Page title matches
- ...want to show as green if the value in '''Text30''' field in your Microsoft Project '''source plan''' contains the text '''Low Risk'''. Further, you want tasks ...s you change the value of the task’s '''Text30''' field in the Microsoft Project '''source plan''' only.4 KB (638 words) - 15:22, 14 July 2017
- 1) From either the '''Task Bars''' or '''Milestones''' tab of the Project-View Properties ('''PVP''') or '''Template Properties''' forms, click the ' ...bove is a dropdown that allows you to select the field from your Microsoft Project '''source plan'''. The second column above ('''Operator''') is a dropdown t4 KB (693 words) - 15:51, 14 July 2017
- The OnePager '''Conditional Formatting''' feature also supports Microsoft Project '''Boolean''' fields (e.g., '''Flag1 through Flag20''', etc.). '''Boolean' 1) As an example, suppose we have the project schedule shown below which consists of three phases and resources consistin3 KB (400 words) - 16:00, 14 July 2017
- ...the '''Save and Use''' button to have OnePager applies these rules to any project view that is made from the '''Template'''. [[Category:Project Views]]4 KB (696 words) - 16:13, 14 July 2017
- ...oject views but will change the '''conditional formatting''' of any future project views made from the '''template'''. [[Category:Project Views]]3 KB (446 words) - 16:21, 14 July 2017
- ...black with a left pointing arrow symbol. First, let’s see the Microsoft Project '''source plan''': 2) When you create the basic project view with '''round-robin color''' assigned from Phase (Text20), it will loo2 KB (310 words) - 16:30, 14 July 2017
- ...nal formatting rules''' using a field that does not exist in the Microsoft Project '''source plan''', OnePager Pro ('''OPP''') will deactivate these specific [[Category:Project Views]]522 B (61 words) - 16:38, 14 July 2017
- Certain fields from Microsoft Project typically change from snapshot to snapshot and will automatically be update ...rows and to identify rows using one of the above fields from the Microsoft Project '''source plan'''.4 KB (633 words) - 17:48, 14 July 2017
- ...d. These controls are found both in the '''Template Properties''' and the Project-View Properties ('''PVP''') forms at their respective '''Advanced''' tabs a ...ere tasks/milestones are not within the '''start-end dates''' range of the project view to be '''cropped''' when you click the '''Crop''' button on the ribbon4 KB (673 words) - 19:26, 14 July 2017
- ...nd '''label areas'''. The controls are in the '''Advanced''' tab of the Project-View Properties ('''PVP''') and of the '''Template Properties''' forms. Th ...apply '''Zebra stripes''' to both rows and swimlanes. The following is a project view where we have multiple projects and have eliminated all background col5 KB (766 words) - 20:24, 14 July 2017
- ==About the New Legend Controls for MS Project== :(1) The first provides more flexibility in presenting the legend in your project views and helps avoid clutter.4 KB (629 words) - 21:27, 14 July 2017
- ...based on''' radio button allows you to select a field from your Microsoft Project '''source plan''' to assign a data driven '''color''' to each task. ...''' can display the '''date imported from any date field''' from Microsoft Project. These properties are controlled essentially the same way as described abo8 KB (1,161 words) - 14:30, 17 July 2017
- ...lor'''. In this option, clicking the dropdown provides a list of Microsoft Project '''source plan''' fields from which to select. ...e for task related '''deadlines''', also allows control over the Microsoft Project '''source plan''' field that controls the symbol '''color''' and the symbol9 KB (1,217 words) - 15:01, 17 July 2017
- ...' elements on the project view and also controls the '''title''' size (the project view's '''title''' is controlled on the '''Main''' tab page): ===Project View Titles===4 KB (570 words) - 15:44, 17 July 2017
- This tab controls various '''other properties''' of the project view and looks like this: .../milestone name''', and the '''Unique-ID''' of the task from the Microsoft Project '''source plan'''. An example is shown below.19 KB (2,818 words) - 21:12, 17 July 2017
