task that you want to graph:

P61-3 0 1-61-(4)-10232017.png

When making your first chart, we strongly recommend that you select 50 or fewer tasks with Yes. Please note that OPP is shipped with a number of fully populated Template Properties forms that are based on the Microsoft Project source plan used in the OnePager Tutorial shipped with the product – BlueGrass Project Plan. Note that three field heading types must always be present: Name, Start, and Finish. Caution. Starting in Microsoft Project 2010, there is a Manual Scheduling mode that allows you to leave dates blank in your schedule. However, behind the scenes, these dates are still being automatically assigned to the project Start Date, or to Today's Date if the project Start Date is not defined. Even though the dates appear to be undefined, they are defined behind the scenes, and are being passed to OPP. Because Today's Date often equals your Snapshot date, it is not surprising to see all of these dateless tasks appearing near the time cursor. Solutions. There are two solutions available:

1) Define the dates for your tasks and milestones in Microsoft Project. This overwrites any default dates that Microsoft Project is assigning, and makes your project schedule more consistent with your OPP timeline. As a rule of thumb, we recommend defining dates for all tasks and milestones in your source plan, especially when it comes to creating a OPP chart.
2) Or, remove the dateless tasks from your OPP graph. You can leave them in your Microsoft Project source plan, but by removing them from the OPP graph, you won't have to explain why certain task bars and milestone symbols are appearing in weird places when they really should not.

To launch OPP and make a chart, click the OPP button on the Microsoft Project ribbon tool bar’s Add-ins tab, which accesses the OnePager Pro Start form:

P70-1 6 1-70-(2)-07012019.png

The OnePager Pro Start form provides you with three options:

1) NEW Clicking the NEW button accesses the OnePager Pro choices (OPC) form.
2) UPDATE Clicking the UPDATE button allows you to BROWSE FILES for an existing chart or select a recently-opened chart.
3) OPEN Clicking the OPEN button allows you to BROWSE FILES for an existing chart or select a recently-opened chart.

Once selected and opened, the chart is available for editing.

Creating a New Chart

Clicking the NEW button accesses the OnePager choices (OPC) form as shown below:

P61-3 0 1 1-61-(6)-04302018.png

Options on the New OnePager Choices form

The OPC form gives you more options for selecting source plans. The illustration above shows that OPP is initiated from Microsoft Project with the source plan shown in the Selected File(s) group shown above. The Add/Remove button gives you the capability to add more source plans to the source packet or, for multiple file packets, to remove files. Clicking the Add/Remove button accesses the Data source selection form as shown below:

P70-3 0 1 1-70-(7)-07052019.png

The Data source selection form displays the current source plan that was loaded with Microsoft Project when you clicked the OnePager Pro button. This form lets you Add more Microsoft Project source plan to create a multi-project chart or Remove a source plan from a multi-file source packet. These options are detailed below.

Adding a New Source Plan

When you click the Add button, OPP gives you the option to bring up a Windows Open form when you select the BROWSE FILES… option as shown here:

P70-3 0 1 1-70-(8)-07052019.png

Clicking the BROWSE FILES… option displays a Window’s Open form so you can select a Microsoft Project source plan to add to the source packet. A sample Open form is shown below:

P70-3 0 1 1-70-(9)-07052019.png

When you select a desired Microsoft Project source plan and click the Open button as shown above, OPP adds the source plan to the source packet and displays it in the Data source selection window as shown below:

P70-3 0 1 1-70-(10)-07052019.png

The selected source plan is added to the source packet as shown above. OPP shows the path name of the source plan in the window if you hover the mouse over the source plan name. If you select a recently used source plan from the dropdown menu displayed when the Add button is clicked (Data source selection form), OPP adds that source plan to the source packet.

