==Overview==
 +
 +
Illustrations used or referenced in this article are from OnePager Pro using data from Microsoft Project but the features, function, controls, and manual edits apply equally to other OnePager editions that import from data sources like Microsoft Excel, Oracle Primavera P6, Smartsheet, Planisware Enterprise, Project for the Web, Asana, and Wrike.
 +
 
==OnePager's Ribbon Tool Bar View Tab==
 
==OnePager's Ribbon Tool Bar View Tab==
  
 
The OnePager Ribbon Tool Bar '''View '''tab is shown in detail below:
 
The OnePager Ribbon Tool Bar '''View '''tab is shown in detail below:
  
<center>[[File:P72-4_0_2_2-72-(53)-08292022.png]]</center>
 
<center>P72-4_0_2_2-72-(53)-08292022.png</center>
 
 
<center>[[File:P72-4_0_2_2-72-(53-1)-06202023.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(53-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(53-1)-06202023.png</center>
+
<!--<center>P72-4_0_2_2-72-(53-1)-06202023.png</center>-->
  
 
The '''View''' tab is useful for managing the contents of the '''Chart Editor''' with respect to which '''snapshots''' are shown, for '''Zooming in''' and '''out''' on specific sections of the chart, for controlling the '''display of graphic elements''', '''refreshing''' the chart, and altering the chart’s '''extent''' by changing its '''Start/Finish dates'''.  The five (5) sub-sections of the '''View '''tab are discussed below:
 
The '''View''' tab is useful for managing the contents of the '''Chart Editor''' with respect to which '''snapshots''' are shown, for '''Zooming in''' and '''out''' on specific sections of the chart, for controlling the '''display of graphic elements''', '''refreshing''' the chart, and altering the chart’s '''extent''' by changing its '''Start/Finish dates'''.  The five (5) sub-sections of the '''View '''tab are discussed below:
Line 18: Line 20:
 
The '''left and right pointing arrows''',  shown below, are '''enabled''' only when, from the current '''Chart Editor snapshot''' being displayed, there is a '''Previous snapshot''' or a '''Next snapshot''' from the perspective of the '''current snapshot''' being displayed in the '''Chart Editor'''.  Clicking the '''Previous or left point arrow''' when it is '''enabled''' causes the Chart Editor to display the '''previous snapshot''' in the sequence of '''snapshot dates'''.  Clicking the '''Next or right pointing arrow''' when it is '''enabled''' takes you to the '''next or further dated snapshot''' available in the chart.
 
The '''left and right pointing arrows''',  shown below, are '''enabled''' only when, from the current '''Chart Editor snapshot''' being displayed, there is a '''Previous snapshot''' or a '''Next snapshot''' from the perspective of the '''current snapshot''' being displayed in the '''Chart Editor'''.  Clicking the '''Previous or left point arrow''' when it is '''enabled''' causes the Chart Editor to display the '''previous snapshot''' in the sequence of '''snapshot dates'''.  Clicking the '''Next or right pointing arrow''' when it is '''enabled''' takes you to the '''next or further dated snapshot''' available in the chart.
  
<center>[[File:P72-4_0_2_2-72-(53A)-09072022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(53A-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(53A)-09072022.png</center>
+
<!--<center>P72-4_0_2_2-72-(53A-1)-06202023.png</center>-->
  
 
====List All Button====
 
====List All Button====
Line 26: Line 28:
  
 
<center>[[File:P72-4_0_2_2-72-(54)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(54)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(54)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(54)-08292022.png</center>-->
  
 
===View Tab – Layout Sub-Section===
 
===View Tab – Layout Sub-Section===
Line 32: Line 34:
 
There are four (4) controls in the '''Layout''' sub-section, shown below, used for controlling the “'''look'''” in the '''Chart Editor''' with respect to '''magnification''' and '''orientation''' on your screen.  These four (4) controls are discussed in detail below:
 
There are four (4) controls in the '''Layout''' sub-section, shown below, used for controlling the “'''look'''” in the '''Chart Editor''' with respect to '''magnification''' and '''orientation''' on your screen.  These four (4) controls are discussed in detail below:
  
