Search results

Jump to: navigation, search

Page title matches

Page text matches

  • ...andalone | OnePager Express Standalone]] <!--7.2.1-71--> Please use these links to navigate to the appropriate section based on how you are using OnePager. ...'''Flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''Flag''' field set to '''No''', '''0''', or '''blank'''
    11 KB (1,692 words) - 15:33, 26 April 2022
  • For more information on Managing Templates please use the following links: [[Category:Task/Milestone Editing]]
    2 KB (350 words) - 14:48, 22 September 2015
  • ==Related Links== [[Category:Task/Milestone Editing]]
    7 KB (1,053 words) - 19:32, 18 February 2017
  • ...ation on editing rows and swimlanes may be accessed by using the following links: [[Category:Task/Milestone Editing]]
    2 KB (289 words) - 23:21, 11 October 2016
  • Task Labels are not considered a “Decoration” for the purpose of this discus ...t…” commands available to modify the decoration properties of a single task/milestone.
    3 KB (438 words) - 16:15, 21 September 2015
  • ...''' feature described in the article at: [[Task Bars Tab for Version 7.1 | Task Bars Tab]] <!--21.3.1-71--> :* '''Shape''' (task bar or milestone symbol)
    6 KB (797 words) - 17:22, 25 April 2022
  • Use the links below to access the named articles: | [[Changing Individual Task/Milestone Properties (Color, Shapes, etc.)]]
    1 KB (139 words) - 16:43, 18 January 2016
  • ==Changing Individual Task/Milestone Colors== ...erful communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.
    18 KB (2,720 words) - 20:33, 24 April 2016
  • :* Shape (task or milestone) Use the links below to access the named articles:
    2 KB (301 words) - 16:55, 18 January 2016
  • ...ox (or perhaps two comment boxes) to indicate the presence of the absorbed task/milestone. To do this follow the steps below: ...n time), a form will appear, asking if you want to be replace the absorbed task name by one comment box or two and at what date position (End or Start Date
    3 KB (520 words) - 16:57, 5 October 2017
  • ...arizes.” OnePager computes the start and end dates of a Virtual Summary Task as its constituent tasks dates change from snapshot to snapshot. It also co To create a Virtual Summary Task, follow these steps:
    5 KB (822 words) - 17:10, 5 October 2017
  • ...to individual shapes. We coined the term “maverick” to describe the task/milestone properties that differ from the global defaults or from data-driv For global editing descriptions for Task/Milestones and Decorations, please see the corresponding articles under the
    1 KB (152 words) - 15:20, 18 September 2015
  • Each of these tabs is described in detail at the following article links: | [[Task Bars Tab (OnePager Pro)]]
    2 KB (219 words) - 17:05, 21 September 2015
  • This tab controls the font characteristics of links. The tab is shown below: 1) '''Font''' This one control in the '''Event Links''' tab of the Project-View Properties ('''PVP''') form provides access to t
    1 KB (190 words) - 17:44, 6 May 2016
  • The article links below provide you with more details on how to use OnePager. There are esse Clicking on any of the links below will take you to the article where you'll find a flow diagram and a s
    6 KB (906 words) - 15:41, 14 September 2016
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    5 KB (820 words) - 15:47, 3 March 2016
  • .../Numbers''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    6 KB (962 words) - 15:40, 3 March 2016
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    6 KB (968 words) - 15:53, 3 March 2016
  • .../Numbers''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    5 KB (811 words) - 15:43, 3 March 2016
  • ...d set the '''Flag/Number''' cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    4 KB (673 words) - 16:00, 3 March 2016
  • ...d set the '''Flag/Number''' cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (709 words) - 16:05, 3 March 2016
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (872 words) - 19:41, 3 March 2016
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (895 words) - 19:40, 3 March 2016
  • ...uded and set the '''flag''' cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    4 KB (662 words) - 17:16, 16 September 2016
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (877 words) - 19:45, 3 March 2016
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (899 words) - 19:47, 3 March 2016
  • ...s long as the related Microsoft Excel plans are constructed with unique '''Task ID''' column contents. ...tomatically provide a unique identifier for rows. Additionally, unique '''Task ID''' numbers are needed so that OnePager Express ('''OPX''') does not get
    7 KB (1,050 words) - 19:59, 4 March 2016
  • ...ded and set the Flag/Number cell to “Yes” leaving the remainder of the task/milestone row’s Flag field set to “No.” ==Related Links==
    4 KB (700 words) - 16:13, 3 March 2016
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    8 KB (1,330 words) - 13:11, 24 May 2016
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    8 KB (1,336 words) - 17:27, 4 March 2016
  • ...ame to identify projects. If you want to display the project summary task (Task 0) at the top of a project file, go to the '''File''' tab on Microsoft Proj ...er the add or the replace snapshot, the processes described in the related links below can be used.
    6 KB (1,015 words) - 21:15, 3 May 2016
  • '''Task labels''' are not considered a '''Decoration''' for the purpose of this dis :(1) Using the '''PVP''' form to change all task/milestone decoration properties, and
    5 KB (669 words) - 14:29, 9 April 2020
  • ...riptions of the controls within the above context menu can be found at the links referenced at the end of this article. ...riptions of the controls within the above context menu can be found at the links referenced at the end of this article.
    5 KB (653 words) - 23:24, 11 October 2016
  • ...or milestones. In this respect the '''VST''' is a OnePager '''summary''' task. To create a Virtual Summary Task ('''VST'''), follow these steps:
    6 KB (907 words) - 17:11, 5 October 2017
  • ==About Links and Linking Tasks/Milestones== ...ow '''dependencies''', OnePager provides a means for you to '''link''' one task or milestone with others. '''OnePager Pro''' does not import dependency in
    6 KB (849 words) - 21:28, 18 March 2016
  • 1) We coined the term '''maverick''' to describe the task/milestone properties that differ from the global defaults or from data driv 3) For global editing descriptions for task/milestones and decorations, please see the articles using this link: [[Man
    3 KB (392 words) - 20:20, 20 February 2017
  • ==About the Task Bars Tab-OnePager Pro== This tab page, shown below, lets you control the style and decoration of task bars. Additionally, within this tab are the controls for creating and manag
    8 KB (1,107 words) - 14:31, 9 April 2020
  • ==About the Task Bars Tab-OnePager Express== This tab page, shown below, lets you control the style and decoration of task bars. Additionally, within this tab are the controls for creating and manag
    7 KB (1,061 words) - 14:33, 9 April 2020
  • ...ng''' rules. Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations will be shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere in OnePager where '''anchor shapes''' are provided
    8 KB (1,170 words) - 14:34, 9 April 2020
  • ...ng''' rules. Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations will be shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere in OnePager where '''anchor shapes''' are provided
    8 KB (1,170 words) - 14:36, 9 April 2020
  • ...Excel plan you selected for '''Gantt Bar/Milestone Fill Color''' on the '''Task Bars and Milestone''' tabs on the Project-View Properties ('''PVP''') form ...ich '''baselines''' are turned on (using the baseline checkboxes on the '''Task Bars''' and '''Milestones''' tabs) but '''incomplete milestones''' are not
    12 KB (1,715 words) - 15:46, 27 May 2016
  • ...sh dates''', the '''task/milestone name''', and the '''Unique-ID''' of the task from the Microsoft Project plan. An example is shown below. ...When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
    16 KB (2,353 words) - 15:28, 22 September 2016
  • ...sh dates''', the '''task/milestone name''', and the '''Unique-ID''' of the task from the Microsoft Excel plan. An example is shown below. ...When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
    16 KB (2,348 words) - 14:32, 24 February 2017
  • ...le provides links to articles which cover the main topics. Please use the links in the sections below as they apply to the operations you want to perform. ...t and each may be done by either a Push or Pull Operation. Please see the links that immediately follow:
    9 KB (1,486 words) - 17:12, 9 May 2016
  • See the article on '''Other Columns''' tab at the following links: [[Template Only Features for Version 5.3 (OnePager Pro) | Template Only F ==Related Links==
    5 KB (645 words) - 17:41, 11 April 2016
  • The article links below provide additional information on the basics of editing tasks/milesto | [[Changing Individual Task/Milestone Properties (Color, Shapes, etc.)]]
    2 KB (297 words) - 16:45, 20 April 2016
  • ...example, in this article: [[Task Bars Tab for Version 5.3 (OnePager Pro) | Task Bars Tab-OnePager Pro]]. :* '''Shape''' (task or milestone)
    3 KB (408 words) - 22:17, 18 April 2016
  • ==About Absorbing One Task Into Another== Task/milestone absorption is a handy way to compress information.
    3 KB (531 words) - 17:03, 5 October 2017
  • ==More on Matching Task/Milestone Identity for Updates== :b) The current source may have had its task identifiers renumbered,
    4 KB (626 words) - 14:22, 10 May 2016
  • The article links below provide you with more details on how to use OnePager. There are esse Clicking on any of the links below will take you to the article where you'll find a flow diagram and a s
    4 KB (660 words) - 16:57, 14 July 2016
  • ...ame to identify projects. If you want to display the project summary task (Task 0) at the top of a project file, go to the '''File''' tab on Microsoft Proj ...er the add or the replace snapshot, the processes described in the related links below can be used.
    6 KB (1,016 words) - 12:22, 25 May 2016
  • The article links below provide additional information on the basics of editing tasks/milesto ...e Properties (Color, Shapes, etc.) for OnePager Live | Changing Individual Task/Milestone Properties (Color, Shapes, etc.)]] 9.2.1-OPL
    3 KB (368 words) - 14:04, 6 June 2016
  • '''Task labels''' are not considered a '''Decoration''' for the purpose of this dis :(1) Using the '''PVP''' form to change all task/milestone decoration properties, and
    5 KB (617 words) - 14:37, 9 April 2020
  • ...scribed, for example, in this article: [[Task Bars Tab for OnePager Live | Task Bars Tab-OnePager LIve]] 21.1.3.1-OPL. :* '''Shape''' (task or milestone)
    3 KB (356 words) - 17:16, 17 May 2016
  • ...riptions of the controls within the above context menu can be found at the links referenced at the end of this article. ...riptions of the controls within the above context menu can be found at the links referenced at the end of this article.
    5 KB (775 words) - 15:47, 17 June 2016
  • ==About Links and Linking Tasks/Milestones== ...ow '''dependencies''', OnePager provides a means for you to '''link''' one task or milestone with others. '''OnePager Pro''' does not import dependency in
    6 KB (839 words) - 21:58, 7 July 2016
  • 1) We coined the term '''maverick''' to describe the task/milestone properties that differ from the global defaults or from data driv 3) For global editing descriptions for task/milestones and decorations, please see the articles using this link: [[Man
    3 KB (394 words) - 15:33, 18 July 2016
  • See the article on '''Field Mappings''' tab at the following links: [[Template Only Features for OnePager Live | Template Only Features]] 24. ...ddition to a description of the OnePager '''Template''' there are also hot links to the OnePager Live Wiki documentation and the email address of OnePager L
    8 KB (1,191 words) - 20:50, 12 July 2017
  • ...colored, semi-transparent bar that represents the baseline schedule for a task/milestone of the same color in the same swimlane. ...bel''' on the left if rows/swimlanes are displayed and on the right if the task/milestone '''labels''' extend beyond the right edge of the graph area.
