- ==Changing Individual Task/Milestone Colors== ...communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.18 KB (2,720 words) - 20:33, 24 April 2016
- ...Start and Finish date data imported from the Microsoft Project plan. Every task in a Microsoft Project plan has a designated start and finish date. Milesto All task and milestone date labels may be modified in a project view without changing the settings5 KB (818 words) - 16:12, 13 July 2016
- ...e Start and Finish date data imported from the Microsoft Excel plan. Every task in a Microsoft Excel plan has a designated start and finish date. Milestone All task and milestone date labels may be modified in a project view without changing the settings5 KB (815 words) - 23:09, 17 September 2015
- [[Category:Task/Milestone Editing]] [[Category:Task/Milestone Decorations]]1 KB (190 words) - 17:44, 6 May 2016
- 1) OnePager allows you to display task bars or milestone labels in a comment box connected to the bar or symbol. This has always be :(1) task bar start and finish dates,1 KB (221 words) - 18:27, 1 March 2016
- 1) OnePager’s feature that transforms a short duration task into a milestone symbol based on a threshold value is changed in version 5.3. :a) The unit of measure in OnePager version 5.3 is task bar duration in number of days.1 KB (175 words) - 18:31, 1 March 2016
- ...a Microsoft Project plan has a designated '''start and finish date'''. A milestone's '''start and finish dates''' are usually the same. You may choose to use All task and milestone '''date labels''' may be modified without changing the settings in the curr6 KB (845 words) - 16:10, 13 July 2016
- ...tart and finish date''' data imported from the Microsoft Excel plan. Every task in a Microsoft Excel plan has a designated '''start and finish date'''. A m All task and milestone date labels may be modified in a project view without changing the settings6 KB (853 words) - 16:14, 13 July 2016
- ==More on Matching Task/Milestone Identity for Updates== :b) The current source may have had its task identifiers renumbered,4 KB (626 words) - 14:22, 10 May 2016
- ==Changing Individual Task/Milestone Colors== ...communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.18 KB (2,654 words) - 15:02, 8 June 2016
- ...a Microsoft Project plan has a designated '''start and finish date'''. A milestone's '''start and finish dates''' are usually the same. You may choose to use All task and milestone '''date labels''' may be modified without changing the settings in the curr6 KB (846 words) - 16:08, 13 July 2016
- [[Category:Task/Milestone Editing]] [[Category:Task/Milestone Decorations]]1 KB (183 words) - 17:10, 20 July 2016
- ==Changing Individual Task/Milestone Colors== ...communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.18 KB (2,661 words) - 19:51, 10 April 2017
- ...Project '''source plan''' has a designated '''start and finish date'''. A milestone's '''start and finish dates''' are usually the same. You may choose to use '''All''' task and milestone '''date labels''' may be modified without changing the settings in the curr6 KB (906 words) - 15:04, 5 April 2017
- ...sh date''' data imported from the Microsoft Excel '''source plan'''. Every task in a Microsoft Excel '''source plan''' has a designated '''start and finish All task and milestone date labels may be modified in a project view without changing the settings6 KB (879 words) - 15:04, 5 April 2017
- [[Category:Task/Milestone Editing]] [[Category:Task/Milestone Decorations]]1 KB (208 words) - 16:13, 11 April 2017
- ==Changing Individual Task/Milestone Colors== ...communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.18 KB (2,665 words) - 19:29, 13 July 2017
- ...sh date''' data imported from the Microsoft Excel '''source plan'''. Every task in a Microsoft Excel '''source plan''' has a designated '''start and finish All task and milestone date labels may be modified in a project view without changing the settings6 KB (883 words) - 21:17, 13 July 2017
- ...Project '''source plan''' has a designated '''start and finish date'''. A milestone's '''start and finish dates''' are usually the same. You may choose to use '''All''' task and milestone '''date labels''' may be modified without changing the settings in the curr6 KB (910 words) - 21:17, 13 July 2017
- [[Category:Task/Milestone Editing]] [[Category:Task/Milestone Decorations]]2 KB (212 words) - 16:21, 17 July 2017
- ==Changing Individual Task/Milestone Colors== ...communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.18 KB (2,675 words) - 16:03, 19 December 2018
- 2) Every task in a Microsoft Project '''source plan''' has a designated '''start and fini 3) A milestone's '''start and finish dates''' are usually the same. You can choose to use6 KB (902 words) - 13:57, 7 January 2019