<center>[[File:P72-4_0_2_2-72-(54A)-09022022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(54A-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(54A)-09022022.png</center>
+
<!--<center>P72-4_0_2_2-72-(54A-1)-06202023.png</center>-->
  
 
====Zoom In/Zoom Out Buttons====
 
====Zoom In/Zoom Out Buttons====
Line 41: Line 43:
 
Suppose the chart’s '''Zoom factor''' is set to 100% as shown here:
 
Suppose the chart’s '''Zoom factor''' is set to 100% as shown here:
  
<center>[[File:P72-4_0_2_2-72-(55)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(55-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(55)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(55-1)-06202023.png</center>-->
  
 
In the illustration above, the '''Zoom to:''' window show '''100%'''.  If the '''Zoom In '''button is clicked once, the '''Zoom factor''' changes to '''110%''' and, as shown in the illustration below, the '''swimlanes''' and '''task bars''' appear larger and less of the chart appears on your screen.  
 
In the illustration above, the '''Zoom to:''' window show '''100%'''.  If the '''Zoom In '''button is clicked once, the '''Zoom factor''' changes to '''110%''' and, as shown in the illustration below, the '''swimlanes''' and '''task bars''' appear larger and less of the chart appears on your screen.  
  
<center>[[File:P72-4_0_2_2-72-(56)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(56-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(56)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(56-1)-06202023.png</center>-->
  
 
Additional clicks on the '''Zoom In '''button''' increases''' the '''Zoom factor''' and ultimately OnePager provides '''horizontal '''and '''vertical scroll bars '''for navigation in the '''Chart Editor'''.
 
Additional clicks on the '''Zoom In '''button''' increases''' the '''Zoom factor''' and ultimately OnePager provides '''horizontal '''and '''vertical scroll bars '''for navigation in the '''Chart Editor'''.
Line 60: Line 62:
  
 
<center>[[File:P72-4_0_2_2-72-(57)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(57)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(57)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(57)-08292022.png</center>-->
  
 
Clicking the '''Zoom to:''' dropdown accesses the dropdown list shown above.  '''Select''' the desired '''Zoom factor''' with a left click and the '''selected value''' is entered into the '''Zoom to: ''' window.
 
Clicking the '''Zoom to:''' dropdown accesses the dropdown list shown above.  '''Select''' the desired '''Zoom factor''' with a left click and the '''selected value''' is entered into the '''Zoom to: ''' window.
Line 71: Line 73:
  
 
<center>[[File:P72-4_0_2_2-72-(58)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(58)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(58)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(58)-08292022.png</center>-->
  
 
The '''Vertical Fit''' option assures that the single page in the '''Chart Editor''' shows all the '''rows''' and '''swimlanes vertically''' even if the screen is not filled to the right as shown below:
 
The '''Vertical Fit''' option assures that the single page in the '''Chart Editor''' shows all the '''rows''' and '''swimlanes vertically''' even if the screen is not filled to the right as shown below:
  
<center>[[File:P72-4_0_2_2-72-(59-1)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(59-2)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(59-1)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(59-2)-06202023.png</center>-->
  
 
The '''Vertical Fit: '''option shows the entire chart vertically in the Chart Editor’s viewing area.  If the extent is large in terms of the charts '''Start/Finish dates'''. A '''horizontal scroll bar''' is provided on the bottom of the chart.
 
The '''Vertical Fit: '''option shows the entire chart vertically in the Chart Editor’s viewing area.  If the extent is large in terms of the charts '''Start/Finish dates'''. A '''horizontal scroll bar''' is provided on the bottom of the chart.
Line 82: Line 84:
 
Selecting the '''Horizontal Fit''' option produces the screen view of the '''Chart Editor''' shown below:
 
Selecting the '''Horizontal Fit''' option produces the screen view of the '''Chart Editor''' shown below:
  
<center>[[File:P72-4_0_2_2-72-(60)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(60-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(60)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(60-1)-06202023.png</center>-->
  
 
In this '''Fit:''' option the chart fills the width of the '''Chart Editor’s viewing area''' but the vertical portion is cut off and available using the '''scroll bar''' on the right.
 