    17 KB (2,555 words) - 15:30, 7 June 2016
  • If you haven't already, we strongly suggest that you use the links below and understand the content of the article referenced: 5) Now put a '''Yes''' in this '''flag''' column for any task that you want to graph:
    23 KB (3,704 words) - 16:51, 7 September 2016
  • This page, which serves as a Portal, enables you to quickly follow links to OnePager 6.0 articles listed below. If you have any questions or comment | [[Absorbing one task into another for Version 6.0 | Absorbing one task into another]] <!--17.0.1-60-->
    4 KB (579 words) - 22:26, 29 December 2020
  • Now put a '''Yes''' in this '''Flag''' field for any task that you want to graph: ...oving them from the '''OPP graph''', you won't have to explain why certain task bars and milestone symbols are appearing in weird places when they really s
    44 KB (6,850 words) - 19:25, 26 April 2022
  • .../Numbers''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    7 KB (1,036 words) - 16:37, 31 May 2016
  • ...d set the '''Flag/Number''' cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (783 words) - 12:32, 24 May 2016
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (946 words) - 12:52, 24 May 2016
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    9 KB (1,430 words) - 13:09, 24 May 2016
  • ...s long as the related Microsoft Excel plans are constructed with unique '''Task ID''' column contents. ...tomatically provide a unique identifier for rows. Additionally, unique '''Task ID''' numbers are needed so that OnePager Express ('''OPX''') does not get
    7 KB (1,049 words) - 12:33, 25 May 2016
  • ==Related Links== [[Category:Task/Milestone Editing for OnePager Live]]
    8 KB (1,186 words) - 16:34, 18 July 2016
  • ==About the Task Bars Tab== This tab page, shown below, lets you control the style and decoration of task bars. Additionally, within this tab are the controls for creating and manag
    8 KB (1,114 words) - 14:24, 20 July 2016
  • ...ng''' rules. Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations will be shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere in OnePager where '''anchor shapes''' are provided
    8 KB (1,179 words) - 14:23, 20 July 2016
  • ...Excel plan you selected for '''Gantt Bar/Milestone Fill Color''' on the '''Task Bars and Milestone''' tabs on the Project-View Properties ('''PVP''') form ==Do Not Duplicate Task/Milestones==
    12 KB (1,803 words) - 15:22, 20 July 2016
  • This tab controls the font characteristics of links. The tab is shown below: 1) '''Font''' This one control in the '''Event Links''' tab of the Project-View Properties ('''PVP''') form provides access to t
    1 KB (183 words) - 17:10, 20 July 2016
  • ...ish dates''', the '''task/milestone name''', and the '''UniqueID''' of the task from the Microsoft Project plan. An example is shown below. ...When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
    17 KB (2,505 words) - 19:54, 21 July 2016
  • ...le provides links to articles which cover the main topics. Please use the links in the sections below as they apply to the operations you want to perform. [[Category:Task/Milestone Editing for OnePager Live]]
    6 KB (989 words) - 14:26, 31 May 2016
  • ...in this article. The sub-sections below provide introductory material and links to more detailed discussions of these new features: ...rce Categories''' assigned to individual tasks, identify the '''Phase''' a task is assigned to, and place keywords in '''Text''' fields for the purposes of
    12 KB (1,819 words) - 23:48, 15 January 2019
  • 5) Now put a '''Yes''' in this '''flag''' field for any task that you want to graph: :c) '''Task Selection''' This is how you tell '''OPP''' which tasks from your Microsoft
    24 KB (3,856 words) - 16:52, 5 May 2017
  • :c) A '''Task ID''' field that OnePager will use to keep track of tasks/milestones as you :c) '''Task Selection''' This is how you tell '''OPX''' which tasks from your Microsoft
    23 KB (3,791 words) - 16:52, 5 May 2017
  • 5) Now put a '''Yes''' in this '''flag''' field for any task that you want to graph: :c) '''Task Selection''' This is how you tell '''OPP''' which tasks from your Microsoft
    25 KB (3,991 words) - 16:56, 5 May 2017
  • :c) A '''Task ID''' field that OnePager will use to keep track of tasks/milestones as you :c) '''Task Selection''' This is how you tell '''OPX''' which tasks from your Microsoft
    24 KB (3,850 words) - 17:00, 5 May 2017
  • The article links below provide you with more details on how to use OnePager. There are esse Clicking on any of the links below will take you to the article where you'll find a flow diagram and a s
    7 KB (1,068 words) - 17:01, 5 May 2017
  • ...rs''' field cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    5 KB (859 words) - 17:30, 4 April 2017
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    5 KB (864 words) - 21:03, 19 July 2017
  • .../Numbers''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    7 KB (1,040 words) - 17:31, 4 April 2017
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    7 KB (1,040 words) - 17:34, 4 April 2017
  • ...the '''Flag/Number''' field cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (699 words) - 10:34, 4 May 2024
  • ...d set the '''Flag/Number''' cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (741 words) - 19:47, 30 April 2017
  • ...nd set the '''flag''' field cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    4 KB (687 words) - 19:47, 30 April 2017
  • ...ded and set the Flag/Number cell to “Yes” leaving the remainder of the task/milestone row’s Flag field set to “No.” ==Related Links==
    5 KB (730 words) - 19:48, 30 April 2017
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (921 words) - 17:45, 4 April 2017
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (936 words) - 17:46, 4 April 2017
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (918 words) - 18:03, 4 April 2017
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (941 words) - 18:04, 4 April 2017
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    9 KB (1,410 words) - 17:57, 4 April 2017
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    9 KB (1,397 words) - 17:59, 4 April 2017
  • ...rce plan''' data into OnePager and increase your flexibility for selecting task and milestones to appear in project views. ===Links to Conditional Import Filters Detailed Articles===
    3 KB (416 words) - 16:38, 8 May 2017
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked on. This action brings up the ...'flag''' fields instead, you may revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    30 KB (4,850 words) - 14:28, 29 May 2017
  • ==Introduction to the OnePager Task Links== These articles describe OnePager’s '''Task Links''' feature. Illustrations used in this article are from OnePager Pro using
    10 KB (1,347 words) - 16:40, 22 April 2022
  • ...related Microsoft Excel '''source plans''' are constructed with unique '''Task ID''' field contents. ...cally provide a '''unique identifier''' for rows. Additionally, unique '''Task ID''' numbers are needed so that OnePager Express ('''OPX''') does not get
    7 KB (1,134 words) - 17:09, 5 May 2017
  • 12) '''OPP''' always uses the label (name) of the project-summary task to identify each project in a multi-project situation. :b) If you want to display the project summary task (Task 0) at the top of a project file, go to the '''File''' tab on Microsoft Proj
    7 KB (1,077 words) - 17:10, 5 May 2017
  • 1) OnePager uses the '''labels''' of the '''project-summary task''' to identify each project in a '''multi-project''' chart. 3) If you want to display the '''project summary task''' at the top of a Microsoft Project file, go to the '''File''' tab on Micr
    11 KB (1,614 words) - 19:17, 19 May 2022
  • ...napshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three (3) ways ...dds new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    10 KB (1,470 words) - 16:44, 27 April 2022
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked. This action brings up the ''' ...'flag''' fields instead, you may revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    31 KB (4,968 words) - 14:33, 29 May 2017
  • ...an 25 OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task/milestone identifier'''. ...') and a text field ('''Text10''') which appears to be used to specify the Task's estimated risk. If we create a simple project view using the standard Si
    14 KB (2,186 words) - 13:44, 5 June 2017
  • ...want to also display for each '''row''' the '''%Complete''' value for each task in each '''row''' of the project view. This can easily be done as follows: ...imlane Labels and/or Additional Text Columns When Collecting More that One Task Into A Row]] <!--12.1.1-60-->.
    15 KB (2,313 words) - 23:21, 6 July 2017
  • ==Links to Detailed Articles on Creating and Editing Rows and Swimlanes== ...n for new OnePager users is that you read the two articles in the table of links below to become familiar with the '''multiple swimlane levels''' concepts a
    9 KB (1,331 words) - 16:52, 25 April 2022
  • ...to '''edit''' the '''colors''', '''shape''' and other '''properties''' of task bar/milestone symbols in the chart. The '''Legend''' can be displayed in th ...anging a '''Gradient''' or by changing to a '''Hash Fill Patterns''' for a task bar/milestone symbol typically adds an entry into the '''legend''' as shown
    4 KB (643 words) - 17:33, 22 April 2022
  • 2) Suppose you want to include '''source plan''' rows where task/milestone '''Start''' dates are greater than a specified date. With versio ...er choices ('''OPC''') form below has an additional radio button in the '''Task Selection''' group, '''Select tasks by custom filter''', and a new button c
    8 KB (1,214 words) - 14:39, 19 May 2017
  • This page, which serves as a Portal, enables you to quickly follow links to OnePager 6.1 articles listed below. If you have any questions or commen ...Version 6.1 | Linking Task and Milestone Using Manual and Data-Driven Task Links (Portal)]] <!--19.0.1-61-->
    5 KB (647 words) - 22:26, 29 December 2020
  • This article provides links to articles which cover the main topics listed in the sub-sections below. Please use the links below as they apply to the operations you want to perform.
    10 KB (1,510 words) - 17:24, 19 May 2017
  • ...ft Project and Microsoft Express '''source plan''' fields at the following links: 5) The links below provide specific information on using '''OPP’s Enterprise Custom Fi
    4 KB (612 words) - 17:19, 11 April 2017
  • ==Related Links== [[Category:Task/Milestone Editing]]
    11 KB (1,698 words) - 17:24, 11 April 2017
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked. This action brings up the ''' ...'flag''' fields instead, you may revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    33 KB (5,266 words) - 14:38, 29 May 2017
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked. This action brings up the ''' ...'flag''' fields instead, you may revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    33 KB (5,368 words) - 14:45, 29 May 2017
  • The article links below provide additional information on the basics of editing tasks/milesto ...one Properties (Color, Shapes, etc.) for Version 6.0 | Changing Individual Task/Milestone Properties (Color, Shapes, etc.)]] <!--9.2.1-60-->
    3 KB (370 words) - 19:57, 10 April 2017
  • ==Changing Individual Task/Milestone Colors== ...erful communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.
    18 KB (2,661 words) - 19:51, 10 April 2017
  • 1) We coined the term '''maverick''' to describe the task/milestone properties that differ from the global defaults or from data driv 3) For global editing descriptions for task/milestones and decorations, please see the articles using this link: [[Man
    4 KB (531 words) - 16:31, 11 April 2017
  • Decorations on task/milestones include the following data-driven elements: ...a '''Decoration''' for the purpose of this discussion. The subject of '''task labels''' is covered in this article: [[Manual Editing for Version 6.0 (Por
    6 KB (784 words) - 14:42, 9 April 2020
  • ...example, in this article: [[Task Bars Tab for Version 6.0 (OnePager Pro) | Task Bars Tab-OnePager Pro]]. <!--21.1.3.1-60--> :* '''Shape''' (task or milestone)
    4 KB (460 words) - 20:28, 10 April 2017
  • ==About Absorbing One Task Into Another== Task/milestone '''absorption''' is a handy way to compress information.
    4 KB (532 words) - 17:05, 5 October 2017
  • ...or milestones. In this respect the '''VST''' is a OnePager '''summary''' task. To create a Virtual Summary Task ('''VST'''), follow these steps:
    6 KB (930 words) - 17:14, 5 October 2017
  • ==About Links and Linking Tasks/Milestones== ...ow '''dependencies''', OnePager provides a means for you to '''link''' one task or milestone with others. '''OnePager Pro''' and '''OnePager Express''' do
    6 KB (919 words) - 15:31, 11 April 2017
  • ==Related Links== [[Category:Task/Milestone Editing]]
    8 KB (1,290 words) - 17:17, 5 May 2017
  • ==About the Task Bars Tab-OnePager Pro== ...tab page, shown below, lets you control the '''style and decoration''' of task bars.
    8 KB (1,155 words) - 14:43, 9 April 2020
  • ==About the Task Bars Tab-OnePager Express== ...tab page, shown below, lets you control the '''style and decoration''' of task bars.
    8 KB (1,106 words) - 14:44, 9 April 2020
  • Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations are shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere where OnePager provides '''anchor shapes'''.
    9 KB (1,215 words) - 14:45, 9 April 2020
  • Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations are shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere where OnePager provides '''anchor shapes'''.
    9 KB (1,217 words) - 14:45, 9 April 2020
  • 6) '''Do not duplicate tasks/milestones'''. Please use the links below for more detailed information on this control: ...ce plan''' you selected for '''Gantt Bar/Milestone Fill Color''' on the '''Task Bars and Milestone''' tabs on the Project-View Properties ('''PVP''') form
    13 KB (1,909 words) - 17:10, 19 May 2017
  • This tab controls the '''font''' characteristics of links. The tab is shown below: 1) '''Font'''. This one control in the '''Event Links''' tab of the Project-View Properties ('''PVP''') form provides access to t
    1 KB (208 words) - 16:13, 11 April 2017
  • ...colored, semi-transparent bar that represents the baseline schedule for a task/milestone of the same color in the same swimlane. ...bel''' on the left if rows/swimlanes are displayed and on the right if the task/milestone '''labels''' extend beyond the right edge of the graph area.
    20 KB (2,948 words) - 12:54, 28 June 2017
  • ...sh dates''', the '''task/milestone name''', and the '''Unique-ID''' of the task from the Microsoft Project '''source plan'''. An example is shown below. ...When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
    19 KB (2,794 words) - 17:13, 19 May 2017
  • ...nish dates''', the '''task/milestone name''', and the '''Task Id''' of the task from the Microsoft Excel '''source plan'''. An example is shown below. ...When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
    17 KB (2,537 words) - 14:05, 18 May 2017
  • 2) We coined the term '''maverick''' to describe the task/milestone properties that differ from the global defaults or from data driv 5) For global '''editing''' descriptions for task/milestones and decorations, please see the articles using this link: [[Man
    4 KB (610 words) - 17:15, 8 January 2019
  • ...me, Percent-Complete, and Critical Path''') appear both here and on the '''Task Bars''' and '''Milestones''' tabs ::(3) Task-name
    11 KB (1,750 words) - 16:35, 5 June 2017
  • ...me, Percent-Complete, and Critical Path''') appear both here and on the '''Task Bars''' and '''Milestones''' tabs. ::(2) Task-name
    10 KB (1,493 words) - 16:21, 5 June 2017
  • ...different '''shapes, colors, fill patterns, and borders'''. Additionally, task/milestones can be '''decorated''' with '''deadline shapes and endpoint shap ...'start or end date''' per your selection. You can choose to represent any task by a milestone symbol at its '''start or finish date'''. Additionally, OneP
    10 KB (1,535 words) - 17:36, 7 April 2017
  • This article describes OnePager’s '''Task Bar Name Label Collision Avoidance''' feature. Illustrations used in this ...ature is to give you '''automatic''' and manual capabilities to '''resolve task bar name label collisions''' in the '''graph''' that look like this before
    7 KB (996 words) - 14:09, 20 May 2022
  • See the article on '''Field Mappings''' tab at the following links: [[Template Only Features for OnePager Live (MS Project Source) | Template ...ddition to a description of the OnePager '''Template''' there are also hot links to the OnePager Live Wiki documentation and the email address of OnePager L
    8 KB (1,212 words) - 15:46, 13 July 2017
  • If you haven't already, we strongly suggest that you use the links below and understand the content of the article referenced: 5) Now put a '''Yes''' in this '''flag''' column for any task that you want to graph:
    23 KB (3,709 words) - 16:40, 13 July 2017
  • ...different '''shapes, colors, fill patterns, and borders'''. Additionally, task/milestones can be '''decorated''' with '''deadline shapes and endpoint shap ...'start or end date''' per your selection. You can choose to represent any task by a milestone symbol at its '''start or finish date'''. Additionally, OneP
    10 KB (1,538 words) - 22:14, 13 July 2017
  • :c) A '''Task ID''' field that OnePager will use to keep track of tasks/milestones as you :c) '''Task Selection''' This is how you tell '''OPX''' which tasks from your Microsoft
    23 KB (3,796 words) - 16:53, 13 July 2017
  • The article links below provide you with more details on how to use OnePager. There are esse Clicking on any of the links below will take you to the article where you'll find a flow diagram and a s
    6 KB (901 words) - 15:56, 21 July 2017
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (958 words) - 21:48, 19 July 2017
  • ...nd set the '''flag''' field cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (724 words) - 21:15, 19 July 2017
  • ...the '''Flag/Number''' field cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (734 words) - 21:12, 19 July 2017
  • ...an 25 OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task/milestone identifier'''. ...') and a text field ('''Text10''') which appears to be used to specify the Task's estimated risk. If we create a simple project view using the standard Si
    14 KB (2,148 words) - 17:24, 21 July 2017
  • ...rce plan''' data into OnePager and increase your flexibility for selecting task and milestones to appear in project views. ===Links to Conditional Import Filters Detailed Articles===
    3 KB (397 words) - 22:00, 13 July 2017
  • The article links below provide additional information on the basics of editing tasks/milesto ...rties (Color, Shapes, etc.) for OnePager Live Beta 2 | Changing Individual Task/Milestone Properties (Color, Shapes, etc.)]] 9.2.1-OPL2
    3 KB (392 words) - 21:38, 13 July 2017
  • ==Changing Individual Task/Milestone Colors== ...erful communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.
