(Created page with "==Overview== 1) As with the previous version of OnePager Pro, version 7.0 of '''OPP''' can now be launched from a '''desktop''' icon as well as from within Microsoft Project....")
 
 
(97 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
==Overview==
 
==Overview==
  
1) As with the previous version of OnePager Pro, version 7.0 of '''OPP''' can now be launched from a '''desktop''' icon as well as from within Microsoft Project.
+
As with previous version of OnePager Pro, version 7.0 of '''OPP''' you can launch '''OPP''' from a '''Desktop Icon''' as well as from within Microsoft Project ('''Add-in'''). Please note that after selecting the '''Desktop Icon''' launch option that you are not able to launch the OnePager '''Add-in''' application.  
  
2) Please note that after selecting the '''Desktop''' launch option that you are not able to launch the OnePager '''Add-in''' application.
+
Only one of these applications ('''Add-in''' or '''Desktop''') can be active at a time. If you attempt to launch both, a warning message appears as shown below.
  
3) Only one of these applications ('''Add-in''' or '''Desktop''') can be active at a time.
+
<center>[[File:P70-3_0_1-70-(1)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1-70-(1)-07052019.png</center>-->
  
4) If you attempt to launch both, a warning message appears as shown below.
+
If you need further information please consult this link: [https://www.onepager.com/support/faq.php?id=77 OnePager Doesn't Launch when the Desktop Icon is Clicked].
  
<center>[[File:P53-3_0_1-53-(01)-11062015.png]]</center>
+
This article provides the basic information needed to '''Getting Started''' and use OnePager Pro ('''OPP''') after you launch '''OPP''' from Microsoft Project.  
  
5) Further note that as mentioned in [[What's New with OnePager Release 7.0?]] 0.4-70, this new version has enhanced features such as '''Task Link Upgrades''' and  '''Time Axis Upgrades''' to name a few.  
+
The article providing '''Getting Started''' guidance when launching '''OPP''' from Microsoft Project is at: [[Getting Started with OnePager Pro Version 7.0 Add-in | Getting Started with OnePager Pro Add-in]] <!--3.0.1.1-70 -->
  
6) This article covers the '''Getting Started''' process when you launch '''OPP''' from the '''Desktop'''. 
+
==Launching OnePager Pro for the First Time==
  
7) The article which provides '''Getting Started''' guidance when launching '''OPP''' from Microsoft Project is at [[Getting Started with OnePager Pro Version 7.0 Add-in | Getting Started with OnePager Pro Add-in]]. 3.0.1.1-70
+
'''OPP''' version 7.0 can be installed so that it can be launched either from Microsoft Project’s '''Add-in''' tab on its ribbon tool bar tab or from a '''Desktop Icon''' or both. Additionally, you can also locate and double-click a '''.TAM''' to launch the desktop '''OPP''' version 7.0. The '''Desktop Icon''' for launching '''OPP''' version 7.0 looks like this:
  
==Launching OnePager Pro for the First Time from the Desktop==
+
<center>[[File:P70-3_0_1_2-70-(2)-07092019.png]]</center>
 +
<!--<center>P70-3_0_1_2-70-(2)-07092019.png</center>-->
  
1) '''OPP''' version 7.0 can be installed so that it can be launched either from Microsoft Project’s '''Add-in''' tab on its tool bar or from a '''Desktop''' icon or both.  Additionally, you can also locate and double-click a '''.TAM''' to bring up the desktop '''OPP''' version 7.0.
+
Before you launch '''OPP''', it is a good idea to '''unhide''' the Microsoft Project '''Flag''' field that tells OnePager which Microsoft Project '''Flag''' field you intend to use to control the import of '''source plan''' data. Note that when you '''unhide''' a field in Microsoft Project, that field can now appear in some of Microsoft Project’s standard reports. Do not forget to '''hide''' the field again before generating such reports if you do not want the field to appear in those reports.  The selected Microsoft Project '''Flag''' field allows you to control which tasks get graphed and are '''saved''' in Microsoft Project for future use. For example, the '''Flag''' field (e.g., Flag20) is shown below:
 
+
2) The '''Desktop''' icon for launching '''OPP''' version 7.0 looks like this:
+
 
+
<center>[[File:P53-3_0_2-53-(1)-11112015.png]]</center>
+
 
+
3) Before you launch '''OPP''', it is a good idea to unhide the Microsoft Project '''flag''' field you intend to use. (Note that when you unhide a field in Microsoft Project, that field can now appear in some of Microsoft Project’s standard reports. Do not forget to hide the field again before generating such reports if you do not want the field to appear in those reports.) The selected '''flag''' field allows you to control which tasks get graphed and to store those choices in Microsoft Project for future use. For example, the '''flag''' field (e.g., Flag20) is shown below:
+
  
 
<center>[[File:P61-3_0_1-61-(2)-10232017.png]]</center>
 
<center>[[File:P61-3_0_1-61-(2)-10232017.png]]</center>
<center>P61-3_0_1-61-(2)-10232017.png</center>
+
<!--<center>P61-3_0_1-61-(2)-10232017.png</center>-->
  
4) To control which tasks get graphed, specify the Microsoft Project '''flag''' field (e.g. Flag1, Flag2 … Flag20) that you wish to use. '''Number''' fields can also be used the same as the '''flag''' fields where a '''1''' in a '''Number''' field indicates '''Yes''' and a '''0''' in a '''Number''' field indicates '''No'''. Unhide that field in Microsoft Project by right-clicking in the field header area and selecting '''Insert Column''':
+
To control which tasks are '''imported''', specify the Microsoft Project '''Flag''' field (e.g. Flag1, Flag2 … Flag20) that you wish to use. '''Number''' fields can also be used the same as the '''Flag''' fields where a '''1''' in a '''Number''' field indicates '''Yes''' and a '''0''' in a '''Number''' field indicates '''No'''. '''Unhide''' that field in Microsoft Project by right-clicking in the field header area and selecting '''Insert Column''':
  
 
<center>[[File:P61-3_0_1-61-(3)-10232017.png]]</center>
 
<center>[[File:P61-3_0_1-61-(3)-10232017.png]]</center>
<center>P61-3_0_1-61-(3)-10232017.png</center>
+
<!--<center>P61-3_0_1-61-(3)-10232017.png</center>-->
  
5) Now put a '''Yes''' in this '''flag''' field for any task that you want to graph:
+
Now put a '''Yes''' in this '''Flag''' field for any task that you want to graph:
  
 
<center>[[File:P61-3_0_1-61-(4)-10232017.png]]</center>
 
<center>[[File:P61-3_0_1-61-(4)-10232017.png]]</center>
<center>P61-3_0_1-61-(4)-10232017.png</center>
+
<!--<center>P61-3_0_1-61-(4)-10232017.png</center>-->
  
:a) When making your first project view, we strongly recommend that you mark 50 or fewer tasks with '''Yes'''.
+
When making your first chart, we strongly recommend that you select 50 or fewer tasks with '''Yes'''. Please note that '''OPP''' is shipped with a number of fully populated '''Templates Properties''' forms that are based on the Microsoft Project '''source plan''' used in the tutorial also shipped with the product – BlueGrass Project Plan. Note that three field heading types must always be present: '''Name''', '''Start''', and '''Finish'''.  '''Caution.''' Starting in Microsoft Project 2010, there is a '''Manual Scheduling''' mode that allows you to leave dates blank in your schedule.  However, behind the scenes, these dates are still being automatically assigned to the project '''Start Date''', or to '''Today's Date''' if the project '''Start Date''' is not defined. Even though the dates appear to be undefined, they are defined behind the scenes, and are being passed to '''OPP'''. Because '''Today's Date''' often equals your '''Snapshot date''', it is not surprising to see all of these '''dateless tasks''' appearing near the time cursor.  '''Solutions.''' There are two solutions available:
  
:b) Please note that '''OPP''' is shipped with a number of fully populated '''Templates''' that are based on the Microsoft Project '''source plan''' used in the tutorial also shipped with the product – BlueGrass Project 2J-303.
+
:1) Define the dates for your tasks and milestones in Microsoft Project. This overwrites any default dates that Microsoft Project is assigning, and makes your project schedule more consistent with your '''OPP''' timeline. As a rule of thumb, we recommend defining dates for all tasks and milestones, especially when it comes to creating a '''OPP''' chart.
  
:c) Starting in Microsoft Project 2010, there is a '''Manual Scheduling''' mode that allows you to leave dates blank in your schedule. However, behind the scenes, these dates are still being automatically assigned to the project '''Start Date''', or to '''Today's Date''' if the project '''Start Date''' is not defined. Even though the dates appear to be undefined, they are defined behind the scenes, and are being passed to '''OPP'''. Because '''Today's Date''' often equals your '''Snapshot date''', it is not surprising to see all of these '''dateless tasks''' appearing near the time cursor.   
+
:2) Remove the '''dateless tasks''' from your '''OPP graph'''. You can leave them in your Microsoft Project '''source plan''', but by removing them from the '''OPP''' graph, you won't have to explain why certain task bars and milestone symbols are appearing in weird places when they really should not.   
  
:d) There are two solutions to this issue:
+
Clicking the '''OPP Icon''' on the '''Desktop''' displays a splash page and then take you to the '''Chart Editor'''.
  
::(1) Define the dates for your tasks and milestones in Microsoft Project. This overwrites any default dates that Microsoft Project is assigning, and makes your project schedule more consistent with your '''OPP''' timeline.  
+
<center>[[File:P70-3_0_1_2-70-(3)-07092019.png]]</center>
 +
<!--<center>P70-3_0_1_2-70-(3)-07092019.png</center>-->
  
::(2) Remove the '''dateless tasks''' from your '''OPP''' graph. You can leave them in project, but by removing them from the '''OPP''' graph, you won't have to explain why certain tasks/milestones are appearing in weird places when they really should not. As a rule of thumb, we recommend defining dates for all tasks and milestones, especially when it comes to graph generation.
+
<center>[[File:P70-3_0_1_2-70-(4)-07092019.png]]</center>
 +
<!--<center>P70-3_0_1_2-70-(4)-07092019.png</center>-->
  
6) Clicking the '''OPP''' icon on the '''Desktop''' displays a splash page and then take you to the Project View Editor ('''PVE''').
+
The '''OnePager Pro Start''' form provides you with three options:
  
<center>[[File:P61-3_0_2-61-(2)-10242017.png]]</center>
+
:1) '''NEW'''  Clicking the '''NEW''' buttons bring up the '''OnePager Pro choices''' ('''OPC''') form.
<center>P61-3_0_2-61-(2)-10242017.png</center>
+
  
 +
:2) '''UPDATE'''  Clicking the '''UPDATE''' button allows you to '''BROWSE FILES''' for an existing chart file or select a recently-opened chart.
  