In this '''Fit:''' option the chart fills the width of the '''Chart Editor’s viewing area''' but the vertical portion is cut off and available using the '''scroll bar''' on the right.
Line 92: Line 94:
  
 
<center>[[File:P72-4_0_2_2-72-(61)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(61)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(61)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(61)-08292022.png</center>-->
  
 
====Time Cursor Checkbox====
 
====Time Cursor Checkbox====
Line 98: Line 100:
 
When the '''Time Cursor''' checkbox is checked '''ON''', the '''time cursor''' is shown in the '''graph''' if the '''snapshot date''' is within the '''Start/Finish date extent''' of the chart as shown below:
 
When the '''Time Cursor''' checkbox is checked '''ON''', the '''time cursor''' is shown in the '''graph''' if the '''snapshot date''' is within the '''Start/Finish date extent''' of the chart as shown below:
  
<center>[[File:P72-4_0_2_2-72-(62)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(62-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(62)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(62-1)-06202023.png</center>-->
  
 
====Hover Boxes Checkbox====
 
====Hover Boxes Checkbox====
Line 106: Line 108:
  
 
<center>[[File:P72-4_0_2_2-72-(63)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(63)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(63)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(63)-08292022.png</center>-->
  
 
The '''Hover Box''' as shown above provides the task bar/milestone symbol’s '''start/finish dates''', '''task name''', and '''Unique ID'''.
 
The '''Hover Box''' as shown above provides the task bar/milestone symbol’s '''start/finish dates''', '''task name''', and '''Unique ID'''.
Line 115: Line 117:
  
 
<center>[[File:P72-4_0_2_2-72-(64)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(64)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(64)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(64)-08292022.png</center>-->
  
 
As another example, if the '''Hover Boxes '''checkbox is also turned '''ON''', the task '''Start/Finish dates''' in the '''Hover Box''' are also augmented with '''time of day values''' from the '''source plan''' as shown here:
 
As another example, if the '''Hover Boxes '''checkbox is also turned '''ON''', the task '''Start/Finish dates''' in the '''Hover Box''' are also augmented with '''time of day values''' from the '''source plan''' as shown here:
  
 
<center>[[File:P72-4_0_2_2-72-(65)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(65)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(65)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(65)-08292022.png</center>-->
  
 
====Legend Checkbox====
 
====Legend Checkbox====
Line 126: Line 128:
 
Turning '''ON''' the '''Legend''' checkbox immediately causes the display of the '''Legend '''in the chart at the location determined by the '''Template Properties''' or '''Chart Properties''' form’s '''Legend''' tab.  An example is shown here:
 
Turning '''ON''' the '''Legend''' checkbox immediately causes the display of the '''Legend '''in the chart at the location determined by the '''Template Properties''' or '''Chart Properties''' form’s '''Legend''' tab.  An example is shown here:
  
<center>[[File:P72-4_0_2_2-72-(66)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(66-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(66)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(66-1)-06202023.png</center>-->
  
 
====Links Checkbox====
 
====Links Checkbox====
Line 133: Line 135:
 
When the '''Links''' checkbox is checked '''ON''' and manual or '''Data-Driven Task Links''' are '''imported''' from the '''source plan''', the '''Chart Editor''' displays the '''task links''' in the '''graph''' as shown here:
 
When the '''Links''' checkbox is checked '''ON''' and manual or '''Data-Driven Task Links''' are '''imported''' from the '''source plan''', the '''Chart Editor''' displays the '''task links''' in the '''graph''' as shown here:
  
<center>[[File:P72-4_0_2_2-72-(67)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(67-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(67)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(67-1)-06202023.png</center>-->
  
 
In order to insert manual '''Task Links''' into the '''graph''' as discussed in the '''Insert '''sub-section above, the '''Links '''checkbox in the '''Graphic elements '''sub-section of the '''View tab''' must be checked '''ON'''.
 