- 2) Every task in a Microsoft Excel '''source plan''' has a designated '''start and finish All task and milestone date labels can be modified in a project view without changing the settings6 KB (875 words) - 14:07, 7 January 2019
- ==About the Task Links Tab== ...s tab controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the project view. The tab is shown below:1 KB (157 words) - 12:09, 24 December 2018
- ==About the Task Links Tab== ...s tab controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the project view. The tab is shown below:1 KB (154 words) - 12:21, 24 December 2018
- ...ault font''' once through '''Chart Properties''' form than it is to select task bars one at a time and change '''fonts''' individually. ...is not required to make '''edits''' that change settings and rules for all task bars and '''text labels''', OnePager provides you with the tools to '''edit7 KB (933 words) - 20:01, 25 April 2022
- ==Introduction to the Task/Milestone Date Label Feature in OnePager== This article describes OnePager’s '''Task/Milestone Date Label''' feature. Illustrations used in this article are from OnePage12 KB (1,795 words) - 17:29, 25 April 2022
- ...e usually the same. You can choose to use '''date labels''' for task bars, milestone symbols, or both. '''All''' task bar and milestone symbol '''date labels''' can be '''edited''' without changing the settings11 KB (1,695 words) - 20:56, 12 January 2021
- ...t Excel '''source plan''' has a designated '''start and finish date'''. A milestone's '''start and finish dates''' are usually the same. You can choose to use ''All''' task and milestone shape '''date labels''' cab be '''edited''' without changing the settings i10 KB (1,547 words) - 21:04, 12 January 2021
- ==About the Task Links Tab== ...' tab controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the chart. The tab is shown below:2 KB (300 words) - 16:22, 20 January 2021
- ==About the Task Links Tab== ...' tab controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the chart. The tab is shown below:2 KB (292 words) - 16:23, 20 January 2021
- ==New Task Bars, Milestone Symbols, and Name Label Selection Rules for OnePager 7.0== ...and right-click selection to facilitate the addition of '''The Smart Task/Milestone Text Labeling Feature'''.13 KB (1,871 words) - 16:14, 30 December 2020
- ...ault font''' once through '''Chart Properties''' form than it is to select task bar one at a time and change '''fonts''' individually. ...is not required to make '''edits''' that change settings and rules for all task bars and '''text labels''', OnePager Pro and Express provide you with the t7 KB (933 words) - 16:38, 10 February 2021
- ==About Selecting Task Bars/Milestone Symbols and Task Bar Name Labels== ...'selecting''' one or multiple task bars and/or milestone symbols and/or '''task bar name labels''' in order to make manual '''edits''':12 KB (1,770 words) - 17:21, 25 January 2021
- ==Changing Individual Task Bar/Milestone Symbol Colors== ...hange the '''color''' of a task bar/milestone symbol you are creating a '''task bar color maverick'''.22 KB (3,348 words) - 17:17, 12 January 2021
- ==Hiding and Unhiding Task/Milestone Text Labels== ...ing Task/Milestone Shapes and Text Labels for Version 7.0 | Selecting Task/Milestone Shapes and Text Labels]] <!--9.1.1-70-->17 KB (2,679 words) - 17:32, 12 January 2021
- ==About Selecting Task Bars/Milestone Symbols and Task Bar Name Labels== ...'selecting''' one or multiple task bars and/or milestone symbols and/or '''task bar name labels''' in order to make manual '''edits''':12 KB (1,751 words) - 19:23, 25 April 2022
- ==Hiding and Unhiding Task/Milestone Text Labels== ...ing Task/Milestone Shapes and Text Labels for Version 7.1 | Selecting Task/Milestone Shapes and Text Labels]] <!--9.1.1-71-->15 KB (2,326 words) - 19:35, 25 April 2022
- ==Changing Individual Task Bar/Milestone Symbol Colors== ...hange the '''color''' of a task bar/milestone symbol you are creating a '''task bar color maverick'''.25 KB (3,815 words) - 19:30, 25 April 2022
- ==About the Task Links Tab== ...' tab controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the chart. The tab is shown below:3 KB (387 words) - 19:45, 19 April 2022
- ...Pager automatically adds the '''Checkmark Decoration''' to any task bar or milestone symbol that achieves '''100% Complete''' status in the chart/snapshot based ...ger for a task bar is represented by a bar positioned at the bottom of the task bar as shown below:8 KB (1,201 words) - 15:09, 5 May 2022
- This article describes OnePager's '''manual editing of task bar/milestone symbols and text''' features. ...ault font''' once through '''Chart Properties''' form than it is to select task bars one at a time and change '''fonts''' individually.7 KB (1,024 words) - 19:41, 18 March 2024
- ==About Selecting Task Bars/Milestone Symbols and Task Bar Name Labels== ...'selecting''' one or multiple task bars and/or milestone symbols and/or '''task bar name labels''' in order to make manual '''edits''':12 KB (1,838 words) - 17:52, 9 January 2024