<center>[[File:P61-3_0_1_2-61-(3)-05012018.png]]</center>
+
:3) '''OPEN'''  Clicking the '''OPEN''' button allows you to '''BROWSE FILES''' for an existing chart or select a recently-opened chart.
<center>P61-3_0_1_2-61-(3)-05012018.png</center>
+
  
7) The '''OnePager Pro Start''' form provides you with three options:
+
Once selected and opened, the chart is available for '''editing'''.
  
:a) '''NEW'''  Clicking the '''NEW''' buttons bring up the '''OnePager Pro choices''' ('''OPC''') form.
+
==Creating a New Chart==
  
:b) '''UPDATE'''  Clicking the '''UPDATE''' button allows you to '''BROWSE FILES''' for an existing project view file or select a recently-opened project view.
+
Clicking the '''NEW''' button accesses the OnePager choices ('''OPC''') form as shown below:
  
:c) '''OPEN'''  Clicking the '''OPEN''' button allows you to '''BROWSE FILES''' for an existing project view or select a recently-opened project view. Once selected and opened, the project view is available for '''editing'''.
+
<center>[[File:P70-3_0_1_2-70-(4A)-07092019.png]]</center>
 +
<!--<center>P70-3_0_1_2-70-(4A)-07092019.png</center>-->
  
==Creating a New Project View==
+
===Options on the New OnePager Choices form===
  
1) Clicking the '''NEW''' button brings up the '''OPC''' form as shown below:
+
The '''OPC''' form gives you more options for selecting '''source plans'''.  The illustration above shows that '''OPP''' is initiated from Microsoft Project with the '''source plan''' shown in the '''Selected File(s)''' group shown above.  The '''Add/Remove''' button gives you the capability to '''add''' more '''source plans''' to the '''source packet''' or, for multiple file packets, to '''remove''' files. Clicking the '''Select''' button displays a dropdown menu with a '''BROWSE FILES...''' option as well as a list of recently accessed Microsoft Project '''source plans''' as shown here:
  
<center>[[File:P61-3_0_1_2-61-(4)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_2-70-(5)-07092019.png]]</center>
<center>P61-3_0_1_2-61-(4)-05012018.png</center>
+
<!--<center>P70-3_0_1_2-70-(5)-07092019.png</center>-->
  
===Options on the New OnePager Choices form===
+
If you select the '''BROWSE FILES...''' option, a Windows '''Open''' form appears from which you can select the desired Microsoft Project '''source plan''' for '''OPP''' to use as shown below:
  
2) We’ve enhanced the '''OPC''' form to give you more options for selecting '''source plans'''.  The illustration above shows that '''OPP''' was initiated from Microsoft Project with the '''source plan''' shown in the '''Selected File(s)''' group shown above. The '''Add/Remove''' button gives you the capability to '''add''' more '''source plans''' to the '''source packet''' or, for multiple file packets, to '''remove''' files.
+
<center>[[File:P70-3_0_1_2-70-(6)-07092019.png]]</center>
 +
<!--<center>P70-3_0_1_2-70-(6)-07092019.png</center>-->
  
:a) Clicking the '''Select''' button displays a dropdown menu with a '''BROWSE FILES...''' option as well as a list of recently accessed Microsoft Project '''source plans''' as shown here:
+
When you select the Microsoft Project '''source plan''' and click the '''Open''' button on the Windows '''Open''' form, '''OPP''' loads the Microsoft Project '''source plan''' selected and expands the '''OPC''' form as shown below:
  
<center>[[File:P61-3_0_1_2-61-(5)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_2-70-(7)-07092019.png]]</center>
<center>P61-3_0_1_2-61-(5)-05012018.png</center>
+
<!--<center>P70-3_0_1_2-70-(7)-07092019.png</center>-->
  
:b) If you select the '''BROWSE FILES...''' option, a Windows '''Open''' form appears from which you can select the desired Microsoft Project '''source plan''' for '''OPP''' to use as shown below:
+
===Adding a New Source Plan===
  
<center>[[File:P61-3_0_1_2-61-(6)-05012018.png]]</center>
+
You now have additional options to use the expanded '''OnePager choices''' form, specifically the '''Add/Remove''' button. The '''Add/Remove''' button gives you the capability to '''add''' more files to the '''source packet''' or, for multiple files to '''remove''' files if desired. Clicking the '''Add/Remove''' button accesses the '''Data source selection''' form as shown below:
<center>P61-3_0_1_2-61-(6)-05012018.png</center>
+
  
:c) When you select the Microsoft Project '''source plan''' and click the '''Open''' button on the Windows '''Open''' form, '''OPP''' loads the Microsoft Project '''source plan''' selected and expands the '''OPC''' form as shown below:
+
<center>[[File:P70-3_0_1_1-70-(7)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(7)-07052019.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(6)-04302018.png]]</center>
+
The '''Data source selection''' form displays the current '''source plan''' that was loaded with Microsoft Project '''source plan''' data when you clicked the '''OPP''' button on the '''desktop''' and selected the first '''source plans''' as described above. This form lets you '''Add''' more Microsoft Project '''source plan''' to create a multi-project chart or '''Remove''' a file from a multi-file '''source packet'''. These options are detailed below. When you click the '''Add''' button, '''OPP''' gives you the option to bring up a Windows '''Open''' form when you select the '''BROWSE FILES…''' option as shown here:
<center>P61-3_0_1_1-61-(6)-04302018.png</center>
+
  
===Adding a New Source Plan===
+
<center>[[File:P70-3_0_1_1-70-(8)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(8)-07052019.png</center>-->
  
3) You now have additional options to use the expanded '''OnePager choices''' form, specifically the '''Add/Remove''' button.  The '''Add/Remove''' button gives you the capability to '''add''' more files to the '''source packet''' or, for multiple files to '''remove''' files if desired.
+
Clicking the '''BROWSE FILES…''' option displays a Window’s '''Open''' form from which you can select a Microsoft Project '''source plans''' to add to the '''source packet'''.  A sample '''Open''' form is shown below:
  
:a) Clicking the '''Add/Remove''' button brings up the '''Data source selection''' form as shown below:
+
<center>[[File:P70-3_0_1_1-70-(9)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(9)-07052019.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(7)-04302018.png]]</center>
+
When you select a desired Microsoft Project '''source plan''' and click the '''Open''' button as shown above, '''OPP''' '''adds''' the file to the '''source packet''' and displays it in the '''Data source selection''' window as shown below:
<center>P61-3_0_1_1-61-(7)-04302018.png</center>
+
  
:b) The '''Data source selection''' form displays the current '''source plan''' that was loaded with Microsoft Project data when you clicked the '''OPP''' button on the '''desktop''' and selected the first '''source plans''' as described above. This form lets you '''Add''' more Microsoft Project '''source plan''' to create a multi-project project view or '''Remove''' a file from a multi-file '''source packet'''.  These options are detailed below.
+
<center>[[File:P70-3_0_1_1-70-(10)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(10)-07052019.png</center>-->
  
:c) '''Add''' a new '''source plan''' to the '''source packet'''   When you click the '''Add''' button, '''OPP''' gives you the option to bring up a Windows '''Open''' form when you select the '''BROWSE FILES…''' option as shown here:
+
The selected '''source plan''' is added to the '''source packet''' as shown above.  '''OPP''' shows the path name of the '''source plans''' in the window if you hover the mouse over the '''source plan''' name. If you select a recently used file from the dropdown menu displayed with the '''Add''' button is clicked in the '''Data source selection''' form, '''OPP''' adds that '''source plan''' to the '''source packet'''.
  
<center>[[File:P61-3_0_1_1-61-(8)-04302018.png]]</center>
+
===Removing a Source Plan===
<center>P61-3_0_1_1-61-(8)-04302018.png</center>
+
  
::i) Clicking the '''BROWSE FILES…''' option displays a Window’s '''Open''' form from which you can select a Microsoft Project '''source plans''' to add to the '''source packet'''.  A sample '''Open''' form is shown below:
+
The '''Remove''' button allows you to remove a '''source plan''' from a '''source packet''' if that '''source plan''' is not needed to create the new chartTo remove a '''source plan''', first select the '''source plan''' in the '''Data source selection''' form’s window so that it is highlighted in blue then click the '''Remove''' button as shown in the sequence below:
  
<center>[[File:P61-3_0_1_1-61-(9)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(11)-07052019.png]]</center>
<center>P61-3_0_1_1-61-(9)-05012018.png</center>
+
<!--<center>P70-3_0_1_1-70-(11)-07052019.png</center>-->
  
::ii) When you select a desired Microsoft Project '''source plan''' and click the '''Open''' button as shown above, '''OPP''' adds the file to the '''source packet''' and displays it in the '''Data source selection''' window as shown below:
+
<center>[[File:P70-3_0_1_1-70-(12)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(12)-07052019.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(10)-04302018.png]]</center>
+
===Other Choices to Make===
<center>P61-3_0_1_1-61-(10)-04302018.png</center>
+
  
::iii) The selected file is added to the '''source packet''' as shown above. '''OPP''' shows the path name of the '''source plans''' in the window if you hover the mouse over the '''source plan''' name.
+
Moving on to the other sections of the '''OPC''' form, you are asked to confirm a few things before you build the chart. '''OPP''' makes good guesses for each of these choices, but you can change any of them:
  
::iv) If you select a recently used file from the dropdown menu displayed with the '''Add''' button is clicked in the '''Data source selection''' form, '''OPP''' adds that '''source plan''' to the '''source packet'''.
+
<center>[[File:P70-3_0_1_1-70-(15)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15)-07052019.png</center>-->
  
===Removing a Source Plan===
+
====Starting Template====
  
:d) '''Remove''' source from '''source packet'''   The '''Remove''' button allows you to remove a '''source file''' from a '''source packet''' if that '''source plan''' is not needed to create the new project view. To remove a '''source plan''', first select the '''source plan''' in the '''Data source selection''' form’s window so that it is highlighted in blue then click the '''Remove''' button as shown in the sequence below:
+
The current '''Template Properties''' form determines which fields get imported from Microsoft Project and how the initial chart looks.  '''OPP''' ships with many sample '''Template Properties''' forms, but you can also customize your own '''Template Properties''' forms. To choose which '''Template Properties''' form to use in building your chart, click the '''Change…''' button in the top group of the '''OPC''' form as shown here:
  
<center>[[File:P61-3_0_1_1-61-(11)-04302018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(15A)-07052019.png]]</center>
<center>P61-3_0_1_1-61-(11)-04302018.png</center>
+
<!--<center>P70-3_0_1_1-70-(15A)-07052019.png</center>-->
 +
 +
For now, just stick with the default '''Template Properties''' form entitled '''Single Project Gantt View – Detailed''', but you can always use a different '''Template Properties''' form to get a different type of chart.
  