- =About the Project-View Properties form Field Mappings Tab= ...umns''' tab on the '''Template Properties''' and added the a tab to the '''Project-View Properties''' forms.11 KB (1,754 words) - 17:21, 17 July 2017
- :a) Click the Project-View Properties ('''PVP''') button on the '''Home''' ribbon. ...t with the single task spanning two standard calendar years. The Microsoft Project '''source plan''' will look like this:9 KB (1,472 words) - 18:49, 17 July 2017
- To customize '''the corner''', access the Project-View Properties ('''PVP''') form, and navigate to the '''Main''' tab. 1) Selecting the '''Rows/swimlane headings''' radio button will cause the project view to show '''text columns headings''' and swimlane '''label headings'''.4 KB (644 words) - 19:03, 17 July 2017
- ...iew, go to the Project-View Properties ('''PVP''') form by clicking the '''Project-View Properties''' button on the ribbon's '''Home''' tab. ...o to the '''Project start date''' window and set the value equal to the '''Project end date''' as shown below:2 KB (336 words) - 19:11, 17 July 2017
- ...iew, go to the Project-View Properties ('''PVP''') form by clicking the '''Project-View Properties''' button on the ribbon's '''Home''' tab. ...o to the '''Project start date''' window and set the value equal to the '''Project end date''' as shown below:2 KB (342 words) - 19:16, 17 July 2017
- Here are the steps to create a new project view: :b) The '''Template's''' format is very similar to the OnePager Project-View Properties ('''PVP''') form which is described elsewhere. It is, in f6 KB (901 words) - 21:06, 19 July 2017
- ...project view for inclusion in another presentation or to further edit the project view. ...ject View - OnePager Express Desktop for Version 6.0 | Opening an EXISTING Project View - OnePager Express Desktop]].4 KB (689 words) - 21:32, 19 July 2017
- ...e '''pull''' operation’s main purpose is to let you update the on-screen project view as you edit its '''source plan'''. The '''pull update''' operation is ...Pro Start''' from which you make a new project view or update an existing project view.8 KB (1,315 words) - 22:15, 19 July 2017
- ...e '''pull''' operation’s main purpose is to let you update the on-screen project view as you edit its '''source plan'''. The '''pull update''' operation is ...ress Start''' from which you make a new project view or update an existing project view.8 KB (1,320 words) - 22:25, 19 July 2017
- ...Pro Start''' from which you make a new project view or update an existing project view. ...e plan''', making the change, and then re-launching OnePager to update the project view.9 KB (1,456 words) - 22:31, 19 July 2017
- ...Pro Start''' from which you make a new project view or update an existing project view. ...e plan''', making the change, and then re-launching OnePager to update the project view.9 KB (1,529 words) - 22:45, 19 July 2017
- ...Pro Start''' from which you make a new project view or update an existing project view. ...e plan''', making the change, and then re-launching OnePager to update the project view.9 KB (1,449 words) - 15:19, 21 July 2017
- ...'''Integrated Master Schedules (IMS)''', or '''multiple separate Microsoft Project source plans'''. ...of any project view subsequently created or updated and are saved with the project view. If you later, create or update a snapshot using a '''flag''' field,30 KB (4,856 words) - 16:55, 21 July 2017
- ...nt of multiple projects through the creation of a Microsoft Project Master Project or Integrated Master Schedule ('''IMS'''). ...er Project'''. Save the '''Master Project''' with an appropriate '''Master Project file name''' for future reference.4 KB (565 words) - 17:34, 21 July 2017
- ...nt of multiple projects through the creation of a Microsoft Project Master Project or Integrated Master Schedule ('''IMS'''). ...er Project'''. Save the '''Master Project''' with an appropriate '''Master Project file name''' for future reference.4 KB (559 words) - 20:50, 18 December 2018
- ...nt of multiple projects through the creation of a Microsoft Project Master Project or Integrated Master Schedule ('''IMS'''). ...change '''Templates''' click the '''Template...''' button on the Microsoft Project tool bar to bring up the '''Template Properties''' form shown below. Then,4 KB (547 words) - 20:30, 5 January 2021