    18 KB (2,665 words) - 19:29, 13 July 2017
  • Decorations on task/milestones include the following data-driven elements: ...a '''Decoration''' for the purpose of this discussion. The subject of '''task labels''' is covered in this article: [[Manual Editing for OnePager Live Be
    6 KB (825 words) - 14:47, 9 April 2020
  • ...rs''' field cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    6 KB (898 words) - 20:54, 19 July 2017
  • ...example, in this article: [[Task Bars Tab for Version 6.0 (OnePager Pro) | Task Bars Tab-OnePager Pro]]. <!--21.1.3.1-60--> :* '''Shape''' (task or milestone)
    4 KB (492 words) - 16:40, 14 July 2017
  • ...want to also display for each '''row''' the '''%Complete''' value for each task in each '''row''' of the project view. This can easily be done as follows: ...imlane Labels and/or Additional Text Columns When Collecting More that One Task Into A Row]] <!--12.1.1-60-->.
    15 KB (2,324 words) - 20:29, 14 July 2017
  • ==About Links and Linking Tasks/Milestones== ...ow '''dependencies''', OnePager provides a means for you to '''link''' one task or milestone with others. '''OnePager Pro''' and '''OnePager Express''' do
    6 KB (923 words) - 22:04, 14 July 2017
  • 1) We coined the term '''maverick''' to describe the task/milestone properties that differ from the global defaults or from data driv 3) For global editing descriptions for task/milestones and decorations, please see the articles using this link: [[Man
    4 KB (551 words) - 17:33, 17 July 2017
  • ==Related Links== [[Category:Task/Milestone Editing]]
    9 KB (1,294 words) - 14:13, 17 July 2017
  • ==About the Task Bars Tab-OnePager Pro== ...tab page, shown below, lets you control the '''style and decoration''' of task bars.
    8 KB (1,161 words) - 14:30, 17 July 2017
  • ==About the Task Bars Tab-OnePager Express== ...tab page, shown below, lets you control the '''style and decoration''' of task bars.
    8 KB (1,120 words) - 14:49, 17 July 2017
  • Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations are shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere where OnePager provides '''anchor shapes'''.
    9 KB (1,217 words) - 15:01, 17 July 2017
  • Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations are shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere where OnePager provides '''anchor shapes'''.
    9 KB (1,218 words) - 15:11, 17 July 2017
  • 6) '''Do not duplicate tasks/milestones'''. Please use the links below for more detailed information on this control: ...ce plan''' you selected for '''Gantt Bar/Milestone Fill Color''' on the '''Task Bars and Milestone''' tabs on the Project-View Properties ('''PVP''') form
    13 KB (1,925 words) - 15:24, 17 July 2017
  • Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations are shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere where OnePager provides '''anchor shapes'''.
    9 KB (1,218 words) - 15:48, 17 July 2017
  • This tab controls the '''font''' characteristics of links. The tab is shown below: 1) '''Font'''. This one control in the '''Event Links''' tab of the Project-View Properties ('''PVP''') form provides access to t
    2 KB (212 words) - 16:21, 17 July 2017
  • ...sh dates''', the '''task/milestone name''', and the '''Unique-ID''' of the task from the Microsoft Project '''source plan'''. An example is shown below. ...When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
    19 KB (2,818 words) - 21:12, 17 July 2017
  • ...nish dates''', the '''task/milestone name''', and the '''Task Id''' of the task from the Microsoft Excel '''source plan'''. An example is shown below. ...When the checkbox is unchecked, this process will not take place and one task dragged over another will be displayed as two separate tasks superimposed.
    17 KB (2,546 words) - 17:03, 17 July 2017
  • ...me, Percent-Complete, and Critical Path''') appear both here and on the '''Task Bars''' and '''Milestones''' tabs ::(3) Task-name
    11 KB (1,754 words) - 17:21, 17 July 2017
  • ...me, Percent-Complete, and Critical Path''') appear both here and on the '''Task Bars''' and '''Milestones''' tabs. ::(2) Task-name
    10 KB (1,499 words) - 17:33, 17 July 2017
  • This article provides links to articles which cover the main topics listed in the sub-sections below. Please use the links below as they apply to the operations you want to perform.
    10 KB (1,516 words) - 19:52, 17 July 2017
  • ==Related Links== [[Category:Task/Milestone Editing]]
    11 KB (1,702 words) - 20:44, 17 July 2017
  • ...ate Properties form only features''', please see the articles shown in the links below: ...OnePager to parse the '''comma-delimited list''' and '''create''' a unique task for each instance in the '''comma-separated''' list. If you anticipate usin
    13 KB (1,861 words) - 20:51, 23 September 2022
  • ...colored, semi-transparent bar that represents the baseline schedule for a task/milestone of the same color in the same swimlane. ...bel''' on the left if rows/swimlanes are displayed and on the right if the task/milestone '''labels''' extend beyond the right edge of the graph area.
    20 KB (2,948 words) - 20:04, 4 February 2024
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    6 KB (901 words) - 21:06, 19 July 2017
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...add new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    12 KB (1,853 words) - 21:53, 19 July 2017
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    9 KB (1,449 words) - 15:19, 21 July 2017
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    9 KB (1,438 words) - 15:27, 21 July 2017
  • ...rce plan''' data into OnePager and increase your flexibility for selecting task and milestones to appear in project views. ===Links to Conditional Import Filters Detailed Articles===
    3 KB (397 words) - 15:52, 21 July 2017
  • ...rce plan''' data into OnePager and increase your flexibility for selecting task and milestones to appear in project views. ===Links to Conditional Import Filters Detailed Articles===
    3 KB (470 words) - 17:14, 21 July 2017
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked. This action brings up the ''' ...'flag''' fields instead, you may revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    33 KB (5,258 words) - 17:13, 21 July 2017
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked on. This action brings up the ...'flag''' fields instead, you may revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    30 KB (4,856 words) - 16:55, 21 July 2017
  • 12) '''OPP''' always uses the label (name) of the project-summary task to identify each project in a multi-project situation. :b) If you want to display the project summary task (Task 0) at the top of a project file, go to the '''File''' tab on Microsoft Proj
    7 KB (1,088 words) - 17:46, 21 July 2017
  • ...related Microsoft Excel '''source plans''' are constructed with unique '''Task ID''' field contents. ...cally provide a '''unique identifier''' for rows. Additionally, unique '''Task ID''' numbers are needed so that OnePager Express ('''OPX''') does not get
    7 KB (1,143 words) - 18:13, 21 July 2017
  • (1) Task Link Upgrade The subsections below provide an overview and links to more detailed descriptions of these new capabilities and enhancements:
    13 KB (1,858 words) - 13:43, 10 December 2018
  • ==Introduction to the OnePager 6.1 Task Links Upgrade== ...called '''Event Links'''). The process for creating and editing '''Event Links''' was limited and totally manual.
    62 KB (9,253 words) - 14:16, 10 December 2018
  • d) Additionally, any task/milestones within the '''timespan stretched''' also appear to be '''stretch ==Links to Detailed Articles==
    45 KB (6,783 words) - 15:11, 8 January 2019
  • ...se 6.1?]] <!--0.4-61-->, this new version has enhanced features such as '''Task Link Upgrades''' and '''Time Axis Upgrades''' to name a few. 5) Now put a '''Yes''' in this '''flag''' field for any task that you want to graph:
    28 KB (4,361 words) - 16:09, 18 December 2018
  • ...se 6.1?]] <!--0.4-61-->, this new version has enhanced features such as '''Task Link Upgrades''' and '''Time Axis Upgrades''' to name a few. 5) Now put a '''Yes''' in this '''flag''' field for any task that you want to graph:
    29 KB (4,550 words) - 16:13, 18 December 2018
  • ...se 6.1?]] <!--0.4-61-->, this new version has enhanced features such as '''Task Link Upgrades''' and '''Time Axis Upgrades''' to name a few. :c) A '''Task ID''' field that OnePager uses to keep track of tasks/milestones as your Mi
    28 KB (4,398 words) - 16:30, 18 December 2018
  • ...se 6.1?]] <!--0.4-61-->, this new version has enhanced features such as '''Task Link Upgrades''', '''Time Axis Upgrades''', and '''Legend Upgrades''' to n :c) A '''Task ID''' field that OnePager uses to keep track of tasks/milestones as your Mi
    29 KB (4,544 words) - 16:51, 18 December 2018
  • ...ne assignments, font properties, time axis choices, headers, footers, task links, and comment boxes'''.
    4 KB (568 words) - 15:36, 12 December 2018
  • ...te''' in the highlighted rectangles above, that '''OPC''' picked up the '''Task Name''' '''field''' for collecting tasks into rows. ==Related Links==
    9 KB (1,340 words) - 22:21, 8 January 2019
  • ...fferent '''shapes, colors, fill patterns, and borders'''. Additionally, '''task/milestones''' can be '''decorated''' with '''deadline shapes and endpoint s ...'start or end date''' per your selection. You can choose to represent any task by a milestone symbol at its '''start or finish date'''. Additionally, OneP
    13 KB (1,867 words) - 17:07, 18 December 2018
  • 2) The article links below provide you with more details on how to use OnePager. 5) Clicking on any of the links below accesses the article where you'll find a flow diagram and a step-by-s
    8 KB (1,165 words) - 21:59, 5 January 2019
  • ...rs''' field cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    6 KB (879 words) - 12:29, 16 January 2019
  • .../Numbers''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    7 KB (1,057 words) - 14:14, 25 December 2018
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    6 KB (883 words) - 12:37, 16 January 2019
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    7 KB (1,056 words) - 14:23, 25 December 2018
  • ...d set the '''Flag/Number''' cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (762 words) - 14:41, 25 December 2018
  • ...nd set the '''flag''' field cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (709 words) - 14:49, 25 December 2018
  • ...ded and set the Flag/Number cell to “Yes” leaving the remainder of the task/milestone row’s Flag field set to “No.” ==Related Links==
    5 KB (748 words) - 15:02, 25 December 2018
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...dds new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (944 words) - 22:45, 4 January 2019
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...dds new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (957 words) - 22:52, 4 January 2019
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...dds new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (941 words) - 23:02, 4 January 2019
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three ways to re ...dds new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (963 words) - 23:10, 4 January 2019
  • 3) Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    9 KB (1,427 words) - 16:57, 5 January 2019
  • 3) Please see the links at the end of this article to access other articles in the series. ...015, and to replace only dates. For this example, we want to change the '''Task Selection''' control to '''Select all tasks'''. When you make these change
    9 KB (1,416 words) - 17:07, 5 January 2019
  • ...rce plan''' data into OnePager and increase your flexibility for selecting task and milestones to appear in project views. ==Links to Conditional Import Filters Detailed Articles==
    3 KB (368 words) - 21:44, 5 January 2019
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked on. This action brings up the ...'flag''' fields instead, you can revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    30 KB (4,785 words) - 22:08, 7 January 2019
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked. This action brings up the ''' ...'flag''' fields instead, you can revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    30 KB (4,883 words) - 21:59, 7 January 2019
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked. This action brings up the ''' ...'flag''' fields instead, you can revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    32 KB (5,177 words) - 22:01, 7 January 2019
  • ...tion above, in the '''Task Selection''' section of the form, the '''Select task by custom filter''' radio button is clicked. This action brings up the ''' ...'flag''' fields instead, you can revert back to either of the two other '''Task Selection''' options provided in the '''OPC''' form shown above.
    33 KB (5,285 words) - 22:02, 7 January 2019
  • ...an 25 OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task/milestone identifier'''. ...') and a text field ('''Text10''') which appears to be used to specify the Task's estimated risk. If we create a simple project view using the standard Si
    14 KB (2,163 words) - 21:38, 5 January 2019
  • 12) '''OPP''' always uses the label (name) of the project-summary task to identify each project in a multi-project situation. :b) If you want to display the project summary task (Task 0) at the top of a project file, go to the '''File''' tab on Microsoft Proj
    7 KB (1,086 words) - 20:38, 18 December 2018
  • ...related Microsoft Excel '''source plans''' are constructed with unique '''Task ID''' field contents. ...cally provide a '''unique identifier''' for rows. Additionally, unique '''Task ID''' numbers are needed so that OnePager Express ('''OPX''') does not get
    8 KB (1,161 words) - 20:03, 4 February 2024
  • ...the '''Flag/Number''' field cell to '''Yes''' leaving the remainder of the task/milestone row’s '''flag''' field set to '''No'''. ==Related Links==
    5 KB (716 words) - 14:33, 25 December 2018
  • ==Links to Detailed Articles== ...e additional information on the '''editing''' of tasks/milestones and task links:
    5 KB (664 words) - 15:29, 19 December 2018
  • ...on box''' with two '''grab points''' (top and bottom) in the middle of the task/milestone. :(5) '''Esc key''' If you want to '''redo''' your task/milestone '''selections''', press the '''ESC key''' and OnePager '''deselec
    3 KB (425 words) - 15:42, 19 December 2018
  • ==Changing Individual Task/Milestone Colors== ...erful communications tool. When you manually change the '''color''' of a task/milestone, we say that you are creating a '''color maverick'''.
    18 KB (2,675 words) - 16:03, 19 December 2018
  • ==Hiding and Unhiding Task/Milestone Labels== 1) You can hide one or more of the task/milestone '''labels'''.
    8 KB (1,293 words) - 16:22, 19 December 2018
  • 3) When you are trying to locate a task/milestone and do not wish to cause all '''hidden''' tasks/milestones, rows, ...owing and a check ('''X''') in the column(s) appropriate for '''why''' the task/milestone is not visible:
    9 KB (1,362 words) - 16:33, 19 December 2018
  • ==Restoring the Default Formatting for a Task/Milestone== 1) To restore a task or milestone to its default formatting, right click the task or milestone, choose '''Format…''' command in the '''context menu''', and
    5 KB (722 words) - 16:40, 19 December 2018
  • 1) Decorations on task/milestones include the following Data-Driven elements: 2) '''Task labels''' are not considered a '''Decoration''' for the purpose of this dis
    6 KB (792 words) - 14:48, 9 April 2020
  • 2) Not every task in a Microsoft Project '''source plan''' has '''Percent complete''' data as ==Modifying All Task Percent Complete Displays==
    7 KB (1,057 words) - 17:51, 19 December 2018
  • ...k (e.g., baseline to task/milestone, endpoints, and deadline connectors to task/milestone) :b) '''Task/Milestone'''
    1,011 B (126 words) - 16:52, 19 December 2018
  • 2) Not every task in a Microsoft Excel '''source plan''' has '''Percent complete''' data asso ==Modifying All Task Percent Complete Displays==
    7 KB (1,048 words) - 17:59, 19 December 2018
  • ...example, in this article: [[Task Bars Tab for Version 6.1 (OnePager Pro) | Task Bars Tab-OnePager Pro]]. <!--21.1.3.1-61--> :* '''Shape''' (task or milestone)
    4 KB (457 words) - 14:39, 20 December 2018
  • ...want to also display for each '''row''' the '''%Complete''' value for each task in each '''row''' of the project view. This can easily be done as follows: ...n: Using Swimlane Labels and/or Text Columns When Collecting More that One Task Into A Row]]. <!--12.1.1-61.-->
    15 KB (2,309 words) - 12:48, 21 December 2018
  • 1) When you are moving task/milestone to different rows and swimlanes, you can end up with '''unoccupie ...e empty when you '''add or update a snapshot'''. This can happen when a task or milestone is present at some '''snapshots''' but is missing from the '''
    6 KB (878 words) - 18:13, 20 December 2018
  • ...graph area, which drags along all the tasks/milestones, including '''Task Links''', that they contain, too!