 +
====Title of the New Chart====
  
<center>[[File:P61-3_0_1_1-61-(12)-04302018.png]]</center>
+
This is the title of the chart and also the suggested '''save''' name. You can change the '''source plan''' name when you save it. We recommend that you enter a title that helps you identify the chart later on as shown here:
<center>P61-3_0_1_1-61-(12)-04302018.png</center>
+
  
===Other Choices to Make===
+
<center>[[File:P70-3_0_1_1-70-(15B)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15B)-07052019.png</center>-->
  
4) Moving on to the other sections of the '''OPC''' form, you are asked to confirm a few things before you build the project view. '''OPP''' makes good guesses for each of these choices, but you can change any of them:
+
For each chart that you create, OnePager remembers '''colors, titles, legends, font sizes''', and all other graph '''properties''' so that your work is saved. Later, you can update the chart with a snapshot of how the project looks on a different date. Then you can browse through the snapshots to see how the project is changing over time. '''OPP''' also '''saves''' the '''path name''' associated with the '''save''' name ('''.TAM'''). '''Path names''' are not available in '''.TAMs''' produced with versions of '''OPP''' prior to version 6.0.
  
<center>[[File:P61-3_0_1_1-61-(15)-04302018.png]]</center>
+
====Task Selection====
<center>P61-3_0_1_1-61-(15)-04302018.png</center>
+
  
:a) '''Starting Template''': The current '''Template''' determines which fields get imported from Microsoft Project and how the initial project view looks.  '''OPP''' ships with many sample '''Templates''', but you can also customize your own '''Templates'''.
+
This is how you tell '''OPP''' which tasks to import from your Microsoft Project '''source plan''' as indicated below:
  
::i) To choose which '''Template''' to use in building your project view, click the '''Change…''' button in the top group of the '''OPC''' form.  
+
<center>[[File:P70-3_0_1_1-70-(15C)-07052019.png]]</center>
::ii) For now, just stick with the default '''Template''' entitled '''Single Project Gantt View – Detailed''', but you can always use a different '''Template''' to get a different type of project view.
+
<!--<center>P70-3_0_1_1-70-(15C)-07052019.png</center>-->
  
:b) '''Title of the New Project View''': This is the title of the graph and also the suggested save '''source plan''' name. You can change the '''source plan''' name when you save itWe recommend that you enter a title that helps you identify the view later on. 
+
Either click the '''Select all tasks''' radio button to graph everything or choose a '''Flag''' field. You can make several charts from a single Microsoft Project '''source plan''', each using a different '''Flag''' or '''Number''' fieldIn '''OPP''' if no '''Flags''' are set to '''Yes''', '''OPP''' provides you with a warning message shown below:
  
::i) For each project view that you create, OnePager remembers '''colors, titles, legends, font sizes''', and all other graph '''properties''' so that your work is saved.  
+
<center>[[File:P70-3_0_1_1-70-(15D)-07052019.png]]</center>
::ii) Later, you can update the project view with a snapshot of how the project looks on a different date. Then you can browse through the snapshots to see how the project is changing over time. 
+
<!--<center>P70-3_0_1_1-70-(15D)-07052019.png</center>-->
::iii)  '''OPP''' lso saves the path name associated with the file ('''.TAM'''). Path names are not available in '''.TAM''' produced with previous version of '''OPP'''.
+
  
:c) '''Task Selection''': This is how you tell '''OPP''' which tasks from your Microsoft Project plan to include.  
+
Clicking the '''Select tasks by custom filter''' button enables the '''Edit filters...''' button. Clicking the '''Edit filters...''' button takes you to a form that controls the new '''Conditional Import Filters''' feature as shown here: 
  
:::i) Either click the '''Select all tasks''' radio button to graph everything or choose a '''flag''' field. You can make several project views from a single Microsoft Project '''source plan''', each using a different '''flag''' or '''number''' field.  In '''OPP''' if no '''flags''' are set to '''Yes''', '''OPP''' provides the user with a warning message.
+
<center>[[File:P70-3_0_1_1-70-(15E)-07052019.png]]</center>
:::ii) Clicking the '''Select tasks by custom filter''' button enables the '''Edit filters...''' button.  Clicking the '''Edit filters...''' button takes you to a form that controls the new '''Conditional Import Filters''' feature.  Please see the article titled [[Conditional Import for Version 7.0 (Portal) | Conditional Import Filters (Portal)]] 7.18.1-70 for more detailed on the use of this new feature.
+
<!--<center>P70-3_0_1_1-70-(15E)-07052019.png</center>-->
  
:d) '''Snapshot Date''': This is the date of the report and lets you keep track of how schedules change over time. Each project view can have several snapshots.  
+
For more information, please see the article titled [[Conditional Import for Version 7.0 (Portal) | Conditional Import Filters (Portal)]] <!--7.18.1-70 -->
  
5) The '''Show field mappings''' button near the bottom of the form can be checked to give you a chance to review and change the Microsoft Project '''field mappings''' to '''OPP''' before you make your first project view.   To do this, click the '''Next&gt;''' button.   You now see the following form:
+
====Snapshot Date====
 +
 
 +
This is the date of the report and lets you keep track of how schedules change over time.  The snapshot date is set by default from your Microsoft Project '''source plan's''' Project Information tab's '''Current date'''. You can change the snapshot date by clicking on the dropdown button at the window shown in the illustration below:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(15F)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15F)-07052019.png</center>-->
 +
 
 +
Making a calendar date selection as shown above establishes the '''snapshot date''' for the chart and the '''snapshot''' being created.  Each chart can have many snapshots. Snapshots and their management are important topics. Snapshots are the basis of how OnePager Pro helps you track the progress of your project.
 +
 
 +
For more information, please see the articles at:  [[Managing Chart Data for Version 7.0 | Managing Chart Data (Portal)]] <!--23.0.1-70-->
 +
 
 +
====Show Field Mappings====
 +
 
 +
The '''Show field mappings''' checkbox is near the bottom of the form. When this box is checked '''ON''' you have a chance to review and change the Microsoft Project '''field mappings''' to '''OPP''' before you make your first chart. To do this, click the '''Next>''' button as shown here:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(15G)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(15G)-07052019.png</center>-->
 +
 
 +
You now see the following form:
  
 
<center>[[File:P61-3_0_1_1-61-(16)-04302018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(16)-04302018.png]]</center>
<center>P61-3_0_1_1-61-(16)-04302018.png</center>
+
<!--<center>P61-3_0_1_1-61-(16)-04302018.png</center>-->
  
6) Notice in the form above that '''OPP''' has relied on the current '''Template''' to make some guesses on what Microsoft Project fields should be used in making the graph.   You can easily change any of these '''field mappings''' by making selections from the dropdown menus.   For example, we show below how to change the '''Finish Date''' :
+
Notice in the form above that '''OPP''' has relied on the current '''Template Properties''' form to make some guesses on what Microsoft Project fields should be used in making the graph. You can easily change any of these '''field mappings''' by making selections from the dropdown menus. For example, we show below how to change which '''Finish Date''' in Microsoft Project is used to create the chart's Finish Date:
  
 
<center>[[File:P61-3_0_1_1-61-(17)-04302018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(17)-04302018.png]]</center>
<center>P61-3_0_1_1-61-(17)-04302018.png</center>
+
<!--<center>P61-3_0_1_1-61-(17)-04302018.png</center>-->
  
 
===Making the Graph===
 
===Making the Graph===
  
7) Once you are satisfied with the '''field mappings''', click the '''Create new project view''' button to import your selected data and create a project view.   After a second or two you see a screen that looks like this:
+
Once you are satisfied with the '''field mappings''', click the '''Create new chart''' button to import the desired Microsoft Project data and create a chart. After a second or two you see a screen that looks like this:
  
<center>[[File:P61-3_0_1_1-61-(18)-04302018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(18-1)-07052019.png]]</center>
<center>P61-3_0_1_1-61-(18)-04302018.png</center>
+
<!--<center>P70-3_0_1_1-70-(18-1)-07052019.png</center>-->
  
8) Note that each task or milestone was '''color''' coded based on the value in the '''Resource Names''' field.  
+
Note that each task bar or milestone symbol was '''color''' coded based on the value in the '''Resource Names''' field. The '''Legend''' contains an optional diagram near the bottom explaining that the bars inside the task bars represent '''percent complete''' extracted from Microsoft Project. '''Percent complete''' comes from a Microsoft Project field that you specified in the '''field mappings''' form. Note that the current '''Template Properties''' form is the '''Template''' used by OnePager Pro to create the first chart and determines how your data looks in the new chart. The '''Template Properties''' form’s '''Task Bars''' tab showing where the '''color''' control is located is shown below:
  
:a) The '''Legend''' contains an optional diagram near the bottom explaining that the bars inside the Gantt bars represent '''percent complete''' extracted from Microsoft Project.
+
<center>[[File:P70-3_0_1_1-70-(19-1)-09252020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(19-1)-09252020.png</center>-->
  
:b) '''Percent complete''' comes from a Microsoft Project field that you specified in the '''field mappings''' form 
+
===Copying the Chart to Microsoft PowerPoint===
  
:c) Note that the current '''Template''', when you press the '''Create new project view''' button, is the '''Template''' for how things look in the new project view.  The '''Template''' form’s '''Task Bars''' tab showing where the '''color''' control is located is shown below:
+
OnePager provides access to the Windows clipboard so you can '''copy''' the chart and '''paste''' it into another application. To copy the current chart snapshot to the clipboard click the '''Copy''' button on the '''Home''' ribbon tool bar tab of the ribbon as shown below:
  
<center>[[File:P61-3_0_1_1-61-(19)-04302018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(37A)-07082019.png]]</center>
<center>P61-3_0_1_1-61-(19)-04302018.png</center>
+
<!--<center>P70-3_0_1_1-70-(37A)-07052019.png</center>-->
  
===Opening a Project View===
+
Then launch Microsoft PowerPoint and paste the clipboard copy of the chart into a Microsoft PowerPoint slide, as shown below:
  
9) The right-most button on the '''OPC''' form is the '''OPEN''' button. Clicking the '''OPEN''' button displays a dropdown menu which happens to be the same for the '''NEW''' and '''UPDATE''' buttons. The options in the dropdown are discussed below:
+
<center>[[File:P61-3_0_1_1-61-(37)-05012018.png]]</center>
 +
<!--<center>P61-3_0_1_1-61-(37)-05012018.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(19A)-04302018.png]]</center>
+
That’s it! You’ve created a professional 1-page schedule summary from a complex Microsoft Project schedule and have copied it into a Microsoft PowerPoint presentation. You can also print the chart by selecting the '''Print''' button on the '''File''' tab. OnePager has other features that let you move task bars vertically to different '''rows and swimlanes''', change the number and levels of swimlanes, add swimlane titles, show graphic dependencies among tasks, change task bar colors, hide task bars, edit text items, add floating comment boxes, add comment boxes to task bars, and standardize on chart styles across organizations.  
<center>P61-3_0_1_1-61-(19A)-04302018.png</center>
+
  