- This article describes OnePager's '''editing of task bar/milestone symbol colors, shapes, labels, etc.''' features. ==Changing Individual Task Bar/Milestone Symbol Colors==26 KB (4,004 words) - 17:54, 9 January 2024
- ...cribes OnePager's features for '''manipulating''' and '''editing task bars/milestone symbols''' and their '''name labels'''. ==Hiding and Unhiding Task/Milestone Text Labels==16 KB (2,450 words) - 17:26, 9 January 2024
- ==Introduction to the Task/Milestone Date Label Feature in OnePager== This article describes OnePager’s '''Task/Milestone Date Label''' feature.12 KB (1,789 words) - 16:37, 14 March 2024
- ==About the Task Links Tab== ...' tab controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the chart. The tab is shown below:4 KB (515 words) - 21:32, 3 January 2024
- This article describes OnePager’s '''Transparent Fills for Task Bars and Milestones''' feature. ...sing '''Order commands''' and the '''transparency feature''' for task bars/milestone symbols. This article discusses both.15 KB (2,223 words) - 15:12, 9 January 2024
- ...purpose of this article is to introduce the '''Conditional Formatting for Task & Milestones''' form and provide some examples of how it can be used to hig As used with OnePager, '''task bar/milestone symbol decorations''' include:53 KB (7,386 words) - 16:50, 23 January 2024
- ...'' created as if the light is coming from the '''upper left''' to create a task-bar '''shadow''' to the lower right. The '''preset drop shadows''' can be The '''drop shadow feature''' not only includes task bar/milestone symbols but also '''baselines''', '''deadlines''', and '''endpoints''', as20 KB (3,027 words) - 18:32, 14 March 2024
Page text matches
- ...different '''shapes, colors, fill patterns, and borders'''. Additionally, task/milestones may be '''decorated''' with '''deadline shapes and endpoint shap ...rious selected '''shapes, fills, and borders'''. There are over a hundred milestone '''shapes''' available in OnePager.9 KB (1,400 words) - 23:18, 11 May 2024
- ...lag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''Flag''' field set to '''No''', '''0''', or '''blank'''. Click th ...as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' field can b11 KB (1,692 words) - 15:33, 26 April 2022
- [[Category:Task/Milestone Editing]]2 KB (350 words) - 14:48, 22 September 2015
- [[Category:Task/Milestone Editing]] [[Category:Task/Milestone Decorations]]7 KB (1,053 words) - 19:32, 18 February 2017
- Comment boxes are a way to attach additional text to a task or milestone that may not otherwise exist in your Microsoft Project plan. They are a gre ...a comment box to any task/milestone on the screen, right-clicking the task/milestone and select “Comments…” as shown below:10 KB (1,620 words) - 15:17, 18 September 2015
- [[Category:Task/Milestone Editing]]2 KB (289 words) - 23:21, 11 October 2016
- Task Labels are not considered a “Decoration” for the purpose of this discus ...commands available to modify the decoration properties of a single task/milestone.3 KB (438 words) - 16:15, 21 September 2015
- ===Mirror Format Setting Changes to Task Bars and Milestones=== ...in the '''Project-View Properties (PVP)''' form’s '''Task Bar''' and '''Milestone''' tabs to accomplish the same result.11 KB (1,743 words) - 14:23, 9 April 2020
- Now put a “Yes” in this flag column for any task that you want to graph: :c) '''Task Selection:''' This is how you tell OnePager Pro which tasks from your Micro16 KB (2,688 words) - 15:33, 22 March 2016
- :c) A “Task ID” field that OnePager will use to keep track of tasks/milestones as you :c) '''Task Selection:''' This is how you tell OnePager Express which tasks from your M15 KB (2,534 words) - 14:03, 28 September 2015
- 3) The project view also saves the task names, text positions, and row and swimlane assignments of the tasks/milest ...'''baseline start''' and '''finish dates''', '''percent complete''' and '''milestone completions'''.6 KB (900 words) - 20:17, 13 September 2016
- ...'''baseline start''' and '''finish dates''', '''percent complete''' and '''milestone completions'''. 2) Launch OnePager using each of the '''Flag''' fields to control the task selection and save the corresponding project views. In the first launch on7 KB (1,037 words) - 20:17, 13 September 2016
- ...rows is the first step, although the most common situation is to make one task per row. Once completed, you have additional controls over row and swimlan ...one task per row''' As the button name suggests, OnePager will place each task in an individual row. '''Note''' that no '''collection''' occurs in this c14 KB (2,096 words) - 15:42, 9 November 2016
