Search results

Jump to: navigation, search

Page title matches

Page text matches

  • 1) '''Where’s My Stuff?!''' is a OnePager feature that helps you '''locate tasks and milestones''' that cannot be easily seen. ...ppearing and provides you a means to '''repair''' the project view so that tasks/milestones are again visible.
    7 KB (1,081 words) - 20:51, 24 April 2016
  • ...eature of OnePager Pro is the ability to display the critical path through tasks on the OnePager graph. ...sk showing where the critical path intersects that task. For example, the summary task below has five red segments, showing that it has five subtasks on the
    5 KB (827 words) - 23:07, 17 September 2015
  • ==About Virtual Summary Tasks== ...and percent-complete bars, and critical-path segments for Virtual Summary Tasks.
    5 KB (822 words) - 17:10, 5 October 2017
  • ...Note that this setting no longer controls the format of the dates on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    11 KB (1,686 words) - 15:30, 22 September 2015
  • ...Note that this setting no longer controls the format of the dates on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    10 KB (1,672 words) - 15:30, 22 September 2015
  • ...Pro ('''OPP''') is the ability to display the '''critical path''' through tasks on the OnePager graph. ...here the '''critical path''' intersects that task. For example, the three tasks below each have red segments, showing that they are on the '''critical path
    5 KB (770 words) - 17:00, 10 June 2016
  • ==About Creating and Managing Virtual Summary Tasks== ...tuent tasks or milestones. In this respect the '''VST''' is a OnePager '''summary''' task.
    6 KB (907 words) - 17:11, 5 October 2017
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    16 KB (2,353 words) - 15:28, 22 September 2016
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    16 KB (2,348 words) - 14:32, 24 February 2017
  • ...ovides an easy interface, the Project View Editor ('''PVE'''), for editing tasks, milestones, or decorations manually. These articles cover manual editing c OnePager also supports global editing of tasks/milestones by allowing you to define default styles for a single project vi
    2 KB (297 words) - 16:45, 20 April 2016
  • ...ovides an easy interface, the Project View Editor ('''PVE'''), for editing tasks, milestones, or decorations manually. These articles cover manual editing c OnePager Live also supports global editing of tasks/milestones by allowing you to define default styles for a single project vi
    3 KB (368 words) - 14:04, 6 June 2016
  • ==About Creating and Managing Virtual Summary Tasks== ...tuent tasks or milestones. In this respect the '''VST''' is a OnePager '''summary''' task.
    6 KB (879 words) - 18:38, 6 July 2016
  • ...ns on Tasks/Milestones for Version 6.0 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-60--> ...ual Summary Tasks for Version 6.0 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-60-->
    4 KB (579 words) - 22:26, 29 December 2020
  • 1) '''Where’s My Stuff?!''' is a OnePager feature that helps you '''locate tasks and milestones''' that cannot be easily seen. ...ppearing and provides you a means to '''repair''' the project view so that tasks/milestones are again visible.
    7 KB (1,090 words) - 16:12, 8 June 2016
  • ...ture of OnePager is the ability to display the '''critical path''' through tasks on the OnePager graph. ...here the '''critical path''' intersects that task. For example, the three tasks below each have red segments, showing that they are on the '''critical path
    6 KB (819 words) - 13:54, 6 May 2024
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    17 KB (2,505 words) - 19:54, 21 July 2016
  • ...ns on Tasks/Milestones for Version 6.1 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-61--> ...ual Summary Tasks for Version 6.1 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-61-->
    5 KB (647 words) - 22:26, 29 December 2020
  • ...ovides an easy interface, the Project View Editor ('''PVE'''), for editing tasks, milestones, or decorations manually. OnePager also supports global editing of tasks/milestones by allowing you to define default styles for a single project vi
    3 KB (370 words) - 19:57, 10 April 2017
  • 1) '''Where’s My Stuff?!''' is a OnePager feature that helps you '''locate tasks and milestones''' that cannot be easily seen. ...ppearing and provides you a means to '''repair''' the project view so that tasks/milestones are again visible.
    7 KB (1,091 words) - 14:59, 5 April 2017
  • ...Pro ('''OPP''') is the ability to display the '''critical path''' through tasks on the OnePager graph. ...here the '''critical path''' intersects that task. For example, the three tasks below each have red segments, showing that they are on the '''critical path
    5 KB (799 words) - 15:10, 5 April 2017
  • ==About Creating and Managing Virtual Summary Tasks== ...tuent tasks or milestones. In this respect the '''VST''' is a OnePager '''summary''' task.