    2 KB (320 words) - 15:54, 20 December 2018
  • This page, which serves as a Portal, enables you to quickly follow links to OnePager 7.0 articles listed below. If you have any questions or commen ...Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
    5 KB (660 words) - 18:19, 5 February 2021
  • 1) When you are moving task/milestone to different rows and swimlanes, you can end up with '''unoccupie ...e empty when you '''add or update a snapshot'''. This can happen when a task or milestone is present at some '''snapshots''' but is missing from the '''
    6 KB (882 words) - 18:06, 20 December 2018
  • ...milar to '''comment boxes''', except that they are '''not''' attached to a task or milestone. '''Free boxes''' are similar to text boxes in Microsoft Power ...one Properties (Color, Shapes, etc.) for Version 6.1 | Changing Individual Task/Milestone Properties (Color, Shapes, etc.)]]. <!--9.2.1-61-->
    7 KB (1,136 words) - 13:55, 21 December 2018
  • ==About Absorbing One Task Into Another== 1) Task/milestone '''absorption''' is a handy way to compress information.
    5 KB (709 words) - 21:27, 10 April 2019
  • ...or milestones. In this respect the '''VST''' is a OnePager '''summary''' task. To create a Virtual Summary Task ('''VST'''), follow these steps:
    7 KB (1,066 words) - 15:20, 21 December 2018
  • ...es OnePager to '''parse the comma-delimited list''' and '''create a unique task bar''' for each instance in the '''comma-separated''' list. Say you want to use '''color-codes''' on task bars/milestone symbols based upon your Asana '''source plan’s Assigned to
    7 KB (1,043 words) - 20:52, 27 November 2023
  • ...on of '''Data-driven Task Links''' and enhancements made to manual '''Task Links''' required enhancements to the OnePager Pro 6.1 '''Template''' and '''Proj ...h enhanced controls to support the new capabilities of '''Data-driven Task Links'''.
    54 KB (7,879 words) - 16:58, 10 December 2018
  • ==OnePager Express 6.1 Enhancements for Data-Driven Task Links== 2) OnePager Express 6.1 is designed to process '''Task Links''' that are specified as '''predecessors''' '''ONLY'''.
    55 KB (8,129 words) - 13:46, 11 December 2018
  • 3) Clicking the '''Select task with 'Yes' in field:''' radio button causes OnePager to import tasks using ...in this control group show the actions that were taken with respect to '''Task Selection''' when the project view was created.
    10 KB (1,436 words) - 12:00, 24 December 2018
  • ==About the Task Bars Tab-OnePager Pro== ...tab page, shown below, lets you control the '''style and decoration''' of task bars.
    8 KB (1,153 words) - 14:49, 9 April 2020
  • ==About the Task Bars Tab-OnePager Express== ...tab page, shown below, lets you control the '''style and decoration''' of task bars.
    8 KB (1,110 words) - 14:49, 9 April 2020
  • 3) Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations are shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere where OnePager provides '''anchor shapes'''.
    9 KB (1,215 words) - 14:50, 9 April 2020
  • 3) Where the controls for this form differ from those on the '''Task Bars''' tab, illustrations are shown in the sub-paragraphs below: ...available as '''anchors''' for connectors between '''comment boxes''' and task/milestones and elsewhere where OnePager provides '''anchor shapes'''.
    9 KB (1,217 words) - 14:51, 9 April 2020
  • ==Related Links== [[Category:Task/Milestone Editing]]
    4 KB (549 words) - 20:58, 7 January 2019
  • 7) '''Do not duplicate tasks/milestones'''. Please use the links below for more detailed information on this control: ...ce plan''' you selected for '''Gantt Bar/Milestone Fill Color''' on the '''Task Bars and Milestone''' tabs on the Project-View Properties ('''PVP''') form
    13 KB (1,909 words) - 17:59, 16 February 2024
  • 8) '''Do not duplicate tasks/milestones'''. Please use the links below for more detailed information on this control: ...ce plan''' you selected for '''Gantt Bar/Milestone Fill Color''' on the '''Task Bars and Milestone''' tabs on the Project-View Properties ('''PVP''') form
    13 KB (1,854 words) - 20:30, 7 January 2019
  • ...rows causes tasks/milestones to get very short and hiding many rows causes task/milestones to get very tall. ==Related Links==
    6 KB (842 words) - 20:39, 7 January 2019
  • ==Related Links== [[Category:Task/Milestone Editing]]
    4 KB (557 words) - 20:51, 7 January 2019
  • ==About the Task Links Tab== ...controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the project view. The tab is shown below:
    1 KB (157 words) - 12:09, 24 December 2018
  • ==About the Task Links Tab== ...controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the project view. The tab is shown below:
    1 KB (154 words) - 12:21, 24 December 2018
  • ...sh dates''', the '''task/milestone name''', and the '''Unique-ID''' of the task from the Microsoft Project '''source plan'''. An example is shown below. ...cle at: [[Absorbing one task into another for Version 6.1 | Absorbing one task into another]]. <!--17.0.1-61.-->
    22 KB (3,388 words) - 12:37, 24 December 2018
  • ...nish dates''', the '''task/milestone name''', and the '''Task ID''' of the task from the Microsoft Excel '''source plan'''. An example is shown below. ...cle at: [[Absorbing one task into another for Version 6.1 | Absorbing one task into another]]. <!--17.0.1-61.-->
    21 KB (3,189 words) - 12:51, 24 December 2018
  • ...me, Percent-Complete, and Critical Path''') appear both here and on the '''Task Bars''' and '''Milestones''' tabs ::(3) Task-name
    11 KB (1,744 words) - 21:16, 7 January 2019
  • ...me, Percent-Complete, and Critical Path''') appear both here and on the '''Task Bars''' and '''Milestones''' tabs. ::(2) Task-name
    10 KB (1,489 words) - 21:24, 7 January 2019
  • ...ne assignments, font properties, time axis choices, headers, footers, task links, and comment boxes'''. It also tells OnePager which '''Fields''' to import ...Milestone Shapes and Text Labels for Version 7.1 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-71-->
    5 KB (664 words) - 17:17, 26 April 2022
  • ...named '''source plan'''. The chart also '''saves''' the '''task bar names, task bar label positions, and row and swimlane assignments, plus the title, lege ...napshot''' is a how the task bars and milestone symbols in a chart look as task bars and milestone symbols on a specific '''snapshot date''' (a.k.a. '''sta
    7 KB (1,020 words) - 17:16, 26 April 2022
  • 1) This article provides links to articles which cover the main topics listed in the sub-sections below. 2) Please use the links below as they apply to the operations you want to perform.
    10 KB (1,604 words) - 13:39, 24 December 2018
  • ==Saving Project View Data from OnePager 6.1 with Data-Driven Task Links and Time Axis Cells with Modified Cell Widths== ...se of OnePager Pro or Express to be able to '''show''' '''data-driven Task Links''' and to support '''Time Axis cells''' of varying '''width''' and '''heigh
    6 KB (848 words) - 16:14, 24 December 2018
  • ...ft Project and Microsoft Express '''source plan''' fields at the following links: 5) The links below provide specific information on using '''OPP’s Enterprise Custom Fi
    4 KB (604 words) - 19:29, 24 December 2018
  • ...of individual rows, the '''height''' of the percent-complete bar within a task bar, and the like. ...mplate''' for you to preset the method you want to use for '''importing''' task/milestone information from your Microsoft Project '''source plan'''.
    14 KB (2,088 words) - 20:46, 8 January 2019
  • ...of individual rows, the '''height''' of the percent-complete bar within a task bar, and the like. ...mplate''' for you to preset the method you want to use for '''importing''' task/milestone information from your Microsoft Project '''source plan'''.
    14 KB (2,107 words) - 18:22, 24 December 2018
  • 1) The '''field splitting''' feature allows you to duplicate tasks when a task in your Microsoft Project '''source plan''' is assigned to '''multiple reso ...ables OnePager to parse the '''comma-delimited list''' and create a unique task for each instance in the '''comma-separated''' list.
    4 KB (614 words) - 22:02, 30 January 2019
  • 1) The '''field splitting''' feature allows you to duplicate tasks when a task in your Microsoft Excel '''source plan''' is assigned to '''multiple resour ...ables OnePager to parse the '''comma-delimited''' list and create a unique task for each instance in the '''comma-separated''' list.
    4 KB (630 words) - 22:04, 30 January 2019
  • ==Related Links== [[Category:Task/Milestone Editing]]
    13 KB (1,963 words) - 19:46, 29 January 2024
  • ...'' The physical connection point on a '''predecessor '''or '''successor''' task that includes the '''Begin''' and '''End type''' '''shape''' and the '''Beg ...colored, semi-transparent bar that represents the baseline schedule for a task/milestone of the same color in the same swimlane.
    39 KB (5,743 words) - 19:55, 24 December 2018
  • ==Manually Creating and Editing Task Links== ...er Pro examples but the method applies equally to '''Manually Created Task Links''' in OnePager Express.
    14 KB (2,193 words) - 17:39, 22 August 2018
  • ==Introduction to the OnePager 6.1 Task Links == ...called '''Event Links'''). The process for creating and editing '''Event Links''' was limited and totally manual.
    8 KB (1,117 words) - 15:25, 10 December 2018
  • ...and''' enhancements''' that are summarized in this article. Additionally, links are provided to more detailed '''Wiki Articles''' pertaining to each new '' :* New '''Hash Fill Patterns '''for task bars and milestone symbols
    21 KB (3,058 words) - 15:01, 2 August 2022
  • ...are discussions of '''manual editing''' of manual and '''Data-driven Task Links''' in the project view. ...n Task Link Import Rules for OnePager Express for Version 6.1| Data-Driven Task Link Import Rules for OnePager Express]]. <!--19.1.3.2-61.-->
    65 KB (9,838 words) - 13:52, 12 December 2018
  • This article covers the '''Global editing''' of '''Task Links'''. As with all '''global editing''', the OnePager Express 6.1 '''Template ...Express)#Task Links Tab | Template Only Features-OnePager Express – Task Links Tab]]. <!--24.1.2-61.-->
    15 KB (2,164 words) - 16:47, 11 December 2018
  • ==Rules for Importing Data-Driven Task Links – Template Form Rules== The requirements for '''importing data-drive Task Links''' '''before''' a project view is created include the following:
    15 KB (2,312 words) - 15:04, 11 December 2018
  • ==About Manual Task Links== This article talks about the enhancements made to manual '''Task Links''' in OnePager Express 6.1.
    46 KB (6,994 words) - 14:37, 11 December 2018
  • ==About Manual Task Links== This article talks about the enhancements made to manual '''Task Links''' in OnePager Pro 6.1.
    46 KB (7,000 words) - 14:18, 11 December 2018
  • ==Rules for Importing Data-Driven Task Links – Template Form Rules== The requirements for '''importing Data-drive Task Links''' '''before''' a project view is created include the following:
    16 KB (2,342 words) - 13:42, 12 December 2018
  • ...ature, gives you greater control over the tailoring of '''Data-driven Task Links''' for schedule discussions. ...nk Filter rules''' feature has no influence on whether '''Data-driven Task Links''' are '''imported'''.
    24 KB (3,723 words) - 15:36, 11 December 2018
  • ...ature, gives you greater control over the tailoring of '''Data-driven Task Links''' for schedule discussions. ...nk Filter rules''' feature has no influence on whether '''Data-driven Task Links''' are '''imported'''.
    29 KB (4,294 words) - 15:57, 11 December 2018
  • This article covers the '''Global editing''' of '''Task Links'''. As with all '''global editing''', the OnePager Pro 6.1 '''Template''' ...nePager Pro)#Task Links Tab | Template Only Features-OnePager Pro – Task Links Tab]]. <!--24.1.1-61.-->
    15 KB (2,167 words) - 16:20, 11 December 2018
  • ...are discussions of '''manual editing''' of manual and '''Data-driven Task Links''' in the project view. ...riven Task Link Import Rules for OnePager Pro for Version 6.1| Data-Driven Task Link Import Rules for OnePager Pro]]. <!--19.1.3.1-61.-->
    65 KB (9,879 words) - 13:18, 12 December 2018
  • ==Editing Global or Individual Task Link Properties and the Project View== ...ituations where making an '''edit''' in OnePager 6.1 to the '''Data-driven Task Link '''environment precipitates a change in the project view and can impac
    9 KB (1,280 words) - 15:06, 12 December 2018
  • ...elow, is a tool you can use to manage '''Data-Driven '''and manual '''Task Links''' in project views and snapshots. ===Accessing the Where Are My Links? Form===
    15 KB (2,337 words) - 14:37, 12 December 2018
  • ...elow, is a tool you can use to manage '''Data-driven '''and manual '''Task Links''' in project views and snapshots. ===Accessing the Where Are My Links? Form===
    15 KB (2,329 words) - 14:50, 12 December 2018
  • ...eleting curtains''' from '''all snapshots''' and you can use the reference links above for more information. '''Background images''' are always in the '''background''', while task bars/milestone symbols and other visual data represented are in the '''fore
    7 KB (940 words) - 15:23, 22 April 2022
  • This page, which serves as a '''Index''', enables you to quickly follow links to OnePager 7.1 articles listed below. If you have any questions or commen ...Milestone Shapes and Text Labels for Version 7.1 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-71-->
    7 KB (853 words) - 19:44, 25 May 2022
  • :d) Additionally, any task/milestones within the '''timespan stretched''' also appear to be '''stretch ...Pro for version 6.1. More information on these topics can be found at the links in the table below:
    26 KB (4,057 words) - 11:51, 13 December 2018
  • ...et percent-complete properties '''form accessed from the '''PVP '''form '''Task Bars '''tab by clicking the '''%Complete Properties''' button as shown in t 3) The '''Template '''form '''Task Bars''' tab '''Task Bar Decorations '''control group’s '''%Complete Properties… '''button p
    19 KB (2,986 words) - 19:34, 14 December 2018
  • ===Task and Milestone Fiscal Year Date Decorations=== ...on tasks and milestones when you select to include '''dates''' as part of task/milestone '''decorations''' such as '''Date labels''', '''Baselines''', '''
    22 KB (3,273 words) - 14:05, 13 December 2018
  • ===Task and Milestone Fiscal Year Date Decorations=== ...on tasks and milestones when you select to include '''dates''' as part of task/milestone '''decorations''' such as '''Date labels''', '''Baselines''', '''
    21 KB (3,270 words) - 13:55, 13 December 2018
  • ...ject '''source plans''', and project views have '''Start/Finish Dates'''. Task and milestones have '''Start/End Dates'''. ...o 6.1 examines the earliest task/milestone '''Start Date''' and the latest task/milestone '''End Date''' to establish the '''Start/Finish Date boundaries''
    15 KB (2,305 words) - 20:18, 13 December 2018
  • :a) '''Decorations '''on tasks/milestones remain visible if any portion of a task/milestone remains visible in the project view after a corresponding '''Time ...and are relocated by OnePager Pro 6.1 as long as any portion of the parent task/milestone is visible in the project view.