:a) Clicking the '''BROWSE FILES...''' option  brings up a Windows '''Open''' form from which you can select a '''.TAM''' that you want to open. Selecting the desired '''.TAM''' causes '''OPP''' to display the selected project view.  From this position, you can '''edit''' the project view, save it, or share it with others.
+
To learn more about these features, read about the specific workflows in this Wiki at [[Basic Workflows for Version 7.0 (Portal) | Basic Workflows (Portal)]] <!--7.0.1-70--> and [[Manual Editing for Version 7.0 (Portal) | Manual versus Data-Driven Editing (Portal)]] <!--9.0.1-70-->
  
:b) Clicking any of the '''RECENT project views''' items in the dropdown menu above causes '''OPP''' to load the associated '''.TAM''' into the Project View Editor ('''PVE''') where you can also '''edit''' the project view, save it, or share it with others.
+
==Opening a Chart==
  
===Updating a Project View with Changes Made to the Microsoft Project Source Plan Data===
+
The right-most button on the '''OPC''' form is the '''OPEN''' button. Clicking the '''OPEN''' button displays a dropdown menu which happens to be the same for the '''UPDATE''' buttons. The options in the dropdown are discussed below:
  
10) Suppose after examining the project view you created before, you realize that it might be best to show more task bars. This, you think, would greatly improve the schedule discussion you are about to attend. Updating the project view at this point is a simple matter.  Recall that '''OPP''' is active and the '''PVE''' is displaying the current project view you want to update.  Additionally, the Microsoft Project '''source plan''' and the application are active.  The original project view looked like this:
+
<center>[[File:P70-3_0_1_1-70-(19A)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(19A)-07052019.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(18)-04302018.png]]</center>
+
Clicking the '''BROWSE FILES...''' option accesses a Windows '''Open''' form from which you can select a '''.TAM''' that you want to open. Selecting the desired '''.TAM''' causes '''OPP''' to display the selected chart in the '''Chart Editor'''. From this position, you can '''edit''' the chart, '''save it''', or '''share it''' with others. Clicking any of the '''RECENT charts''' items in the dropdown menu above causes '''OPP''' to load the associated '''.TAM''' into the '''Chart Editor''' where you can also '''edit''' the chart, save it, or share it with others.
<center>P61-3_0_1_1-61-(18)-04302018.png</center>
+
  
:a) Since Microsoft Project is still an active program and the Microsoft Project '''source plan''' you are using is still being displayed, go back to the Microsoft Project application and change the '''Flag20''' field setting for the rows you want to now display from '''No''' to '''Yes'''. A section of the Microsoft Project '''source plan''' where this is done is shown below:
+
==Replacing A Snapshot - Updating a Chart with Changes Made to the Microsoft Project Source Plan's Data==
 +
 
 +
Suppose after examining the chart you created and '''saved''', you realize that it might be best to show more task bars. This, you think, would greatly improve your schedule presentation. '''Updating''' the chart at this point is a simple matter. Recall that '''OPP''' is active and the '''Chart Editor''' is displaying the current chart you want to update. Additionally, the Microsoft Project '''source plan''' and the application are active.  The original chart looked like this:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(18-1)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(18-1)-07052019.png</center>-->
 +
 
 +
Since Microsoft Project is still an active program and the Microsoft Project '''source plan''' you are using is still being displayed, go back to the Microsoft Project application and change the '''Flag20''' field setting from '''No''' to '''Yes''' for the tasks you want to now display. A section of the Microsoft Project '''source plan''' where this is done is shown below:
  
 
<center>[[File:P61-3_0_1-61-(19A)-10232017.png]]</center>
 
<center>[[File:P61-3_0_1-61-(19A)-10232017.png]]</center>
<center>P61-3_0_1-61-(19A)-10232017.png</center>
+
<!--<center>P61-3_0_1-61-(19A)-10232017.png</center>-->
  
:b) Once you’ve made the ''Flag20''' changes lines 8 through 15 in the Microsoft Project the '''source plan'''  looks like this:
+
Once you’ve made the '''Flag20''' changes lines 8 through 15 in the Microsoft Project the '''source plan'''  looks like this:
  
 
<center>[[File:P61-3_0_1-61-(19B)-10232017.png]]</center>
 
<center>[[File:P61-3_0_1-61-(19B)-10232017.png]]</center>
<center>P61-3_0_1-61-(19B)-10232017.png</center>
+
<!--<center>P61-3_0_1-61-(19B)-10232017.png</center>-->
 
+
:c) With the Microsoft Project '''source plan''' updated, go back to '''OPP''' and navigate to the '''Data''' tab on the ribbon where you’ll see several buttons.  To update your project view to show the additional rows from your Microsoft Project '''source plan'''. click the '''Replace Snapshot''' button as shown below:
+
  
<center>[[File:P61-3_0_1-61-(19C)-10232017.png]]</center>
+
With the Microsoft Project '''source plan''' updated, go back to '''OPP''' and navigate to the '''Data''' ribbon tool bar tab on the ribbon where you see several buttons. To '''update''' your chart to show the additional tasks from your Microsoft Project '''source plan'''. click the '''Replace Snapshot''' button as shown below:
<center>P61-3_0_1-61-(19C)-10232017.png</center>
+
  
:d) When you click the '''Replace Snapshot''' button, '''OPP''' goes back to the associated Microsoft Project '''source plan''' that you just changed, brings in all the rows that changed, and update your project view.
+
<center>[[File:P70-3_0_1_1-70-(19C)-07052019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(19C)-07052019.png</center>-->
  
:e) At the conclusion of the operation, the updated project view looks like this:
+
When you click the '''Replace Snapshot''' button, '''OPP''' goes back to the Microsoft Project '''source plan''' that you just changed, '''imports''' all the tasks that changed, and update your chart. At the conclusion of the operation, the updated chart looks like this:
  
 
<center>[[File:P61-3_0_1_1-61-(19D)-04302018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(19D)-04302018.png]]</center>
<center>P61-3_0_1_1-61-(19D)-04302018.png</center>
+
<!--<center>P61-3_0_1_1-61-(19D)-04302018.png</center>-->
  
11) The example above is just one of many uses of the '''Data''' tab’s '''Replace Snapshot''' button when you need to update a project view. And, you can do this as many times as necessary until the project view is the way you need it. In addition to adding and removing rows by changing the '''Flag20''' field, you can need to change '''Start Dates''', '''Finish Dates''', or '''Percent Complete''' and display these data changes in the project view. Using the procedure above you can do this very efficiently.
+
The example above is just one of many uses of the '''Data''' ribbon tool bar tab’s '''Replace Snapshot''' button when you need to update a chart. And, you can do this as many times as necessary until the chart is the way you need it. In addition to adding and removing rows by changing the Microsoft Project '''Flag20''' field, you can change '''source plan''' task '''Start Dates''', '''Finish Dates''', or '''Percent Complete''' and display these data changes in the chart. Using the procedure above you can do this very efficiently. You can now '''save''' the chart by giving it a '''save''' name. When you '''save''' the chart in '''OPP''', OnePager saves the '''.TAM''' and '''saves''' the Microsoft Project '''source plan name''' and '''path''' information. This is useful when you want to further update the chart or when you want to add a snapshot later on. In the examples below we assume that the chart is saved as '''BlueGrass Project Report - Pro'''.
  
12) You can now save the project view by giving it a name.  When you save the project view in '''OPP''', OnePager saves the '''.TAM''' and within saves the Microsoft Project '''source plan name''' and '''path''' information.  This is useful when you want to further update the project view or when you want to add a snapshot later on.  In the examples below we assume that the project view is saved as '''BlueGrass Project Report - Pro'''.
+
==Adding a Snapshot - Adding to the Chart with Changes Made to the Microsoft Project Source Plan's Data==
  
===Adding a Snapshot to a Project View===
+
The power of '''OPP''' is illustrated when, after a period of progress on the project, it is time to produce another chart. OnePager produces your next snapshot with the same look and feel as the original. Assuming that the Microsoft Project '''source plan''' was updated with '''actual start and finish, percent complete''', and other relevant data during the reporting interval, '''OPP''' can easily generate a new snapshot. Suppose we have the following chart created on 7/1/2019 and we want to create another graph from the updated Microsoft Project '''source plan''' on 8/1/2019.
 
+
13) The power of '''OPP''' is illustrated when, after a period of progress on the project, it is time to produce another project view, with the same look and feel. Assuming that the Microsoft Project '''source plan''' was updated with actual '''start''' and '''finish''', '''percent complete''', and other relevant data during the reporting interval, '''OPP''' can easily generate a new snapshot.
+
 
+
14) Suppose we have the following project view created on 7/1/2019 and we want to create another graph from the updated Microsoft Project '''source plan''' on 8/1/2019.
+
  
 
<center>[[File:P61-3_0_1_1-61-(20)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(20)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(20)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(20)-05012018.png</center>-->
 
+
:a) Before creating a new snapshot for 8/1/2019 as planned, we need to update the Microsoft Project '''source plan''' say by updating the '''Percent Complete''' for the ADONIS Subcontractor Selection task to 75%.  When the '''source plan''' is updated with this revised information we can proceed.
+
  
:b) Launch '''OPP''' either from Microsoft Project or from the '''Desktop''' icon and click the '''UPDATE''' button on the '''OnePager Pro Start''' form. Doing so accesses the following '''OnePager choices''' ('''OPC''') form:
+
Before creating a new snapshot for 8/1/2019 as planned, we need to update the Microsoft Project '''source plan''' say by updating the '''Percent Complete''' for the ADONIS Subcontractor Selection task to 75%. When the '''source plan''' is updated with this revised information we can proceed. Launch '''OPP''' either from Microsoft Project ('''Add-in''') or from the '''Desktop icon''' and click the '''UPDATE''' button on the '''OnePager Pro Start''' form. Doing so accesses the following '''OnePager choices''' ('''OPC''') form shown here:
  
 
<center>[[File:P61-3_0_1_1-61-(20A)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(20A)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(20A)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(20A)-05012018.png</center>-->
  
:c) In the '''OPC''' form select the '''NEW snapshot at date:''' as shown above. You can want to select a current date for the snapshot so that this snapshot represents the project at the status date point in time. To see which snapshot dates already exist, just position your mouse over the '''NEW snapshot-date:''' window to see a list of the existing dates.   
+
In the '''OPC''' form select the '''NEW snapshot at date:''' as shown above. You can also select a date for the snapshot so that this snapshot represents the project at the status date point in time. To see which snapshot dates already exist, just position your mouse over the '''NEW snapshot at date:''' window to see a list of the existing dates.   
  