In order to insert manual '''Task Links''' into the '''graph''' as discussed in the '''Insert '''sub-section above, the '''Links '''checkbox in the '''Graphic elements '''sub-section of the '''View tab''' must be checked '''ON'''.
Line 147: Line 149:
  
 
<center>[[File:P72-4_0_2_2-72-(68)-08292022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(68)-08292022.png]]</center>
<center>P72-4_0_2_2-72-(68)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(68)-08292022.png</center>-->
  
 
===View Tab – Dates Sub-Section===
 
===View Tab – Dates Sub-Section===
Line 154: Line 156:
  
 
<center>[[File:P72-4_0_2_2-72-(68A)-09022022.png]]</center>
 
<center>[[File:P72-4_0_2_2-72-(68A)-09022022.png]]</center>
<center>P72-4_0_2_2-72-(68A)-09022022.png</center>
+
<!--<center>P72-4_0_2_2-72-(68A)-09022022.png</center>-->
  
 
The '''Dates''' sub-section is discussed in detail below:
 
The '''Dates''' sub-section is discussed in detail below:
Line 162: Line 164:
 
Clicking on the '''Start date picker''' dropdown accesses the OnePager standard '''Date Picker''' form as shown below:
 
Clicking on the '''Start date picker''' dropdown accesses the OnePager standard '''Date Picker''' form as shown below:
  
<center>[[File:P72-4_0_2_2-72-(69)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(69-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(69)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(69-1)-06202023.png</center>-->
  
 
With the '''Start date picker''' form accessed, you can use the form to set the '''Start date '''that is used to define the '''left side of the graph'''.  This '''Start date''' is separate and apart from the '''start date''' provided by the '''source plan'''.  The chart’s '''start date''' is for the purpose only of establishing the '''visible left''' or '''earliest date''' for the chart.  Based on the '''Start date selected''', the chart may have '''empty space '''to the left of the first task bar/milestone symbol or some task bar/milestone symbols may be '''cut off''' on the '''left side''' of the chart with consideration of the display or '''swimlane''' and/or '''row label cells'''.
 
With the '''Start date picker''' form accessed, you can use the form to set the '''Start date '''that is used to define the '''left side of the graph'''.  This '''Start date''' is separate and apart from the '''start date''' provided by the '''source plan'''.  The chart’s '''start date''' is for the purpose only of establishing the '''visible left''' or '''earliest date''' for the chart.  Based on the '''Start date selected''', the chart may have '''empty space '''to the left of the first task bar/milestone symbol or some task bar/milestone symbols may be '''cut off''' on the '''left side''' of the chart with consideration of the display or '''swimlane''' and/or '''row label cells'''.
Line 171: Line 173:
 
Clicking on the '''Finish date picker''' dropdown accesses the OnePager standard '''Date Picker''' form as shown below:
 
Clicking on the '''Finish date picker''' dropdown accesses the OnePager standard '''Date Picker''' form as shown below:
  
<center>[[File:P72-4_0_2_2-72-(70)-08292022.png]]</center>
+
<center>[[File:P72-4_0_2_2-72-(70-1)-06202023.png]]</center>
<center>P72-4_0_2_2-72-(70)-08292022.png</center>
+
<!--<center>P72-4_0_2_2-72-(70-1)-06202023.png</center>-->
  
 
With the '''Finish date picker''' form accessed, you can use the form to set the '''Finish date '''that is used to define the '''right side of the graph'''.  This '''Finish date''' is separate and apart from the '''finish date''' provided by the '''source plan'''.  The chart’s '''finish date''' is for the purpose only of establishing the '''visible right''' or '''latest date''' for the chart.  Based on the '''Finish date selected''', the chart may have '''empty space '''to the '''right of the latest''' task bar/milestone symbol or some task bar/milestone symbols may be '''cut off''' on the '''right side''' of the chart.
 