    32 KB (4,967 words) - 20:44, 13 December 2018
  • :d) Additionally, any task/milestones within the '''stretched''' '''timespans''' also are '''stretched ...ying the '''stretched timespans''' are correspondingly '''stretched''' but task '''Start/End Date boundaries''' are not changed relative to the '''stretche
    38 KB (5,853 words) - 12:12, 14 December 2018
  • ...levels''' into a portion of the '''graph '''so that task, milestones, task links, comment boxes and other decorations can be viewed close to a '''Time Axis ==Related Links==
    24 KB (3,714 words) - 13:11, 14 December 2018
  • ...to repeat descriptions and examples here. This article uses Wiki internal links to provide you with access to more detailed articles covering the use and o ...'''to configure your project views and snapshots, the table below provides links to more complete and in depth treatment of '''The Grid''':
    38 KB (5,803 words) - 13:56, 14 December 2018
  • ==Related Links== [[Category:Task/Milestone]]
    41 KB (6,287 words) - 19:46, 29 January 2024
  • ==Related Links== [[Category:Task/Milestone]]
    15 KB (2,248 words) - 19:57, 14 December 2018
  • :d) Additionally, any task/milestones within the '''timespan stretched''' also appear to be '''stretch ...ess for version 6.1. More information on these topics can be found at the links in the table below:
    26 KB (4,008 words) - 19:57, 8 January 2019
  • ...ject '''source plans''', and project views have '''Start/Finish Dates'''. Task and milestones have '''Start/End Dates'''. ...s 6.1 examines the earliest task/milestone '''Start Date''' and the latest task/milestone '''End Date''' to establish the '''Start/Finish Date boundaries''
    15 KB (2,301 words) - 20:27, 13 December 2018
  • :a) '''Decorations '''on tasks/milestones remain visible if any portion of a task/milestone remains visible in the project view after a corresponding '''Time ...are relocated by OnePager Express 6.1 as long as any portion of the parent task/milestone is visible in the project view.
    32 KB (4,899 words) - 21:00, 13 December 2018
  • ...levels''' into a portion of the '''graph '''so that task, milestones, task links, comment boxes and other decorations can be viewed close to a '''Time Axis ==Related Links==
    24 KB (3,676 words) - 13:24, 14 December 2018
  • ...to repeat descriptions and examples here. This article uses Wiki internal links to provide you with access to more detailed articles covering the use and o ...'''to configure your project views and snapshots, the table below provides links to more complete and in depth treatment of '''The Grid''':
    38 KB (5,732 words) - 20:20, 8 January 2019
  • :d) Additionally, any task/milestones within the '''stretched''' '''timespans''' also are '''stretched ...ying the '''stretched timespans''' are correspondingly '''stretched''' but task '''Start/End Date boundaries''' are not changed relative to the '''stretche
    38 KB (5,739 words) - 12:31, 14 December 2018
  • ==Related Links== [[Category:Task/Milestone]]
    40 KB (6,155 words) - 15:05, 14 December 2018
  • ...et percent-complete properties '''form accessed from the '''PVP '''form '''Task Bars '''tab by clicking the '''%Complete Properties''' button as shown in t 3) The '''Template '''form '''Task Bars''' tab '''Task Bar Decorations '''control group’s '''%Complete Properties… '''button p
    19 KB (2,945 words) - 19:43, 14 December 2018
  • ==Related Links== [[Category:Task/Milestone]]
    15 KB (2,197 words) - 20:08, 14 December 2018
  • ==Related Links== [[Category:Task/Milestone]]
    4 KB (573 words) - 20:19, 14 December 2018
  • ==Related Links== [[Category:Task/Milestone]]
    4 KB (567 words) - 17:02, 23 January 2019
  • The subsections below provide an overview and links to more detailed descriptions of the new '''upgraded capabilities, features ...are “Phases” and the '''rows''' within each '''Phase''' show the '''task bars''' at their appropriate '''start/end dates'''.
    20 KB (2,933 words) - 15:20, 25 January 2021
  • Now put a '''Yes''' in this '''Flag''' field for any task that you want to graph: ...oving them from the '''OPP graph''', you won't have to explain why certain task bars and milestone symbols are appearing in weird places when they really s
    36 KB (5,723 words) - 16:46, 8 February 2021
  • Now put a '''Yes''' in this '''Flag''' field for any task that you want to graph: ...oving them from the '''OPP''' graph, you won't have to explain why certain task bars and milestone symbols are appearing in weird places when they really s
    37 KB (5,906 words) - 15:32, 25 January 2021
  • ...itional formatting''') values. In addition to manual '''editing individual task bar/ milestone symbol(s)''', OnePager can dynamically '''format''' your cha ...ine your desired '''shapes''', '''colors''' and other '''properties''' for task bars/milestone symbols and other '''decorations'''. You can access the '''
    5 KB (719 words) - 21:35, 20 April 2022
  • ...s enhanced features such as the '''User Interface Upgrade''' and '''Smart Task/Milestone Text Label Collision Avoidance Feature''' to name a few. This art :3) A '''Task ID''' field that OnePager uses to keep track of tasks/milestones as your Mi
    33 KB (5,222 words) - 15:35, 25 January 2021
  • ...s enhanced features such as the '''User Interface Upgrade''' and '''Smart Task/Milestone Text Label Collision Avoidance Feature''' to name a few. This ar :* A '''Task ID''' field that OnePager uses to keep track of tasks/milestones as your Mi
    34 KB (5,383 words) - 15:37, 25 January 2021
  • ...''date'''. Often there is a need to update a snapshot by '''replacing its task and/or milestone data''' with updated information. OnePager supports three ...' tasks that were not previously '''flagged'''. OnePager does not change task '''labels''' in this mode.
    27 KB (4,152 words) - 16:11, 26 April 2022
  • ...te''' in the highlighted rectangles above, that '''OPC''' picked up the '''Task Name''' '''field''' for collecting tasks into rows. To access the form for ==Related Links==
    9 KB (1,371 words) - 21:46, 10 January 2021
  • ...rows''' and '''swimlanes''' is a common way to organize your chart so that task bars and milestone symbols in the '''rows''' can be '''grouped''' together ...look - '''swimlane levels''', '''text columns''', the '''collection''' of task bars into chart '''rows''', and the '''grouping of rows''' into the chart's
    23 KB (3,351 words) - 15:17, 26 February 2021
  • ...are the lowest level of horizontal organization that contain at least one task bar or milestone symbol. :a) '''Rows''' contain task bars and milestone symbols positioned and graphed in accordance with '''imp
    17 KB (2,467 words) - 19:25, 8 February 2021
  • ...ays of '''creating''' and '''updating''' charts and snapshots. The article links below provide you with access to more detailed articles on how to use OnePa ...re on how to accomplish the workflow. At the end of '''this article''' are links to cautionary articles dealing with '''merging wrong source plan''' tasks d
    8 KB (1,170 words) - 22:46, 11 January 2021
  • ...rs''' field cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    5 KB (841 words) - 21:20, 28 February 2019
  • .../Numbers''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...g20''' as a default. Most users select '''Flag20''' to tell OnePager which task/milestone rows to import but any of the 20 '''Flag''' fields or any of the
    6 KB (1,010 words) - 21:12, 28 February 2019
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    5 KB (844 words) - 21:17, 28 February 2019
  • ...'''flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''flag''' field set to '''No''', '''0''', or blank. ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    6 KB (1,008 words) - 21:24, 28 February 2019
  • ...ault font''' once through '''Chart Properties''' form than it is to select task bars one at a time and change '''fonts''' individually. ...is not required to make '''edits''' that change settings and rules for all task bars and '''text labels''', OnePager provides you with the tools to '''edit
    7 KB (933 words) - 20:01, 25 April 2022
  • '''Decorations''' on task bars/milestone symbols include the following '''Data-Driven''' elements: '''Task bar name labels''' are not considered a '''Decoration''' for the purpose of
    12 KB (1,673 words) - 19:18, 25 April 2022
  • :3) A '''Task ID''' field that OnePager uses to keep track of tasks/milestones as your Mi :* A '''Task ID''' field that OnePager uses to keep track of tasks/milestones as your Mi
    42 KB (6,566 words) - 17:51, 30 May 2022
  • ...''date'''. Often there is a need to update a snapshot by '''replacing its task and/or milestone data''' with updated information. OnePager supports three ...new''' tasks that were not previously flagged. OnePager does not change task '''labels''' in this mode.
    6 KB (964 words) - 20:38, 11 January 2021
  • ...''date'''. Often there is a need to update a snapshot by '''replacing its task and/or milestone data''' with updated information. OnePager supports three ...new''' tasks that were not previously flagged. OnePager does not change task '''labels''' in this mode.
    6 KB (978 words) - 18:58, 12 February 2021
  • ...napshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three (3) ways ...dds new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (952 words) - 21:56, 11 January 2021
  • ...snapshot date. Often there is a need to update a snapshot by replacing its task/milestone data with updated information. OnePager supports three (3) ways t ...dds new tasks that were not previously flagged. OnePager does not change task labels in this mode.
    6 KB (972 words) - 22:06, 11 January 2021
  • ...the pull feature for '''OPP''' and four (4) for '''OPX'''. Please see the links at the end of this article to access other articles in the series. In this case, you want to create a chart for 8/1/2019 that includes '''all task changes''' from the Microsoft Project '''source plan''' that were provided
    10 KB (1,498 words) - 21:18, 11 January 2021
  • ...the pull feature for '''OPX''' and four (4) for '''OPP'''. Please see the links at the end of this article to access other articles in the series. In this case, you want to create a chart for 8/1/2019 that includes all task changes from the Microsoft Excel '''source plan''' that were provided to y
    10 KB (1,499 words) - 22:31, 11 January 2021
  • ...tional Import Filters''' to simplify the '''import''' of '''source plan''' task and milestone data into OnePager and increase your '''flexibility''' for se ==Links to Conditional Import Filters Detailed Articles==
    4 KB (473 words) - 00:05, 12 January 2021
  • ...nagement controls on the '''OnePager choices''' ('''OPC''') form in the '''Task Selection''' control group of the form. Finally, after a chart is created ...task or milestone, the task or milestone is '''imported'''. Otherwise the task or milestone is skipped.
    36 KB (5,640 words) - 23:01, 11 January 2021
  • ...nagement controls on the '''OnePager choices''' ('''OPC''') form in the '''Task Selection''' control group of the form. Finally, after a chart is created ...task or milestone, the task or milestone is '''imported'''. Otherwise the task or milestone is skipped.
    37 KB (5,734 words) - 23:13, 11 January 2021
  • ...nagement controls on the '''OnePager choices''' ('''OPC''') form in the '''Task Selection''' control group of the form. Finally, after a chart is created ..., in the '''Task Selection''' section of the '''OPC''' form, the '''Select task by custom filter''' radio button is clicked on. This action immediately ac
    39 KB (6,020 words) - 23:30, 11 January 2021
  • ...nagement controls on the '''OnePager choices''' ('''OPC''') form in the '''Task Selection''' control group of the form. Finally, after a chart is created ..., in the '''Task Selection''' section of the '''OPC''' form, the '''Select task by custom filter''' radio button is clicked on. This action immediately ac
    39 KB (6,125 words) - 23:46, 11 January 2021
  • ...an 25 OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task/milestone identifier'''. With this feature, you can easily refer back to y ...') and a text field ('''Text10''') which appears to be used to specify the task's estimated risk. If we create a simple chart using the standard Single Pr
    13 KB (1,860 words) - 00:10, 12 January 2021
  • ...me to identify projects. If you want to display the project summary task (Task 0) at the top of a project file, go to the '''File''' tab on Microsoft Proj ...the add or the replace snapshot, the processes described in the '''Related Links''' section below can be used. The key to updating multi-project charts is t
    7 KB (1,048 words) - 20:45, 5 January 2021
  • ...related Microsoft Excel '''source plans''' are constructed with unique '''Task ID''' field contents. ...ce plans''' such that each row has a unique number or identifier in the '''Task ID''' field.
    9 KB (1,338 words) - 15:31, 12 January 2021
  • ...cally provide a '''unique identifier''' for rows. Additionally, unique '''Task ID''' numbers are needed so that OnePager Express ('''OPX''') does not get ...'reused''' for a later snapshot. '''OPX''' can process out of sequence '''Task ID''' numbers.