- ...multiple projects''' through the creation of a Microsoft Project '''Master Project''' or '''Integrated Master Schedule''' ('''IMS'''). ...ject'''. '''Save''' the '''Master Project''' with an appropriate '''Master Project file name''' for future reference.7 KB (960 words) - 15:04, 12 January 2021
- ...multiple projects''' through the creation of a Microsoft Project '''Master Project''' or '''Integrated Master Schedule''' ('''IMS'''). ...lies to OnePager Bundle ('''OPB''') where '''OPB''' is accessing Microsoft Project '''source plans'''.7 KB (967 words) - 14:12, 26 April 2022
- ...multiple projects''' through the creation of a Microsoft Project '''Master Project''' or '''Integrated Master Schedule''' ('''IMS'''). ...lies to OnePager Bundle ('''OPB''') where '''OPB''' is accessing Microsoft Project '''source plans'''.7 KB (987 words) - 21:25, 9 January 2024
Page text matches
- ...ch a new project view is created and from which all of the settings in the Project-View Properties ('''PVP''') form are initially populated. ...ople! If everyone starts with the same '''Template''', then the resulting project views will adhere to standards that make it much easier for your audiences8 KB (1,212 words) - 15:46, 13 July 2017
- ...ting and managing an account, signing on and off, uploading MS Project and MS Excel files, downloading PV's, management of source and PV files, troublesh279 B (41 words) - 16:05, 13 July 2017
- The figure below shows the main features of the OnePager project view chart: ...ne graph. However, to illustrate all the feature below we've created this project view.10 KB (1,538 words) - 22:14, 13 July 2017
- ...(Portal)]] 3.0.1-OPL2 article covered a few ways of creating and updating project views and snapshots. ==Creating a NEW Project View with OnePager Live==6 KB (901 words) - 15:56, 21 July 2017
- Once created, snapshots are saved in the project view’s '''.TAM''' file and are organized by snapshot date. Often there is ...ss you trigger a re-computation on the '''Rows and Swimlanes''' tab of the Project-View Properties ('''PVP''') form.6 KB (958 words) - 21:48, 19 July 2017
- ...ked up as part of a regular reporting process. When updated, the Microsoft Project '''source plan''' becomes the source for reporting schedule updates. ...ted Microsoft Project '''source plan''' to add snapshots to record how the project changes between reporting periods.5 KB (777 words) - 21:36, 19 July 2017
- ...project view for inclusion in another presentation or to further edit the project view. ...may not import new or old data from Microsoft Project. However, Microsoft Project needs to be launched so that you can access the '''OnePager Pro''' button.4 KB (687 words) - 21:28, 19 July 2017
- ...'source plan’s''' fields and instructing OnePager to produce additional project views using these alternative '''flag''' fields. ...priately populating the cells with '''Yes” and “No''', three different project views can be prepared, have snapshots added to them, and updated or replace5 KB (724 words) - 21:15, 19 July 2017
- ...''source plan’s''' field then instructing OnePager to produce additional project views using these alternative '''Flag/Number''' fields. ...priately populating the cells with '''Yes''' and '''No''', three different project views can be prepared, snapshots may be added to them, and updated or repla5 KB (734 words) - 21:12, 19 July 2017
- ...fficient, especially if you had already invested time editing the original project view before you realized that you needed another field. ...''') that is a vastly more efficient way to bring additional fields into a project view after you've created and edited it.14 KB (2,148 words) - 17:24, 21 July 2017
- ==About Sharing Project Views== Individual project views can be saved as '''.TAM''' files and shared with other OnePager users5 KB (843 words) - 20:17, 17 July 2017
- ==About Merging the Wrong Tasks into a Project View== ...hould be the same set of tasks with, perhaps, some added or removed as the project moves toward completion.12 KB (1,933 words) - 22:20, 13 July 2017
- This approach for controlling the import of Microsoft Project/Excel '''source plan''' rows is quite flexible. ...d increase your flexibility for selecting task and milestones to appear in project views.3 KB (397 words) - 22:00, 13 July 2017