With the '''Finish date picker''' form accessed, you can use the form to set the '''Finish date '''that is used to define the '''right side of the graph'''.  This '''Finish date''' is separate and apart from the '''finish date''' provided by the '''source plan'''.  The chart’s '''finish date''' is for the purpose only of establishing the '''visible right''' or '''latest date''' for the chart.  Based on the '''Finish date selected''', the chart may have '''empty space '''to the '''right of the latest''' task bar/milestone symbol or some task bar/milestone symbols may be '''cut off''' on the '''right side''' of the chart.
 +
 +
===View Tab - Present Sub-Section===
 +
 +
The '''Present''' sub-section has one control button, the '''Present''' button as shown below:
 +
 +
<center>[[File:P72-4_0_2_2-72-(110)-06202023.png]]</center>
 +
<!--<center>P72-4_0_2_2-72-(110)-06202023.png</center>-->
 +
 +
Clicking the '''Present''' button places the '''Chart Editor''' into '''Presentation Mode''' and removes the OnePager tool bar from the screen. 
 +
 +
For more information on '''Presentation Mode''', please see the article at:
 +
 +
<center>
 +
{| class="wikitable"
 +
| [[Using Presentation Mode with OnePager for Version 7.2 | Using Presentation Mode with OnePager]] <!--23.6.1-72-->
 +
|}
 +
</center>
 +
 +
==Related Links==
 +
 +
{| class="wikitable"
 +
| [[Understanding Charts and Snapshots for OnePager for Version 7.2 | Understanding Charts and Snapshots for OnePager ]] <!--4.0.1.1-72-->
 +
| [[OnePager's Ribbon Tool Bar Home Tab for Version 7.2 | Ribbon Tool Bar - Home Tab]] <!--4.0.2.2.1-72-->
 +
|-
 +
| [[OnePager's Ribbon Tool Bar Insert Tab for Version 7.2 | Ribbon Tool Bar - Insert Tab]] <!--4.0.2.2.3-72-->
 +
| [[OnePager's Ribbon Tool Bar Page Layout Tab for Version 7.2 | Ribbon Tool Bar - Page Layout Tab]] <!--4.0.2.2.5-72-->
 +
|-
 +
| [[OnePager's Ribbon Tool Bar Data Tab for Version 7.2 | Ribbon Tool Bar - Data Tab]] <!--4.0.2.2.7-72-->
 +
| [[OnePager's Ribbon Tool Bar File Page for Version 7.2 | Ribbon Tool Bar - File Page]] <!--4.0.2.2.11-72-->
 +
|-
 +
| [[OnePager's Ribbon Tool Bar Supporting Controls for Version 7.2 | Ribbon Tool Bar - Supporting Controls]] <!--4.0.2.2.13-72-->
 +
| [[Creating Multi-Page Charts with Version 7.2 (Portal) | Creating Multi-Page Charts (Portal)]] <!--8.6.1-72-->
 +
|-
 +
| [[Advanced Tab for OnePager for Version 7.2 | Advanced Tab]] <!--21.13.1-72-->
 +
| [[Changing the Chart’s Start/Finish Dates for OnePager for Version 7.2 | Changing the Chart’s Start/Finish Dates]] <!--22.3.1-72-->
 +
|-
 +
| [[Using Presentation Mode with OnePager for Version 7.2 | Using Presentation Mode with OnePager]] <!--23.6.1-72-->
 +
| [[Troubleshooting for Version 7.2 (Redraw, Re-Starting, Feedback, Log Reporting) | Troubleshooting (Redraw, Re-Starting, AutoSave, Feedback, Log Reporting)]] <!--26.0.1-72-->
 +
|}
  
 
(4.0.2.2.9-72)
 
(4.0.2.2.9-72)

Latest revision as of 18:23, 10 January 2024

Overview

Illustrations used or referenced in this article are from OnePager Pro using data from Microsoft Project but the features, function, controls, and manual edits apply equally to other OnePager editions that import from data sources like Microsoft Excel, Oracle Primavera P6, Smartsheet, Planisware Enterprise, Project for the Web, Asana, and Wrike.

OnePager's Ribbon Tool Bar View Tab

The OnePager Ribbon Tool Bar View tab is shown in detail below:

P72-4 0 2 2-72-(53-1)-06202023.png

The View tab is useful for managing the contents of the Chart Editor with respect to which snapshots are shown, for Zooming in and out on specific sections of the chart, for controlling the display of graphic elements, refreshing the chart, and altering the chart’s extent by changing its Start/Finish dates. The five (5) sub-sections of the View tab are discussed below:

View Tab – Snapshots Sub-Section

The three (3) controls in the Snapshots sub-section are enabled only when the chart contains two ( 2) or more snapshots.