    7 KB (1,140 words) - 20:04, 4 February 2024
  • ==Links to Detailed Articles== ...e additional information on the '''editing''' of tasks/milestones and task links:
    5 KB (647 words) - 12:52, 6 January 2021
  • ...on box''' with two '''grab points''' (top and bottom) in the middle of the task/milestone. :(5) '''Esc key''' If you want to '''redo''' your task/milestone '''selections''', press the '''ESC key''' and OnePager '''deselec
    3 KB (411 words) - 22:43, 22 February 2019
  • ...f the field used to display '''Percent complete''' in the chart. Not every task in a '''source plan''' has '''Percent complete''' data associated with it. ==Editing All Task Percent Complete Displays==
    11 KB (1,597 words) - 15:20, 20 May 2022
  • ...cate a task bar/milestone symbol and do not wish to cause all '''hidden''' task bars/milestone symbols, and '''rows''', to be made visible, go the OnePage ...owing and a check ('''X''') in the column(s) appropriate for '''why''' the task bar/milestone symbol is not visible:
    10 KB (1,630 words) - 17:40, 12 January 2021
  • ...o longer adhere to the '''default formatting''' and inn so doing create '''task bar and milestone symbol mavericks'''. ==Restoring the Default Formatting for a Task Bar/Milestone Symbol==
    9 KB (1,339 words) - 17:44, 12 January 2021
  • '''Decorations''' on task bars/milestone symbols include the following '''Data-Driven''' elements: '''Task bar name labels''' are not considered a '''Decoration''' for the purpose of
    11 KB (1,602 words) - 19:08, 5 February 2021
  • ...oject field used to display '''Percent complete''' in the chart. Not every task in a Microsoft Project '''source plan''' has '''Percent complete''' data as ==Editing All Task Percent Complete Displays==
    10 KB (1,411 words) - 21:11, 12 January 2021
  • ==Editing All Task Percent Complete Displays== ===Chart Properties Form - Task Bars Tab===
    8 KB (1,174 words) - 21:15, 12 January 2021
  • ...y, '''OPP''' displays '''critical path''' information within the displayed task bars. Below is a sample chart with the '''critical path''' feature '''enabl ...ing where the '''source plan's''' '''critical path''' intersects with each task bar on the '''path''' as illustrated above.
    10 KB (1,397 words) - 15:24, 13 January 2021
  • ...eld set to '''Yes''' so that OnePager '''imports''' the data for all three task bars: ...bove, '''deadline shapes''' that are not contained within their respective task bar are shown with '''back dash-dot connecting lines''' to illustrate the c
    15 KB (2,259 words) - 15:35, 13 January 2021
  • ...xpress '''Template Properties''' and '''Chart Properties''' form at the '''Task Bars''' tab as is explained later in this article. To illustrate with a sim ...bove, '''deadline shapes''' that are not contained within their respective task bar are shown with '''back dash-dot connecting lines''' to illustrate the c
    16 KB (2,325 words) - 15:44, 13 January 2021
  • There are four (4) '''endpoints''' definable in OnePager for each task bar. By definition, milestone symbols in OnePager do not have multiple ''' ...task-oriented '''milestones''' as they occupy the same row as their parent task bar.
    11 KB (1,663 words) - 15:51, 13 January 2021
  • ...nd Endpoint4''') can be thought of as additional '''deadlines dates''' for task bars that can be defined to meet your needs. ...task-oriented '''milestones''' as they occupy the same row as their parent task bar. By convention and as a default, the initial association of '''Endpoint
    11 KB (1,607 words) - 15:58, 13 January 2021
  • ==About Ordering Task/Milestones With Decorations== ...'''overlaid''' in the chart by other '''graphics'''. '''Decorations''' on task bars/milestone symbols are always drawn in the same '''z-order''' from '''b
    5 KB (755 words) - 16:04, 13 January 2021
  • ...cribed in the article at: [[Task Bars Tab for Version 7.0 (OnePager Pro) | Task Bars Tab-OnePager Pro]]. <!--21.1.3.1-70--> :* '''Shape''' (task bar or milestone symbol)
    6 KB (740 words) - 16:39, 26 January 2021
  • ...ts''' automatically as you '''update''' the value of the '''source plan''' task’s '''Text30''' field in the Microsoft Project '''source plan''' only. ...er the chart is created by using the '''Chart Properties''' form at the '''Task Bars''' or '''Milestones''' tab as is done in the example that follows.
    6 KB (818 words) - 18:15, 13 January 2021
  • ...ries of '''snapshots''' automatically as you '''update''' the value of the task’s '''Risk Assessment''' field in the Microsoft Excel '''source plan''' on ...er the chart is created by using the '''Chart Properties''' form at the '''Task Bars''' or '''Milestones''' tab as is done in the example that follows.
    6 KB (820 words) - 18:17, 13 January 2021
  • ...onal formatting rules''' that apply specified '''actions''' to appropriate task bars/milestone symbols when the specified '''conditions''' in your defined ...a '''Text1''' value of '''Medium''', and set the '''color''' green''' for task barss associated with a '''Category''' value of '''Low'''.
    23 KB (3,444 words) - 18:28, 13 January 2021
  • ...'''Category''' value of '''Medium''', and set the '''color''' green''' for task bars associated with a '''Category''' value of '''Low'''. There are nine (9) sets of task bar/milestone symbol '''attributes''' that can be altered to respond to '''
    23 KB (3,449 words) - 18:36, 13 January 2021
  • ...(with '''Flag1=Yes'''), regardless of the '''team name''' with a different task bar shape. ...Formatting Rule''' by accessing the '''Chart Properties''' form at its '''Task Bars''' tab and clicking the '''Manage Rule...''' button at the bottom of t
    6 KB (833 words) - 18:40, 13 January 2021
  • ...m Available = TRUE'''), regardless of the '''team name''' with a different task bar shape. ...Formatting Rule''' by accessing the '''Chart Properties''' form at its '''Task Bars''' tab and clicking the '''Manage Rule...''' button at the bottom of t
    6 KB (843 words) - 18:44, 13 January 2021
  • ...re six (6) '''fields''' that you can set to '''conditionally format''' the task bars/milestone symbols. These '''fields''' are described in the table bel .... If the condition is '''false''', retain the '''default color''' for the task bar/milestone symbol.
    7 KB (1,087 words) - 18:46, 13 January 2021
  • ...re six (6) '''fields''' that you can set to '''conditionally format''' the task bars/milestone symbols. These '''fields''' are described in the table bel .... If the condition is '''false''', retain the '''default color''' for the task bar/milestone symbol.
    7 KB (1,084 words) - 18:47, 13 January 2021
  • ...h either the '''Template Properties''' or '''Chart Properties''' form's '''Task Bars''' or '''Milestones''' tabs. Clicking the '''Manage Rules...''' button ==Related Links==
    8 KB (1,261 words) - 18:52, 13 January 2021
  • ...form through either the '''Template''' or '''Chart Properties''' form's '''Task Bars''' or '''Milestones''' tabs. Clicking the '''Manage Rules...''' button ==Related Links==
    8 KB (1,265 words) - 16:34, 25 January 2021
  • ...rticle, whenever a '''conditional formatting''' rule is '''applied''' to a task bar/milestone symbol's '''color''' or '''shape''' when the '''Legend''' is ...esent these four task bars in '''black''' with a '''left pointing arrow''' task bar.
    4 KB (623 words) - 20:29, 13 January 2021
  • ...rticle, whenever a '''conditional formatting''' rule is '''applied''' to a task/milestone shape's '''color''' or '''shape''' when the '''Legend''' is displ ...ent these four task shapes in '''black''' with a '''left pointing arrow''' task shape.
    4 KB (628 words) - 20:32, 13 January 2021
  • ==Related Links== ...Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
    2 KB (258 words) - 20:34, 13 January 2021
  • ==Related Links== ...Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
    1 KB (182 words) - 20:35, 13 January 2021
  • ==Links to Detailed Articles on Creating and Editing Rows and Swimlanes== ...er Pro and Express users is that you read the two articles in the table of links below to become familiar with the '''multiple swimlane levels''' concepts a
    8 KB (1,155 words) - 18:05, 18 January 2021
  • ...an 25 OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task/milestone identifier'''. With this feature, you can easily refer back to y ...') and a text field ('''Text10''') which appears to be used to specify the task's estimated risk. If we create a simple chart using the standard Single Pr
    18 KB (2,637 words) - 16:54, 26 April 2022
  • ===Adding a Task ID Field to Your Microsoft Excel Source Plan=== ...press tracks tasks from snapshot to snapshot though the Microsoft Excel '''Task ID''' field in the '''source plan'''. There is no such field intrinsically
    17 KB (2,686 words) - 16:20, 26 April 2022
  • ...ays of '''creating''' and '''updating''' charts and snapshots. The article links in the next several sections that follow provide you with access to more de ...s on how to accomplish the workflows. At the end of '''this article''' are links to cautionary articles dealing with '''merging wrong source plan''' tasks d
    6 KB (901 words) - 17:09, 26 April 2022
  • ...'' are available in the '''Font properties''' form accesses by selecting a task bar/milestone symbol '''text''', time axis cell '''text''', or text within ==Related Links==
    14 KB (2,044 words) - 16:57, 25 January 2021
  • :* '''Task Link''' ...-dependent''' we mean that the value, style, or format of an object (i.e., task bar or milestone symbol property) can change from one '''snapshot''' to ano
    6 KB (866 words) - 17:19, 14 January 2021
  • :* '''Task Link''' ...-dependent''' we mean that the value, style, or format of an object (i.e., task bar or milestone symbol property) can change from one '''snapshot''' to ano
    6 KB (858 words) - 17:23, 14 January 2021
  • ...chart area, which drags along all the tasks/milestones, including '''Task Links''', that they contain, too!
    2 KB (314 words) - 17:30, 25 February 2019
  • ...Milestones into Rows for Version 7.0 | Collecting, Formatting, and Sorting Task/Milestones into Rows]] <!--12.01.1-70--> ==Related Links==
    19 KB (2,754 words) - 17:04, 14 January 2021
  • ...h Date''') or because a new snapshot is not '''importing''' one or more '''task bars/milestone symbols''' that were present in previous snapshots. OnePage In the examples that follow, four task bars are hidden:
    9 KB (1,353 words) - 17:09, 14 January 2021
  • ==Related Links== [[Category:Task/Milestone Editing]]
    6 KB (943 words) - 17:47, 14 January 2021
  • ==Related Links== [[Category:Task/Milestone Editing]]
    7 KB (1,110 words) - 17:52, 14 January 2021
  • ...ilestone symbols occupying the individual '''rows'''. The option to alter task bar/milestone symbol '''heights''' as a '''percentage of row height''' is d ...hart Properties '''form’s '''Task Bars''' or '''Milestones''' tab’s '''Task Height''' sub-control group as shown below:
    17 KB (2,661 words) - 17:59, 14 January 2021
  • ==Related Links== ...Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
    14 KB (2,050 words) - 18:05, 14 January 2021
  • ...ember '''rows'''. This command does not '''unhide the unhidden rows'''’ task bars/milestone symbols if these were specifically '''hidden''' previously. ...and '''swimlanes''' were previously automatically '''hidden'''. Whenever task bars/milestone symbols, '''rows''', or '''swimlanes''' are '''hidden''' the
    39 KB (5,812 words) - 16:59, 25 January 2021
  • Please use the '''links''' in the '''Contents Box''' above quickly jump to a particular topic. ...''. The '''added swimlane''' consists of one '''row''' '''empty''' of any task bars/milestone symbols, there are no '''labels''' in any '''text column cel
    20 KB (2,928 words) - 15:44, 18 January 2021
  • ...chart at the '''row '''containing the '''MERLIN Subcontractor Selection''' task bar and '''split the swimlane at the top of the row'''. ...l''' for the '''row''' containing the '''MERLIN Subcontractor Selection''' task bar to access the '''text column''' right-click '''context menu''' as shown
    21 KB (3,033 words) - 16:08, 18 January 2021
  • ==Related Links== ...Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
    21 KB (3,084 words) - 16:21, 18 January 2021
  • The '''added row''' is '''empty''' of any task bars/milestone symbols, there are no '''labels''' in any '''text column cel ...of''' '''the selected''' '''swimlane level cell''' that is '''empty''' of task bars/milestone symbols and with '''blank text column cells''', if any, as s
    8 KB (1,158 words) - 16:26, 18 January 2021
  • ...r '''position''' in the chart, and the '''properties of the row''' and any task bars/milestone symbols occupying the '''rows'''. ==Related Links==
    15 KB (2,133 words) - 16:32, 18 January 2021
  • ==Related Links== ...Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
    30 KB (4,421 words) - 16:42, 18 January 2021
  • ...be remedied manually by '''adding blank/empty rows''' to vertically space task bars from another. This solution does lead to increasing the '''vertical h ...'''endpoints''', the '''row zebra striping''' is '''ordered''' behind the task bars/milestone symbols and their '''decorations'''.
    35 KB (5,323 words) - 14:06, 3 March 2021
  • ...be remedied manually by '''adding blank/empty rows''' to vertically space task bars from another. This solution does lead to increasing the '''vertical h ...'''endpoints''', the '''row zebra striping''' is '''ordered''' behind the task bars/milestone symbols and their '''decorations'''.
    35 KB (5,352 words) - 17:46, 18 January 2021
  • '''Comment boxes''' are a way to display '''text''' associated with task bar/milestone symbol '''name labels imported''' from your Microsoft Project ...tone''' right-click '''context menu''' associated with right-clicking on a task bar/milestone symbol.
    39 KB (5,993 words) - 20:55, 13 January 2021
  • ...''', and '''critical path segments''' (One Pager Pro ('''OPP''') only) for task bars being summarized. The illustrations and examples in this article are f ===Make a Virtual Summary Task===
    10 KB (1,570 words) - 18:13, 18 January 2021
  • ==Introduction to the OnePager Task Links== ...'''data and the OnePager Pro chart created with the corresponding '''Task Links''':
    9 KB (1,307 words) - 22:12, 19 January 2021
  • ...boxes''', except that they are '''not''' attached to or associated with a task bar or milestone symbol. '''Free boxes''' are similar to text boxes in Micr ...in the '''free box''' right-click '''context menu''' above, please use the links below:
    25 KB (3,754 words) - 15:22, 14 January 2021
  • The '''graph area''' is the rectangle that contains all the task bars and milestone symbols, excluding '''text columns and swimlane labels'' ...n on each page is no guarantee that the '''Legend''' does not obscure some task shapes and milestone shapes or '''text labels''' on some of the pages. In
    12 KB (1,890 words) - 20:27, 25 January 2021
  • ...to indicate the presence of the '''absorbed''' (or '''shorter duration''') task bar/milestone symbol. ===Enabling the Absorbing Task Bars Feature===
    16 KB (2,473 words) - 18:11, 18 January 2021
  • ==OnePager Pro Enhancements for Data-Driven Task Links== OnePager Pro is designed to process '''Task Links''' that are specified as '''predecessors''' '''ONLY'''.
    61 KB (8,838 words) - 22:25, 15 February 2021
  • ==OnePager Express Enhancements for Data-Driven Task Links== OnePager Express is designed to process '''Task Links''' that are specified as '''predecessors''' '''ONLY'''.
    63 KB (9,139 words) - 22:25, 15 February 2021
  • ==About Manual Task Links== This article covers the enhancements made to manual '''Task Links''' in OnePager Pro.