- ...product’s name implies, OnePager is intended to take a complex Microsoft Project or Microsoft Excel '''source plan''' and render it into a concise and infor ...r the multi-page feature can be found on the '''Page Layout''' tabs of the Project-View Properties ('''PVP''') and '''Template Properties''' forms.3 KB (395 words) - 21:53, 13 July 2017
- 1) The '''Normal View''' mode is what you’re accustom to seeing in the '''Project View Editor''' ('''PVE''') window of OnePager. As such, the '''Normal View ...in the '''PVE''' window of the '''Page Layout''' tab and shows the entire project view sectioned into pages with the page numbers displayed as watermarks in11 KB (1,739 words) - 21:48, 13 July 2017
- [[Category:Project-View Properties Form]] [[Category:Editing a Project View]]2 KB (209 words) - 21:53, 13 July 2017
- ...mined from your printer selection made in the '''Page Layout''' tab of the Project-View Properties ('''PVP''') form or the '''Template Properties''' form. ...ection is applied to the '''document’s size''' and OnePager will fit the project view to fit best within that '''document size'''.8 KB (1,173 words) - 03:27, 10 May 2024
- ...low the selection of the number of pages into which you want to divide the project view. OnePager will then automatically adjust the '''scaling factor''' as ...change the '''page size''' to '''Legal''', OnePager will '''rescale''' the project view to fit as one page on the legal size '''document''' by changing the ''3 KB (456 words) - 21:51, 13 July 2017
- ...will contain all the information. In some circumstances, these result in project view '''pages''' that may be cluttered. [[Category:Editing a Project View]]2 KB (334 words) - 21:52, 13 July 2017
- :m) After completing the '''delete''' of the '''page break''', the project view will look like this in the Page Break view: :b) The two controls are synchronized with the '''Page Layout''' tab of the Project-View Properties ('''PVP''') form.6 KB (998 words) - 21:56, 13 July 2017
- .../milestones are not appearing and provides you a means to '''repair''' the project view so that tasks/milestones are again visible. ...e.g., '''Flag20''' for Microsoft Project) by you for import from Microsoft Project or Microsoft Excel for the specific '''snapshot''' being viewed, but it was7 KB (1,095 words) - 21:44, 13 July 2017
- As you make changes to your project view, you will often change the format properties of tasks and milestones s ...elect all''' button. This will select all tasks/milestones in the current project view.2 KB (317 words) - 21:45, 13 July 2017
- ...e Project-View Properties form for Version 6.0 (Portal) | Editing with the Project-View Properties form (Portal)]] <!--21.0.1-60-->. ==Using the Project-View Properties Form==6 KB (825 words) - 14:47, 9 April 2020
- ==Modifying All Date Labels in a Project View== All task and milestone date labels may be modified in a project view without changing the settings in the current '''Template''' by using t6 KB (883 words) - 21:17, 13 July 2017
- ...ed from the Microsoft Project '''source plan'''. Every task in a Microsoft Project '''source plan''' has a designated '''start and finish date'''. A mileston ==Modifying All Date Labels in a Project View==6 KB (910 words) - 21:17, 13 July 2017
- ...ential that these data be properly represented in the associated Microsoft Project '''source plan''' before the data are imported to OnePager Pro ('''OPP'''). 1) Click the Project-View Properties ('''PVP''') button on the '''Home''' ribbon in the '''Setti6 KB (883 words) - 21:18, 13 July 2017
- 1) Click the Project-View Properties ('''PVP''') button on the '''Home''' ribbon in the '''Setti [[Category:Project Views]]6 KB (886 words) - 21:18, 13 July 2017
- ...sential that the associated data be properly represented in your Microsoft Project '''source plan''' before the data are imported to OnePager Pro ('''OPP'''). 1) Click the Project-View Properties ('''PVP''') button on the '''Home''' ribbon in the '''Setti10 KB (1,549 words) - 21:19, 13 July 2017
- 1) Click the Project-View Properties ('''PVP''') button on the '''Home''' ribbon in the '''Setti ::i) For illustrative purposes, the portion of the project view shown below is using a '''flat fill pattern''' for both the tasks/mile10 KB (1,569 words) - 20:04, 4 February 2024