    6 KB (930 words) - 17:14, 5 October 2017
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    19 KB (2,794 words) - 17:13, 19 May 2017
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    17 KB (2,537 words) - 14:05, 18 May 2017
  • ...ovides an easy interface, the Project View Editor ('''PVE'''), for editing tasks, milestones, or decorations manually. OnePager also supports global editing of tasks/milestones by allowing you to define default styles for a single project vi
    3 KB (392 words) - 21:38, 13 July 2017
  • 1) '''Where’s My Stuff?!''' is a OnePager feature that helps you '''locate tasks and milestones''' that cannot be easily seen. ...ppearing and provides you a means to '''repair''' the project view so that tasks/milestones are again visible.
    7 KB (1,095 words) - 21:44, 13 July 2017
  • ...Pro ('''OPP''') is the ability to display the '''critical path''' through tasks on the OnePager graph. ...here the '''critical path''' intersects that task. For example, the three tasks below each have red segments, showing that they are on the '''critical path
    5 KB (803 words) - 21:22, 13 July 2017
  • ==About Creating and Managing Virtual Summary Tasks== ...tuent tasks or milestones. In this respect the '''VST''' is a OnePager '''summary''' task.
    6 KB (898 words) - 21:57, 14 July 2017
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    19 KB (2,818 words) - 21:12, 17 July 2017
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...place and one task dragged over another will be displayed as two separate tasks superimposed.
    17 KB (2,546 words) - 17:03, 17 July 2017
  • ...ries (i.e., '''daisy chain''') of manual '''Task Links''' connecting these tasks/milestones. :d) In a similar fashion to how OnePager 6.1 assists you to manage '''hidden tasks''', OnePager 6.1 provides a '''Where Are My Links?''' form that lists '''Ta
    62 KB (9,253 words) - 14:16, 10 December 2018
  • ...nt''' once through '''Project View Properties''' form than it is to select tasks one at a time and change '''fonts''' individually. ...article links below provide additional information on the '''editing''' of tasks/milestones and task links:
    5 KB (664 words) - 15:29, 19 December 2018
  • 1) '''Where’s My Stuff?!''' is a OnePager feature that helps you '''locate tasks and milestones''' that cannot be easily seen. ...ppearing and provides you a means to '''repair''' the project view so that tasks/milestones are again visible.
    9 KB (1,362 words) - 16:33, 19 December 2018
  • ...Pro ('''OPP''') is the ability to display the '''critical path''' through tasks on the OnePager graph. ...here the '''critical path''' intersects that task. For example, the three tasks below each have red segments, showing that they are on the '''critical path
    5 KB (794 words) - 18:30, 19 December 2018
  • ...ns on Tasks/Milestones for Version 7.0 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-70--> ...ual Summary Tasks for Version 7.0 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-70-->
    5 KB (660 words) - 18:19, 5 February 2021
  • ==About Creating and Managing Virtual Summary Tasks== ...tuent tasks or milestones. In this respect the '''VST''' is a OnePager '''summary''' task.
    7 KB (1,066 words) - 15:20, 21 December 2018
  • ===Import Process Summary=== ...oft Project '''source plans''' can be fully constrained, that is have many tasks with '''Predecessor '''data, '''importing all Data-driven Task Links''' can
    54 KB (7,879 words) - 16:58, 10 December 2018
  • ...xpress 6.1 is enhanced such that you can '''import Dependency''' values on tasks from Microsoft Excel '''source plans''' where the '''syntax format selectio ===Import Process Summary===
    55 KB (8,129 words) - 13:46, 11 December 2018
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...d as two separate tasks superimposed. For more information on '''Absorbed Tasks''' please see the article at: [[Absorbing one task into another for Versio
    22 KB (3,388 words) - 12:37, 24 December 2018
  • ...that this setting no longer controls the '''format of the dates''' on the tasks and milestones. ...d as two separate tasks superimposed. For more information on '''Absorbed Tasks''' please see the article at: [[Absorbing one task into another for Versio
    21 KB (3,189 words) - 12:51, 24 December 2018
  • ...e '''Project View Editor '''('''PVE'''), it is assumed that '''Data-driven Tasks '''are '''imported'''. For more information on the rules governing the ''' ...Task Links '''have their positions on '''predecessor''' or '''successor''' tasks determined by data '''imported '''from your '''source plan'''.