- ...different '''shapes, colors, fill patterns, and borders'''. Additionally, task/milestones may be '''decorated''' with '''deadline shapes and endpoint shap ...rious selected '''shapes, fills, and borders'''. There are over a hundred milestone '''shapes''' available in OnePager.9 KB (1,403 words) - 18:08, 24 April 2016
- ...umbers cell to “Yes” for these while leaving the remainder of the task/milestone row’s Flag field set to “No” or blank. ...Flag20 as a default. Most users select Flag20 to tell OnePager which task/milestone rows to import but any of the 20 Flag fields or any of the 20 Number fields4 KB (600 words) - 14:34, 29 June 2015
- [[Category:Task/Milestone Editing]]2 KB (239 words) - 20:20, 15 September 2015
- ...''' feature described in the article at: [[Task Bars Tab for Version 7.1 | Task Bars Tab]] <!--21.3.1-71--> :* '''Shape''' (task bar or milestone symbol)6 KB (797 words) - 17:22, 25 April 2022
- [[Category:Task/Milestone Editing]]3 KB (511 words) - 22:43, 17 September 2015
- [[Category:Task/Milestone Editing]]3 KB (508 words) - 22:42, 17 September 2015
- ...antt bars to milestone symbols by right-clicking them and making the “As milestone at finish” selection shown below: ...below the project level as milestone symbols positioned at the end of the task period as shown below:4 KB (538 words) - 17:28, 23 December 2015
- | [[Changing Individual Task/Milestone Properties (Color, Shapes, etc.)]] [[Category:Task/Milestone Editing]]1 KB (139 words) - 16:43, 18 January 2016
- ...x''' with two '''grab points''' (top and bottom) in the middle of the task/milestone. :(5) '''Esc key''' If you want to '''redo''' your task/milestone '''selections''', press the '''ESC key''' and OnePager will '''deselect'''2 KB (230 words) - 18:09, 9 February 2017
- ==Changing Individual Task/Milestone Colors== ...communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.18 KB (2,720 words) - 20:33, 24 April 2016
File:P52-9 2-(30)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (30)(900 × 547 (105 KB)) - 14:33, 2 July 2015File:P52-9 2-(31)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (31)(900 × 217 (65 KB)) - 14:34, 2 July 2015File:P52-9 2-(1)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (1)(900 × 79 (35 KB)) - 14:04, 2 July 2015File:P52-9 2-(2)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (2)(400 × 188 (17 KB)) - 14:05, 2 July 2015File:P52-9 2-(3)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (3)(900 × 547 (86 KB)) - 14:06, 2 July 2015File:P52-9 2-(4)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (4)(500 × 725 (70 KB)) - 14:07, 2 July 2015File:P52-9 2-(5)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (5)(500 × 360 (68 KB)) - 14:09, 2 July 2015File:P52-9 2-(6)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (6)(500 × 530 (89 KB)) - 14:10, 2 July 2015File:P52-9 2-(7)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (7)(900 × 482 (122 KB)) - 14:11, 2 July 2015File:P52-9 2-(8)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (8)(900 × 231 (101 KB)) - 14:12, 2 July 2015File:P52-9 2-(9)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (9)(900 × 187 (13 KB)) - 14:13, 2 July 2015File:P52-9 2-(10)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (10)(900 × 188 (13 KB)) - 14:14, 2 July 2015File:P52-9 2-(11)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (11)(900 × 518 (169 KB)) - 14:14, 2 July 2015File:P52-9 2-(12)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (12)(900 × 548 (149 KB)) - 14:15, 2 July 2015File:P52-9 2-(13)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (13)(900 × 544 (154 KB)) - 14:16, 2 July 2015File:P52-9 2-(14)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (14)(900 × 548 (91 KB)) - 14:17, 2 July 2015File:P52-9 2-(15)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (15)(900 × 98 (68 KB)) - 14:18, 2 July 2015File:P52-9 2-(16)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (16)(900 × 256 (75 KB)) - 14:19, 2 July 2015File:P52-9 2-(17)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (17)(900 × 596 (95 KB)) - 14:19, 2 July 2015File:P52-9 2-(18)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (18)(900 × 240 (67 KB)) - 14:20, 2 July 2015File:P52-9 2-(19)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (19)(900 × 547 (95 KB)) - 14:21, 2 July 2015File:P52-9 2-(20)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (20)(900 × 249 (80 KB)) - 14:22, 2 July 2015File:P52-9 2-(21)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (21)(900 × 180 (39 KB)) - 14:22, 2 July 2015File:P52-9 2-(22)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (22)(900 × 407 (103 KB)) - 14:23, 2 July 2015File:P52-9 2-(23)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (23)(900 × 197 (58 KB)) - 14:24, 2 July 2015File:P52-9 2-(24)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (24)(900 × 102 (68 KB)) - 14:25, 2 July 2015File:P52-9 2-(25)-06012015.png Changing Individual Task/Milestone Properties (Color, Shapes, etc.) (9.2) (25)(900 × 230 (104 KB)) - 14:25, 2 July 2015