- ...er can use the '''critical path''' indicator, '''Critical''', in Microsoft Project. ..., OnePager can use any '''Flag''' or '''Number''' fields in your Microsoft Project '''source plan''' as a '''critical path''' indicator .5 KB (803 words) - 21:22, 13 July 2017
- ...t visualization of a '''Critical Path''' for '''source plans''' input from MS Excel. Where OnePager Pro ('''OPP''') can draw upon calculations made by Microsoft Project with respect to the determination of the '''critical path''', Microsoft Exc2 KB (270 words) - 21:22, 13 July 2017
- ...ith '''Start and Finish dates''', a '''deadline date''', and the Microsoft Project '''Flag20''' field set to '''Yes''' so that OnePager imports the data for a 1) To display '''deadlines''' for tasks, navigate to the Project-View Properties' ('''PVP''') '''Task Bars''' tab. To display '''deadlines''9 KB (1,294 words) - 21:23, 13 July 2017
- 1) To display '''deadlines''' for tasks, navigate to the Project-View Properties' ('''PVP''') '''Task Bars''' tab. To display '''deadlines'' ...ne''' '''Color-Code Delay''' features. To set the stage, suppose we have a project of three tasks with the following initial conditions:9 KB (1,293 words) - 21:25, 13 July 2017
- ...[Deadlines for OnePager Live Beta 2 (MS Project Source) | Deadlines for MS Project Source]] 10.9.1-OPL2). As an additional thought, you may consider the four ...fault, the initial association of '''Endpoints 1 through 4''' to Microsoft Project '''source plan''' fields is as follows:7 KB (1,074 words) - 21:27, 13 July 2017
- ...e: [[Deadlines for OnePager Live Beta 2 (MS Excel Source) | Deadlines for MS Excel Source]] 10.10.1-OPL2). As an additional thought, you can consider th ...settings input to OnePager Express ('''OPX''') during the creation of the project view.7 KB (1,096 words) - 21:29, 13 July 2017
- ==About Merging the Wrong Tasks into a Project View== ...hould be the same set of tasks with, perhaps, some added or removed as the project moves toward completion.12 KB (1,933 words) - 17:59, 16 February 2024
- Here are the steps to create a new project view: 1) Launch Microsoft Project and bring up the desired Microsoft Project '''source plan'''.6 KB (903 words) - 01:05, 17 May 2024
- ==About Merging the Wrong Tasks into a Project View== ...hould be the same set of tasks with, perhaps, some added or removed as the project moves toward completion.12 KB (1,933 words) - 22:31, 13 July 2017
- ==About Merging the Wrong Tasks into a Project View== ...hould be the same set of tasks with, perhaps, some added or removed as the project moves toward completion.12 KB (1,929 words) - 22:32, 13 July 2017
- ...hat will alter the look of your project view as the data in your Microsoft Project '''source plan''' or Microsoft Excel '''source plan''' changes. It goes bey ...rm. To create (or modify) rules after you create a project view, use the Project-View Properties ('''PVP''') form.4 KB (492 words) - 16:40, 14 July 2017
- ...want to show as green if the value in '''Text30''' field in your Microsoft Project '''source plan''' contains the text '''Low Risk'''. Further, you want tasks ...s you change the value of the task’s '''Text30''' field in the Microsoft Project '''source plan''' only.4 KB (638 words) - 15:22, 14 July 2017
- ...ss to the '''Conditional Formatting Rules''' engine prior to creation of a project view is through the '''Task Bars''' or '''Milestones''' tab of the '''Templ 7) If we now create the project view, it will look like this for the first snapshot on 10/1/2015:4 KB (641 words) - 15:43, 14 July 2017
- 3) Creating a simple project view without '''Conditional Formatting rules''' will produce something like 5) When the '''Conditional Formatting Rules''' are in place and the project view is created it will look like this:3 KB (445 words) - 16:04, 14 July 2017
- 1) From either the '''Task Bars''' or '''Milestones''' tab of the Project-View Properties ('''PVP''') or '''Template Properties''' forms, click the ' ...bove is a dropdown that allows you to select the field from your Microsoft Project '''source plan'''. The second column above ('''Operator''') is a dropdown t4 KB (693 words) - 15:51, 14 July 2017
- The OnePager '''Conditional Formatting''' feature also supports Microsoft Project '''Boolean''' fields (e.g., '''Flag1 through Flag20''', etc.). '''Boolean' 1) As an example, suppose we have the project schedule shown below which consists of three phases and resources consistin3 KB (400 words) - 16:00, 14 July 2017