    65 KB (9,838 words) - 13:52, 12 December 2018
  • ...e '''Project View Editor '''('''PVE'''), it is assumed that '''Data-driven Tasks '''are '''imported'''. For more information on the rules governing the ''' ...Task Links '''have their positions on '''predecessor''' or '''successor''' tasks determined by data '''imported '''from your '''source plan'''.
    65 KB (9,879 words) - 13:18, 12 December 2018
  • ...ns on Tasks/Milestones for Version 7.1 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-71--> ...ual Summary Tasks for Version 7.1 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-71-->
    7 KB (853 words) - 19:44, 25 May 2022
  • ...nd Milestones Using "Where's My Stuff?!" for Version 7.1 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]] <!--9.4.1-71--> ...ns on Tasks/Milestones for Version 7.1 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-71-->
    7 KB (933 words) - 20:01, 25 April 2022
  • ...ault font''' once through '''Chart Properties''' form than it is to select tasks one at a time and change '''fonts''' individually. ...article links below provide additional information on the '''editing''' of tasks/milestones and task links:
    5 KB (647 words) - 12:52, 6 January 2021
  • ...is '''hidden''' (e.g., manually''' hidden''', incorporated into a Virtual Summary Task ('''VST'''), or '''absorbed''' into another task bar). :* '''De-Flagged Tasks/Milestones'''. The task bar/milestone symbol is not '''flagged''' (e.g., '
    10 KB (1,630 words) - 17:40, 12 January 2021
  • ===Critical Paths in Virtual Summary Tasks=== ...Project '''source plan''' as a '''critical path''' indicator. A '''virtual summary task (VST)''' constructed from several individual task bars in the chart wi
    10 KB (1,397 words) - 15:24, 13 January 2021
  • ==About Creating and Managing Virtual Summary Tasks== ...bars or milestone symbols. In this respect the '''VST''' is a OnePager '''summary '''task displayed in the chart. OnePager computes the '''start and end da
    10 KB (1,584 words) - 03:27, 10 May 2024
  • OnePager Pro can now '''import Dependency''' values on tasks from Microsoft Project '''source plans''' where the '''syntax format select ===Import Process Summary===
    61 KB (8,838 words) - 22:25, 15 February 2021
  • OnePager Express can now '''import Dependency''' values on tasks from Microsoft Excel '''source plans''' where the '''syntax format selectio ===Import Process Summary===
    63 KB (9,139 words) - 22:25, 15 February 2021
  • ...diting''' using the '''Chart Editor ''', it is assumed that '''Data-driven Tasks '''are '''imported'''. ...Task Links '''have their positions on '''predecessor''' or '''successor''' tasks determined by data '''imported '''from your '''source plan'''.
    67 KB (10,045 words) - 19:48, 3 March 2021
  • ...diting''' using the '''Chart Editor ''', it is assumed that '''Data-driven Tasks '''are '''imported'''. ...Task Links '''have their positions on '''predecessor''' or '''successor''' tasks determined by data '''imported '''from your '''source plan'''.
    66 KB (9,993 words) - 20:16, 21 January 2021
  • For more information on '''Absorbed Tasks''', please see the article at: [[Absorbing one task into another for Versi ...ments''' checkbox is checked '''ON''' during the construction of a Virtual Summary Task ('''VST''') with milestone symbols, the milestone symbols are displaye
    30 KB (4,491 words) - 17:33, 20 January 2021
  • For more information on '''Absorbed Tasks''', please see the article at: [[Absorbing one task into another for Versi ...ments''' checkbox is checked '''ON''' during the construction of a Virtual Summary Task ('''VST''') with milestone symbols, the milestone symbols are displaye
    29 KB (4,407 words) - 16:41, 20 January 2021
  • ...nd Milestones Using "Where's My Stuff?!" for Version 7.0 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]] <!--9.4.1-70--> ...ns on Tasks/Milestones for Version 7.0 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-70-->
    7 KB (933 words) - 16:38, 10 February 2021
  • OnePager Pro can now '''import Dependency''' values on tasks from Microsoft Project '''source plans''' where the '''syntax format''' for OnePager Express can now '''import Dependency''' values on tasks from Microsoft Excel '''source plans''' where the '''syntax format selectio
    73 KB (10,653 words) - 17:08, 10 May 2022
  • ==Introduction to Virtual Summary Tasks in OnePager== This article describes OnePager’s '''Virtual Summary Tasks''' feature. Illustrations used in this article are from OnePager Pro using
    11 KB (1,652 words) - 16:57, 22 April 2022
  • ==Critical Path Representation in Virtual Summary Tasks== ===Critical Paths in Virtual Summary Tasks===
    12 KB (1,676 words) - 16:02, 20 May 2022
  • ...is '''hidden''' (e.g., manually''' hidden''', incorporated into a Virtual Summary Task ('''VST'''), or '''absorbed''' into another task bar). :* '''De-Flagged Tasks/Milestones'''. The task bar/milestone symbol is not '''flagged''' (e.g., '
    10 KB (1,597 words) - 19:38, 25 April 2022
  • ...diting''' using the '''Chart Editor ''', it is assumed that '''Data-driven Tasks '''are '''imported'''. ...Task Links '''have their positions on '''predecessor''' or '''successor''' tasks determined by data '''imported '''from your '''source plan'''.