 
<center>[[File:P61-3_0_1_1-61-(20B)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(20B)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(20B)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(20B)-05012018.png</center>-->
  
:d) You can use the built in calendar dropdown or type in the new snapshot’s month, day, and year in the window provided as shown below:
+
You can use the built in calendar dropdown or type in the new snapshot’s month, day, and year in the window provided as shown below:
  
 
<center>[[File:P61-3_0_1_1-61-(20C)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(20C)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(20C)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(20C)-05012018.png</center>-->
  
:e) Uncheck the '''Show field mappings''' checkbox if you want to use the same '''field mappings''' as you used before.   The bottom of the screen now looks like this:
+
Un-check the '''Show field mappings''' checkbox '''OFF''' if you want to use the same '''field mappings''' as you used before. The bottom of the screen now looks like this:
  
 
<center>[[File:P60-3_0_1-60-(26)-01252017.png]]</center>
 
<center>[[File:P60-3_0_1-60-(26)-01252017.png]]</center>
<center>P60-3_0_1-60-(26)-01252017.png</center>
+
<!--<center>P60-3_0_1-60-(26)-01252017.png</center>-->
  
f) Pressing the large '''New''' button creates a new snapshot for the project view.  The project view opens at the new snapshot.   The '''color''', '''fonts''', '''title''', and '''swimlane''' assignments are consistent between the two snapshots:
+
Pressing the large '''New''' button creates a new snapshot for the chart.  The chart opens at the new snapshot. The '''color''', '''fonts''', '''title''', and '''swimlane''' assignments are consistent between the two snapshots:
  
 
<center>[[File:P61-3_0_1_1-61-(20D)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(20D)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(20D)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(20D)-05012018.png</center>-->
  
:g) You can go back and forth between the two snapshots by using the '''snapshot forward/backward''' buttons on the '''View''' tab as shown below:
+
You can go back and forth between the two snapshots by using the '''snapshot forward/backward''' buttons on the '''View''' tab as shown below:
  
<center>[[File:P61-3_0_1_1-61-(20E)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(20E)-07052019.png]]</center>
<center>P61-3_0_1_1-61-(20E)-05012018.png</center>
+
<!--<center>P70-3_0_1_1-70-(20E)-07052019.png</center>-->
  
==Editing the Project View==
+
==Editing the Chart==
  
1) You can always '''edit''' the '''font sizes''' and '''text positions''' on task shapes to optimize readability. To do this, hold down the left mouse button and '''drag''' a selection box ('''lasso''') that encloses many tasks/milestones at once:
+
===Editing Task Bar Name Label Font Sizes===
 +
 
 +
You can always '''edit''' the '''font sizes''' and '''label positions''' on task bars to optimize readability. To do this, hold down the left mouse button and '''drag''' a selection box ('''lasso''') that encloses many task bars and milestone symbols at once:
  
 
<center>[[File:P61-3_0_1_1-61-(29)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(29)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(29)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(29)-05012018.png</center>-->
  
:a) When you release the mouse, the enclosed tasks/milestones are all be selected:
+
When you release the mouse, the enclosed task bars or milestone symbols are all be selected:
  
 
<center>[[File:P61-3_0_1_1-61-(30)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(30)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(30)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(30)-05012018.png</center>-->
  
:b) Click the '''Increase Font Size''' button on the tool bar shown below:
+
Click the '''Increase Font Size''' button on the '''Home''' ribbon tool bar tab shown below:
  
<center>[[File:P61-3_0_1_1-61-(31)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(31)-07082019.png]]</center>
<center>P61-3_0_1_1-61-(31)-05012018.png</center>
+
<!--<center>P70-3_0_1_1-70-(31)-07082019.png</center>-->
  
:c) The project view now looks something like this:
+
The chart now looks something like this:
  
 
<center>[[File:P61-3_0_1_1-61-(32)-05012018.png]]</center>
 
<center>[[File:P61-3_0_1_1-61-(32)-05012018.png]]</center>
<center>P61-3_0_1_1-61-(32)-05012018.png</center>
+
<!--<center>P61-3_0_1_1-61-(32)-05012018.png</center>-->
  
:d) Repeating this operation for the remaining tasks/milestones (we could have done '''Select All''' and done it all at once!), we obtain a project view with larger fonts on all the tasks/milestones:
+
Repeating this operation for the remaining task bars or milestone symbols (we could have done '''Select All''' and done it all at once!), we obtain a chart with larger fonts on all the task bars and milestone symbols:
  
<center>[[File:P61-3_0_1_1-61-(33)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(33)-07082019.png]]</center>
<center>P61-3_0_1_1-61-(33)-05012018.png</center>
+
<!--<center>P70-3_0_1_1-70-(33)-07082019.png</center>-->
  
2) Another common '''editing''' action is to move the task names from their current positions to a positions elsewhere around or on the task bar. 
+
===Editing Task Bar Name Label Positions===
  
:a) To do this, select a set of tasks/milestones as before, but this time click one of the '''text-positioning''' buttons on the tool bar:
+
Another common '''editing''' action is to move the task bar's '''name label''' from their current positions to a positions elsewhere around or on the task bar or milestone symbol. To do this, click the '''name label''' to select it and then click the '''Label Position''' button on the '''Home''' ribbon tool bar tab. This action accesses the '''Label Position''' dropdown list where you can select one of the '''label-positioning''' buttons as shown here:
  
<center>[[File:P61-3_0_1_1-61-(34)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(34)-04292020.png]]</center>
<center>P61-3_0_1_1-61-(34)-05012018.png</center>
+
<!--<center>P70-3_0_1_1-70-(34)-04292020.png</center>-->
  
:b) In case you change your mind about the last '''editing''' action you took, you can '''UNDO''' the last '''editing''' action by clicking the '''UNDO''' button above the OnePager tool bar.  Successive clicking the '''UNDO''' button undoes '''editing''' actions in the reverse order that they were applied.
+
At this point, as an example, click the '''Left''' option in the dropdown and the selected '''name label''' is moved to the left side of the task bar or milestone symbol as shown here:
  
<center>[[File:P61-3_0_1_1-61-(35)-05012018.png]]</center>
+
<center>[[File:P70-3_0_1_1-70-(34A)-07082019.png]]</center>
<center>P61-3_0_1_1-61-(35)-05012018.png</center>
+
<!--<center>P70-3_0_1_1-70-(34A)-07082019.png</center>-->
  
3) Save the '''edited''' project view by pressing the '''Save''' button above the tool bar next to the '''UNDO''' button.  All of the '''font size''' changes, '''text-position''' '''edits''', and the new '''Legend''' position are now saved in case you need to update this project view with new data at a later time.
+
In case you change your mind about the '''last editing action''' you took, you can '''UNDO''' the '''last editing action''' by clicking the '''UNDO''' button above the OnePager tool bar.  Successive clicking the '''UNDO''' button undoes '''editing''' actions in the reverse order that they were applied.
  
===Copying the Project View to PowerPoint===
+
<center>[[File:P70-3_0_1_1-70-(35)-04292020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(35)-04292929.png</center>-->
  
4) Finally, copy the current project view snapshot to the clipboard by pressing the '''Copy''' button on the '''Home''' tab of the ribbon.  Then paste the graph into a PowerPoint slide, as shown below:
+
'''Save''' the '''edited''' chart by pressing the '''Save''' button above the ribbon tool bar tab next to the '''UNDO''' button. All of the '''font size''' changes, '''label-position''' '''edits''', and the new '''Legend''' position are now '''saved''' in case you need to '''update''' this chart with new data at a later time.
  
<center>[[File:P61-3_0_1_1-61-(37)-05012018.png]]</center>
+
===Editing Other Chart Contents===
<center>P61-3_0_1_1-61-(37)-05012018.png</center>
+
  
5) That’s it! You’ve now created a professional 1-page schedule summary from a complex Microsoft Project schedule and have copied it into a Microsoft PowerPoint presentation.  
+
The examples above are just samples of '''Chart Editor''' capabilities provided for '''editing''' within the chart. Making other '''edits''' to task bars/milestone symbols and '''text labels''' are covered in more detail at:  [[Manual Editing Task/Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
  
:a) You can also print the graph by selecting the '''Print''' button on the '''File''' tab.  
+
Additionally, you can add task bar/milestone symbol information related to each task bar/milestone symbol such as '''baseline data''', '''percent complete''' information, and '''critical path information'''. You can add '''comment boxes''' to task bars, '''free floating comment boxes in the chart''', vertical '''curtains''', '''task links''' to show dependencies, '''multiple swimlane levels''' and '''background images'''. And you can change the chart's '''Start/End Dates''', add or hide the '''Legend''', and add '''time axes''' at the top, bottom, and within the '''graph'''. Further, you are able to '''edit''' task bar/milestone symbol '''shapes''', you have at your disposal controls for '''editing''' '''rows/swimlanes''', '''headers and footers''' in the chart, '''background colors''', and other text information shown in the '''graph'''.
  
:b) OnePager has other features that let you move tasks vertically to different '''rows and swimlanes''', change the number of swimlanes, add swimlane titles, show dependencies among tasks, change task colors, hide tasks, add floating comment boxes, and standardize on graph styles across organizations.
+
These capabilities and the articles that provide the detailed information on how to use them can be found at:  [[OnePager Version 7.0#Ways to Make Changes to Your Chart | Ways to Make Changes to Your Chart]] <!--0.04-70-->
  
:c) To learn more about these features, read about the specific workflows in this Wiki at [[Basic Workflows for Version 7.0 (Portal) | Basic Workflows (Portal)]] 7.0.1-70 and [[Manual Editing for Version 7.0 (Portal) | Manual versus Data-Driven Editing (Portal)]]. 9.0.1-70
+
==Enhanced Capabilities Provided in OnePager Pro Version 7.0==
 +
 
 +
===Multiple Swimlane Levels===
 +
 
 +
Previous versions of OnePager Pro and Express supported one level of '''swimlanes''' which allowed you to group '''rows''' together based on a particular '''source plan''' data field and its values. OnePager Pro and Express version 7.0 now supports '''three  swimlane levels''' which can be '''nested''' inside one another to better display a hierarchy relationship for a Program, it’s Projects, and their Phases as shown here:
 +
 
 +
<center>[[File:P70-0_4-70-(20)-03102020.png]]</center>
 +
<!--<center>P70-0_4-70-(20)-03102020.png</center>-->
 +
 
 +
In the illustration above, the '''first swimlane level''' is “Program” and under it as the '''second swimlane level''' are its “Projects”.  The '''third swimlane level''' under each “Project” are “Phases” and the '''rows''' within each '''Phase''' show the '''task bars''' at their appropriate '''start/end dates'''. Definition and '''editing''' of these '''multiple swimlane levels''' is accomplished in the '''Template Properties''' and '''Chart Properties '''form’s '''Rows/Swimlanes '''tab that is modified to provide all the controls necessary to manage these '''multiple swimlane levels''' in the chart.  The '''Rows/Swimlanes '''tab  of the '''Chart Properties '''form is shown below:
 +
 
 +
<center>[[File:P70-0_4-70-(21-1)-08282020.png]]</center>
 +
<!--<center>P70-0_4-70-(21-1)-08282020.png</center>-->
 +
 