- 1) From either the '''Task Bars''' or '''Milestones''' tab of the Project-View Properties ('''PVP''') or '''Template Properties''' form, click the '' [[Category:Project Views]]4 KB (698 words) - 15:56, 14 July 2017
- ...the '''Save and Use''' button to have OnePager applies these rules to any project view that is made from the '''Template'''. [[Category:Project Views]]4 KB (696 words) - 16:13, 14 July 2017
- ...e plan''' shown below where the '''Phase''' field is used to represent the project’s phases. Highlighted below are four tasks of which three are in Phase T 2) When you create the basic project view with '''round-robin color''' assigned from Phase, it will look like th2 KB (308 words) - 16:33, 14 July 2017
- ...the '''Save and Use''' button to have OnePager applies these rules to any project view that is made from the '''Template'''. [[Category:Project Views]]4 KB (695 words) - 16:16, 14 July 2017
- ...oject views but will change the '''conditional formatting''' of any future project views made from the '''template'''. [[Category:Project Views]]3 KB (446 words) - 16:21, 14 July 2017
- ...oject views but will change the '''conditional formatting''' of any future project views made from the '''template'''. [[Category:Project Views]]3 KB (445 words) - 16:25, 14 July 2017
- ...black with a left pointing arrow symbol. First, let’s see the Microsoft Project '''source plan''': 2) When you create the basic project view with '''round-robin color''' assigned from Phase (Text20), it will loo2 KB (310 words) - 16:30, 14 July 2017
- ...nal formatting rules''' using a field that does not exist in the Microsoft Project '''source plan''', OnePager Pro ('''OPP''') will deactivate these specific [[Category:Project Views]]522 B (61 words) - 16:38, 14 July 2017
- [[Category:Project Views]] [[Category:Project-View Properties Form]]523 B (61 words) - 16:40, 14 July 2017
- ...sort''' project tasks and milestones dynamically based on your underlying project data. ...ou should also read the [[Understanding_Project_View_Properties_(Portal) | Project View Properties]] <!--21.1.2-60--> articles to familiarize yourself with so15 KB (2,339 words) - 07:36, 11 May 2024
- ...nd '''label areas'''. The controls are in the '''Advanced''' tab of the Project-View Properties ('''PVP''') and of the '''Template Properties''' forms. Th ...apply '''Zebra stripes''' to both rows and swimlanes. The following is a project view where we have multiple projects and have eliminated all background col5 KB (766 words) - 20:29, 14 July 2017
- OnePager enables you to manually '''add''' blank rows or swimlanes to the project view. [[Category:Project Views]]2 KB (220 words) - 02:30, 18 May 2024
- ...e''' There may be an impact on the output formatting for '''multi-page''' project views. 4) When you have multiple additional '''text columns''' showing in the project view, you can resize them individually by using the procedure specified abo4 KB (584 words) - 18:06, 14 July 2017
- ...to a single resource), and makes better use of the space available in your project view. 1) Configuration of rows begins by going to the Project-View Properties ('''PVP''') form and clicking the '''Rows/Swimlanes''' tab5 KB (832 words) - 17:29, 14 July 2017
- ...t columns''' and swimlane '''labels''' appear on the left hand side of the project view and provide space to display '''source plan''' data for each row or sw [[Category:Project Views]]1 KB (218 words) - 17:37, 14 July 2017
- ...ne '''labels''' are generated automatically based on data in the Microsoft Project or Microsoft Excel '''source plan'''. However, they can be edited manually. 1) When a project view has multiple additional '''Text Columns''' displayed you will find it5 KB (861 words) - 20:03, 4 February 2024
- Certain fields from Microsoft Project typically change from snapshot to snapshot and will automatically be update ...rows and to identify rows using one of the above fields from the Microsoft Project '''source plan'''.4 KB (633 words) - 17:48, 14 July 2017
- ...fields and the snapshots will change to show the most current data in the project view and in the '''text column''' as successive snapshots are taken over ti ...ring, and collection are set to use the '''% Done''' field to organize the project view.4 KB (560 words) - 17:54, 14 July 2017