Previous/Next Buttons

The left and right pointing arrows, shown below, are enabled only when, from the current Chart Editor snapshot being displayed, there is a Previous snapshot or a Next snapshot from the perspective of the current snapshot being displayed in the Chart Editor. Clicking the Previous or left point arrow when it is enabled causes the Chart Editor to display the previous snapshot in the sequence of snapshot dates. Clicking the Next or right pointing arrow when it is enabled takes you to the next or further dated snapshot available in the chart.

P72-4 0 2 2-72-(53A-1)-06202023.png

List All Button

When you click the List All button, OnePager accesses the Select snapshot form which lists all the snapshots by date in the chart. Selecting a snapshot date in the grid displays that selected snapshot in the Chart Editor when you click the OK button on the Select snapshot form as shown below:

P72-4 0 2 2-72-(54)-08292022.png

View Tab – Layout Sub-Section

There are four (4) controls in the Layout sub-section, shown below, used for controlling the “look” in the Chart Editor with respect to magnification and orientation on your screen. These four (4) controls are discussed in detail below:

P72-4 0 2 2-72-(54A-1)-06202023.png

Zoom In/Zoom Out Buttons

The Zoom In/Zoom Out buttons change the magnification (Zoom factor) within the graph and allow you to focus in or away from portions of the chart as demonstrated below:

Suppose the chart’s Zoom factor is set to 100% as shown here:

P72-4 0 2 2-72-(55-1)-06202023.png

In the illustration above, the Zoom to: window show 100%. If the Zoom In button is clicked once, the Zoom factor changes to 110% and, as shown in the illustration below, the swimlanes and task bars appear larger and less of the chart appears on your screen.

P72-4 0 2 2-72-(56-1)-06202023.png

Additional clicks on the Zoom In button increases the Zoom factor and ultimately OnePager provides horizontal and vertical scroll bars for navigation in the Chart Editor.

Clicking the Zoom Out button reduces the magnification making the graph look smaller in the Chart Editor.

Each time either the Zoom In or Zoom Out button is clicked, the value in the Zoom to: window is changed to reflect the change in Zoom factor.

Zoom To: Dropdown and Window

The Zoom to: window has a dropdown list of most use Zoom factors as shown below:

P72-4 0 2 2-72-(57)-08292022.png

Clicking the Zoom to: dropdown accesses the dropdown list shown above. Select the desired Zoom factor with a left click and the selected value is entered into the Zoom to: window.

You also have the option to set the Zoom factor to by clicking in the Zoom to: window and typing the desired value. After typing in the value, the checkbox to the left of the Zoom to: window is enabled and clicking this checkbox sets the new Zoom factor value into the Chart Editor. The values accepted range from 5% to 500%.

Fit: Dropdown

The Fit: dropdown lets you set the orientation of the graph in the Chart Editor to either Vertical or Horizontal as shown in the dropdown below:

P72-4 0 2 2-72-(58)-08292022.png

The Vertical Fit option assures that the single page in the Chart Editor shows all the rows and swimlanes vertically even if the screen is not filled to the right as shown below:

P72-4 0 2 2-72-(59-2)-06202023.png

The Vertical Fit: option shows the entire chart vertically in the Chart Editor’s viewing area. If the extent is large in terms of the charts Start/Finish dates. A horizontal scroll bar is provided on the bottom of the chart.

Selecting the Horizontal Fit option produces the screen view of the Chart Editor shown below:

P72-4 0 2 2-72-(60-1)-06202023.png

In this Fit: option the chart fills the width of the Chart Editor’s viewing area but the vertical portion is cut off and available using the scroll bar on the right.

View Tab – Graphic Elements Sub-Section

There are five (5) checkbox controls in the Graphic Elements sub-section used for controlling which graphic elements such as the time cursor, Hover Boxes, Timestamps, The Legend, or Task Links are shown in the chart. These five (5) checkbox controls are discussed in detail below:

P72-4 0 2 2-72-(61)-08292022.png

Time Cursor Checkbox

When the Time Cursor checkbox is checked ON, the time cursor is shown in the graph if the snapshot date is within the Start/Finish date extent of the chart as shown below:

P72-4 0 2 2-72-(62-1)-06202023.png

Hover Boxes Checkbox

Checking the Hover Boxes checkbox ON turns on the Hover Box feature allowing you to use the Hover Box to examine task bars and milestone symbols and obtain additional information as shown below:

P72-4 0 2 2-72-(63)-08292022.png

The Hover Box as shown above provides the task bar/milestone symbol’s start/finish dates, task name, and Unique ID.