    48 KB (7,215 words) - 17:38, 19 January 2021
  • ==About Manual Task Links== This article covers the enhancements made to manual '''Task Links''' in OnePager Express.
    48 KB (7,210 words) - 20:12, 21 January 2021
  • ==Rules for Importing Data-Driven Task Links – Template Properties Form Rules== ...discussed in this article along with rules for '''showing Data-Driven Task Links''' in the chart.
    15 KB (2,327 words) - 16:58, 3 March 2021
  • ==Rules for Importing Data-Driven Task Links – Template Properties Form Rules== ...discussed in this article along with rules for '''showing Data-Driven Task Links''' in the chart.
    15 KB (2,327 words) - 18:08, 19 January 2021
  • ==About Editing With Task Link Filtering Rules== ===Show and Hiding Task Links===
    24 KB (3,706 words) - 18:18, 19 January 2021
  • ==About Editing With Task Link Filtering Rules== ===Show and Hiding Task Links===
    28 KB (4,191 words) - 18:30, 19 January 2021
  • This article covers the '''Global editing''' of '''Task Links'''. As with all '''global editing''', the OnePager Pro 7.0 '''Template''' ...nePager Pro)#Task Links Tab | Template Only Features-OnePager Pro – Task Links Tab]]. 24.1.1-70
    15 KB (2,139 words) - 16:23, 18 February 2019
  • This article covers the '''Global editing''' of '''Task Links'''. As with all '''global editing''', the OnePager Express 7.0 '''Template ...Express)#Task Links Tab | Template Only Features-OnePager Express – Task Links Tab]]. 24.1.2-70
    15 KB (2,136 words) - 16:34, 18 February 2019
  • ...ides discussions of '''manual editing''' of manual and '''Data-driven Task Links''' in the chart. In the discussion that follows on '''manual editing''' us ...riven Task Link Import Rules for OnePager Pro for Version 7.0| Data-Driven Task Link Import Rules for OnePager Pro]] <!--19.1.3.1-70-->
    67 KB (10,045 words) - 19:48, 3 March 2021
  • ...ides discussions of '''manual editing''' of manual and '''Data-driven Task Links''' in the chart. In the discussion that follows on '''manual editing''' us ...Task Link Import Rules for OnePager Express for Version 7.0 | Data-Driven Task Link Import Rules for OnePager Express]] <!--19.1.3.2-70-->
    66 KB (9,993 words) - 20:16, 21 January 2021
  • ...elow, is a tool you can use to manage '''Data-Driven '''and manual '''Task Links''' in charts and snapshots. ===Accessing the Where Are My Links? Form===
    15 KB (2,345 words) - 21:48, 19 January 2021
  • ...elow, is a tool you can use to manage '''Data-Driven '''and manual '''Task Links''' in charts and snapshots. ===Accessing the Where Are My Links? Form===
    15 KB (2,342 words) - 22:02, 19 January 2021
  • ==Editing Global or Individual Task Link Properties and the Chart== ...5) situations where making an '''edit''' in OnePager to the '''Data-driven Task Link '''environment precipitates a change in the chart and can impact all s
    9 KB (1,254 words) - 22:06, 19 January 2021
  • ...eleting curtains''' from '''all snapshots''' and you can use the reference links above for more information. '''Background images''' are always in the '''background''', while task bars/milestone symbols and other visual data represented are in the '''fore
    6 KB (854 words) - 20:35, 25 January 2021
  • 2) We coined the term '''maverick''' to describe the task/milestone properties that differ from the global defaults or from data driv 5) For global '''editing''' descriptions for task/milestones and decorations, please see the articles using this link: [[Man
    4 KB (564 words) - 23:26, 21 January 2019
  • ===Task Selection Control Group=== ...''' is performed after the chart is '''created'''. Clicking the '''Select task with 'YES' in field:''' radio button causes OnePager to '''import tasks usi
    12 KB (1,743 words) - 15:28, 4 March 2021
  • ...erties''' form, below, provides you with the capabilities to '''collect''' task from you imported '''source plans '''into '''rows''', '''group rows''' into ...ti-level swimlane '''capabilities of OnePager version 7.0, the two article links below are comprehensive and helpful:
    13 KB (1,947 words) - 15:07, 20 January 2021
  • ==About the Task Bars Tab for OnePager Pro== ...tab page, shown below, lets you control the '''style and decoration''' of task bars. Additionally, within this tab are the controls for creating and mana
    19 KB (2,865 words) - 16:22, 4 March 2021
  • ==About the Task Bars Tab for OnePager Express== ...tab page, shown below, lets you control the '''style and decoration''' of task bars. Additionally, within this tab are the controls for creating and man
    18 KB (2,722 words) - 15:22, 20 January 2021
  • ...as task labels, date labels, or percent complete values associated with a task bar/milestone symbol were represented in the '''graph''' horizontally in a ...rdering''' button is shown below in the '''Chart Properties '''form’s '''Task Bars''' tab:
    10 KB (1,521 words) - 18:20, 19 February 2021
  • ...in the '''Milestones''' tab and have these '''edits mirrored''' in the '''Task Bars''' tab of the '''Chart Properties''' form and vice versa. Please check the links for more information on sub-forms accessible from the '''Milestones''' tab.
    18 KB (2,703 words) - 15:32, 20 January 2021
  • ...in the '''Milestones''' tab and have these '''edits mirrored''' in the '''Task Bars''' tab of the '''Chart Properties''' form and vice versa. Please check the links for more information on sub-forms accessible from the '''Milestones''' tab.
    18 KB (2,614 words) - 15:39, 20 January 2021
  • ...ab giving you a checkbox to specifically tell OnePager '''Do not duplicate task/milestones''' items in the '''Legend '''regardless of their differences in ...e, the '''Legend''' below shows both a blue milestone symbol item and blue task bar with the '''Do not duplicate tasks/milestones''' checkbox checked '''OF
    13 KB (1,963 words) - 17:24, 4 March 2021
  • ...ab giving you a checkbox to specifically tell OnePager '''Do not duplicate task/milestones''' items in the '''Legend '''regardless of their differences in ...e, the '''Legend''' below shows both a blue milestone symbol item and blue task bar with the '''Do not duplicate tasks/milestones''' checkbox checked '''OF
    13 KB (1,964 words) - 15:57, 20 January 2021
  • ...his mode is the preferred option because it preserves the '''heights''' of task bars and milestones symbols. ...ilestone symbols to get very short and '''hiding''' many '''rows''' causes task bars/milestone symbols to get very tall. Even in this '''fixed height mod
    7 KB (981 words) - 16:01, 20 January 2021
  • ==Related Links== [[Category:Task/Milestone Editing]]
    6 KB (947 words) - 16:17, 25 January 2021
  • ==Related Links== [[Category:Task/Milestone Editing]]
    6 KB (931 words) - 16:13, 25 January 2021
  • ==About the Task Links Tab== ...controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the chart. The tab is shown below:
    2 KB (300 words) - 16:22, 20 January 2021
  • ==About the Task Links Tab== ...controls the '''global editing''' of '''data-driven''' and manual '''Task Links''' in the chart. The tab is shown below:
    2 KB (292 words) - 16:23, 20 January 2021
  • ..., the '''task bar/milestone symbol name''', and the '''Unique-ID''' of the task from the Microsoft Project '''source plan'''. ...Select associated text''' checkbox is checked '''OFF''', only the selected task bar/milestone symbol is shown as selected.
    30 KB (4,491 words) - 17:33, 20 January 2021
  • ..., the '''task bar/milestone symbol name''', and the '''Unique-ID''' of the task from the Excel '''source plan'''. ...Select associated text''' checkbox is checked '''OFF''', only the selected task bar/milestone symbol is shown as selected.
    29 KB (4,407 words) - 16:41, 20 January 2021
  • ...(25) OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task bar/milestone symbol identifier'''. You can easily refer back to your '''s ...ppings''' tab: (1) '''Percent-complete''', (2) '''Critical-path''', (3) '''Task-name''', (4) '''Start date''', (5) '''Finish date''', (6) '''Baseline start
    14 KB (2,094 words) - 16:59, 20 January 2021
  • ...(25) OnePager '''purposes''' from '''Baseline Finish Date''' to '''Unique task bar/milestone symbol identifier'''. You can easily refer back to your '''s ...named in the '''Field Mappings''' tab: (1) '''Percent-complete''', (2) '''Task-name''', (3) '''Start date''', (4) '''Finish date''', (5) '''Baseline start
    12 KB (1,774 words) - 16:59, 20 January 2021
  • ...to repeat descriptions and examples here. This article uses Wiki internal links to provide you with access to more detailed articles covering the use and o ...how you can use '''The Grid '''to configure your charts and snapshots, the links shown below provide access to more complete and in depth treatment of '''Th
    42 KB (6,239 words) - 20:26, 18 January 2021
  • ...d '''time axis''' coordinated with the various '''start/finish dates''' of task bars and milestone symbols represented in the '''graph'''. OnePager provid If, in the course of '''Hiding Time Axis Level Cells''', task bars/milestone symbols become '''hidden''', entries are made in the '''Wher
    27 KB (4,092 words) - 17:29, 15 January 2021
  • ...d '''time axis''' coordinated with the various '''start/finish dates''' of task bars and milestone symbols represented in the '''graph'''. OnePager provid If, in the course of '''Hiding Time Axis Level Cells''', task bars/milestone symbols become '''hidden''', entries are made in the '''Wher
    26 KB (4,014 words) - 19:55, 21 January 2021
  • ...controls are used elsewhere in OnePager for '''Background Color(s)''' for task bars/milestone symbols, for example. ==Related Links==
    18 KB (2,708 words) - 17:56, 25 January 2021
  • ===Task Bar and Milestone Symbol Fiscal Year Date Decorations=== ...rs and milestone symbols when you select to include '''dates''' as part of task bar/milestone symbol's '''decorations''' such as '''Date labels''', '''Base
    21 KB (3,299 words) - 18:37, 15 January 2021
  • ===Task Bar and Milestone Symbol Fiscal Year Date Decorations=== ...rs and milestone symbols when you select to include '''dates''' as part of task bars/milestone symbol's '''decorations''' such as '''Date labels''', '''Bas
    22 KB (3,301 words) - 18:43, 15 January 2021
  • ...ject '''source plans''', and project views have '''Start/Finish Dates'''. Task and milestones have '''Start/End Dates'''. ...r Pro examines the earliest task/milestone '''Start Date''' and the latest task/milestone '''End Date''' to establish the '''Start/Finish Date boundaries''
    15 KB (2,293 words) - 16:28, 22 January 2019
  • ...ject '''source plans''', and project views have '''Start/Finish Dates'''. Task and milestones have '''Start/End Dates'''. ...press examines the earliest task/milestone '''Start Date''' and the latest task/milestone '''End Date''' to establish the '''Start/Finish Date boundaries''
    15 KB (2,289 words) - 16:37, 22 January 2019
  • ...me Axis Level Cells''' disappear from the chart along with portions of the task bars/milestone symbols occupying the '''timespan''' being '''hidden''' in t The '''hidden Time Axis Level Cells''' are not shown in the chart and any task bars/milestone symbols or portions of the '''graph''' occupying the '''hidd
    32 KB (4,982 words) - 19:25, 5 March 2021
  • ...me Axis Level Cells''' disappear from the chart along with portions of the task bars/milestone symbols occupying the '''timespan''' being '''hidden''' in t The '''hidden Time Axis Level Cells''' are not shown in the chart and any task bars/milestone symbols or portions of the '''graph''' occupying the '''hidd
    32 KB (4,928 words) - 18:17, 18 January 2021
  • ...l''' and '''Top Level '''as shown in the example above. Additionally, any task bars/milestone symbols within the '''stretched''' '''timespans''' also are ...not changed relative to the '''stretched''' '''timespans'''. Portions of task bars that are outside the '''stretched''' '''timespans''' are not '''stretc
    38 KB (5,703 words) - 20:05, 21 January 2021
  • ...l''' and '''Top Level '''as shown in the example above. Additionally, any task bars/milestone symbols within the '''stretched''' '''timespans''' also are ...not changed relative to the '''stretched''' '''timespans'''. Portions of task bars that are outside the '''stretched''' '''timespans''' are not '''stretc
    38 KB (5,692 words) - 18:48, 18 January 2021
  • ...a portion of the '''graph '''so that '''task bars/milestone symbols, task links, comment boxes''' and other '''decorations''' can be seen close to a '''Tim ==Related Links==
    26 KB (3,842 words) - 19:59, 18 January 2021
  • ...a portion of the '''graph '''so that '''task bars, milestone symbols, task links, comment boxes and other decorations''' can be viewed close to a '''Time Ax ==Related Links==
    25 KB (3,808 words) - 20:08, 18 January 2021
  • ...to repeat descriptions and examples here. This article uses Wiki internal links to provide you with access to more detailed articles covering the use and o ...'''to configure your project views and snapshots, the table below provides links to more complete and in depth treatment of '''The Grid''':
    38 KB (5,710 words) - 14:18, 23 January 2019
  • ...to repeat descriptions and examples here. This article uses Wiki internal links to provide you with access to more detailed articles covering the use and o ...'''to configure your project views and snapshots, the table below provides links to more complete and in depth treatment of '''The Grid''':
    38 KB (5,645 words) - 14:39, 23 January 2019
  • ...me Axis Level Cells''' disappear from the chart along with portions of the task bars/milestone symbols occupying the '''timespan''' being '''hidden'''.... ==Related Links==
    41 KB (6,199 words) - 15:20, 19 January 2021
  • ...me Axis Level Cells''' disappear from the chart along with portions of the task bars/milestone symbols occupying the '''timespan''' being '''hidden'''.... ==Related Links==
    41 KB (6,208 words) - 15:34, 19 January 2021
  • ...mplete properties '''form accessed from the '''Chart Properties '''form '''Task Bars '''tab by clicking the '''%Complete Properties''' button as shown in t The '''Template Properties '''form '''Task Bars''' tab '''Task Bar Decorations '''control group’s '''%Complete Properties… '''button p
    20 KB (2,976 words) - 15:57, 19 January 2021
  • ...mplete properties '''form accessed from the '''Chart Properties '''form '''Task Bars '''tab by clicking the '''%Complete Properties''' button as shown in t ...r '''Milestone symbols.''' The '''Template '''form '''Task Bars''' tab '''Task Bar Decorations '''control group’s '''%Complete Properties… '''button p
    20 KB (2,973 words) - 16:02, 19 January 2021
  • ==Related Links== [[Category:Task/Milestone]]
    14 KB (2,145 words) - 16:12, 19 January 2021
  • ==Related Links== [[Category:Task/Milestone]]
    14 KB (2,134 words) - 16:16, 19 January 2021
  • ==Related Links== [[Category:Task/Milestone]]
    4 KB (600 words) - 15:36, 8 March 2021
  • ==Related Links== [[Category:Task/Milestone]]
    4 KB (597 words) - 18:32, 25 January 2021
  • ...'''Retrieving existing charts''', and '''Saving charts'''. Please use the links below as they apply to the OnePager products and operations you want to per Please see the links that immediately follow:
    14 KB (2,052 words) - 15:56, 25 January 2021
  • ...rs''' field cell to '''Yes''' for these while leaving the remainder of the task's and milestone's '''Flag''' field set to '''No''', '''0''', or blank. ...k on a task bar or milestone symbol and use the mouse to drag the selected task bar or milestone symbol up or down from '''row to row''' in the chart. When
    6 KB (988 words) - 20:10, 11 January 2021
  • ...e '''last page''' that you performed an operation on such as clicking on a task/milestone. You can make such page selections either in the '''normal view' ...resize''' it in PowerPoint, Word, etc. without losing the sharpness of the task bars, milestone symbols, decorations, and fonts.