 +
In addition to adding '''multiple swimlane levels''', the tab shown above is simplified by reorganizing the controls associated with '''Rows''' and '''Text Columns'''. '''Sorting''' controls for '''rows''' and '''swimlanes''' are in separate sub-control groups as shown above. There is a '''Row Borders Formatting… '''button in the '''Rows '''control group with the controls for defining and '''global editing''' of '''row borders''' and access buttons for '''Swimlane Formatting… '''and '''Text Column Formatting…''' The controls shown above for the '''Chart Properties '''form are also found in the distributed '''Template Properties '''form’s '''Rows/Swimlanes''' tab. More detailed introductory information on the new '''Multiple Swimlane Levels''' feature can be found at these links:
 +
 
 +
<center>
 +
{| class="wikitable"
 +
| [[Using Rows and Swimlanes for OnePager Version 7.0 | Using Rows and Swimlanes]] <!--4.0.1.5-70-->
 +
|-
 +
| [[Creating and Editing Rows and Swimlanes for Version 7.0 (Portal) | Creating and Editing Rows and Swimlanes (Portal)]] <!--12.0.1-70-->
 +
|}
 +
</center>
  
 
===Displaying Data-Driven Task Links===
 
===Displaying Data-Driven Task Links===
  
6) OnePager Pro 7.0 is enhanced to assist you with displaying Microsoft Project '''dependency''' fields in your project view. Typically, this feature is turned '''OFF''' in all '''Templates''' distributed with OnePager. However, the feature can be turned '''ON''' either before or after the creation of a project view.
+
OnePager Pro 7.0 is enhanced to assist you with displaying Microsoft Project '''Predecessor''' fields in your chart. Typically, this feature is turned '''OFF''' in all '''Template Properties''' forms distributed with OnePager. However, the feature can be turned '''ON''' either before or after the creation of a chart. To turn the '''Data-Driven Task Link''' feature '''ON''' prior to creating a chart, go to the '''Template Properties''' form you plan to uses and click on the '''Task Links''' tab and then click the '''Import predecessors''' checkbox in the '''Data-Driven Task Links''' control group as shown below:
  
:a) To turn the '''Data-Driven Task Link''' feature '''ON''' prior to creating a project view, go to the '''Template''' form you plan to uses and click on the '''Task Links''' tab and then click the '''Import predecessors''' checkbox in the '''Data-Driven Task Links''' control group as shown below:
+
<center>[[File:P70-3_0_1_1-70-(38-1)-09252020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(38-1)-09252020.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(38)-04302018.png]]</center>
+
With the '''Import predecessors''' checkbox checked '''ON''' in the '''Template Properties''' form, the chart first created looks like this:
<center>P61-3_0_1_1-61-(38)-04302018.png</center>
+
  
:b) With the '''Import predecessors''' checkbox checked in the '''Template''' form, the project view first created looks like this:
+
<center>[[File:P70-3_0_1_1-70-(39)-07082019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(39)-07082019.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(39)-04302018.png]]</center>
+
To turn the '''Data-Driven Task Link''' feature '''ON''' after the chart is created, go to the '''Chart Properties''' form's '''Task Links''' tab and then click the '''Import predecessors''' checkbox '''ON''' in the '''Data-Driven Task Links''' control group as shown below:
<center>P61-3_0_1_1-61-(39)-04302018.png</center>
+
  
:c) To turn the '''Data-Driven Task Link''' feature '''ON''' after the project view is created, go to the '''Project-View Properties''' form's '''Task Links''' tab and then click the '''Import predecessors''' checkbox in the '''Data-Driven Task Links''' control group as shown below:
+
<center>[[File:P70-3_0_1_1-70-(40-1)-09252020.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(40-1)-09252020.png</center>-->
  
<center>[[File:P61-3_0_1_1-61-(40)-04302018.png]]</center>
+
Once imported, '''Data-Driven Task Links''' can be '''shown''' or '''hidden''' and can be '''edited''' globally using the '''Template Properties or Chart Properties''' forms as shown above or individually using a '''task link''' right-click '''context menu'''. OnePager Pro 7.0 continues to support manual '''Task Links''' which in previous OnePager Pro versions were called '''Event Links'''. The OnePager version 7.0 '''Data-Driven Task Links''' feature is flexible and powerful.
<center>P61-3_0_1_1-61-(40)-04302018.png</center>
+
  
:d) Once imported, '''Data-Driven Task Links''' can be '''shown''' or '''hidden''' and can be '''edited''' globally using the '''Template/Project-View Properties''' forms as shown above or individually using a selection right-click '''context menu'''.
+
More details are provided in the series of articles at: [[Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 7.0 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]] <!--19.0.1-70-->
  
:e) OnePager Pro 7.0 continues to support manual '''Task Links''' which in previous OnePager Pro versions were called '''Event Links'''.
+
===Editing the Time Axis===
  
7) The OnePager version 7.0 '''Data-Driven Task Links''' feature is flexible and powerful. More details are provided in the series of articles at:  [[Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 7.0 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]]. 19.0.1-70
+
OnePager Pro is also enhanced with new capabilities and feature so you can '''edit''' the '''time axis''' and configure it to focus on specific time periods of interest in your project schedule presentation. As an example of the enhancements made to the '''time axis''' is the addition of the '''time axis cell stretch''' feature where you can lengthen the horizontal extend of any '''time axis cell''' so as to provide more space to focus on details within that time period. An example of a stretched '''lower level time axis cell''' is shown below:
 +
 
 +
<center>[[File:P70-3_0_1_1-70-(41)-07082019.png]]</center>
 +
<!--<center>P70-3_0_1_1-70-(41)-07082019.png</center>-->
 +
 
 +
For additional detailed information on the '''editing''' of '''time axis cells''' and other related capabilities please see this article at:  [[Modifying the Time Axis for Version 7.0 (Portal) | Modifying the Time Axis (Portal)]] <!--22.0.1-70-->
  
 
==Related Links==
 
==Related Links==
  
[[What's New with OnePager Release 7.0?]] 0.4-70
+
[[What's New with OnePager Release 7.0?]] <!--0.4-70 -->
 +
 
 +
[[Getting Started with OnePager Pro Version 7.0 Add-in | Getting Started with OnePager Pro Add-in]] <!--3.0.1.1-70-->
 +
 
 +
[[Conditional Import for Version 7.0 (Portal) | Conditional Import Filters (Portal)]] <!--7.18.1-70-->
 +
 
 +
[[Basic Workflows for Version 7.0 (Portal) | Basic Workflows (Portal)]] <!--7.0.1-70-->
 +
 
 +
[[Manual Editing Task/Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
 +
 
 +
[[Using Rows and Swimlanes for OnePager Version 7.0 | Using Rows and Swimlanes]] <!--4.0.1.5-70-->
  
[[Getting Started with OnePager Pro Version 7.0 Add-in | Getting Started with OnePager Pro Add-in]] 3.1.1-70
+
[[Creating and Editing Rows and Swimlanes for Version 7.0 (Portal) | Creating and Editing Rows and Swimlanes (Portal)]] <!--12.0.1-70-->
  
[[Conditional Import for Version 7.0 (Portal) | Conditional Import Filters (Portal)]] 7.18.1-70
+
[[Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 7.0 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]] <!--19.0.1-70-->
  
[[Basic Workflows for Version 7.0 (Portal) | Basic Workflows (Portal)]] 7.0.1-70
+
[[Modifying the Time Axis for Version 7.0 (Portal) | Modifying the Time Axis (Portal)]] <!--22.0.1-70-->
  
[[Manual Editing for Version 7.0 (Portal) | Manual versus Data-Driven Editing (Portal)]] 9.0.1-70
+
[[Managing Chart Data for Version 7.0 | Managing Chart Data (Portal)]] <!--23.0.1-70-->
  
[[Linking Task and Milestones Using Manual and Data-Driven Task Links for Version 7.0 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]] 19.0.1-70
+
[[Managing Templates for Version 7.0 (Portal) | Managing Templates (Portal)]] <!--24.0.1-70-->
  
 
(3.0.1.2-70)
 
(3.0.1.2-70)
Line 377: Line 435:
 
[[Category:OnePager Choices Form]]
 
[[Category:OnePager Choices Form]]
 
[[Category:Snapshots]]
 
[[Category:Snapshots]]
[[Category:Project Views]]
+
[[Category:Charts]]
 
[[Category:Templates]]
 
[[Category:Templates]]
[[Category:Editing a Project View]]
+
[[Category:Editing the Chart]]
 
[[Category:Sharing Output]]
 
[[Category:Sharing Output]]
 
[[Category:Task Links]]
 
[[Category:Task Links]]
 +
[[Category:Time Axis]]
 +
[[Category:Multiple Swimlane Levels]]
 
[[Category:OnePager - Tool Bar]]
 
[[Category:OnePager - Tool Bar]]
 
[[Category:Help]]
 
[[Category:Help]]
 
[[Category:OnePager Pro]]
 
[[Category:OnePager Pro]]

Latest revision as of 15:32, 25 January 2021

Overview

As with previous version of OnePager Pro, version 7.0 of OPP you can launch OPP from a Desktop Icon as well as from within Microsoft Project (Add-in). Please note that after selecting the Desktop Icon launch option that you are not able to launch the OnePager Add-in application.

Only one of these applications (Add-in or Desktop) can be active at a time. If you attempt to launch both, a warning message appears as shown below.

P70-3 0 1-70-(1)-07052019.png

If you need further information please consult this link: OnePager Doesn't Launch when the Desktop Icon is Clicked.

This article provides the basic information needed to Getting Started and use OnePager Pro (OPP) after you launch OPP from Microsoft Project.