Timestamps Checkbox

When the Timestamps checkbox is turned ON, some dates in the chart are augmented with the time of day data taken from the source plan, if provided. For example, with the Timestamps checkbox checked ON, dates in the Select snapshot form are augmented with time of day information as shown below:

P72-4 0 2 2-72-(64)-08292022.png

As another example, if the Hover Boxes checkbox is also turned ON, the task Start/Finish dates in the Hover Box are also augmented with time of day values from the source plan as shown here:

P72-4 0 2 2-72-(65)-08292022.png

Legend Checkbox

Turning ON the Legend checkbox immediately causes the display of the Legend in the chart at the location determined by the Template Properties or Chart Properties form’s Legend tab. An example is shown here:

P72-4 0 2 2-72-(66-1)-06202023.png

Links Checkbox

When the Links checkbox is checked ON and manual or Data-Driven Task Links are imported from the source plan, the Chart Editor displays the task links in the graph as shown here:

P72-4 0 2 2-72-(67-1)-06202023.png

In order to insert manual Task Links into the graph as discussed in the Insert sub-section above, the Links checkbox in the Graphic elements sub-section of the View tab must be checked ON.

View Tab – Refresh Sub-Section

The Refresh sub-section contains the Redraw button discussed below.

Redraw Button

The Redraw button forces the Chart Editor to redraw all graphics in the chart. This function is useful when occasionally you may find an artifact in the graph or are unsure that the chart is perfectly up-to-date. The Redraw button is shown below:

P72-4 0 2 2-72-(68)-08292022.png

View Tab – Dates Sub-Section

The Dates sub-section contains two (2) Date Picker dropdowns for the chart’s Start date and Finish date, respectively as shown below:

P72-4 0 2 2-72-(68A)-09022022.png

The Dates sub-section is discussed in detail below:

Start Date Picker Dropdown

Clicking on the Start date picker dropdown accesses the OnePager standard Date Picker form as shown below:

P72-4 0 2 2-72-(69-1)-06202023.png

With the Start date picker form accessed, you can use the form to set the Start date that is used to define the left side of the graph. This Start date is separate and apart from the start date provided by the source plan. The chart’s start date is for the purpose only of establishing the visible left or earliest date for the chart. Based on the Start date selected, the chart may have empty space to the left of the first task bar/milestone symbol or some task bar/milestone symbols may be cut off on the left side of the chart with consideration of the display or swimlane and/or row label cells.

Finish Date Picker Dropdown

Clicking on the Finish date picker dropdown accesses the OnePager standard Date Picker form as shown below:

P72-4 0 2 2-72-(70-1)-06202023.png

With the Finish date picker form accessed, you can use the form to set the Finish date that is used to define the right side of the graph. This Finish date is separate and apart from the finish date provided by the source plan. The chart’s finish date is for the purpose only of establishing the visible right or latest date for the chart. Based on the Finish date selected, the chart may have empty space to the right of the latest task bar/milestone symbol or some task bar/milestone symbols may be cut off on the right side of the chart.

View Tab - Present Sub-Section

The Present sub-section has one control button, the Present button as shown below:

P72-4 0 2 2-72-(110)-06202023.png

Clicking the Present button places the Chart Editor into Presentation Mode and removes the OnePager tool bar from the screen.

For more information on Presentation Mode, please see the article at:

Using Presentation Mode with OnePager

Related Links

Understanding Charts and Snapshots for OnePager Ribbon Tool Bar - Home Tab
Ribbon Tool Bar - Insert Tab Ribbon Tool Bar - Page Layout Tab
Ribbon Tool Bar - Data Tab Ribbon Tool Bar - File Page
Ribbon Tool Bar - Supporting Controls Creating Multi-Page Charts (Portal)
Advanced Tab Changing the Chart’s Start/Finish Dates
Using Presentation Mode with OnePager Troubleshooting (Redraw, Re-Starting, AutoSave, Feedback, Log Reporting)

(4.0.2.2.9-72)