- OnePager’s Project-View Properties ('''PVP''') form's '''Rows & Swimlanes''' tab provides a wa ...are sorted among each other to determine their '''order''' in the overall project view.2 KB (324 words) - 17:57, 14 July 2017
- ...borders''' checkbox at the bottom of the '''Rows & Swimlanes''' tab of the Project-View Properties ('''PVP''') form shown below: [[Category:Project Views]]3 KB (433 words) - 18:02, 14 July 2017
- 6) If your project view is displaying two or more additional '''text columns''', left clicking [[Category:Project Views]]2 KB (342 words) - 18:11, 14 July 2017
- ...onal '''text columns''' within them), can be manually re-positioned in the project view. ...the swimlane with the mouse in the '''swimlane label''' up or down in the project view to re-position it.1 KB (174 words) - 18:17, 14 July 2017
- ...omatic: Use row height of…''' window in the '''Page Layout''' tab of the Project-View Properties ('''PVP''') form or the '''Template Properties''' form. [[Category:Project Views]]3 KB (491 words) - 19:11, 14 July 2017
- ...the '''Gantt Bar Height''' control is set to '''Absolute height''' in the Project-View Properties ('''PVP''') form’s '''Task Bar''' tab, then increasing th [[Category:Project Views]]2 KB (304 words) - 19:15, 14 July 2017
- Both rows and swimlanes can be '''hidden''' in the project view. [[Category:Project Views]]3 KB (373 words) - 05:46, 10 May 2024
- ...d. These controls are found both in the '''Template Properties''' and the Project-View Properties ('''PVP''') forms at their respective '''Advanced''' tabs a ...ere tasks/milestones are not within the '''start-end dates''' range of the project view to be '''cropped''' when you click the '''Crop''' button on the ribbon4 KB (673 words) - 19:26, 14 July 2017
- ...d. These controls are found both in the '''Template Properties''' and the Project-View Properties ('''PVP''') forms at their respective '''Advanced''' tabs i ...ere tasks/milestones are not within the '''start-end dates''' range of the project view to be '''cropped''' when you click the '''Crop''' button on the ribbon4 KB (671 words) - 19:41, 14 July 2017
- ...re initially grouped by OnePager '''automatically''' based on the imported project '''source plan''' data, they can be manually divided into two swimlanes aft [[Category:Project Views]]2 KB (345 words) - 19:49, 14 July 2017
- OnePager automatically '''groups''' rows into swimlanes based on the project '''source plan''' data imported. This grouping can always be modified manu [[Category:Project Views]]3 KB (384 words) - 19:52, 14 July 2017
- [[Category:Project Views]] [[Category:Project-View Properties Form]]2 KB (330 words) - 19:58, 14 July 2017
- [[Category:Project Views]] [[Category:Project-View Properties Form]]1 KB (204 words) - 20:11, 14 July 2017
- [[Category:Project Views]] [[Category:Project-View Properties Form]]1 KB (202 words) - 20:15, 14 July 2017
- [[Category:Project Views]] [[Category:Project-View Properties Form]]1 KB (190 words) - 20:19, 14 July 2017
- ...nd '''label areas'''. The controls are in the '''Advanced''' tab of the Project-View Properties ('''PVP''') and of the '''Template Properties''' forms. Th ...apply '''Zebra stripes''' to both rows and swimlanes. The following is a project view where we have multiple projects and have eliminated all background col5 KB (766 words) - 20:24, 14 July 2017
- ...o a task or milestone shape that may not otherwise exist in your Microsoft Project or Microsoft Excel '''source plan'''. ...''' default properties''' of the '''comment box''' to the settings in the Project-View Properties ('''PVP''') form.14 KB (2,094 words) - 20:48, 14 July 2017
- To add a '''free box''' to the project view, go to the '''Insert''' tab on the ribbon and selecting the '''Free Bo ...''' to the '''front''' of the project view or send it to '''back''' of the project view by using the '''Order''' command.7 KB (1,093 words) - 20:59, 14 July 2017
- ==About The Project View Legend== ...derstand the meaning of the '''colors''' and '''shapes''' in your OnePager project view.2 KB (334 words) - 21:33, 14 July 2017
- [[Category:Editing a Project View]] [[Category:Project Views]]2 KB (335 words) - 21:12, 14 July 2017