Removing a Source Plan

The Remove button allows you to remove a source plan from a source packet if that source plan is not needed to create the new chart. To remove a source plan, first select the source plan in the Data source selection form’s window so that it is highlighted in blue then click the Remove button as shown in the sequence below:

P70-3 0 1 1-70-(11)-07052019.png
P70-3 0 1 1-70-(12)-07052019.png

Other Choices to Make

Moving on to the other groups of the OPC form, you are asked to confirm a few things before you build the chart. OPP makes good guesses for each of these choices, but you can change any of them:

P70-3 0 1 1-70-(15)-07052019.png

Starting Template

The current Template Properties form determines which fields are imported from Microsoft Project and how the initial chart looks. OPP ships with many sample Templates Properties forms, but you can also customize your own Template Properties form. To choose which Template Properties form to use in building your chart, click the Change… button in the top group of the OPC form as shown here:

P70-3 0 1 1-70-(15A)-07052019.png

For now, just stick with the default Template Properties form entitled Single Project Gantt View – Detailed, but you can always use a different Template Properties form to get a different type of chart.

Title of the New Chart

This is the Title of the chart and also the suggested save name. You can change the save name when you save it. We recommend that you enter a Title that helps you identify the chart later on as shown here:

P70-3 0 1 1-70-(15B)-07052019.png

For each chart you create, OnePager remembers colors, titles, legends, font sizes, and all other graph properties so that your work is saved. Later, you can update the chart with a snapshot of how the project looks on a different date. Then you can browse through the snapshots to see how the project is changing over time. OPP also saves the path name associated with the save name (.TAM). Path names are not available in .TAMs produced with versions of OPP prior to version 6.0.

Task Selection

This is how you tell OPP which tasks to import from your Microsoft Project source plan as indicated below:

P70-3 0 1 1-70-(15C)-07052019.png

Either click the Select all tasks radio button to create a chart with everything or choose a Flag field. You can make several charts from a single Microsoft Project source plan, each using a different Flag or Number field. In OPP, if no Flags are set to Yes, OPP provides you with a warning message shown below:

P70-3 0 1 1-70-(15D)-07052019.png

Clicking the Select tasks by custom filter button enables the Edit filters... button. Clicking the Edit filters... button takes you to a form that controls the Conditional Import Filters feature as shown here.

P70-3 0 1 1-70-(15E)-07052019.png

For more detailed information, please see the article at: Conditional Import Filters (Portal)

Making a calendar date selection as shown above establishes the snapshot date for the chart and the snapshot being created. Each chart can have many snapshots. Snapshots and their management are important topics. Snapshots are the basis of how OnePager Pro helps you track the progress of your project. For more information, please see the articles at: Managing Chart Data (Portal)

You now see the following form:

P61-3 0 1 1-61-(16)-04302018.png

Notice in the above form that OPP has relied on the current Template Properties form to make some guesses on which Microsoft Project source plan fields should be used in making the chart. You can easily change any of these field mappings by making selections from the dropdown menus. For example, shown below is how to change which Finish Date in Microsoft Project is used to create the chart's Finish Date:

P61-3 0 1 1-61-(17)-04302018.png

Making the Graph

Once you are satisfied with the field mappings, click the Create new chart button to import the desired Microsoft Project source plan data and create a OnePager Pro chart. After a second or two you see the Chart Editor form that looks like this:

P70-3 0 1 1-70-(18-1)-07052019.png

Note that each task bar or milestone symbol is color coded based on the value in the Resource Names field. The Legend contains an optional diagram near the bottom explaining that the bars inside the task bars represent percent complete extracted from Microsoft Project. Percent complete comes from a Microsoft Project field that you specified in the field mappings form. Note that the current Template Properties form is the Template use by OnePager Pro to create the first chart and determines how your data looks in the new chart. The Template Properties form's Task Bars tab shows where the color control is located is shown below:

P70-3 0 1 1-70-(19-1)-09252020.png

Copying the Chart to Microsoft PowerPoint

OnePager provides access to the Windows clipboard so you can copy the chart and paste it into another application. To copy the current chart snapshot to the clipboard click the Copy button on the Home ribbon tool bar tab as shown below:

P70-3 0 1 1-70-(37A)-07082019.png

Then launch Microsoft PowerPoint and paste the clipboard copy of the chart into a Microsoft PowerPoint slide, as shown below:

P61-3 0 1 1-61-(37)-05012018.png

That’s it! You’ve created a professional 1-page schedule summary from a complex Microsoft Project schedule and copied it into a Microsoft PowerPoint presentation. You can also print the chart by selecting the Print button on the File tab. OnePager has other features that let you move task bars vertically to different rows and swimlanes, change the number and levels of swimlanes, add swimlane titles, show graphic dependencies among tasks, change task bar colors, hide task bars, edit text items, add floating comment boxes, add comment boxes to task bars, and standardize on chart styles across organizations. To learn more about these features, read about the specific workflows in this Wiki at: Basic Workflows (Portal)

Opening a Chart

The right-most button on the OPC form is the OPEN button. Clicking the OPEN button displays a dropdown menu which is the same for the UPDATE button. The options in the dropdown are discussed below:

P70-3 0 1 1-70-(19A)-07052019.png

Clicking the BROWSE FILES... option accesses a Windows Open form from which you can select a .TAM that you want to open. Selecting the desired .TAM causes OPP to display the selected chart in the Chart Editor. From the Chart Editor, you can edit the chart, save it, or share it with others. Clicking any of the RECENT charts items in the dropdown menu above causes OPP to load the associated .TAM into the Chart Editor.

Replacing A Snapshot - Updating a Chart with Changes Made to the Microsoft Project Source Plan's Data

Suppose, after examining the chart you created and saved, you realize that it might be best to show more task bars. This, you think, would greatly improve your schedule presentation. Updating the chart at this point is simple. Recall that OPP is active and the Chart Editor is displaying the current chart you want to update. Additionally, the Microsoft Project source plan and the application are active. The original chart looked like this:

P70-3 0 1 1-70-(18-1)-07052019.png

Since Microsoft Project is still an active program and the Microsoft Project source plan you are using is still being displayed, go back to the Microsoft Project application and change the Flag20 field setting from No to Yes for the tasks you want to now import and display. A section of the Microsoft Project source plan where this is done is shown below:

P61-3 0 1-61-(19A)-10232017.png

Once you’ve made the Flag20 changes lines 8 through 15 in the Microsoft Project the source plan looks like this:

P61-3 0 1-61-(19B)-10232017.png

With the Microsoft Project source plan updated, go back to OPP and navigate to the Data ribbon tool bar tab where you see several buttons. To update your chart to show the additional task bars from your Microsoft Project source plan, click the Replace Snapshot button as shown below:

P70-3 0 1 1-70-(19C)-07052019.png

When you click the Replace Snapshot button, OPP goes back to the Microsoft Project source plan that you just changed, imports all the tasks that changed, and updates your chart. At the conclusion of the operation, the updated chart looks like this:

P61-3 0 1 1-61-(19D)-04302018.png

The example above is just one of many uses of the Data ribbon tool bar tab’s Replace Snapshot button when you need to update a chart. You can do this as many times as necessary until the chart is the way you need it. In addition to adding and removing tasks by changing the Microsoft Project Flag20 field, you can change source plan task Start Dates, Finish Dates, or Percent Complete and display these data changes in the chart. Using the procedure above you can do this very efficiently. You can now save the chart by giving it a save name. When you save the chart in OPP, OnePager saves the .TAM and saves the Microsoft Project source plan name and path information. This is useful when you want to further update the chart or when you want to add a snapshot later on. In the examples below we assume that the chart is saved as BlueGrass Project Report - Pro.

Adding a Snapshot - Adding to the Chart with Changes Made to the Microsoft Project Source Plan's Data

The power of OPP is illustrated when, after a period of progress on the project, it is time to produce another chart. OnePager produces your next snapshot with the same look and feel as the original. ssuming that the Microsoft Project source plan was updated with actual start and finish, percent complete, and other relevant data during the reporting interval, OPP can easily generate a new snapshot. Suppose we have the following chart created on 7/1/2019 and we want to create another graph from the updated Microsoft Project source plan on 8/1/2019.