The article providing Getting Started guidance when launching OPP from Microsoft Project is at: Getting Started with OnePager Pro Add-in

Launching OnePager Pro for the First Time

OPP version 7.0 can be installed so that it can be launched either from Microsoft Project’s Add-in tab on its ribbon tool bar tab or from a Desktop Icon or both. Additionally, you can also locate and double-click a .TAM to launch the desktop OPP version 7.0. The Desktop Icon for launching OPP version 7.0 looks like this:

P70-3 0 1 2-70-(2)-07092019.png

Before you launch OPP, it is a good idea to unhide the Microsoft Project Flag field that tells OnePager which Microsoft Project Flag field you intend to use to control the import of source plan data. Note that when you unhide a field in Microsoft Project, that field can now appear in some of Microsoft Project’s standard reports. Do not forget to hide the field again before generating such reports if you do not want the field to appear in those reports. The selected Microsoft Project Flag field allows you to control which tasks get graphed and are saved in Microsoft Project for future use. For example, the Flag field (e.g., Flag20) is shown below:

P61-3 0 1-61-(2)-10232017.png

To control which tasks are imported, specify the Microsoft Project Flag field (e.g. Flag1, Flag2 … Flag20) that you wish to use. Number fields can also be used the same as the Flag fields where a 1 in a Number field indicates Yes and a 0 in a Number field indicates No. Unhide that field in Microsoft Project by right-clicking in the field header area and selecting Insert Column:

P61-3 0 1-61-(3)-10232017.png

Now put a Yes in this Flag field for any task that you want to graph:

P61-3 0 1-61-(4)-10232017.png

When making your first chart, we strongly recommend that you select 50 or fewer tasks with Yes. Please note that OPP is shipped with a number of fully populated Templates Properties forms that are based on the Microsoft Project source plan used in the tutorial also shipped with the product – BlueGrass Project Plan. Note that three field heading types must always be present: Name, Start, and Finish. Caution. Starting in Microsoft Project 2010, there is a Manual Scheduling mode that allows you to leave dates blank in your schedule. However, behind the scenes, these dates are still being automatically assigned to the project Start Date, or to Today's Date if the project Start Date is not defined. Even though the dates appear to be undefined, they are defined behind the scenes, and are being passed to OPP. Because Today's Date often equals your Snapshot date, it is not surprising to see all of these dateless tasks appearing near the time cursor. Solutions. There are two solutions available:

1) Define the dates for your tasks and milestones in Microsoft Project. This overwrites any default dates that Microsoft Project is assigning, and makes your project schedule more consistent with your OPP timeline. As a rule of thumb, we recommend defining dates for all tasks and milestones, especially when it comes to creating a OPP chart.
2) Remove the dateless tasks from your OPP graph. You can leave them in your Microsoft Project source plan, but by removing them from the OPP graph, you won't have to explain why certain task bars and milestone symbols are appearing in weird places when they really should not.

Clicking the OPP Icon on the Desktop displays a splash page and then take you to the Chart Editor.

P70-3 0 1 2-70-(3)-07092019.png
P70-3 0 1 2-70-(4)-07092019.png

The OnePager Pro Start form provides you with three options:

1) NEW Clicking the NEW buttons bring up the OnePager Pro choices (OPC) form.
2) UPDATE Clicking the UPDATE button allows you to BROWSE FILES for an existing chart file or select a recently-opened chart.
3) OPEN Clicking the OPEN button allows you to BROWSE FILES for an existing chart or select a recently-opened chart.

Once selected and opened, the chart is available for editing.

Creating a New Chart

Clicking the NEW button accesses the OnePager choices (OPC) form as shown below:

P70-3 0 1 2-70-(4A)-07092019.png

Options on the New OnePager Choices form

The OPC form gives you more options for selecting source plans. The illustration above shows that OPP is initiated from Microsoft Project with the source plan shown in the Selected File(s) group shown above. The Add/Remove button gives you the capability to add more source plans to the source packet or, for multiple file packets, to remove files. Clicking the Select button displays a dropdown menu with a BROWSE FILES... option as well as a list of recently accessed Microsoft Project source plans as shown here:

P70-3 0 1 2-70-(5)-07092019.png

If you select the BROWSE FILES... option, a Windows Open form appears from which you can select the desired Microsoft Project source plan for OPP to use as shown below:

P70-3 0 1 2-70-(6)-07092019.png

When you select the Microsoft Project source plan and click the Open button on the Windows Open form, OPP loads the Microsoft Project source plan selected and expands the OPC form as shown below:

P70-3 0 1 2-70-(7)-07092019.png

Adding a New Source Plan

You now have additional options to use the expanded OnePager choices form, specifically the Add/Remove button. The Add/Remove button gives you the capability to add more files to the source packet or, for multiple files to remove files if desired. Clicking the Add/Remove button accesses the Data source selection form as shown below:

P70-3 0 1 1-70-(7)-07052019.png

The Data source selection form displays the current source plan that was loaded with Microsoft Project source plan data when you clicked the OPP button on the desktop and selected the first source plans as described above. This form lets you Add more Microsoft Project source plan to create a multi-project chart or Remove a file from a multi-file source packet. These options are detailed below. When you click the Add button, OPP gives you the option to bring up a Windows Open form when you select the BROWSE FILES… option as shown here:

P70-3 0 1 1-70-(8)-07052019.png

Clicking the BROWSE FILES… option displays a Window’s Open form from which you can select a Microsoft Project source plans to add to the source packet. A sample Open form is shown below:

P70-3 0 1 1-70-(9)-07052019.png

When you select a desired Microsoft Project source plan and click the Open button as shown above, OPP adds the file to the source packet and displays it in the Data source selection window as shown below:

P70-3 0 1 1-70-(10)-07052019.png

The selected source plan is added to the source packet as shown above. OPP shows the path name of the source plans in the window if you hover the mouse over the source plan name. If you select a recently used file from the dropdown menu displayed with the Add button is clicked in the Data source selection form, OPP adds that source plan to the source packet.

Removing a Source Plan

The Remove button allows you to remove a source plan from a source packet if that source plan is not needed to create the new chart. To remove a source plan, first select the source plan in the Data source selection form’s window so that it is highlighted in blue then click the Remove button as shown in the sequence below:

P70-3 0 1 1-70-(11)-07052019.png
P70-3 0 1 1-70-(12)-07052019.png

Other Choices to Make

Moving on to the other sections of the OPC form, you are asked to confirm a few things before you build the chart. OPP makes good guesses for each of these choices, but you can change any of them:

P70-3 0 1 1-70-(15)-07052019.png

Starting Template

The current Template Properties form determines which fields get imported from Microsoft Project and how the initial chart looks. OPP ships with many sample Template Properties forms, but you can also customize your own Template Properties forms. To choose which Template Properties form to use in building your chart, click the Change… button in the top group of the OPC form as shown here:

P70-3 0 1 1-70-(15A)-07052019.png

For now, just stick with the default Template Properties form entitled Single Project Gantt View – Detailed, but you can always use a different Template Properties form to get a different type of chart.

Title of the New Chart

This is the title of the chart and also the suggested save name. You can change the source plan name when you save it. We recommend that you enter a title that helps you identify the chart later on as shown here:

P70-3 0 1 1-70-(15B)-07052019.png

For each chart that you create, OnePager remembers colors, titles, legends, font sizes, and all other graph properties so that your work is saved. Later, you can update the chart with a snapshot of how the project looks on a different date. Then you can browse through the snapshots to see how the project is changing over time. OPP also saves the path name associated with the save name (.TAM). Path names are not available in .TAMs produced with versions of OPP prior to version 6.0.

Task Selection

This is how you tell OPP which tasks to import from your Microsoft Project source plan as indicated below:

P70-3 0 1 1-70-(15C)-07052019.png

Either click the Select all tasks radio button to graph everything or choose a Flag field. You can make several charts from a single Microsoft Project source plan, each using a different Flag or Number field. In OPP if no Flags are set to Yes, OPP provides you with a warning message shown below:

P70-3 0 1 1-70-(15D)-07052019.png

Clicking the Select tasks by custom filter button enables the Edit filters... button. Clicking the Edit filters... button takes you to a form that controls the new Conditional Import Filters feature as shown here:

P70-3 0 1 1-70-(15E)-07052019.png

For more information, please see the article titled Conditional Import Filters (Portal)

Snapshot Date

This is the date of the report and lets you keep track of how schedules change over time. The snapshot date is set by default from your Microsoft Project source plan's Project Information tab's Current date. You can change the snapshot date by clicking on the dropdown button at the window shown in the illustration below:

P70-3 0 1 1-70-(15F)-07052019.png

Making a calendar date selection as shown above establishes the snapshot date for the chart and the snapshot being created. Each chart can have many snapshots. Snapshots and their management are important topics. Snapshots are the basis of how OnePager Pro helps you track the progress of your project.

For more information, please see the articles at: Managing Chart Data (Portal)

Show Field Mappings

The Show field mappings checkbox is near the bottom of the form. When this box is checked ON you have a chance to review and change the Microsoft Project field mappings to OPP before you make your first chart. To do this, click the Next> button as shown here:

P70-3 0 1 1-70-(15G)-07052019.png

You now see the following form:

P61-3 0 1 1-61-(16)-04302018.png

Notice in the form above that OPP has relied on the current Template Properties form to make some guesses on what Microsoft Project fields should be used in making the graph. You can easily change any of these field mappings by making selections from the dropdown menus. For example, we show below how to change which Finish Date in Microsoft Project is used to create the chart's Finish Date:

P61-3 0 1 1-61-(17)-04302018.png

Making the Graph

Once you are satisfied with the field mappings, click the Create new chart button to import the desired Microsoft Project data and create a chart. After a second or two you see a screen that looks like this:

P70-3 0 1 1-70-(18-1)-07052019.png

Note that each task bar or milestone symbol was color coded based on the value in the Resource Names field. The Legend contains an optional diagram near the bottom explaining that the bars inside the task bars represent percent complete extracted from Microsoft Project. Percent complete comes from a Microsoft Project field that you specified in the field mappings form. Note that the current Template Properties form is the Template used by OnePager Pro to create the first chart and determines how your data looks in the new chart. The Template Properties form’s Task Bars tab showing where the color control is located is shown below:

P70-3 0 1 1-70-(19-1)-09252020.png

Copying the Chart to Microsoft PowerPoint

OnePager provides access to the Windows clipboard so you can copy the chart and paste it into another application. To copy the current chart snapshot to the clipboard click the Copy button on the Home ribbon tool bar tab of the ribbon as shown below:

P70-3 0 1 1-70-(37A)-07082019.png

Then launch Microsoft PowerPoint and paste the clipboard copy of the chart into a Microsoft PowerPoint slide, as shown below:

P61-3 0 1 1-61-(37)-05012018.png

That’s it! You’ve created a professional 1-page schedule summary from a complex Microsoft Project schedule and have copied it into a Microsoft PowerPoint presentation. You can also print the chart by selecting the Print button on the File tab. OnePager has other features that let you move task bars vertically to different rows and swimlanes, change the number and levels of swimlanes, add swimlane titles, show graphic dependencies among tasks, change task bar colors, hide task bars, edit text items, add floating comment boxes, add comment boxes to task bars, and standardize on chart styles across organizations.

To learn more about these features, read about the specific workflows in this Wiki at Basic Workflows (Portal) and Manual versus Data-Driven Editing (Portal)

Opening a Chart

The right-most button on the OPC form is the OPEN button. Clicking the OPEN button displays a dropdown menu which happens to be the same for the UPDATE buttons. The options in the dropdown are discussed below:

P70-3 0 1 1-70-(19A)-07052019.png

Clicking the BROWSE FILES... option accesses a Windows Open form from which you can select a .TAM that you want to open. Selecting the desired .TAM causes OPP to display the selected chart in the Chart Editor. From this position, you can edit the chart, save it, or share it with others. Clicking any of the RECENT charts items in the dropdown menu above causes OPP to load the associated .TAM into the Chart Editor where you can also edit the chart, save it, or share it with others.