- ...e legend on all pages or some pages, OnePager provides the controls in the Project-View Properties ('''PVP''') form and the '''Template Properties''' form to ...e concepts for '''legend anchoring''' positioning apply only to multi-page project views.10 KB (1,612 words) - 20:04, 4 February 2024
- 3) The legend item, and all associated tasks or milestones, in the project view will automatically be reformatted to match the change. ...ame''' in the legend will not change any underlying data in your Microsoft Project or Microsoft Excel '''source plan'''.6 KB (873 words) - 21:23, 14 July 2017
- ==About the New Legend Controls for MS Project== :(1) The first provides more flexibility in presenting the legend in your project views and helps avoid clutter.4 KB (629 words) - 21:27, 14 July 2017
- ==About the New Legend Controls for MS Excel== :(1) The first provides more flexibility in presenting the legend in your project views and helps avoid clutter.4 KB (625 words) - 21:33, 14 July 2017
- To add a new curtain to a project view, follow the steps below: 4) In project views with '''multiple snapshots''', this method of creating a curtain will8 KB (1,140 words) - 21:49, 14 July 2017
- [[Category:Editing a Project View]] [[Category:Project Views]]3 KB (504 words) - 21:54, 14 July 2017
- ...'') is a summary task created by OnePager that does not exist in Microsoft Project or Excel. It represents the '''start date''' and '''end date''' of two or m 5) The project view will now look like this:6 KB (898 words) - 21:57, 14 July 2017
- ...'''OnePager Express''' do not import dependency information from Microsoft Project or Microsoft Excel. Adding links manually to the project view requires you to identify the two task/milestones that will serve as th6 KB (931 words) - 07:25, 17 May 2024
- ...orating the project view with a company logo, a picture of the product the project is building, or to show other relevant visuals. [[Category:Editing a Project View]]1 KB (152 words) - 22:26, 14 July 2017
- OnePager allows you to '''insert''' standard images into a project views and use them as '''backgrounds''' anywhere in the graph area. Use th ...cking the '''Open''' button '''inserts''' the image into the center of the project view, as shown below:1 KB (176 words) - 22:13, 14 July 2017
- When a graphic is '''inserted''' into a project view and '''selected''' with a left-click there are '''eight grab boxes''' ...age, left-click its interior, '''drag''' it to the desired position in the project view, and release the left-click button as shown here:1 KB (154 words) - 22:16, 14 July 2017
- Once an image is '''inserted''' into a project view you have the controls necessary to mange the image with respect to ''' Once you’ve placed an image into the project view you have the option to change the '''background''' to a different imag4 KB (582 words) - 22:27, 14 July 2017
- ==About Editing with the Project-View Properties Form== ...ews based on global default settings. These settings are maintained in the Project-View Properties ('''PVP''') form, which contains some of the most powerful4 KB (551 words) - 17:33, 17 July 2017
- ...VP''' tab page, shown below, lets you set the most general properties of a project view. ...e person’s name that can appear in a '''header or footer''' entry in the project view.9 KB (1,294 words) - 14:13, 17 July 2017
- ...'' several tasks/milestones into each row based on values from a Microsoft Project or a Microsoft Excel ''' source plan''' data field. ...ts of rows that you can '''group''' together using values from a Microsoft Project or Microsoft Excel '''source plan''' data field. For example, you can '''g4 KB (589 words) - 14:20, 17 July 2017
- ...based on''' radio button allows you to select a field from your Microsoft Project '''source plan''' to assign a data driven '''color''' to each task. ...''' can display the '''date imported from any date field''' from Microsoft Project. These properties are controlled essentially the same way as described abo8 KB (1,161 words) - 14:30, 17 July 2017
- ...nePager Live Beta 2 (MS Excel Source) | Labeling Task/Milestone Dates for MS Excel Source]] 10.2.1-OPL2 ...complete for OnePager Live Beta 2 (MS Excel Source) | Percent complete for MS Excel Source]] 10.4.1-OPL28 KB (1,120 words) - 14:49, 17 July 2017