P61-3 0 1 1-61-(20)-05012018.png

Before creating a new snapshot for 8/1/2019 as planned, we need to update the Microsoft Project source plan say by updating the Percent Complete for the ADONIS Subcontractor Selection task to 75%. When the source plan is updated with this revised information we can proceed. Launch OPP either from Microsoft Project (Add-in) or from the Desktop Icon and click the UPDATE button on the OnePager Pro Start form. Doing so accesses the following OnePager choices (OPC) form shown here:

P61-3 0 1 1-61-(20A)-05012018.png

In the OPC form select the NEW snapshot at date: as shown above. You can also select a date for the snapshot so that this snapshot represents the project at the status date point in time. To see which snapshot dates already exist, just position your mouse over the NEW snapshot at date: window to see a list of the existing dates.

P61-3 0 1 1-61-(20B)-05012018.png

You can use the built in calendar dropdown or type in the new snapshot’s month, day, and year in the window provided as shown below:

P61-3 0 1 1-61-(20C)-05012018.png

Un-check the Show field mappings checkbox OFF if you want to use the same field mappings as you used before. The bottom of the screen now looks like this:

P60-3 0 1-60-(26)-01252017.png

Pressing the large New button creates a new snapshot for the chart. The chart opens at the new snapshot. The color, fonts, title, and swimlane assignments are consistent between the two snapshots:

P61-3 0 1 1-61-(20D)-05012018.png

You can go back and forth between the two snapshots by using the snapshot forward/backward buttons on the View ribbon tool bar tab as shown below:

P70-3 0 1 1-70-(20E)-07052019.png

Editing the Chart

Editing Task Bar Name Label Font Sizes

You can always edit the font sizes and label positions on task bars and milestone symbols to optimize readability. To do this, hold down the left mouse button and drag a selection box (Lasso) that encloses many task bars and milestone symbols at once:

P61-3 0 1 1-61-(29)-05012018.png

When you release the mouse, the enclosed task bars and milestone symbols are all be selected:

P61-3 0 1 1-61-(30)-05012018.png

Click the Increase Font Size button on the Home ribbon tool bar tab shown below:

P70-3 0 1 1-70-(31)-07082019.png

The chart now looks something like this:

P61-3 0 1 1-61-(32)-05012018.png

Repeating this operation for the remaining task bars and milestone symbols (we could have done Select All and done it all at once!), we obtain a chart with larger fonts on all the task bars and milestone symbols:

P70-3 0 1 1-70-(33)-07082019.png

Editing Task Bar Name Label Positions

Another common editing action is to move the task bar's name label from their current positions to positions elsewhere around or on the task bar. To do this, click the name label to select it and then click the Label Position button on the Home ribbon tool bar tab. This action accesses the Label Position dropdown list where you can select one of the label positioning buttons as shown here:

P70-3 0 1 1-70-(34)-04292020.png

At this point, as an example, click the Left option in the dropdown and the selected name label is moved to the left side of the task bar as shown here:

P70-3 0 1 1-70-(34A)-004292020.png

In case you change your mind about the last editing action you took, you can UNDO the last editing action by clicking the UNDO button above the OnePager ribbon tool bar tabs. Successive clicking the UNDO button undoes editing actions in the reverse order that they were applied.

P70-3 0 1 1-70-(35)-04292020.png

Save the edited chart by pressing the Save button above the ribbon tool bar tab next to the UNDO button. All of the font size changes, text-position edits, and the new Legend position are now saved in case you need to update this chart with new data at a later time.

Editing Other Chart Contents

The examples above are just samples of Chart Editor capabilities provided for editing within the chart. Making other edits to task bars and milestone symbols and name labels are covered in more detail in this article: Manual Editing Task/Milestone Shapes and Text Labels (Portal)

Additionally, you can add task bar and milestone symbol information related to each task and milestone imported such as baseline data, percent complete information, and critical path information. You can add comment boxes to task bars, free floating comment boxes in the chart, vertical curtains, task links to show dependencies, multiple swimlane levels and background images. And you can change the chart's Start/End Dates, add or hide the Legend, and add time axis levels at the top, bottom, and within the graph. Further, you are able to edit task bar and milestone symbol shapes; you have controls for editing rows/swimlanes, headers and footers in the chart, background colors, and other text information shown in the graph. These capabilities and the articles that provide the detailed information on how to use them can be found at: Ways to Make Changes to Your Chart