    67 KB (10,050 words) - 16:29, 22 April 2022
  • For more information on '''Absorbed Tasks''', please see the article at: [[Absorbing one task into another for Versi ...ments''' checkbox is checked '''ON''' during the construction of a Virtual Summary Task ('''VST''') with milestone symbols, the milestone symbols are displaye
    40 KB (6,046 words) - 15:55, 10 October 2022
  • OnePager can '''import Dependency''' values on '''tasks/milestones''' from Smartsheet '''source plans''' where the '''syntax format ...ager is designed to process '''Task Links''' associated with Smartsheet '''tasks/milestones''' that are specified as '''predecessors''' '''ONLY'''.
    10 KB (1,442 words) - 16:06, 24 May 2022
  • ==Selecting Tasks for Import into OnePager== ...eated. The benefit derived from '''OnePager '''is that you can select the tasks you which to display in your '''OnePager '''chart along with other decorati
    44 KB (6,478 words) - 20:08, 18 May 2022
  • ====Activity Selection Option (1): Select All Tasks==== ====Activity Selection Option (2): Select Tasks with ‘Yes’ in field:====
    63 KB (9,198 words) - 20:01, 18 May 2022
  • ...Summary Tasks&nbsp;for Version 7.1 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-71-->
    10 KB (1,462 words) - 15:45, 22 April 2022
  • 9) It is also possible to represent the tasks below the longest project level task bar as milestone symbols positioned at 3) At the '''Advanced''' tab, check the '''Safely combine tasks from different files''' checkbox '''ON''' as shown above.
    23 KB (3,498 words) - 14:47, 26 April 2022
  • ...u are creating a chart where you want to display '''constraints''' between tasks, we advise that you add and populate a Smartsheet column called '''Predeces ...g a dropdown list of Smartsheet available '''column names''' along with '''virtual column names '''created by OnePager.
    46 KB (6,750 words) - 15:33, 19 January 2024
  • ...ns on Tasks/Milestones for Version 7.2 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-72--> ...ual Summary Tasks for Version 7.2 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-72-->
    8 KB (1,067 words) - 16:40, 25 January 2024
  • ====Activity Selection Option (1): Select All Tasks==== ====Activity Selection Option (2): Select Tasks with ‘Yes’ in field:====
    65 KB (9,587 words) - 19:35, 28 March 2024
  • 9) It is also possible to represent the tasks below the longest project level task bar as milestone symbols positioned at 3) At the '''Advanced''' tab, check the '''Safely combine tasks from different files''' checkbox '''ON''' as shown above.
    24 KB (3,524 words) - 20:53, 9 January 2024
  • ...nd Milestones Using "Where's My Stuff?!" for Version 7.2 | Managing Hidden Tasks and Milestones Using "Where's My Stuff?!"]] <!--9.4.1-72--> ...ns on Tasks/Milestones for Version 7.2 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-72-->
    7 KB (1,024 words) - 19:41, 18 March 2024
  • ...is '''hidden''' (e.g., manually''' hidden''', incorporated into a Virtual Summary Task ('''VST'''), or '''absorbed''' into another task bar). :* '''De-Flagged Tasks/Milestones'''. The task bar/milestone symbol is not '''flagged''' (e.g., '
    11 KB (1,674 words) - 17:22, 9 January 2024
  • ==Critical Path Representation in Virtual Summary Tasks== ===Critical Paths in Virtual Summary Tasks===
    13 KB (1,860 words) - 16:49, 14 March 2024
  • ...ager can create Gantt charts or Timeline layout charts by '''collecting''' tasks from your '''source plans''' and placing them into '''rows''' in your OnePa ...ecision made, the next step is to determine how '''imported source plan''' tasks/milestones and their '''rows''' are '''sorted''' in the chart.