Replacing A Snapshot - Updating a Chart with Changes Made to the Microsoft Project Source Plan's Data

Suppose after examining the chart you created and saved, you realize that it might be best to show more task bars. This, you think, would greatly improve your schedule presentation. Updating the chart at this point is a simple matter. Recall that OPP is active and the Chart Editor is displaying the current chart you want to update. Additionally, the Microsoft Project source plan and the application are active. The original chart looked like this:

P70-3 0 1 1-70-(18-1)-07052019.png

Since Microsoft Project is still an active program and the Microsoft Project source plan you are using is still being displayed, go back to the Microsoft Project application and change the Flag20 field setting from No to Yes for the tasks you want to now display. A section of the Microsoft Project source plan where this is done is shown below:

P61-3 0 1-61-(19A)-10232017.png

Once you’ve made the Flag20 changes lines 8 through 15 in the Microsoft Project the source plan looks like this:

P61-3 0 1-61-(19B)-10232017.png

With the Microsoft Project source plan updated, go back to OPP and navigate to the Data ribbon tool bar tab on the ribbon where you see several buttons. To update your chart to show the additional tasks from your Microsoft Project source plan. click the Replace Snapshot button as shown below:

P70-3 0 1 1-70-(19C)-07052019.png

When you click the Replace Snapshot button, OPP goes back to the Microsoft Project source plan that you just changed, imports all the tasks that changed, and update your chart. At the conclusion of the operation, the updated chart looks like this:

P61-3 0 1 1-61-(19D)-04302018.png

The example above is just one of many uses of the Data ribbon tool bar tab’s Replace Snapshot button when you need to update a chart. And, you can do this as many times as necessary until the chart is the way you need it. In addition to adding and removing rows by changing the Microsoft Project Flag20 field, you can change source plan task Start Dates, Finish Dates, or Percent Complete and display these data changes in the chart. Using the procedure above you can do this very efficiently. You can now save the chart by giving it a save name. When you save the chart in OPP, OnePager saves the .TAM and saves the Microsoft Project source plan name and path information. This is useful when you want to further update the chart or when you want to add a snapshot later on. In the examples below we assume that the chart is saved as BlueGrass Project Report - Pro.

Adding a Snapshot - Adding to the Chart with Changes Made to the Microsoft Project Source Plan's Data

The power of OPP is illustrated when, after a period of progress on the project, it is time to produce another chart. OnePager produces your next snapshot with the same look and feel as the original. Assuming that the Microsoft Project source plan was updated with actual start and finish, percent complete, and other relevant data during the reporting interval, OPP can easily generate a new snapshot. Suppose we have the following chart created on 7/1/2019 and we want to create another graph from the updated Microsoft Project source plan on 8/1/2019.

P61-3 0 1 1-61-(20)-05012018.png

Before creating a new snapshot for 8/1/2019 as planned, we need to update the Microsoft Project source plan say by updating the Percent Complete for the ADONIS Subcontractor Selection task to 75%. When the source plan is updated with this revised information we can proceed. Launch OPP either from Microsoft Project (Add-in) or from the Desktop icon and click the UPDATE button on the OnePager Pro Start form. Doing so accesses the following OnePager choices (OPC) form shown here:

P61-3 0 1 1-61-(20A)-05012018.png

In the OPC form select the NEW snapshot at date: as shown above. You can also select a date for the snapshot so that this snapshot represents the project at the status date point in time. To see which snapshot dates already exist, just position your mouse over the NEW snapshot at date: window to see a list of the existing dates.

P61-3 0 1 1-61-(20B)-05012018.png

You can use the built in calendar dropdown or type in the new snapshot’s month, day, and year in the window provided as shown below:

P61-3 0 1 1-61-(20C)-05012018.png

Un-check the Show field mappings checkbox OFF if you want to use the same field mappings as you used before. The bottom of the screen now looks like this:

P60-3 0 1-60-(26)-01252017.png

Pressing the large New button creates a new snapshot for the chart. The chart opens at the new snapshot. The color, fonts, title, and swimlane assignments are consistent between the two snapshots:

P61-3 0 1 1-61-(20D)-05012018.png

You can go back and forth between the two snapshots by using the snapshot forward/backward buttons on the View tab as shown below:

P70-3 0 1 1-70-(20E)-07052019.png

Editing the Chart

Editing Task Bar Name Label Font Sizes

You can always edit the font sizes and label positions on task bars to optimize readability. To do this, hold down the left mouse button and drag a selection box (lasso) that encloses many task bars and milestone symbols at once:

P61-3 0 1 1-61-(29)-05012018.png

When you release the mouse, the enclosed task bars or milestone symbols are all be selected:

P61-3 0 1 1-61-(30)-05012018.png

Click the Increase Font Size button on the Home ribbon tool bar tab shown below:

P70-3 0 1 1-70-(31)-07082019.png

The chart now looks something like this:

P61-3 0 1 1-61-(32)-05012018.png

Repeating this operation for the remaining task bars or milestone symbols (we could have done Select All and done it all at once!), we obtain a chart with larger fonts on all the task bars and milestone symbols:

P70-3 0 1 1-70-(33)-07082019.png

Editing Task Bar Name Label Positions

Another common editing action is to move the task bar's name label from their current positions to a positions elsewhere around or on the task bar or milestone symbol. To do this, click the name label to select it and then click the Label Position button on the Home ribbon tool bar tab. This action accesses the Label Position dropdown list where you can select one of the label-positioning buttons as shown here:

P70-3 0 1 1-70-(34)-04292020.png

At this point, as an example, click the Left option in the dropdown and the selected name label is moved to the left side of the task bar or milestone symbol as shown here:

P70-3 0 1 1-70-(34A)-07082019.png

In case you change your mind about the last editing action you took, you can UNDO the last editing action by clicking the UNDO button above the OnePager tool bar. Successive clicking the UNDO button undoes editing actions in the reverse order that they were applied.

P70-3 0 1 1-70-(35)-04292020.png

Save the edited chart by pressing the Save button above the ribbon tool bar tab next to the UNDO button. All of the font size changes, label-position edits, and the new Legend position are now saved in case you need to update this chart with new data at a later time.

Editing Other Chart Contents

The examples above are just samples of Chart Editor capabilities provided for editing within the chart. Making other edits to task bars/milestone symbols and text labels are covered in more detail at: Manual Editing Task/Milestone Shapes and Text Labels (Portal)

Additionally, you can add task bar/milestone symbol information related to each task bar/milestone symbol such as baseline data, percent complete information, and critical path information. You can add comment boxes to task bars, free floating comment boxes in the chart, vertical curtains, task links to show dependencies, multiple swimlane levels and background images. And you can change the chart's Start/End Dates, add or hide the Legend, and add time axes at the top, bottom, and within the graph. Further, you are able to edit task bar/milestone symbol shapes, you have at your disposal controls for editing rows/swimlanes, headers and footers in the chart, background colors, and other text information shown in the graph.

These capabilities and the articles that provide the detailed information on how to use them can be found at: Ways to Make Changes to Your Chart

Enhanced Capabilities Provided in OnePager Pro Version 7.0

Multiple Swimlane Levels

Previous versions of OnePager Pro and Express supported one level of swimlanes which allowed you to group rows together based on a particular source plan data field and its values. OnePager Pro and Express version 7.0 now supports three swimlane levels which can be nested inside one another to better display a hierarchy relationship for a Program, it’s Projects, and their Phases as shown here:

P70-0 4-70-(20)-03102020.png

In the illustration above, the first swimlane level is “Program” and under it as the second swimlane level are its “Projects”. The third swimlane level under each “Project” are “Phases” and the rows within each Phase show the task bars at their appropriate start/end dates. Definition and editing of these multiple swimlane levels is accomplished in the Template Properties and Chart Properties form’s Rows/Swimlanes tab that is modified to provide all the controls necessary to manage these multiple swimlane levels in the chart. The Rows/Swimlanes tab of the Chart Properties form is shown below:

P70-0 4-70-(21-1)-08282020.png

In addition to adding multiple swimlane levels, the tab shown above is simplified by reorganizing the controls associated with Rows and Text Columns. Sorting controls for rows and swimlanes are in separate sub-control groups as shown above. There is a Row Borders Formatting… button in the Rows control group with the controls for defining and global editing of row borders and access buttons for Swimlane Formatting… and Text Column Formatting… The controls shown above for the Chart Properties form are also found in the distributed Template Properties form’s Rows/Swimlanes tab. More detailed introductory information on the new Multiple Swimlane Levels feature can be found at these links:

Using Rows and Swimlanes
Creating and Editing Rows and Swimlanes (Portal)

Displaying Data-Driven Task Links

OnePager Pro 7.0 is enhanced to assist you with displaying Microsoft Project Predecessor fields in your chart. Typically, this feature is turned OFF in all Template Properties forms distributed with OnePager. However, the feature can be turned ON either before or after the creation of a chart. To turn the Data-Driven Task Link feature ON prior to creating a chart, go to the Template Properties form you plan to uses and click on the Task Links tab and then click the Import predecessors checkbox in the Data-Driven Task Links control group as shown below:

P70-3 0 1 1-70-(38-1)-09252020.png

With the Import predecessors checkbox checked ON in the Template Properties form, the chart first created looks like this:

P70-3 0 1 1-70-(39)-07082019.png

To turn the Data-Driven Task Link feature ON after the chart is created, go to the Chart Properties form's Task Links tab and then click the Import predecessors checkbox ON in the Data-Driven Task Links control group as shown below:

P70-3 0 1 1-70-(40-1)-09252020.png

Once imported, Data-Driven Task Links can be shown or hidden and can be edited globally using the Template Properties or Chart Properties forms as shown above or individually using a task link right-click context menu. OnePager Pro 7.0 continues to support manual Task Links which in previous OnePager Pro versions were called Event Links. The OnePager version 7.0 Data-Driven Task Links feature is flexible and powerful.

More details are provided in the series of articles at: Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)

Editing the Time Axis

OnePager Pro is also enhanced with new capabilities and feature so you can edit the time axis and configure it to focus on specific time periods of interest in your project schedule presentation. As an example of the enhancements made to the time axis is the addition of the time axis cell stretch feature where you can lengthen the horizontal extend of any time axis cell so as to provide more space to focus on details within that time period. An example of a stretched lower level time axis cell is shown below:

P70-3 0 1 1-70-(41)-07082019.png

For additional detailed information on the editing of time axis cells and other related capabilities please see this article at: Modifying the Time Axis (Portal)

Related Links

What's New with OnePager Release 7.0?

Getting Started with OnePager Pro Add-in

Conditional Import Filters (Portal)

Basic Workflows (Portal)

Manual Editing Task/Milestone Shapes and Text Labels (Portal)

Using Rows and Swimlanes

Creating and Editing Rows and Swimlanes (Portal)

Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)

Modifying the Time Axis (Portal)

Managing Chart Data (Portal)

Managing Templates (Portal)

(3.0.1.2-70)