Enhanced Capabilities Provided in OnePager Pro Version 7.0

Multiple Swimlane Levels

Previous versions of OnePager Pro and Express supported one level of swimlanes which allowed you to group rows together based on a particular source plan data field and its values. OnePager Pro and Express version 7.0 now supports three swimlane levels which can be nested inside one another to better display a hierarchy relationship for a Program, it’s Projects, and their Phases as shown here:

P70-0 4-70-(20)-03102020.png

In the illustration above, the first swimlane level is “Program” and under it as the second swimlane level are its “Projects”. The third swimlane level under each “Project” are “Phases” and the rows within each Phase show the task bars at their appropriate start/end dates. Definition and editing of these multiple swimlane levels is accomplished in the Template Properties and Chart Properties form’s Rows/Swimlanes tab that is modified to provide all the controls necessary to manage these multiple swimlane levels in the chart. The Rows/Swimlanes tab of the Chart Properties form is shown below:

P70-0 4-70-(21-1)-08282020.png

In addition to adding multiple swimlane levels, the tab shown above is simplified by reorganizing the controls associated with Rows and Text Columns. Sorting controls for rows and swimlanes are in separate sub-control groups as shown above. There is a Row Borders Formatting… button in the Rows control group with the controls for defining and global editing of row borders and access buttons for Swimlane Formatting… and Text Column Formatting… The controls shown above for the Chart Properties form are also found in the distributed Template Properties form’s Rows/Swimlanes tab. More detailed introductory information on the new Multiple Swimlane Levels feature can be found at these links:

Using Rows and Swimlanes
Creating and Editing Rows and Swimlanes (Portal)

Displaying Data-Driven Task Links

OnePager Pro 7.0 is enhanced to assist you with displaying Microsoft Project Predecessor fields in your chart. Typically, this feature is turned OFF in all Template Properties forms distributed with OnePager. However, the feature can be turned ON either before or after the creation of a chart. To turn the Data-Driven Task Link feature ON prior to creating a chart, go to the Template Properties form you plan to uses and click on the Task Links tab and then click the Import predecessors checkbox in the Data-Driven Task Links control group as shown below:

P70-3 0 1 1-70-(38-1)-09252020.png

With the Import predecessors checkbox checked ON in the Template Properties form, the chart first created looks like this:

P70-3 0 1 1-70-(39)-07082019.png

To turn the Data-Driven Task Link feature ON after the chart is created, go to the Chart Properties form's Task Links tab and then click the Import predecessors checkbox ON in the Data-Driven Task Links control group as shown below:

P70-3 0 1 1-70-(40-1)-09252020.png

Once imported, Data-Driven Task Links can be shown or hidden and can be edited globally using the Template Properties or Chart Properties forms as shown above or individually using a task linkright-click context menu. OnePager Pro 7.0 continues to support manual Task Links which in previous OnePager Pro versions were called Event Links. The OnePager version 7.0 Data-Driven Task Links feature is flexible and powerful. More details are provided in the series of articles at: Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal). 19.0.1-70 -->

Editing the Time Axis

OnePager Pro is also enhanced with new capabilities and feature so you can edit the time axis and configure it to focus on specific time periods of interest in your project schedule presentation. As an example of the enhancements made to the time axis is the addition of the time axis cell stretch feature where you can lengthen the horizontal extend of any time axis cell so as to provide more space to focus on details within that time period. An example of a stretched lower level time axis cell is shown below:

P70-3 0 1 1-70-(41)-07082019.png

For additional detailed information on the editing of time axis cells and other related capabilities please see this article at: Modifying the Time Axis (Portal)

Related Links

What's New with OnePager Release 7.0?

Getting Started with OnePager Pro Desktop

Conditional Import Filters (Portal)

Basic Workflows (Portal)

Manual Editing Task/Milestone Shapes and Text Labels (Portal)

Using Rows and Swimlanes

Creating and Editing Rows and Swimlanes (Portal)

Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)

Modifying the Time Axis (Portal)

Managing Chart Data (Portal)

Managing Templates (Portal)

(3.0.1.1-70)