    31 KB (4,529 words) - 14:00, 5 January 2024
  • ==Introduction to Virtual Summary Tasks in OnePager== This article describes OnePager’s '''Virtual Summary Tasks''' feature.
    12 KB (1,749 words) - 20:33, 4 January 2024
  • OnePager Pro can now '''import Dependency''' values on tasks from Microsoft Project '''source plans''' where the '''syntax format''' for OnePager Express can now '''import Dependency''' values on tasks from Microsoft Excel '''source plans''' where the '''syntax format selectio
    75 KB (10,845 words) - 20:22, 4 January 2024
  • ...Summary Tasks&nbsp;for Version 7.2 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-72-->
    11 KB (1,555 words) - 20:12, 4 January 2024
  • OnePager can '''import Dependency''' values on '''tasks/milestones''' from Smartsheet '''source plans''' where the '''syntax format ...ager is designed to process '''Task Links''' associated with Smartsheet '''tasks/milestones''' that are specified as '''predecessors''' '''ONLY'''.
    11 KB (1,535 words) - 20:09, 4 January 2024
  • ...diting''' using the '''Chart Editor ''', it is assumed that '''Data-driven Tasks '''are '''imported'''. ...Task Links '''have their positions on '''predecessor''' or '''successor''' tasks determined by data '''imported '''from your '''source plan'''.
    68 KB (10,183 words) - 16:16, 4 January 2024
  • For more information on '''Absorbed Tasks''', please see the article at: ...ts''' checkbox is checked '''ON''' during the construction of a '''Virtual Summary Task''' ('''VST''') with milestone symbols, the milestone symbols are displ
    49 KB (7,402 words) - 14:10, 25 March 2024
  • ...form that can be used for this purpose. More information on how to select tasks using the '''Project for the Web Task List''' form is provided below. ...own list of Project for the Web available '''column names''' along with '''virtual column names '''created by OnePager.
    37 KB (5,598 words) - 15:40, 19 January 2024
  • ...howing a dropdown list of Asana available '''column names''' along with '''virtual column names '''created by OnePager. ==Selecting Tasks for Import into OnePager==
    46 KB (6,862 words) - 21:12, 28 March 2024
  • ...ns on Tasks/Milestones for Version 7.2 (Portal) | Modifying Decorations on Tasks/Milestones (Portal)]] <!--10.0.1-72--> ...Summary Tasks&nbsp;for Version 7.2 | Creating and Managing Virtual Summary Tasks]] <!--18.0.1-72-->
    24 KB (3,492 words) - 15:02, 26 March 2024
  • ...'''import''' to OnePager '''ON''' assures that OnePager can identify these tasks and successfully '''import''' them. An example is shown here: ...n list of Planisware Enterprise available '''column names''' along with '''virtual column names '''created by OnePager.
    42 KB (6,182 words) - 18:44, 16 March 2024
  • ...'''import''' to OnePager '''ON''' assures that OnePager can identify these tasks and successfully '''import''' them. An example is shown here: ...howing a dropdown list of Wrike available '''column names''' along with '''virtual column names '''created by OnePager.
    37 KB (5,632 words) - 17:37, 19 January 2024
  • OnePager can '''import Dependency''' values on '''tasks/milestones''' from Asana '''source plans''' where the '''syntax format''' f OnePager is designed to process '''Task Links''' associated with Asana '''tasks/milestones''' that are specified as '''predecessors''' '''ONLY'''.
    11 KB (1,535 words) - 16:36, 4 January 2024
  • OnePager can '''import Dependency''' values on '''tasks/milestones''' from Project for the Web '''source plans''' where the '''synt ...esigned to process '''Task Links''' associated with Project for the Web '''tasks/milestones''' that are specified as '''predecessors''' '''ONLY'''.
    11 KB (1,574 words) - 20:06, 4 January 2024
  • OnePager can '''import Dependency''' values on '''tasks/milestones''' from Planisware Enterprise '''source plans''' where the '''sy ...igned to process '''Task Links''' associated with Planisware Enterprise '''tasks/milestones''' that are specified as '''predecessors''' '''ONLY'''.
    11 KB (1,548 words) - 16:23, 23 March 2024
  • OnePager can '''import Dependency''' values on '''tasks/milestones''' from Wrike '''source plans''' where the '''syntax format''' f OnePager is designed to process '''Task Links''' associated with Wrike '''tasks/milestones''' that are specified as '''predecessors''' '''ONLY'''.
    11 KB (1,535 words) - 16:33, 4 January 2024