    8 KB (1,147 words) - 16:53, 15 January 2021
  • ==Saving Project View Data from OnePager 7.0 with Data-Driven Task Links and Time Axis Cells with Modified Cell Widths== ...se of OnePager Pro or Express to be able to '''show''' '''data-driven Task Links''' and to support '''Time Axis cells''' of varying '''width''' and '''heigh
    6 KB (834 words) - 17:44, 23 January 2019
  • ...ate Properties form only features''', please see the articles shown in the links below: ...OnePager to parse the '''comma-delimited list''' and '''create''' a unique task for each instance in the '''comma-separated''' list. If you anticipate usin
    11 KB (1,542 words) - 21:44, 16 February 2021
  • ...al '''rows''', the '''height''' of the '''percent-complete bar''' within a task bar, and the like. ...s''' form for you to preset the method you want to use for '''importing''' task/milestone information from your Microsoft Project '''source plan'''.
    17 KB (2,430 words) - 23:10, 15 February 2021
  • ...al '''rows''', the '''height''' of the '''percent-complete bar''' within a task bar, and the like. ...s''' form for you to preset the method you want to use for '''importing''' task/milestone information from your Microsoft Excel '''source plan'''.
    16 KB (2,399 words) - 15:39, 15 January 2021
  • :* Automatically '''imported''' by OnePager Pro with other task and milestone related data. ...ect '''source plans''', and their role within OnePager Pro, please see the links at: [[Merging the Wrong Tasks into a Chart for Version 7.0 - OnePager Pro#O
    16 KB (2,451 words) - 21:30, 11 January 2021
  • ...uch as for controlling '''(1) rows/swimlane organization, (2) selection of task bar/milestone symbol colors, or (3) Field Mappings selections''' on the ''' ==Related Links==
    8 KB (1,210 words) - 21:43, 16 February 2021
  • ...es OnePager to '''parse the comma-delimited list''' and '''create a unique task bar''' for each instance in the '''comma-separated''' list. Say you want to use '''color-codes''' on task bars/milestone symbols based upon your Microsoft Project '''source plan’s
    5 KB (731 words) - 15:49, 15 January 2021
  • ...es OnePager to '''parse the comma-delimited''' list and '''create a unique task bar''' for each instance in the '''comma-separated''' list. Say you want to use '''color-codes''' on task bars/milestone symbols based upon your Microsoft Excel '''source plan’s R
    5 KB (736 words) - 16:09, 15 January 2021
  • ...re made available throughout OnePager to support the '''colorization''' of task bars/milestone symbols, backgrounds, borders, and other text applications i ==Related Links==
    13 KB (1,951 words) - 18:34, 14 January 2021
  • ...etely '''redraw''' itself after you've made an '''edit''' or '''dragged''' task bars/milestone symbols or '''rows''' or '''swimlanes''' around in the '''Ch ==Related Links==
    9 KB (1,312 words) - 18:24, 14 January 2021
  • ...oft Project '''source plans''', and charts have '''Start/Finish Dates'''. Task bars and milestone symbols have '''Start/End Dates'''. The purpose of this ...nes the earliest task bar/milestone symbol '''Start Date''' and the latest task bar/milestone symbol '''End Date''' to establish the '''Start/Finish Date b
    15 KB (2,331 words) - 18:03, 25 January 2021
  • ...s '''Task Links '''feature, the '''Template Properties '''form’s '''Task Links '''tab is almost identical to the same tab in the '''Chart Properties '''fo ...nePager Pro)#Task Links Tab | Template Only Features-OnePager Pro – Task Links Tab]] <!--24.1.1-70-->
    15 KB (2,244 words) - 21:02, 19 January 2021
  • ...itional formatting''') values. In addition to manual '''editing individual task bar/ milestone symbol(s)''', OnePager can dynamically '''format''' your cha ...ine your desired '''shapes''', '''colors''' and other '''properties''' for task bars/milestone symbols and other '''decorations'''. You can access the '''
    5 KB (774 words) - 17:21, 20 January 2021
  • ...' '''Task Links '''feature, the '''Template Properties '''form’s '''Task Links '''tab is almost identical to the same tab in the '''Chart Properties '''fo ...Express)#Task Links Tab | Template Only Features-OnePager Express – Task Links Tab]] <!-- 24.2.1-70-->
    15 KB (2,221 words) - 21:09, 19 January 2021
  • ...'' The physical connection point on a '''predecessor '''or '''successor''' task bar that includes the '''Begin''' and '''End type''' '''shape''' and the '' ...ed, semi-transparent bar that represents the '''baseline schedule''' for a task bar/milestone symbol of the same color in the same swimlane.
    41 KB (6,109 words) - 20:46, 25 January 2021
  • ...ne assignments, font properties, time axis choices, headers, footers, task links, and comment boxes'''. It also tells OnePager which '''Fields''' to import ...Milestone Shapes and Text Labels for Version 7.0 (Portal) | Manual Editing Task/Milestone Shapes and Text Labels (Portal)]] <!--9.0.1-70-->
    4 KB (639 words) - 21:42, 10 January 2021
  • ...the '''Flag/Number''' field cell to '''Yes''' leaving the remainder of the task's and milestone's '''flag''' field set to '''No'''. ==Related Links==
    5 KB (739 words) - 20:20, 11 January 2021
  • ...ng''' of each '''color''' and '''shape''' to your audience with respect to task bars and milestone symbols in the chart. Accordingly, OnePager provides yo ...ct the Microsoft Project or Excel '''field''' that is to be used to create task bar/milestone symbol '''colors''' in the chart.
    17 KB (2,550 words) - 15:42, 3 March 2021
  • ...to '''edit''' the '''colors''', '''shape''' and other '''properties''' of task bar/milestone symbols in the chart. The '''Legend''' can be displayed in th ...tab in the '''Template Properties''' form, we recommend using the article links below to find detailed information on the controls in both forms.
    4 KB (592 words) - 21:13, 14 January 2021
  • ==Saving Chart Data from OnePager 7.0 with Data-Driven Task Links and Time Axis Cells with Modified Cell Widths== ===Data-Driven Task Links===
    8 KB (1,137 words) - 16:57, 15 January 2021
  • ...rs''' field cell to '''Yes''' for these while leaving the remainder of the task's and milestone's '''Flag''' field set to '''No''', '''0''', or blank. At t ...k on a task bar or milestone symbol and use the mouse to drag the selected task bar or milestone symbol up or down from '''row to row''' in the chart. When
    8 KB (1,178 words) - 20:15, 11 January 2021
  • ...'''Flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''Flag''' field set to '''No''', '''0''', or blank. Clic ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    5 KB (873 words) - 21:33, 11 January 2021
  • ...'''Flag''' cell to '''Yes''' for these while leaving the remainder of the task/milestone row’s '''Flag''' field set to '''No''', '''0''', or blank. Laun ...It''' as a default. Most users select '''Show It''' to tell OnePager which task/milestone rows to import but any '''Boolean''' fields or any '''Number''' f
    7 KB (1,045 words) - 21:37, 11 January 2021
  • 2) These added '''Flag/Number''' fields are used to determine which plan task and milestones to '''import'''. ...d set the '''Flag/Number''' cell to '''Yes''' leaving the remainder of the task and milestone '''Flag''' field set to '''No'''.
    5 KB (783 words) - 16:03, 9 February 2021
  • ...nd set the '''Flag''' field cell to '''Yes''' leaving the remainder of the task/milestone row’s '''Flag''' field set to '''No'''. ==Related Links==
    5 KB (706 words) - 20:03, 4 February 2024
  • ...ded and set the Flag/Number cell to “Yes” leaving the remainder of the task/milestone row’s Flag field set to “No.” ==Related Links==
    5 KB (742 words) - 22:09, 11 January 2021
  • ===Adding a Task ID Field to Your Microsoft Excel Source Plan=== ...cel '''source plan''' and becomes included in the '''.xls file'''. The '''Task ID''' field and its associated values are:
    18 KB (2,666 words) - 22:37, 11 January 2021
  • 2) These reference links to our '''Blog''' are useful: ===Changing Task Bar Shape Representation===
    7 KB (960 words) - 15:04, 12 January 2021
  • 1) OnePager Pro ('''OPP''') uses the '''labels''' of the '''project-summary task''' to identify each project in a '''multi-project''' chart. 3) If you want to display the '''project summary task''' at the top of a Microsoft Project file, go to the '''File''' tab on Micr
    11 KB (1,568 words) - 15:12, 12 January 2021
  • ...h Date''') or because a new snapshot is not '''importing''' one or more '''task bars/milestone symbols''' that were present in previous snapshots. OnePage In the examples that follow, two task bars each are hidden in a top '''Left#3 swimlane level cell''' and in an in
    9 KB (1,377 words) - 17:14, 14 January 2021
  • ...o repeat descriptions and examples here. This article uses Wiki internal links to provide you with access to more detailed articles covering the use and o ...e Grid '''to configure your charts and snapshots, the table below provides links to more complete and in depth treatment of '''The Grid''':
    42 KB (6,217 words) - 18:22, 25 January 2021
  • ...osoft Excel '''source plans''', and charts have '''Start/Finish Dates'''. Task bars and milestone symbols have '''Start/End Dates'''. The purpose of this ...nes the earliest task bar/milestone symbol '''Start Date''' and the latest task bar/milestone symbol '''End Date''' to establish the '''Start/Finish Date b
    15 KB (2,296 words) - 20:35, 15 January 2021
  • ...rviewed later in this article. An example a manual method for resolving '''task bar name label collisions''' using '''edited''' charts representing a typic ===Manual Method for Resolving Task Bar Name Label Collisions===
    21 KB (3,178 words) - 21:20, 8 January 2021
  • ...'''Select-All''' and '''Yes/No''' options for selecting '''source plan''' task and milestone data for '''import'''. The '''Conditional Import Filters''' ...tional Import Filters''' to simplify the '''import''' of '''source plan''' task and milestone data into OnePager and increase your '''flexibility''' for se
    3 KB (458 words) - 16:49, 26 April 2022
  • ===Links to Add-in and Standalone Sub-Sections=== ...ndalone Procedure | OnePager Pro Standalone Procedure]]. Please use these links to navigate to the appropriate section based on how you are using OnePager.
    8 KB (1,166 words) - 16:09, 9 February 2021
  • ===Links to Add-in and Standalone Sub-Sections=== ...e Procedures | OnePager Express Standalone Procedures]]. Please use these links to navigate to the appropriate section based on how you are using OnePager.
    7 KB (1,132 words) - 16:23, 9 February 2021
  • ...o Standalone | OnePager Pro Standalone]] <!--7.1.1-71--> Please use these links to navigate to the appropriate section based on how you are using OnePager. ...rs''' field cell to '''Yes''' for these while leaving the remainder of the task's and milestone's '''Flag''' field set to '''No''', '''0''', or '''blank'''
    13 KB (1,954 words) - 15:29, 26 April 2022
  • '''Chart Properties''' Form - '''Task Bars''' Tab: ...''' form which is '''enhanced''' with the controls supporting the '''Smart Task/Milestone Text Labeling''' feature:
    6 KB (912 words) - 16:16, 30 December 2020
  • ==New Task Bars, Milestone Symbols, and Name Label Selection Rules for OnePager 7.0== ...click and right-click selection to facilitate the addition of '''The Smart Task/Milestone Text Labeling Feature'''.
    13 KB (1,871 words) - 16:14, 30 December 2020
  • ...ault font''' once through '''Chart Properties''' form than it is to select task bar one at a time and change '''fonts''' individually. ...is not required to make '''edits''' that change settings and rules for all task bars and '''text labels''', OnePager Pro and Express provide you with the t
    7 KB (933 words) - 16:38, 10 February 2021
  • ==About Selecting Task Bars/Milestone Symbols and Task Bar Name Labels== ...'selecting''' one or multiple task bars and/or milestone symbols and/or '''task bar name labels''' in order to make manual '''edits''':
    12 KB (1,770 words) - 17:21, 25 January 2021
  • ==Changing Individual Task Bar/Milestone Symbol Colors== ...hange the '''color''' of a task bar/milestone symbol you are creating a '''task bar color maverick'''.
    22 KB (3,348 words) - 17:17, 12 January 2021
  • ==Hiding and Unhiding Task/Milestone Text Labels== ...electing Task/Milestone Shapes and Text Labels for Version 7.0 | Selecting Task/Milestone Shapes and Text Labels]] <!--9.1.1-70-->
    17 KB (2,679 words) - 17:32, 12 January 2021
  • ...ab giving you a checkbox to specifically tell OnePager '''Do not duplicate task/milestones''' items in the '''Legend '''regardless of their differences in ...e, the '''Legend''' below shows both a blue milestone symbol item and blue task bar with the '''Do not duplicate tasks/milestones''' checkbox checked '''OF
    27 KB (4,072 words) - 15:56, 3 March 2021
  • ...ab giving you a checkbox to specifically tell OnePager '''Do not duplicate task/milestones''' items in the '''Legend '''regardless of their differences in ...e, the '''Legend''' below shows both a green milestone symbol item and red task bar with the '''Do not duplicate tasks/milestones''' checkbox checked '''OF
    27 KB (4,075 words) - 15:59, 21 January 2021

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)